H02J3/12

Method and system for integration and control of power for consumer power circuits

In one embodiment, a power system includes a power panel operable to distribute alternating current (AC) power and pulse power to a plurality of power outlets and having an AC circuit breaker and a pulse power circuit breaker, the pulse power comprising a sequence of pulses alternating between a low direct current (DC) voltage state and a high DC voltage state, a power inverter and converter coupled to the power panel through an AC power connection and a pulse power connection and including a DC power input for receiving DC power from a renewable energy source, an AC power input for receiving AC power, and a connection to an energy storage device, and a power controller in communication with the power inverter and converter and operable to balance power load and allocate power received at the DC power input and the AC power input to the power panel.

Electric power system control with measurement of energy demand and energy efficiency
09847639 · 2017-12-19 · ·

A method, apparatus, system and computer program is provided for controlling an electric power system, including implementation of voltage measurement using paired comparison analysis applied to calculating a shift in average usage per customer from one time period to another time period for a given electrical use population where the pairing process is optimized using a novel technique to improve the accuracy of the measurement.

Electric power system control with measurement of energy demand and energy efficiency
09847639 · 2017-12-19 · ·

A method, apparatus, system and computer program is provided for controlling an electric power system, including implementation of voltage measurement using paired comparison analysis applied to calculating a shift in average usage per customer from one time period to another time period for a given electrical use population where the pairing process is optimized using a novel technique to improve the accuracy of the measurement.

LOAD-DEPENDENT POWER CONTROL FOR HAIR IRON HAVING CERAMIC HEATERS

Methods and apparatus include a hair iron having a controller and a heater between first and second arms movable relative to each other between open and closed positions. The controller connects or not the heater to a line voltage to heat hair when placed between the arms during use. A proportional-integral-derivative (PID) controller communicates with a thermistor measuring a current temperature of the heater and makes requests of the controller to operate the heater at a setpoint temperature. In various embodiments, the heater heats to full power during warm-up and operates thereafter at lower temperatures based on a reading of the line voltage and a time to adjust the current temperature to the desired setpoint temperature.

Managing queue distribution between critical datacenter and flexible datacenter

Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexible datacenters, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed more efficiently or advantageously at a flexible datacenter, the computational operation is instead obtained by the flexible datacenters for performance The critical datacenter and flexible datacenters preferably share a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions. A queue system may be used to organize computational operations waiting for distribution to either the critical datacenter or the flexible datacenter.

Managing queue distribution between critical datacenter and flexible datacenter

Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexible datacenters, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed more efficiently or advantageously at a flexible datacenter, the computational operation is instead obtained by the flexible datacenters for performance The critical datacenter and flexible datacenters preferably share a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions. A queue system may be used to organize computational operations waiting for distribution to either the critical datacenter or the flexible datacenter.

IMPROVEMENTS IN OR RELATING TO CIRCUIT INTERRUPTION APPARATUSES

A circuit interruption apparatus, for an electrical network, comprising a circuit interruption device that is operatively connectable at a source side to a source of the electrical network and at a back side to a load of an electrical network. The circuit interruption device when closed permits and when open inhibits the current flow between the source side the back side,. The current interruption device is configured to open when a current flowing therethrough meets or exceeds a fault current threshold. The circuit interruption apparatus also includes a fault current level determination unit that is configured to determine a predicted fault current level as a function of measured current and voltage values at the circuit interruption device before and after a variation in the current and voltage values at the circuit interruption device that result from a change of load at the back side of the circuit interruption device.

IMPROVEMENTS IN OR RELATING TO CIRCUIT INTERRUPTION APPARATUSES

A circuit interruption apparatus, for an electrical network, comprising a circuit interruption device that is operatively connectable at a source side to a source of the electrical network and at a back side to a load of an electrical network. The circuit interruption device when closed permits and when open inhibits the current flow between the source side the back side,. The current interruption device is configured to open when a current flowing therethrough meets or exceeds a fault current threshold. The circuit interruption apparatus also includes a fault current level determination unit that is configured to determine a predicted fault current level as a function of measured current and voltage values at the circuit interruption device before and after a variation in the current and voltage values at the circuit interruption device that result from a change of load at the back side of the circuit interruption device.

Building load modification responsive to utility grid events using robotic process automation
11682903 · 2023-06-20 · ·

Responding to grid events is provided. The system determines, based on an event, to modify an electrical load of a site. The system selects a parameter for the site to adjust to modify the electrical load. The system identifies a script constructed from previously processed interactions between a human-machine interface of the building management system to adjust the parameter for the site. The system establishes a communication session with a remote access agent executed by a computing device of the site to invoke the building management system of the site. The system generates a sequence of commands defined by the script to adjust the one or more parameters for the site. The system transmits the sequence of commands to cause the remote access agent to execute the sequence of commands on the human-machine interface of the building management system to modify the electrical load of the site.

Building load modification responsive to utility grid events using robotic process automation
11682903 · 2023-06-20 · ·

Responding to grid events is provided. The system determines, based on an event, to modify an electrical load of a site. The system selects a parameter for the site to adjust to modify the electrical load. The system identifies a script constructed from previously processed interactions between a human-machine interface of the building management system to adjust the parameter for the site. The system establishes a communication session with a remote access agent executed by a computing device of the site to invoke the building management system of the site. The system generates a sequence of commands defined by the script to adjust the one or more parameters for the site. The system transmits the sequence of commands to cause the remote access agent to execute the sequence of commands on the human-machine interface of the building management system to modify the electrical load of the site.