B61L27/40

Method for Extracting and Analyzing Spatial Information of Control and Protection Zone of Rail Transit With Multiple Threshold Constraints

A method for extracting and analyzing spatial information of a control and protection zone of rail transit with multiple threshold constraints, including the following steps: 1, performing format conversion on a data file and extracting a plurality of coordinate points; 2, selecting key points from the plurality of coordinate points for data simplification to obtain a simplified limit line, a simplified outer structure edge line and a simplified boundary line of construction; 3, programming the simplified limit line, the simplified outer structure edge line, and the simplified boundary line of construction, calling a database, and reading data therefrom for spatial relationship comparison; 4, determining whether the construction of a rail-involved construction project intrudes into a control and protection zone of rail transit according to a result of the spatial relationship comparison, thus completing the extraction and analysis of the spatial information of the control and protection zone of rail transit.

Method for Extracting and Analyzing Spatial Information of Control and Protection Zone of Rail Transit With Multiple Threshold Constraints

A method for extracting and analyzing spatial information of a control and protection zone of rail transit with multiple threshold constraints, including the following steps: 1, performing format conversion on a data file and extracting a plurality of coordinate points; 2, selecting key points from the plurality of coordinate points for data simplification to obtain a simplified limit line, a simplified outer structure edge line and a simplified boundary line of construction; 3, programming the simplified limit line, the simplified outer structure edge line, and the simplified boundary line of construction, calling a database, and reading data therefrom for spatial relationship comparison; 4, determining whether the construction of a rail-involved construction project intrudes into a control and protection zone of rail transit according to a result of the spatial relationship comparison, thus completing the extraction and analysis of the spatial information of the control and protection zone of rail transit.

Systems and methods for railway asset management
11731676 · 2023-08-22 · ·

Systems and methods for railway asset management. The methods comprise: using a virtual reality device to recognize and collect real world information about railway assets located in a railyard; and using the real world information to (i) associate a railway asset to a data collection unit, (ii) provide an individual with an augmented reality experience associated with the railyard and/or (iii) facilitate automated railyard management tasks.

Systems and methods for railway asset management
11731676 · 2023-08-22 · ·

Systems and methods for railway asset management. The methods comprise: using a virtual reality device to recognize and collect real world information about railway assets located in a railyard; and using the real world information to (i) associate a railway asset to a data collection unit, (ii) provide an individual with an augmented reality experience associated with the railyard and/or (iii) facilitate automated railyard management tasks.

TRAIN OPERATION CONTROL SYSTEM AND METHOD BASED ON TRAIN-GROUND COORDINATION
20230257010 · 2023-08-17 · ·

A train operation control system and method based on train-ground coordination are provided. The system includes a dispatching center server, a resource management unit (RMU) for ground train control equipment, and on-board train control equipment (CC), wherein the dispatching center server is connected via communication to the on-board CC, and the on-board CC is connected via communication to the RMU for the ground train control equipment; and the RMU for the ground train control equipment and the on-board CC coordinatively complete resource management and implement train operation control, wherein the resource management is divided into two levels, at a first level, the RMU is responsible for performing the resource management in the unit of section, and at a second level, a preceding train and a succeeding train interact with each other via direct train-to-train communication, such that finer resource sharing in a section is achieved between the trains.

SYSTEM AND METHOD FOR AUTOMATICALLY ADJUSTING PLANNED TRAIN OPERATION DIAGRAM

The present disclosure relates to a system and method for automatic adjustment of a planned train operation chart. The system comprises a train operation data analysis module, a passenger flow data matching module, and an operation chart adjustment module that are connected in sequence. The train operation data analysis module is connected to the operation chart adjustment module; the train operation data analysis module assesses the deviation between an actual operation chart and a planned operation chart on the basis of ATS historical operation data to obtain an operation chart assessment result; the passenger flow data matching module calculates the actual passenger flow distribution on the basis of on-board weighing passenger flow data and AFC passenger flow data, and matches the actual passenger flow distribution with the actual operation chart to obtain a passenger flow matching result; and the operation chart adjustment module performs optimizing adjustment.

TRAIN CONTROL METHOD BASED ON MOBILE AUTHORIZATION VERIFICATION
20230257012 · 2023-08-17 · ·

The invention relates to a train control method based on mobile authorization verification, which compares driving permission sent by a vehicle-mounted device to a ground trackside device with driving permission calculated by itself, and outputs the strictest driving permission. Compared with the prior art, the invention has the advantages that the correctness of mobile authorization calculation is improved, and the safety of train stop points is ensured.

TRAIN CONTROL METHOD BASED ON MOBILE AUTHORIZATION VERIFICATION
20230257012 · 2023-08-17 · ·

The invention relates to a train control method based on mobile authorization verification, which compares driving permission sent by a vehicle-mounted device to a ground trackside device with driving permission calculated by itself, and outputs the strictest driving permission. Compared with the prior art, the invention has the advantages that the correctness of mobile authorization calculation is improved, and the safety of train stop points is ensured.

Electric rail vehicle

A Rail Drone can include: a payload interface, a drivetrain, and a rail platform 515. The Rail Drone can additionally or alternatively include any other suitable set of components. The Rail Drone can integrate a standardized payload interface and an autonomous electric road vehicle platform into a rolling stock architecture. The Rail Drone can be a stand-alone, payload-agnostic, motive element which can be independently or cooperatively capable of carrying heavy loads across long distances at various cruising speeds.

Electric rail vehicle

A Rail Drone can include: a payload interface, a drivetrain, and a rail platform 515. The Rail Drone can additionally or alternatively include any other suitable set of components. The Rail Drone can integrate a standardized payload interface and an autonomous electric road vehicle platform into a rolling stock architecture. The Rail Drone can be a stand-alone, payload-agnostic, motive element which can be independently or cooperatively capable of carrying heavy loads across long distances at various cruising speeds.