G05B13/048

Apparatus to estimate the root means square value or the amplitude of limit cycle oscillations in systems that encounter oscillatory instabilities and methods thereof

Oscillatory instabilities are ubiquitous of systems, and these usually arise out of low amplitude aperiodic oscillations. These oscillatory instabilities generally affect the performance and the lifespan of systems in an adverse manner. An apparatus and a method are disclosed here to estimate the rms value or the amplitude of limit cycle oscillations for control of the oscillatory instability.

Machine control using real-time model

A priori geo-referenced vegetative index data is obtained for a worksite, along with field data that is collected by a sensor on a work machine that is performing an operation at the worksite. A predictive model is generated, while the machine is performing the operation, based on the geo-referenced vegetative index data and the field data. A model quality metric is generated for the predictive model and is used to determine whether the predictive model is a qualified predicative model. If so, a control system controls a subsystem of the work machine, using the qualified predictive model, and a position of the work machine, to perform the operation.

Control system database systems and methods

The embodiments described herein include one embodiment that provides a control method that includes connecting a first controller to a control system; receiving control system configuration data from a database, in which the configuration data comprises holistic state data of a second controller in the control system; and configuring operation of the first controller based at least in part on the configuration data received.

Smart thermostat with model predictive control

A thermostat for a building zone includes at least one of a model predictive controller and an equipment controller. The model predictive controller is configured to obtain a cost function that accounts for a cost of operating HVAC equipment during each of a plurality of time steps, use a predictive model to predict a temperature of the building zone during each of the plurality of time steps, and generate temperature setpoints for the building zone for each of the plurality of time steps by optimizing the cost function subject to a constraint on the predicted temperature. The equipment controller is configured to receive the temperature setpoints generated by the model predictive controller and drive the temperature of the building zone toward the temperature setpoints during each of the plurality of time steps by operating the HVAC equipment to provide heating or cooling to the building zone.

Compute load shaping using virtual capacity and preferential location real time scheduling

Methods, systems, and apparatus, including computer programs encoded on a computer storage medium, for shaping compute load using virtual capacity. In one aspect, a method includes obtaining a load forecast that indicates forecasted future compute load for a cell, obtaining a power model that models a relationship between power usage and computational usage for the cell, obtaining a carbon intensity forecast that indicates a forecast of carbon intensity for a geographic area where the cell is located, determining a virtual capacity for the cell based on the load forecast, the power model, and the carbon intensity forecast, and providing the virtual capacity for the cell to the cell.

Method and apparatus for coordinating the utilization of operational zones to achieve production goals
11644814 · 2023-05-09 · ·

A system, method, and apparatus is provided for production processes to coordinate the utilization of the operational zone for process variables and automate the execution of the target settings to maximize the production goals without requiring human intervention.

Error correction for predictive schedules for a thermostat

A heating, ventilation, and air conditioning (HVAC) control device is configured to record a plurality of actual occupancy statuses, to determine a plurality of corresponding predicted occupancy statuses, and to compare the plurality of predicted occupancy statuses to the plurality of actual occupancy statuses. The device is further configured to identify conflicting occupancy statuses based on the comparison. A conflicting occupancy status indicates a difference between an actual occupancy status and a corresponding predicted occupancy status. The device is further configured to identify timestamps corresponding with the conflicting occupancy statuses, to identify historical occupancy statuses corresponding with the identified timestamps, and to update the conflicting occupancy statuses in the predicted occupancy schedule with the historical occupancy statuses.

PREDICT NEW SYSTEM STATUS BASED ON STATUS CHANGES

A computer-implemented method for predicting an effect of an intervention on managed computing resources using a first system automation management system, comprising an automated operations controller and at least one automation agent is disclosed. The method comprises sending initial state data of the first system automation management system to a second system automation management system which is a functional duplicate of the first system automation management system, sending a status change command and a related expected response vector, equivalent to a result of the intervention to the second system automation management system, determining, by the second system automation management system, a predicted response vector of the managed computing resources in response to the received status change command, and responding, by the second system automation management system, with the determined response vector and a set of predicted actions derived therefrom.

GENERATING DIGITAL TWIN SYSTEMS FOR MULTIPHYSICS SYSTEMS
20230144325 · 2023-05-11 ·

A method includes receiving one or more process inputs and one or more process outputs associated with one or more operations of one or more components of an industrial automation system. The method also includes determining a model representative of the one or more components based on the one or more process inputs and the one or more process outputs; identifying a boundary response time threshold associated with an unmeasured operating parameter of the one or more components based on the one or more process outputs; determining one or more inputs to modify the one or more operations of the one or more components based on the boundary response time threshold; and receiving one or more measured outputs of the one or more components after providing the one or more inputs to the model, the one or more measured outputs are acquired before the boundary response time threshold.

Method and apparatus for managing industrial gas production

A method of controlling an industrial gas production facility comprising: receiving time-dependent power data receiving time-dependent operational characteristic data; defining one or more power constraints for the operational parameters of the power network; defining one or more process constraints for the operational parameters of each industrial gas plant; generating, based on the power data, the operational characteristic data, the one or more power constraints and the one or more process constraints, control set point values for the one or more industrial gas plants to achieve a pre-determined production parameter for the industrial gas production facility; and sending the control set point values to a control system to control the one or more industrial gas plants by adjusting one or more control set points of the industrial gas plants to achieve the pre-determined production parameter for the industrial gas production facility.