B61L11/08

Vehicle management system

A vehicle management system communicates with monitor devices coupled with a path control device at an intersection between route segments. The path control device switches positions to connect different combinations of the route segments. The system receives signals from the monitor devices to determine which of the route segments are coupled with each other and receives an authority signal from a travel authority system that indicates which of the route segments that the vehicle is authorized to travel. The system directs the vehicle through the path control device responsive to a combination of: (a) receipt of the authority signal and (b) receipt of at least one of the monitor signals or failure to receive one or more of the monitor signals.

DISPLAY OF SIGNAL DEVICES AND SAFETY DEVICE OF A RAILWAY VEHICLE
20210284208 · 2021-09-16 ·

A method for displaying secondary signal devices for a driver of a railway vehicle during a journey by a railway vehicle. From a current vehicle position of the railway vehicle and an already known signal position of a secondary signal device, an actual distance of the railway vehicle in relation to the secondary signal device is determined. In the case that the actual distance is not reached in respect of a predefined current warning distance of the railway vehicle relative to the secondary signal device, a proximity of the railway vehicle relative to the secondary signal device is displayed to the driver.

Railroad virtual track block system

A method of railroad track control includes partitioning a physical track block into a plurality of virtual track blocks, the physical track block defined by first and second insulated joints disposed at corresponding first and second ends of a length of railroad track. The presence of an electrical circuit discontinuity in one of the plurality of virtual track blocks; is detected and in response a corresponding virtual track block position code indicating the presence of the discontinuity in the one of the plurality of virtual track blocks is generated.

Railroad virtual track block system

A method of railroad track control includes partitioning a physical track block into a plurality of virtual track blocks, the physical track block defined by first and second insulated joints disposed at corresponding first and second ends of a length of railroad track. The presence of an electrical circuit discontinuity in one of the plurality of virtual track blocks; is detected and in response a corresponding virtual track block position code indicating the presence of the discontinuity in the one of the plurality of virtual track blocks is generated.

RAILROAD VIRTUAL TRACK BLOCK SYSTEM

A method of railroad track control includes partitioning a physical track block into a plurality of virtual track blocks, the physical track block defined by first and second insulated joints disposed at corresponding first and second ends of a length of railroad track. The presence of an electrical circuit discontinuity in one of the plurality of virtual track blocks; is detected and in response a corresponding virtual track block position code indicating the presence of the discontinuity in the one of the plurality of virtual track blocks is generated.

RAILROAD VIRTUAL TRACK BLOCK SYSTEM

A method of railroad track control includes partitioning a physical track block into a plurality of virtual track blocks, the physical track block defined by first and second insulated joints disposed at corresponding first and second ends of a length of railroad track. The presence of an electrical circuit discontinuity in one of the plurality of virtual track blocks; is detected and in response a corresponding virtual track block position code indicating the presence of the discontinuity in the one of the plurality of virtual track blocks is generated.

RAILROAD VIRTUAL TRACK BLOCK SYSTEM

A method of railroad track control includes partitioning a physical track block into a plurality of virtual track blocks, the physical track block defined by first and second insulated joints disposed at corresponding first and second ends of a length of railroad track. The presence of an electrical circuit discontinuity in one of the plurality of virtual track blocks; is detected and in response a corresponding virtual track block position code indicating the presence of the discontinuity in the one of the plurality of virtual track blocks is generated.

RAILROAD VIRTUAL TRACK BLOCK SYSTEM

A method of railroad track control includes partitioning a physical track block into a plurality of virtual track blocks, the physical track block defined by first and second insulated joints disposed at corresponding first and second ends of a length of railroad track. The presence of an electrical circuit discontinuity in one of the plurality of virtual track blocks; is detected and in response a corresponding virtual track block position code indicating the presence of the discontinuity in the one of the plurality of virtual track blocks is generated.

RAILROAD VIRTUAL TRACK BLOCK SYSTEM

A method of railroad track control includes partitioning a physical track block into a plurality of virtual track blocks, the physical track block defined by first and second insulated joints disposed at corresponding first and second ends of a length of railroad track. The presence of an electrical circuit discontinuity in one of the plurality of virtual track blocks; is detected and in response a corresponding virtual track block position code indicating the presence of the discontinuity in the one of the plurality of virtual track blocks is generated.

RAILROAD VIRTUAL TRACK BLOCK SYSTEM

A method of railroad track control includes partitioning a physical track block into a plurality of virtual track blocks, the physical track block defined by first and second insulated joints disposed at corresponding first and second ends of a length of railroad track. The presence of an electrical circuit discontinuity in one of the plurality of virtual track blocks; is detected and in response a corresponding virtual track block position code indicating the presence of the discontinuity in the one of the plurality of virtual track blocks is generated.