H04Q2213/13523

Technologies for data center multi-zone cabling

Technologies for connecting data cables in a data center are disclosed. In the illustrative embodiment, racks of the data center are grouped into different zones based on the distance from the racks in a given zone to a network switch. All of the racks in a given zone are connected to the network switch using data cables of the same length. In some embodiments, certain physical resources such as storage may be placed in racks that are in zones closer to the network switch and therefore use shorter data cables with lower latency. An orchestrator server may, in some embodiments, schedule workloads or create virtual servers based on the different zones and corresponding latency of different physical resources.

Techniques to configure physical compute resources for workloads via circuit switching

Embodiments are generally directed apparatuses, methods, techniques and so forth to select two or more processing units of the plurality of processing units to process a workload, and configure a circuit switch to link the two or more processing units to process the workload, the two or more processing units each linked to each other via paths of communication and the circuit switch.

TECHNIQUES TO CONTROL SYSTEM UPDATES AND CONFIGURATION CHANGES VIA THE CLOUD

Embodiments are generally directed apparatuses, methods, techniques and so forth determine an access level of operation based on an indication received via one or more network links from a pod management controller, and enable or disable a firmware update capability for a firmware device based on the access level of operation, the firmware update capability to change firmware for the firmware device. Embodiments may also include determining one or more configuration settings of a plurality of configuration settings to enable for configuration based on the access level of operation, and enable configuration of the one or more configuration settings.

TECHNOLOGIES FOR DYNAMICALLY MANAGING RESOURCES IN DISAGGREGATED ACCELERATORS

Technologies for dynamically managing resources in disaggregated accelerators include an accelerator. The accelerator includes acceleration circuitry with multiple logic portions, each capable of executing a different workload. Additionally, the accelerator includes communication circuitry to receive a workload to be executed by a logic portion of the accelerator and a dynamic resource allocation logic unit to identify a resource utilization threshold associated with one or more shared resources of the accelerator to be used by a logic portion in the execution of the workload, limit, as a function of the resource utilization threshold, the utilization of the one or more shared resources by the logic portion as the logic portion executes the workload, and subsequently adjust the resource utilization threshold as the workload is executed. Other embodiments are also described and claimed.

Robotically serviceable computing rack and sleds

Examples may include racks for a data center and sleds for the racks, the sleds arranged to house physical resources for the data center. The sleds and racks can be arranged to be autonomously manipulated, such as, by a robot. The sleds and racks can include features to facilitate automated installation, removal, maintenance, and manipulation by a robot.

TECHNIQUES TO CONFIGURE PHYSICAL COMPUTE RESOURCES FOR WORKLOADS VIA CIRCUIT SWITCHING
20220103446 · 2022-03-31 ·

Embodiments are generally directed apparatuses, methods, techniques and so forth to select two or more processing units of the plurality of processing units to process a workload, and configure a circuit switch to link the two or more processing units to process the workload, the two or more processing units each linked to each other via paths of communication and the circuit switch.

Techniques to verify and authenticate resources in a data center computer environment

Embodiments are generally directed apparatuses, methods, techniques and so forth to receive a sled manifest comprising identifiers for physical resources of a sled, receive results of an authentication and validation operations performed to authenticate and validate the physical resources of the sled, determine whether the results of the authentication and validation operations indicate the physical resources are authenticate or not authenticate. Further and in response to the determination that the results indicate the physical resources are authenticated, permit the physical resources to process a workload, and in response to the determination that the results indicate the physical resources are not authenticated, prevent the physical resources from processing the workload.

Angled Faceplates for a network element

A module for a networking node is disclosed. The module includes a Printed Circuit Board (“PCB”), one or more circuits mounted to the PCB and a faceplate. The faceplate includes a middle plate, a first side plate, and a second side plate. The first side plate extends from the middle plate at an obtuse angle relative to the middle plate towards a first side and back of the module. The second side plate extends from the middle plate, opposite to the first side plate, at an obtuse angle relative to the middle plate towards a second side and the back of the module.

TECHNOLOGIES FOR DYNAMICALLY MANAGING RESOURCES IN DISAGGREGATED ACCELERATORS

Technologies for dynamically managing resources in disaggregated accelerators include an accelerator. The accelerator includes acceleration circuitry with multiple logic portions, each capable of executing a different workload. Additionally, the accelerator includes communication circuitry to receive a workload to be executed by a logic portion of the accelerator and a dynamic resource allocation logic unit to identify a resource utilization threshold associated with one or more shared resources of the accelerator to be used by a logic portion in the execution of the workload, limit, as a function of the resource utilization threshold, the utilization of the one or more shared resources by the logic portion as the logic portion executes the workload, and subsequently adjust the resource utilization threshold as the workload is executed. Other embodiments are also described and claimed.

Technologies for switching network traffic in a data center

Technologies for switching network traffic include a network switch. The network switch includes one or more processors and communication circuitry coupled to the one or more processors. The communication circuitry is capable of switching network traffic of multiple link layer protocols. Additionally, the network switch includes one or more memory devices storing instructions that, when executed, cause the network switch to receive, with the communication circuitry through an optical connection, network traffic to be forwarded, and determine a link layer protocol of the received network traffic. The instructions additionally cause the network switch to forward the network traffic as a function of the determined link layer protocol. Other embodiments are also described and claimed.