Patent classifications
Y04S10/30
DEVICE FOR THE CERTIFIED MEASUREMENT OF ELECTRIC PARAMETERS AND CUSTOMERS' FLEXIBILITY BEHAVIOUR, AND FOR COMMUNICATING WITH A DISTRIBUTION SYSTEM OPERATOR
Disclosed is a device for the certified measurement of electric parameters and customers' flexibility behaviour, and for communicating with a distribution system operator, comprises a System on Module, or SoM, a Certification Module, a Customer Communication Module and a Communication Module.
Power management for network device line modules
A line module for use in a network device includes a plurality of circuits; and a power module connected to the plurality of circuits, and to a first Power Distribution Unit (PDU) and a second PDU, wherein the first PDU and the second PDU provide power distribution by different feeds, wherein the power module is configured to initiate a shutdown procedure when one or more of i) a current drawn from any feed equals or exceeds a first current threshold, and ii) an aggregate current drawn from all feeds equal or exceeds a second current threshold.
Modular power conversion system
A method for determining when a connection of a power system to a grid has been disconnected. The method includes the power system supplying a first amount of reactive power to the grid to which the power system is connected, and the power system determining if there is a frequency change within the grid. This includes if the frequency change does not exceed a predetermined threshold, the power system supplying a second amount of reactive power to the grid, and if the frequency exceeds a predetermined threshold, the power system supplying a first amount of reactive power to the grid.
Communication device, information processing system, information processing method, and computer program
A communication device is provided with: a first communication part that is connected to an energy storage device or a power supply related apparatus and communicates with the energy storage device or the power supply related apparatus; an acquisition part that acquires information including a state of the energy storage device or the power supply related apparatus on the basis of a set timing; a change acceptance part that accepts a change in the timing and changes the timing; and a transmission part that transmits, at a timing after the change, the information acquired by the acquisition part to a first apparatus by using a second communication part communicatively connected to the first apparatus.
Method and apparatus for obtaining location information of controller
This application provides a method and apparatus for obtaining location information of a controller. The method includes: obtaining, by an inverter, signal feature information of each photovoltaic unit in a high-voltage direct current string, where the signal feature information of a photovoltaic unit includes a communication identifier of the photovoltaic unit and a signal feature of another photovoltaic unit, and the photovoltaic unit includes one controller and at least one photovoltaic module; determining an installation sequence of the photovoltaic units based on signal feature information of the photovoltaic units; and determining relative installation location information of each photovoltaic unit based on relative installation location information of a target photovoltaic unit in the high-voltage direct current string and the installation sequence of the photovoltaic units, where the target photovoltaic unit is at least one photovoltaic unit in the high-voltage direct current string.
Microgrid overcurrent protection device
A microgrid overcurrent protection device and a method for overcurrent protection of a microgrid. The protection device including a voltage controlled overcurrent detector for detecting an overcurrent above an overcurrent threshold and a phase directional detector arranged for current direction in a downstream or an upstream direction. The overcurrent threshold of the voltage controlled overcurrent detector is set at an upper overcurrent threshold when a measured voltage Vm is above a threshold voltage Vs and set at a lower overcurrent threshold when the measured voltage Vm is below the threshold voltage Vs. The device further includes a timer arranged for generating a trigger signal with a first delay time period when a downstream current direction and an overcurrent are detected and with a second delay time period when an upstream current direction and an overcurrent are detected.
Deep convolutional neural network based anomaly detection for transactive energy systems
A computer-implemented method for power grid anomaly detection using a convolutional neural network (CNN) trained to detect anomalies in electricity demand data and electricity supply data includes receiving (i) electricity demand data comprising time series measurements of consumption of electricity by a plurality of consumers, and (ii) electricity supply data comprising time series measurements of availability of electricity by one or more producers. An input matrix is generated that comprises the electricity demand data and the electricity supply data. The CNN is applied to the input matrix to yield a probability of anomaly in the electricity demand data and the electricity supply data. If the probability of anomaly is above a threshold value, an alert message is generated for one or more system operators.
SYSTEMS AND METHODS FOR AUTOMATED DETECTION OF SWITCH CAPACITOR OPERATION
Systems and methods herein automate detection of switched-capacitor bank operation on a power grid. At least one power line sensor (106) may be positioned on a power line to measure electric field strength and current. A processor may be in communication with the power line sensor and memory storing a capacitor bank analyzer as computer readable instructions that, when executed by the processor, control the processor to: receive electric field data and current data from the power line sensor. The processor may extract key characteristics from the electric field data and the current data, compare the key characteristics to a library of key characteristics of a predictive model, and output, based on the predictive model, a label indicating presence of, or lack of, a capacitor switching event. E-field and current data from multiple line sensors may be aggregated to provide additional insight to capacitor bank operation.
Method, system and software product to identify installations likely to exhibit an electrical non-conformity
A method, a system and a tangible product and non-transitory computer program are provided to automatically identify electrical installations in an electrical distribution system that are likely to exhibit an electrical non-conformity (ENC). The method requires only electrical profiles collected from meters and IT tools, without the need for any other sub-metering equipment. The method includes the steps of recovering electrical profiles generated by the meters; applying algorithmic processing associated with indicators of an ENC on the profiles; and identifying electrical installations likely to exhibit an ENC, according to the indicators that have met their target conditions. The method may include the recovery of local meteorological data and nominal data related to the electrical installations to confirm or deny that the identified electrical installations are likely to be non-conforming.
Battery energy storage system and microgrid controller
This invention is directed to systems and methods that track a specified stored energy level profile for a BESS in a microgrid. The systems and methods including using a control algorithm that tracks the stored energy level profile for the BESS. The controller algorithm includes a Kalman Filter design for a model-based state reconstruction to overcome sensor/communication errors during real-time operation. The latter is important to guarantee the ability of the microgrid to continue its seamless operation during periods of erroneous sensor measurements or flawed communication.