B60P1/5485

Solar power plant construction method

A Solar power plant construction method includes a string formation step of arranging solar modules delivered to an assembly plant on support frames to form planar solar strings, a conveyance step of stacking the solar strings in a container and loading the container on a container truck to convey the container to a power plant site, and a solar string installation step of transferring the container delivered to the power plant site to a site machine and measuring distances and directions between a crane included in the site machine placed at a predetermined position of a stand array group for mounting solar array provided in the power plant site and stands to pull up the solar strings by the crane of the site machine to sequentially distribute the solar strings to respective stand positions measured in the stand position measurement step to form and fix a solar array.

SOLAR POWER PLANT CONSTRUCTION METHOD

A Solar power plant construction method includes a string formation step of arranging solar modules delivered to an assembly plant on support frames to form planar solar strings, a conveyance step of stacking the solar strings in a container and loading the container on a container truck to convey the container to a power plant site, and a solar string installation step of transferring the container delivered to the power plant site to a site machine and measuring distances and directions between a crane included in the site machine placed at a predetermined position of a stand array group for mounting solar array provided in the power plant site and stands to pull up the solar strings by the crane of the site machine to sequentially distribute the solar strings to respective stand positions measured in the stand position measurement step to form and fix a solar array.

Trailer

A trailer for lifting and positioning at least one reel thereon. The trailer includes a pair of articulated arms comprising a first elongate member and a second elongate member pivotally mounted to the first elongate member. The first elongate members are generally horizontal and movable relative to the trailer between a retracted position and a rearwardly extended position. The second elongate members are pivotable between a horizontal position in parallel alignment with the first elongate members and an upright position wherein the second elongate members are orthogonal to the first elongate members. The second elongate members are provided with respective jacks to stabilise them with respect to the ground surface. A hoist to lift the reel from the support surface to an effective height greater than an effective height of a deck of the trailer is disposed between the second elongate members.