B66C23/26

Boom attach/detach device of crane and boom attach/detach method for crane

A boom attach/detach device includes a boom, an extensible cylinder, and a boom supporting device. At least a part of the boom supporting device is arranged more to a boom front end side than an upper slewing body. When the extensible cylinder conducts extension and contraction operation in a state where coupling between the upper slewing body and the boom by a boom foot pin is cut off, the boom supporting device supports the boom to enable a rear end portion of the boom to move in a boom axis direction. The boom can be attached or detached with ease without a need to use a separate power device from a crane to suppress increases in size, in mass, and in cost of an upper slewing body.

System and Method of Concealing Permanent Hard Point Attachments below a Paver Stone Surface
20200130228 · 2020-04-30 ·

A method for installing and deploying concealed mounting points for a davit or jib crane on a roof patio or large balcony covered with stone pavers. Specifically, a metal plate assembly lower flange is affixed to the concrete roof slab with its contact points covered by waterproofing membrane. The metal assembly hard point upper flange holes correspond to the holes in the mounting base of the davit or jib crane. The metal assembly when installed is lower than the pavers supported by metal pedestal transition components. As such, the metal assembly hard point is concealed and covered by a removable cover plate that also sits on top of the metal pedestal transition components and is flush with the top of the pavers.

System and Method of Concealing Permanent Hard Point Attachments below a Paver Stone Surface
20200130228 · 2020-04-30 ·

A method for installing and deploying concealed mounting points for a davit or jib crane on a roof patio or large balcony covered with stone pavers. Specifically, a metal plate assembly lower flange is affixed to the concrete roof slab with its contact points covered by waterproofing membrane. The metal assembly hard point upper flange holes correspond to the holes in the mounting base of the davit or jib crane. The metal assembly when installed is lower than the pavers supported by metal pedestal transition components. As such, the metal assembly hard point is concealed and covered by a removable cover plate that also sits on top of the metal pedestal transition components and is flush with the top of the pavers.

Crane and device for controlling same

The invention relates to a crane, in particular a rotary tower crane (1), comprising a crane boom (3), from which runs a hoisting cable (6) connected to the load hook (7), as well as comprising a load hook positioning device (8) for determining the load hook position, wherein the load hook positioning device (8) has at least three electromagnetic radio modules (9) exchanging radio signals with one another, of which at least one radio module is attached to the load hook and at least two further radio modules are attached to the crane structure and/or in the environment of the crane in a spaced apart manner, as well as an electronic evaluation device for evaluating the radio signals and determining the position of the load hook from the radio signals.

UPPER SPREADER GUIDE DEVICE

An upper spreader guide device includes a pair of left and right boom-side guide parts each supported by a boom so as to be arranged in a raised attitude of rising diagonally upward from the boom in a state where the boom is arranged in a lowered attitude, and a pair of left and right movable guide parts supported by the pair of boom-side guide parts, respectively, such that a relative position with respect to the pair of boom-side guide parts is changeable between a protruding position and a retraction position.

Mobile construction crane comprising a superstructure and an undercarriage and one or more electrical consumers

The invention relates to a mobile construction crane comprising a superstructure and an undercarriage, wherein one or more electrical consumers are provided in or at the superstructure, wherein a supply of the one or more electrical consumers with electrical energy takes place by at least one current generator installed in the undercarriage.

TOWER CRANE
20190359455 · 2019-11-28 ·

A tower crane under safety management and control includes a cargo boom, a spool and a pulley located on the cargo boom, a motor coupled to the spool, a hook, a 3D camera module, and a controller coupled to the 3D camera module and the motor. A tow rope of the spool rolls around the pulley and connects the hook. The 3D camera module includes a first camera facing the hook and a second camera back to the hook. The first and second cameras respectively take images, in real time. The controller obtains the images taken by the first camera when lifting a load downwards, obtains the images taken by the second camera when lifting the load upwards, detects whether there are obstacles within the images; and controls the motor reducing working speed or stopping working when there is an obstacle within the images.

Method for transferring a tower crane and a frame and take-up mechanism therefor
10486947 · 2019-11-26 · ·

The present invention relates to a method for transferring a tower crane with a mobile crane, in particular crawler crane, wherein the mounted tower crane is lifted by means of the lifting cable of the mobile crane, in order to transfer the same to the target site, and the tower crane is stabilized by means of one or more connecting points between mobile crane boom and crane tower.

Method for transferring a tower crane and a frame and take-up mechanism therefor
10486947 · 2019-11-26 · ·

The present invention relates to a method for transferring a tower crane with a mobile crane, in particular crawler crane, wherein the mounted tower crane is lifted by means of the lifting cable of the mobile crane, in order to transfer the same to the target site, and the tower crane is stabilized by means of one or more connecting points between mobile crane boom and crane tower.

Installation and support method including a tower crane for supporting a high-voltage line electric cable

A support installation includes support members for supporting an electric cable, a tower crane, a mast and a jib linked to an upper portion of the mast. The jib and the mast respectively extend according to a jib direction and a substantially vertical mast direction. The support members are secured to the jib and disposed at a plurality of locations distant according to the jib direction. The support members extend transversally to the jib direction to protrude laterally from the jib. The jib is cantilevered when the support installation is in the service configuration.