C22B15/0095

IRRIGATION IMPACTS ON A LEACH STOCKPILE

The system may include a secondary irrigation feature that determines a percent of overlap of each of a plurality of submodules in a first lift over each of a plurality of submodules in a second lift and adjusts at least one of leaching operations or a leaching model based on the total tonnage weighted average of metal in the second lift. The method may further comprise determining an acid gap based on a difference between total acid given and total acid consumption; and further adjusting at least one of the leaching operations or the leaching model based on the acid gap. The method may further comprise determining a percentage of compacted material based on the material that is compacted and irrigated divided by the material that is irrigated; and further adjusting at least one of the leaching operations or the leaching model based on the percentage of compacted material.

ACID IMPACTS ON A LEACH STOCKPILE

The system may include a secondary irrigation feature that determines a percent of overlap of each of a plurality of submodules in a first lift over each of a plurality of submodules in a second lift and adjusts at least one of leaching operations or a leaching model based on the total tonnage weighted average of metal in the second lift. The method may further comprise determining an acid gap based on a difference between total acid given and total acid consumption; and further adjusting at least one of the leaching operations or the leaching model based on the acid gap. The method may further comprise determining a percentage of compacted material based on the material that is compacted and irrigated divided by the material that is irrigated; and further adjusting at least one of the leaching operations or the leaching model based on the percentage of compacted material.

COMPACTION IMPACTS ON A LEACH STOCKPILE

The system may include a secondary irrigation feature that determines a percent of overlap of each of a plurality of submodules in a first lift over each of a plurality of submodules in a second lift and adjusts at least one of leaching operations or a leaching model based on the total tonnage weighted average of metal in the second lift. The method may further comprise determining an acid gap based on a difference between total acid given and total acid consumption; and further adjusting at least one of the leaching operations or the leaching model based on the acid gap. The method may further comprise determining a percentage of compacted material based on the material that is compacted and irrigated divided by the material that is irrigated; and further adjusting at least one of the leaching operations or the leaching model based on the percentage of compacted material.

METHOD FOR PREPARING METAL POWDER
20170173698 · 2017-06-22 ·

Provided is a method for preparing metal powder; a metal nitrate or metal sulfate is combined with ammonia water to produce an ammonia-containing complex metal salt solution; the said solution is then quantitatively jet-mixed with the solution containing the hydroxylamine compounds, and reacted under intense stirring; a dispersant solution is added during the reaction process, and after the reaction is complete, the solution is separated by centrifugation to yield the metal power. The method of the present invention can effectively control the reaction rate during the production process, and well control the nucleation rate and dispersity, with the produced metal powder having very good crystallinity, sphericity, tap property and dispersity.

SYSTEM AND METHOD FOR CONTROL OF A COPPER MELTING FURNACE

A method and system of controlling a melting process of copper in a copper melting furnace including measuring at least one furnace parameter, wherein the at least one furnace parameter includes one or both of a furnace temperature and a furnace exhaust oxygen concentration, calculating a first rate of change of the furnace parameter over a first time period, calculating a second rate of change of the furnace parameter over a second time period at least a portion of which occurs after the first time period, comparing the first rate of change with the second rate of change, and indicating substantial completion of a process phase in the furnace when the second rate of change deviates by a predetermined threshold percentage from the first rate of change.

METHOD OF CONVERTING COPPER CONTAINING MATERIAL

The present invention provides a method of converting copper containing material to blister copper comprising: (a) providing copper containing material comprising copper sulfides and iron sulfides, whereby the copper containing material comprises at least 35 wt % copper of the total weight of the copper containing material; (b) reacting the copper containing material in a furnace with an oxygen containing gas, in the absence of flux, to effect oxidation of iron sulfide and copper sulfide, and controlling injection of the oxygen containing gas and the temperature so that the resulting converter slag is in a molten phase to obtain blister copper and converter slag.

Irrigation impacts on a leach stockpile

The system may include a secondary irrigation feature that determines a percent of overlap of each of a plurality of submodules in a second lift over each of a plurality of submodules in a first lift and adjusts at least one of leaching operations or a leaching model based on the total tonnage weighted average of metal in the second lift. The method may further comprise determining an acid gap based on a difference between total acid given and total acid consumption; and further adjusting at least one of the leaching operations or the leaching model based on the acid gap. The method may further comprise determining a percentage of compacted material based on the material that is compacted and irrigated divided by the material that is irrigated; and further adjusting at least one of the leaching operations or the leaching model based on the percentage of compacted material.

System and method for adjusting leaching operations based on leach analytic data

The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of parameters to obtain forecast data for a mining production target; comparing the forecast data for the mining production target to the actual data for the mining production target; determining deviations between the forecast data and the actual data, based on the comparing; and changing each of the plurality of parameters from the forecast data to the actual data to determine a contribution to the deviations for each of the plurality of parameters.

IRRIGATION IMPACTS ON A LEACH STOCKPILE

The system may include a secondary irrigation feature that determines a percent of overlap of each of a plurality of submodules in a second lift over each of a plurality of submodules in a first lift and adjusts at least one of leaching operations or a leaching model based on the total tonnage weighted average of metal in the second lift. The method may further comprise determining an acid gap based on a difference between total acid given and total acid consumption; and further adjusting at least one of the leaching operations or the leaching model based on the acid gap. The method may further comprise determining a percentage of compacted material based on the material that is compacted and irrigated divided by the material that is irrigated; and further adjusting at least one of the leaching operations or the leaching model based on the percentage of compacted material.

SYSTEM AND METHOD FOR ADJUSTING LEACHING OPERATIONS BASED ON LEACH ANALYTIC DATA

The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of parameters to obtain forecast data for a mining production target; comparing the forecast data for the mining production target to the actual data for the mining production target; determining deviations between the forecast data and the actual data, based on the comparing; and changing each of the plurality of parameters from the forecast data to the actual data to determine a contribution to the deviations for each of the plurality of parameters.