H02J3/28

Electric Power System Planning Operation Device, Method, and System

An object is to provide an electric power system planning operation device, a method, and a system that can realize the reduction of social costs and the improvement of the resilience of an electric power system. An electric power system planning operation device against occurrence of a disaster includes: a disaster information selection unit that selects disaster information data of a disaster type to be handled, to be used as disaster information selection result data, from disaster information data for each disaster type; a disaster countermeasure candidate calculation unit that calculates a disaster countermeasure candidate, to be used as disaster countermeasure candidate calculation result data, by using the disaster information selection result data, system maintenance countermeasure candidate data that is information about performing maintenance of a system facility in preparation for a disaster, and system operation countermeasure candidate data that is information about defining a system operation countermeasure in preparation for a disaster; a reliability economic efficiency index value calculation unit that calculates a reliability economic efficiency index value for the disaster countermeasure candidate calculation result, to be used as reliability economic efficiency index value data, by using the disaster countermeasure candidate calculation result data, system data that is information about the configuration of an electric power system, damage cost data that is information about the amount of damage at the time of an assumed disaster type, and reliability economic efficiency index data that is information indexing a relation between reliability and economic efficiency; and a disaster countermeasure decision unit that decides a disaster countermeasure by using the reliability economic efficiency index value data.

Electric Power System Planning Operation Device, Method, and System

An object is to provide an electric power system planning operation device, a method, and a system that can realize the reduction of social costs and the improvement of the resilience of an electric power system. An electric power system planning operation device against occurrence of a disaster includes: a disaster information selection unit that selects disaster information data of a disaster type to be handled, to be used as disaster information selection result data, from disaster information data for each disaster type; a disaster countermeasure candidate calculation unit that calculates a disaster countermeasure candidate, to be used as disaster countermeasure candidate calculation result data, by using the disaster information selection result data, system maintenance countermeasure candidate data that is information about performing maintenance of a system facility in preparation for a disaster, and system operation countermeasure candidate data that is information about defining a system operation countermeasure in preparation for a disaster; a reliability economic efficiency index value calculation unit that calculates a reliability economic efficiency index value for the disaster countermeasure candidate calculation result, to be used as reliability economic efficiency index value data, by using the disaster countermeasure candidate calculation result data, system data that is information about the configuration of an electric power system, damage cost data that is information about the amount of damage at the time of an assumed disaster type, and reliability economic efficiency index data that is information indexing a relation between reliability and economic efficiency; and a disaster countermeasure decision unit that decides a disaster countermeasure by using the reliability economic efficiency index value data.

POWER CONTROL APPARATUS, POWER CONTROL METHOD AND PROGRAM
20220376507 · 2022-11-24 ·

A power control device for controlling one or more secondary batteries for charging or discharging includes: a monitor unit configured to obtain an amount of power storage of each of the one or more secondary batteries; a secondary battery selection unit configured to select a secondary battery to be controlled from the one or more secondary batteries based on a target amount of power storage and an amount of power storage; and a secondary battery control unit configured to control a selected secondary battery.

POWER CONTROL APPARATUS, POWER CONTROL METHOD AND PROGRAM
20220376507 · 2022-11-24 ·

A power control device for controlling one or more secondary batteries for charging or discharging includes: a monitor unit configured to obtain an amount of power storage of each of the one or more secondary batteries; a secondary battery selection unit configured to select a secondary battery to be controlled from the one or more secondary batteries based on a target amount of power storage and an amount of power storage; and a secondary battery control unit configured to control a selected secondary battery.

METHOD FOR OPERATING STORAGE BATTERY SYSTEM
20220376318 · 2022-11-24 · ·

A plurality of storage batteries are divided into a plurality of storage battery blocks. A useful life of each of the storage batteries is shorter than the project life. Total capacity of the plurality of storage batteries is equal to or greater than the product of capacity required for a project and a ratio of the project life to the useful life. The project life is divided into a plurality of periods. For each of the plurality of periods, a rest storage battery block is selected from the plurality of storage battery blocks in rotation, the rest storage battery block is rested, and an operational storage battery block is operated. The sum of actual operating time of each of the storage battery blocks and equivalent operating time of each of the storage battery blocks is prevented from exceeding the useful life during the project life.

METHOD FOR OPERATING STORAGE BATTERY SYSTEM
20220376318 · 2022-11-24 · ·

A plurality of storage batteries are divided into a plurality of storage battery blocks. A useful life of each of the storage batteries is shorter than the project life. Total capacity of the plurality of storage batteries is equal to or greater than the product of capacity required for a project and a ratio of the project life to the useful life. The project life is divided into a plurality of periods. For each of the plurality of periods, a rest storage battery block is selected from the plurality of storage battery blocks in rotation, the rest storage battery block is rested, and an operational storage battery block is operated. The sum of actual operating time of each of the storage battery blocks and equivalent operating time of each of the storage battery blocks is prevented from exceeding the useful life during the project life.

Hybrid power generation system combines renewable energy with direct-air-capture (DAC)
11588332 · 2023-02-21 · ·

A method, system and computer-readable medium where an integrator application identifies an excess energy condition based on a supply load of electricity exceeding a consumptive load. The integrator application directs an air scrubber to utilize the excess electricity to remove carbon dioxide from the ambient air and routes the carbon dioxide to an enhanced coal bed methane well where methane is displaced by the carbon dioxide. In response to identifying an energy deficient condition based on the consumptive load exceeding the supply load, the integrator application routes the methane to a gas power plant and directs the gas power plant to convent the methane to electricity.

Energy storage system

The invention relates to an energy storage system for storing heat and coldness and for providing electrical energy, characterized by an energy converter, wherein the energy converter is designed to produce electrical energy from heat and coldness and to produce heat and coldness from electrical energy, the energy converter being in heat-transferring contact with a hot heat exchanger and with a cold heat exchanger, the hot heat exchanger being connected to a heat reservoir and the cold heat exchanger being connected to a coldness reservoir, and a control unit being provided, which operates the energy storage system in a first operating mode, in which heat and coldness are formed from electrical energy by means of the energy converter, and in a second operating mode, in which electrical energy is produced from heat and coldness.

Energy storage system

The invention relates to an energy storage system for storing heat and coldness and for providing electrical energy, characterized by an energy converter, wherein the energy converter is designed to produce electrical energy from heat and coldness and to produce heat and coldness from electrical energy, the energy converter being in heat-transferring contact with a hot heat exchanger and with a cold heat exchanger, the hot heat exchanger being connected to a heat reservoir and the cold heat exchanger being connected to a coldness reservoir, and a control unit being provided, which operates the energy storage system in a first operating mode, in which heat and coldness are formed from electrical energy by means of the energy converter, and in a second operating mode, in which electrical energy is produced from heat and coldness.

CONTROL DEVICE, CONTROL METHOD FOR WATER HEATER, AND PROGRAM

In a control device, an instruction acquirer acquires an instruction to suppress in a specified period supplying of generated power generated by power generator installed in a power-consuming area to a commercial electrical power system. Upon the instruction acquirer acquiring the instruction, a water heater controller commands a water heater installed in the power-consuming area to perform a water heat-up operation when a predetermined condition is satisfied in the specified period.