Patent classifications
H02J13/00004
Microgrid control system and microgrid
Provided in the present invention are a microgrid control system and a microgrid, the microgrid control system comprising: a grid-connected switch, an energy router, a first controller and a second controller; the first controller controls the grid-connected switch and sends a first control instruction; the second controller receives the first control instruction and responds to the first control instruction for controlling the energy router.
Recovered electric power measuring system and method for collecting data from a recovered electric power measuring system
Apparatus and methods for recovering energy in a petroleum, petrochemical, or chemical plant as described. The invention relates to a recovered electric power measuring system comprising at least one processor; at least one memory storing computer-executable instructions; and at least one receiver configured to receive data from a sensor on an electrical powerline connected to a generator of a power-recovery turbine, the power-recovery turbine located in a petroleum, petrochemical, or chemical process zone wherein a portion of a first process stream flows through the power-recovery turbine and generates recovered electric power as direct current, the power-recovery turbine electrically connected to a single DC to AC inverter and the output of the DC to AC inverter electrically connected to a first substation.
Intelligent low-voltage power delivery system and method
A system for delivering power and data over a single wire via a hub, wherein the hub can control and power multiple low-power Class 2 circuits. The hub can be controlled remotely through a computing device such as a mobile phone or a computer.
Detecting actuations of buttons of a control device
A load control device may be used to control and deliver power to an electrical load. The load control device may comprise a control circuit for controlling the power delivered to the electrical load. The load control device may comprise multiple actuators, where each of the actuators is connected between a terminal of the control circuit and a current regulating device. The number of the actuators may be greater than the number of the terminals. The control circuit may measure signals at the terminals and determine a state configuration for the actuators based on the measured signals. The control circuit may compare the state configuration to a predetermined dataset to detect a ghosting condition.
Method for implementing power delivery transaction for potential electrical output of integrated renewable energy source and energy storage system facility
Methods for implementing power delivery transactions between a buyer and a seller of electrical energy supplied to an electrical grid by an integrated renewable energy source (RES) and energy storage system (ESS) of a RES-ESS facility are provided. Estimated total potential output of the RES is compared to a point of grid interconnect (POGI) limit to identify potential RES overgeneration, and the buyer is charged if potential RES overgeneration is less than potential overgeneration during one or more retrospective time windows. The method provides a basis for the RES-ESS facility owner to be paid for an estimated amount of energy that did not get stored as a result of a grid operator not fully discharging an ESS prior to the start of a new day.
Remote shared content experience systems
A system provides a “virtual room” for remotely sharing content experiences via electronic devices at different locations. The system may enable synchronization of the content at the different locations, access control, be able to provide and/or experience interaction feedback regarding the content, control the interaction feedback that is provided and/or experienced, enhance the ability of people to distinguish the content from the interaction feedback, and so on. As such, people may be able to share content experiences more like they were present in a single location while remote from each other.
SMART BUILDING MANAGER
A building manager includes a communications interface configured to receive information from a smart energy grid. The building manager further includes an integrated control layer configured to receive inputs from and to provide outputs to a plurality of building subsystems. The integrated control layer includes a plurality of control algorithm modules configured to process the inputs and to determine the outputs. The building manager further includes a fault detection and diagnostics layer configured to use statistical analysis on the inputs received from the integrated control layer to detect and diagnose faults. The building manager yet further includes a demand response layer configured to process the information received from the smart energy grid to determine adjustments to the plurality of control algorithms of the integrated control layer.
COMMUNICATING WITH AND CONTROLLING LOAD CONTROL SYSTEMS
Systems and methods are disclosed for communicating with and controlling load control systems of respective user environments from locations that are remote from the user environments.
PREMISES POWER USAGE MONITORING SYSTEM
A control system (300) allows recognized standard premise electrical outlets, for example NEMA, CEE and BS, among others to be remotely monitored and/or controlled, for example, to intelligently execute blackouts or brownouts or to otherwise remotely control electrical devices. The system (300) includes a number of smart receptacles (302) that communicate with a local controller (304), e.g., via power lines using the TCP/IP protocol. The local controller (304), in turn, communicates with a remote controller (308) via the internet.
INFORMATION PROCESSING APPARATUS FOR SMART GRID
A smart grid information processing apparatus is applied to a smart grid including a transmission grid being connected to a plurality of electrical equipment units and a communication network transmitting information of at least an amount of electric energy transmitted through the transmission grid. The information processing apparatus is configured to execute a first recording process and a withdrawal process. The first recording process is a process of recording virtual electrical storage capacities in association with respective users, each of the virtual electrical storage capacities corresponding to an amount of electric energy in which a corresponding user is allowed to receive from the smart grid. The withdrawal process is a process of reducing the virtual electrical storage capacity of the user according to an amount of electric energy that has been received by the user from the transmission grid.