B66C15/04

OHT VEHICLE TRACTION DEVICE AND METHOD OF MANAGING OHT SYSTEM USING SAME
20220106169 · 2022-04-07 · ·

Proposed are an OHT (overhead hoist transport) vehicle traction device and a method of managing an OHT system using same. The OHT vehicle traction device may solve problems of a driving-malfunction vehicle on the rails of an OHT system or tows the vehicle, and the method of managing the OHT system may increase the management efficiency of the entire OHT system by solving problems of a driving-malfunction vehicle or towing the vehicle in an unmanned type.

Construction machine, in particular a crane, and method for the control thereof
11119467 · 2021-09-14 · ·

A construction machine, in particular in the form of a crane such as a revolving tower crane, having a control apparatus for controlling at least one piece of work equipment of the construction machine using a structure data model that includes digital information on a structure to be erected and/or to be worked. A method of controlling such a construction machine with the aid of digital data from such a structure data model. The construction machine has a data exchange module connectable to the master construction site computer for the exchange of digital data with a master construction site computer, with the data exchange module having reading and/or writing means for reading and/or writing access to the master construction site computer. The construction machine carries out at least individual work steps such as the traveling of a construction element in automated manner using digital data from the master construction site computer. A control module that can be positioned at the load suspension means and/or at the construction element to be traveled and that can be configured as a wearable, in particular in the form of gloves having integrated movement control sensors is provided for the fine positioning.

Construction machine, in particular a crane, and method for the control thereof
11119467 · 2021-09-14 · ·

A construction machine, in particular in the form of a crane such as a revolving tower crane, having a control apparatus for controlling at least one piece of work equipment of the construction machine using a structure data model that includes digital information on a structure to be erected and/or to be worked. A method of controlling such a construction machine with the aid of digital data from such a structure data model. The construction machine has a data exchange module connectable to the master construction site computer for the exchange of digital data with a master construction site computer, with the data exchange module having reading and/or writing means for reading and/or writing access to the master construction site computer. The construction machine carries out at least individual work steps such as the traveling of a construction element in automated manner using digital data from the master construction site computer. A control module that can be positioned at the load suspension means and/or at the construction element to be traveled and that can be configured as a wearable, in particular in the form of gloves having integrated movement control sensors is provided for the fine positioning.

CRANE WITH AN ANTI-COLLISION DEVICE AND METHOD FOR INSTALLING SUCH AN ANTI-COLLISION DEVICE
20210269285 · 2021-09-02 ·

The invention relates to a method for installing an anti-collision device of a crane which has a boom that can be rotated about an upright rotational axis of the crane. A crane position and an orientation of the crane, in particular of the boom, are determined, wherein the crane position is automatically determined by means of a satellite navigation module on the crane and is provided to the anti-collision device in the form of global coordinates, and the orientation of the crane is automatically determined by means of an orientation sensor system attached to the crane and is provided to the anti-collision device in the form of a direction in the global coordinate system.

Method of monitoring at least one crane
11034556 · 2021-06-15 · ·

Methods and systems for monitoring at least one crane, preferably two or more cranes, in particular revolving tower cranes, on a construction site, wherein one or more optical detection means are provided, and wherein a collision monitoring unit analyzes the recorded optical data to recognize a possible collision between at least one crane and one further crane and/or another projecting edge.

METHOD OF CONSTRUCTION SITE MONITORING, WORK MACHINE, AND SYSTEM FOR CONSTRUCTION SITE MONITORING
20210114846 · 2021-04-22 ·

The present disclosure relates to a method for real time monitoring of the current status of a construction site having one or more work machines, wherein a monitoring means installed at least one work machine monitors the environment of the work machine in real time and generates corresponding monitoring data, with the generated monitoring data being transmitted by the monitoring means to at least one processing unit for a real time evaluation of the current construction site status.

METHOD OF CONSTRUCTION SITE MONITORING, WORK MACHINE, AND SYSTEM FOR CONSTRUCTION SITE MONITORING
20210114846 · 2021-04-22 ·

The present disclosure relates to a method for real time monitoring of the current status of a construction site having one or more work machines, wherein a monitoring means installed at least one work machine monitors the environment of the work machine in real time and generates corresponding monitoring data, with the generated monitoring data being transmitted by the monitoring means to at least one processing unit for a real time evaluation of the current construction site status.

Remotely operated crane system

Provided are embodiments of a remote crane system including a remote controlled crane system and a remote crane control center (RCCC). The remote controlled crane system adapted to operate based on local control commands, send, to the RCCC via a communication network, crane operational data corresponding to operation of the remote controlled crane system, and receive, from the RCCC via the communication network, remote control commands, and operate based on the remote control commands. The RCCC including remote crane controls and a remote crane operator interface, and being adapted to receive, from the crane system via the communication network, the crane operational data, and present, via the remote crane operator interface, crane operational information corresponding to the crane operational data, receive, via the remote crane controls, remote control commands and send, to the crane controller via the communication network, crane remote control data including the remote control commands.

Construction Machine, in Particular a Crane, and Method for the Control Thereof
20210072727 · 2021-03-11 ·

A construction machine, in particular in the form of a crane such as a revolving tower crane, having a control apparatus for controlling at least one piece of work equipment of the construction machine using a structure data model that includes digital information on a structure to be erected and/or to be worked. A method of controlling such a construction machine with the aid of digital data from such a structure data model. The construction machine has a data exchange module connectable to the master construction site computer for the exchange of digital data with a master construction site computer, with the data exchange module having reading and/or writing means for reading and/or writing access to the master construction site computer. The construction machine carries out at least individual work steps such as the traveling of a construction element in automated manner using digital data from the master construction site computer. A control module that can be positioned at the load suspension means and/or at the construction element to be traveled and that can be configured as a wearable, in particular in the form of gloves having integrated movement control sensors is provided for the fine positioning.

Crawler crane
10934138 · 2021-03-02 · ·

The present disclosure relates to a crawler crane comprising at least one camera system, wherein the camera system is adapted to detect data relating to the relative position of the crawler crane to a suspended ballast and/or to at least one travelable ballast wagon.