Patent classifications
G05B2219/32085
METHODS AND DEVICES FOR A COLLABORATION OF AUTOMATED AND AUTONOMOUS MACHINES
A device may include a processor configured to determine a layout for a plurality of automated machine clusters to be deployed in an environment based on a plurality of operation policies and an input task, wherein each operation policy provides a policy to operate one or more automated machines of one of the plurality of automated machine clusters for a trained task based on one or more policy parameters. The processor may further be configured to adjust the one or more policy parameters of at least one of the plurality of operation policies based on the determined layout in the environment and the input task.
System and method for industrial plant design collaboration
A system includes a collaborative design system that includes a processor configured to display an industrial plant layout on a display. The processor is also configured to overlay the industrial plant layout onto a geographic image. Further, the processor is configured to receive one or more inputs from a plurality of remote users. In addition, the processor is configured to manipulate the layout with respect to the geographic image based on the one or more inputs. Moreover, the processor is configured to create an industrial plant design based on the industrial plant layout and the geographic image.
LINE CONFIGURATION PLANNING DEVICE
A line configuration planning device determine a task sequence during production of the to-be-produced product and the task time by the worker or the automatic machine for each task on the basis of the task information and the task time information. The line configuration planning device determine a required cycle time for producing the to-be-produced product on the basis of the production plan information. The line configuration planning device generate, on the basis of the determined task sequence, task time, and required cycle time, an allocation proposal for the worker and the automatic machine such that an estimated cycle time for producing the to-be-produced product is less than or equal to the required cycle time. The line configuration planning device determine a production line configuration for the to-be-produced product on the basis of the allocation proposal and the equipment configuration information.
LOGICAL-TO-PHYSICAL PRODUCTION SYSTEM ALIGNMENT AND DEVELOPMENT
A method of developing a production system that is aligned with the logical and physical requirements of the production system. The method includes building a logical control node as a structured data object containing a hierarchical list of design requirements associated with a portion of a production system. The logical control node is combined with other logical control nodes associated with other portions of the production system based on relationships between the respective requirements stored in the logical control nodes. The logical network is then converted into a physical model of the production system by converting the logical control nodes into their related physical nodes and confirming the arrangement of the physical nodes conforms to the relationships established in the logical network and any other relevant requirements stored in the logical control nodes.
INFORMATION PROCESSING METHOD, INFORMATION PROCESSING APPARATUS AND NON-TRANSITORY STORAGE MEDIUM
The present disclosure makes it possible to construct a production line of products using pieces of first equipment located in a geographical area and mobile second equipment. An information processing method tries to assign pieces of first equipment to a series of work processes to produce products based on the pieces of first equipment located in the geographical area and positions thereof, decides installation of pieces of second equipment to be assigned to a part of the series of work processes to which a part of the pieces of equipment cannot be assigned from among the pieces of first equipment when there is the part of the series of work processes to which the part of the pieces of equipment cannot be assigned from among the pieces of first equipment, outputs a request to transport the pieces of second equipment to an installation position in the geographical area.
SELF-ADAPTIVE CONFIGURATION METHOD AND SYSTEM FOR LINKAGE RESPONSE OF CONSTRUCTION TYPE, MOTION TYPE, CONTROL TYPE AND OPTIMIZATION TYPE
Disclosed are a self-adaptive configuration method and system for linkage response of a construction type, a motion type, a control type and an optimization type. The disclosure aims to provide the self-adaptive configuration method and system for linkage response of quick adjustment and design of a workshop production line. The self-adaptive configuration method comprises the following steps of step A: construction type configuration; step B: motion type design; step C: control type design; and step D: optimization type evolution, wherein the step D comprises first-level iterative optimization, second-level iterative optimization and third-level iterative optimization. A closed optimization cycle is formed by the first-level iterative optimization, the second-level iterative optimization and the third-level iterative optimization jointly, and the multi-level iterative optimization is performed on the production line linkage design framework, so that the workshop production line can be self-adaptively and quickly adjusted and designed.
Navigation system for clean rooms
A method for configuring a clean room (2) for the manufacture of pharmaceutical products and the manufacture of pharmaceutical products includes the steps: selecting a pharmaceutical product for the manufacture in the clean room (2); determining one or a plurality of specific devices (16) and/or one or a plurality of specific materials (18) for the manufacture of the selected pharmaceutical product; and assigning locations for the particular, respectively specific devices (16) and/or specific materials (18) in the clean room (2) and, that is, by using a navigation system (4). The navigation system (4) issues at least one notification (6, 8, 10, 12, 14) associated with a location in the clean room (2) indicating where the specific device (16) and/or the specific material (18) for the manufacture of the selected pharmaceutical product is/are to be placed.
PROPOSAL EVALUATION MECHANISM OF EQUIPMENT/SYSTEM DEGRADATION AND DESIGN CONDITION DEVIATION FOR PRODUCTION PLANT OR FACILITY
A proposal evaluation mechanism of equipment/system procurement for production plant or facility includes: a supplier unit, a first setting unit, a first calculation unit, a second setting unit, and a second calculation unit. The supplier unit includes a plurality of suppliers and is provided for individually submitting a first curve function and a second curve function to the first setting unit and the second setting unit to be subjected to calculation. This calculation will be conducted based the first calculation unit and the second calculation unit according to settings contained in the first setting unit and the second setting unit to determine a first efficiency calculation function, and a first production capacity calculation function, a second efficiency calculation function, and a second production capacity calculation function accordingly. Comparison is made among different ones of the suppliers with respect to such functions to serve as basis of determination for tendering award.
Systems and methods for designing and securing edge data processing pipelines
According to some exemplary embodiments, the present disclosure is directed to a secure edge datastream processing and distribution system comprising a trusted datastream with metadata indicating ownership and access rights added at an edge. Further embodiments include sensors, machines or robots sending sensor data attributes to a fog operating system data pipeline, the fog operating system data pipeline sending dynamic data tags to secure containers and/or the fog operating system data pipeline sending role and org assignment data to secure containers. The secure containers may send correlated edge analytics to an authorization policy engine, and/or the secure containers may send datastream identification definition data to an authorization policy engine.
INDUSTRIAL AUTOMATION PROJECT ACCELERATION
Various embodiments of the present technology provide an integrated platform that provides acceleration tools that can be used across multiple lifecycle phases of an industrial automation system to assist users in various lifecycle phases of an industrial automation system. In accordance with various embodiments, the integrated platform can take historical designs and provide various acceleration actions (e.g., initial designs, answering specific questions, expert analysis, etc.) for a current system. Various embodiments can use a common, cross-platform data file that links activity and efficiently provides needed information to a user. Some embodiments provide and manage reviews of layouts or designs by experts (e.g., individuals and expert systems) to aid in identifying needed changes to the design or system.