Patent classifications
H02G1/06
CABLE HANDLING SYSTEM FOR LONGWALL MINING MACHINES
A method of operating a cable handling system of a longwall mining machine having a shearer movable along a pan line to mine material along a mine face, the cable handling system including: i) a service line configured to carry one or more supply lines to the shearer for facilitating shearer operation, ii) a plurality of interconnected trays to accommodate the service line, iii) a plurality of sensor nodes distributed along a length of the service line, and iv) a plurality of transceivers distributed along a length of the pan line, the method comprising: a) sensing orientation, acceleration and/or position data of the service line using the plurality of sensor nodes, b) using the plurality of transceivers to receive the orientation, acceleration and/or position data from the plurality of sensor nodes and to transmit the orientation, acceleration and/or position data to a controller, and c) detecting, by the controller, an actual or imminent failure mode of the service line using analysis of the orientation, acceleration and/or position data from the plurality of the sensor nodes.
Self-aligning mechanical mount and electrical connection system for electronic modules with features for robotic assembly
A self-aligning mechanical mount and electrical connection system for an electronic module comprises a mechanical mount assembly configured to be integrated into or attached to a base frame and defining a mount connection position assurance (CPA) feature for self-aligning and securing of the electronic module therein, and an electrical connection assembly configured to be integrated into or attached to the mechanical mount assembly and comprising a modular electrical connector (i) being electrically connected to an electrical backbone wire cable and (ii) defining a connector CPA feature for self-aligning the modular electrical connector with a corresponding electrical connector integrated into or attached to the electronic module when the electronic module is secured in the mechanical mount assembly.
Self-aligning mechanical mount and electrical connection system for electronic modules with features for robotic assembly
A self-aligning mechanical mount and electrical connection system for an electronic module comprises a mechanical mount assembly configured to be integrated into or attached to a base frame and defining a mount connection position assurance (CPA) feature for self-aligning and securing of the electronic module therein, and an electrical connection assembly configured to be integrated into or attached to the mechanical mount assembly and comprising a modular electrical connector (i) being electrically connected to an electrical backbone wire cable and (ii) defining a connector CPA feature for self-aligning the modular electrical connector with a corresponding electrical connector integrated into or attached to the electronic module when the electronic module is secured in the mechanical mount assembly.
Leveling Tool
A leveling tool configured to be releasably attached to a pipe includes a level carried by a main body and a pair of first and second articulating arms extending from the main body. One or more magnets are carried by the arms. Each of the first and second arms is configured articulate so as wrap at least part way around a pipe. The first and second magnets are configured to releasably attach the first and second arms to the pipe.
De-trenching apparatus
De-trenching apparatus (100) for extracting a buried line, such as a cable or pipeline, is disclosed. The de-trenching apparatus comprises a channel (112) configured to receive a buried line to be extracted, the channel comprising a first flared opening (114) at a front end of the de-trenching apparatus and a second flared opening (115) at the rear end of the de-trenching apparatus, the first and second flared openings each having a curved surface (111) configured to support the line during extraction, and material removal means for removing material from around the buried line ahead of the de-trenching apparatus.
Method and Equipment for Installing a Power Cable in a Deployment Site
Method and Equipment for Installing a Power Cable in a Deployment Site The present disclosure relates to a method for installing a single power cable span in a deployment site comprising a rail for supporting the single cable span by trolleys, the method comprising the steps of providing a conveyor belt outside of the deployment site, the conveyor belt having a plurality of locations set at a predetermined distance one from the other along a longitudinal movement direction of the conveyor belt and moving integrally with the latter; repeating the following steps until the single cable span reaches a predetermined position while the conveyor belt is moving, positioning a first part of a holder at one of the locations; while advancing the single cable span, laying a portion thereof on said first part of the holder positioned at the location moving with the conveyor belt; connecting a second part of the holder to the first one to lock the cable span portion in between; while the cable span portion locked by the holder is leaving the conveyor belt, removing the first part of the holder from the location moving with the conveyor belt. According to another aspect, the present disclosure relates to an equipment for the installation of a single power cable span in a deployment site.
Method and Equipment for Installing a Power Cable in a Deployment Site
Method and Equipment for Installing a Power Cable in a Deployment Site The present disclosure relates to a method for installing a single power cable span in a deployment site comprising a rail for supporting the single cable span by trolleys, the method comprising the steps of providing a conveyor belt outside of the deployment site, the conveyor belt having a plurality of locations set at a predetermined distance one from the other along a longitudinal movement direction of the conveyor belt and moving integrally with the latter; repeating the following steps until the single cable span reaches a predetermined position while the conveyor belt is moving, positioning a first part of a holder at one of the locations; while advancing the single cable span, laying a portion thereof on said first part of the holder positioned at the location moving with the conveyor belt; connecting a second part of the holder to the first one to lock the cable span portion in between; while the cable span portion locked by the holder is leaving the conveyor belt, removing the first part of the holder from the location moving with the conveyor belt. According to another aspect, the present disclosure relates to an equipment for the installation of a single power cable span in a deployment site.
ARRANGEMENT FOR THE ASSEMBLY AND WIRING OF ELECTRICAL COMPONENTS IN SWITCHGEAR CONSTRUCTION AND A CORRESPONDING METHOD
An arrangement for the assembly and wiring of electrical components in switchgear construction, the arrangement comprising a robot with an end effector designed as a gripper, a mounting plate holding device, with which a mounting plate is held in a mounting position with respect to the robot, and a component supply in the access area of the robot, via which components to be mounted on the mounting plate are provided for removal by the robot, wherein a controller of the robot has machine data for controlling the robot including position data for the arrangement of components on a mounting plane of a mounting plate to be equipped, wherein the robot has an optical imaging system which is adapted to detect an orientation of a mounting plate with respect to the robot, the controller of the robot being adapted to provide the position data with an offset representing the orientation of the mounting plate with respect to the robot as a function of the detected orientation. A corresponding method is further described.
ARRANGEMENT FOR THE ASSEMBLY AND WIRING OF ELECTRICAL COMPONENTS IN SWITCHGEAR CONSTRUCTION AND A CORRESPONDING METHOD
An arrangement for the assembly and wiring of electrical components in switchgear construction, the arrangement comprising a robot with an end effector designed as a gripper, a mounting plate holding device, with which a mounting plate is held in a mounting position with respect to the robot, and a component supply in the access area of the robot, via which components to be mounted on the mounting plate are provided for removal by the robot, wherein a controller of the robot has machine data for controlling the robot including position data for the arrangement of components on a mounting plane of a mounting plate to be equipped, wherein the robot has an optical imaging system which is adapted to detect an orientation of a mounting plate with respect to the robot, the controller of the robot being adapted to provide the position data with an offset representing the orientation of the mounting plate with respect to the robot as a function of the detected orientation. A corresponding method is further described.
METHOD AND SYSTEM WITH TWO CURVES FOR GUIDING A CABLE TIE
A guide system to enable installation of a cable tie on a supporting element by passing the cable tie through a first passage to traverse the supporting element, then through a second passage to come back to the same side of the supporting element, enabling the cable tie to surround one or more cables. The guide device includes a gutter with a guide surface with two curves, a first longitudinal curve enabling the surface to extend from a passage to the other passage and a second transverse curve forming a partial envelope for receiving the cable tie and guiding and holding the cable tie in the gutter. The device also has at least one protrusion with a wedging surface projecting from the surface of the gutter to come into contact with and wedge against the supporting element to lock the gutter in position in relation to the supporting element.