Patent classifications
Y04S20/12
Frequency response optimization based on a change in battery state-of-charge during a frequency response period
A frequency response optimization system includes a battery configured to store and discharge electric power, a power inverter configured to control an amount of the electric power stored or discharged from the battery at each of a plurality of time steps during a frequency response period, and a frequency response controller. The frequency response controller is configured to receive a regulation signal from an incentive provider, determine statistics of the regulation signal, use the statistics of the regulation signal to generate an optimal frequency response midpoint that achieves a desired change in a state-of-charge (SOC) of the battery while participating in a frequency response program, and use the midpoints to determine optimal battery power setpoints for the power inverter. The power inverter is configured to use the optimal battery power setpoints to control the amount of the electric power stored or discharged from the battery.
Method and Control Device for Operating a Stationary, Electric Energy Storage That Is Provided for an Electric Consumption Unit
A method operates an electric energy storage that is provided for an electric consumption unit, wherein the electric consumption unit is additionally coupled to an electric power grid. The method is characterized in that the control device performs the following steps of a) providing different operation logics for controlling the power flow as a function of the state of charge and of a total unit load, b) observing a status signal that is signaling the present and/or the next supply condition of the grid, c) selecting one of the operation logics as an active operation logic depending on a current value of the status signal, and d) operating the power converter according to the active operation logic.
WIRELESS DEVICE POWERED BY A CITY DEVICE AND A METHOD OF PROVIDING WIRELESS CELLULAR AND INTERNET SERVICES
A cell and/or internet device that can be connected to existing city devices that are powered by city power to install a wireless cell and/or internet service to the city. The system has a plurality of the cell and/or internet devices connected to associated city devices powered by city power, and the cell and/or internet devices are controlled by a server. A method of using the system to provide cell and/or internet services to a city.
MICROGRID ENERGY RESERVOIR TRANSACTION VERIFICATION VIA SECURE, DISTRIBUTED LEDGER
A system may include an energy reservoir controller associated with a microgrid's energy reservoir adapted to store energy (e.g., a battery to store electrical energy). A computer processor of the energy reservoir controller may receive indications of digital currency tokens from a token creation platform. At least some of the digital currency tokens may be placed into an available energy container based on an amount of energy stored in the energy reservoir. A consumer within the microgrid may submit a transaction request for energy, and it may be arranged for an amount of energy to be transferred from the energy reservoir to the consumer. Based on the amount of energy transferred to the consumer, a number of digital currency tokens may be moved from the available energy container into a used energy container. Information about the transaction request may then be recorded via a secure, distributed transaction ledger.
POWER SOURCE COMMUNICATION WITH DOWNSTREAM DEVICE BY CHANGING OUTPUT VOLTAGE ON A POWER BUS
A power generation system includes a power source that is configured to communicate with at least one of a downstream load or a downstream device by changing a voltage on a power bus between the power source and the at least one of the downstream load or the downstream device, while power source provides power on the power bus to the at least one of the downstream load or the downstream device.
POWER CONTROL APPARATUS, POWER CONTROL METHOD, AND COMPUTER PROGRAM
A power control apparatus capable of stable transition of a set voltage is provided. A power control apparatus includes a DC to DC converter connected to a DC bus line, a communication unit that communicates with another power control apparatus, and a control unit that controls power interchange with the other power control apparatus through the DC bus line, in which the control unit controls at least a control mode and a droop rate, the control mode includes a first mode for controlling a voltage of the DC bus line, a second mode for controlling a current flowing through the DC bus line, and a third mode for stopping the power interchange, and when the control mode is shifted from the first mode to the second mode or the third mode, the control unit controls the droop rate to be set to a predetermined value other than 0%.
Building and Building Cluster Energy Management and Optimization System and Method
Disclosed are various embodiments for optimizing energy management. A quantity of renewable power that will be generated by renewable energy generation sources can be forecasted. The energy demand for a building or a cluster of buildings can be forecasted. A pricing model for buying energy from a grid can be determined. A quantity of energy to import from the grid or export to the grid can be scheduled based on the quantity of renewable energy forecasted and the state of charge or health of battery energy storage system, current and future operations of building HVAC, lighting and plug loads system, the forecasted energy demand for the building, and the pricing of the energy from the grid.
SYSTEM AND METHOD FOR ESTIMATING AND PROVIDING DISPATCHABLE OPERATING RESERVE ENERGY CAPACITY THROUGH USE OF ACTIVE LOAD MANAGEMENT
Systems for providing operating reserves to an electric power grid are disclosed. In one embodiment, a system comprises at least one power consuming device, at least one controllable device, and a client device constructed and configured in network communication. The at least one controllable device is operably coupled to the at least one power consuming device. The at least one controllable device is operable to control a power flow from the electric power grid to the at least one power consuming device responsive to power control instructions from the client device. Each of the at least one power consuming device has an actual value of power reduced and/or to be reduced based on revenue grade metrology, and confirmed by measurement and verification. The actual value of power reduced and/or to be reduced is a curtailment value as supply equivalence and provides operating reserve for the electric power grid.
Off-Grid Electrical Power System
Various implementations power homes and businesses without needing to connect to electric utility company-provided power, i.e., they can operate off-grid. Generally the systems includes solar panel racks (e.g., photovoltaic cells on sheets stabilized using ballasts, anchors, or mounting) that generate electrical power used to provide power to a building or that is stored on batteries. The system includes the solar panel racks and an enclosure to be installed at the premises and separate from the building. The enclosure includes the batteries and inverters that are electronically connected to the solar panel racks and batteries. The inverters are configured to convert direct current (DC) electricity from the solar power racks and batteries to alternating current (AC) electricity to provide power to the building via wires electrically connecting the inverters to the main panel of the building.
Photovoltaic Transfer Switch with Non-Essential Load Cutoff
In an a power management system for managing a plurality of essential loads and a plurality of nonessential loads that can be fed electric power from an alternate power source and from a grid power source, a power distribution network transmits power from the alternate power source and the grid power source to the essential loads and to the nonessential loads. A grid power sensor senses a grid power failure. A wireless transmitter is coupled to the grid power sensor and transmits a decouple signal when the grid power sensor detects a grid power failure. A plurality couplers selectively couple the nonessential loads to the power distribution network. Each of the plurality of couplers includes a wireless receiver and a switch that responsive to the wireless receiver. The couplers also decouple at least one of the nonessential loads from the power distribution network when the decouple signal is received.