Patent classifications
E02D15/06
GROUTING CONSOLIDATION METHOD FOR FULL CASING BOREHOLE GUIDE PREFABRICATED PILE AND PREFABRICATED PILE THEREFOR
A grouting consolidation method for a full casing borehole guide prefabricated pile, comprising the following steps: S1, driving a drilling rig carrying a casing (1) to perform borehole construction, the borehole construction being performed to a preset hole depth to form a borehole (2); S2. the casing (1) being housed in the borehole (2); S3. implanting a prefabricated pile (4) into the borehole (2) so that the prefabricated pile (4) reaches a hole bottom of the borehole (2); S4. injecting a slurry (3) into the borehole (2); S5. pulling out the casing (1) so that the prefabricated pile (4) and an inner cavity of the borehole (2) are fixed and cemented into an integrated structure. Also provided is a prefabricated pile, comprising a pile body and a grouting channel (5) provided on the pile body, wherein a liquid inlet end (11) of the grouting channel (5) extends out from an upper end surface of the pile body and a liquid outlet end (12) of the grouting channel (5) extends out from a lower end surface of the pile body and/or a side surface of the pile body.
GROUTING CONSOLIDATION METHOD FOR FULL CASING BOREHOLE GUIDE PREFABRICATED PILE AND PREFABRICATED PILE THEREFOR
A grouting consolidation method for a full casing borehole guide prefabricated pile, comprising the following steps: S1, driving a drilling rig carrying a casing (1) to perform borehole construction, the borehole construction being performed to a preset hole depth to form a borehole (2); S2. the casing (1) being housed in the borehole (2); S3. implanting a prefabricated pile (4) into the borehole (2) so that the prefabricated pile (4) reaches a hole bottom of the borehole (2); S4. injecting a slurry (3) into the borehole (2); S5. pulling out the casing (1) so that the prefabricated pile (4) and an inner cavity of the borehole (2) are fixed and cemented into an integrated structure. Also provided is a prefabricated pile, comprising a pile body and a grouting channel (5) provided on the pile body, wherein a liquid inlet end (11) of the grouting channel (5) extends out from an upper end surface of the pile body and a liquid outlet end (12) of the grouting channel (5) extends out from a lower end surface of the pile body and/or a side surface of the pile body.
UNDERWATER REPAIR SYSTEM FOR CAVITY REGION OF CONCRETE PANEL ROCK-FILL DAM PANEL
- Yingli Wu ,
- Ruiji Yi ,
- Sheng Yang ,
- Wanli Guo ,
- Denghua Li ,
- Limin Xiao ,
- Jingping Ming ,
- Qiming Zhong ,
- Hongxia Fan ,
- Hua Fu ,
- Hua Ling ,
- Fang Wang ,
- Ting Shen ,
- Yong Li ,
- Yongyong Cao ,
- Jun Li ,
- Ming Zhang ,
- Zhaosheng Zhang ,
- Zehua Huangfu ,
- Shilin Li ,
- Juhua Zhang ,
- Jiefu Wu ,
- Zhe Hu ,
- Lifei Gong ,
- Gang WU ,
- Yufeng Huangfu ,
- Chen Chen ,
- Jing Yuan
Provided is an underwater repair system for a cavity region of a concrete panel rock-fill dam panel, including a moving platform, a work cabin, a pressure drainage apparatus, a traction apparatus, and a positioning apparatus; the traction apparatus controlling the movement of the moving platform on the surface of a dam concrete panel; the positioning apparatus transmits a detection position, the work cabin is a pressure cabin, the work cabin being connected to the pressure drainage apparatus, and a drill apparatus and grouting apparatus being arranged in the work cabin; the moving platform moves into the cavity region, and the pressure drainage apparatus starts up to drain the water in the work cabin, a partially closed waterless space being formed inside the work cabin, the drill apparatus drilling the concrete panel at the upper end of the cavity region and the grouting apparatus subsequently implementing grouting to complete the repair.
UNDERWATER REPAIR SYSTEM FOR CAVITY REGION OF CONCRETE PANEL ROCK-FILL DAM PANEL
- Yingli Wu ,
- Ruiji Yi ,
- Sheng Yang ,
- Wanli Guo ,
- Denghua Li ,
- Limin Xiao ,
- Jingping Ming ,
- Qiming Zhong ,
- Hongxia Fan ,
- Hua Fu ,
- Hua Ling ,
- Fang Wang ,
- Ting Shen ,
- Yong Li ,
- Yongyong Cao ,
- Jun Li ,
- Ming Zhang ,
- Zhaosheng Zhang ,
- Zehua Huangfu ,
- Shilin Li ,
- Juhua Zhang ,
- Jiefu Wu ,
- Zhe Hu ,
- Lifei Gong ,
- Gang WU ,
- Yufeng Huangfu ,
- Chen Chen ,
- Jing Yuan
Provided is an underwater repair system for a cavity region of a concrete panel rock-fill dam panel, including a moving platform, a work cabin, a pressure drainage apparatus, a traction apparatus, and a positioning apparatus; the traction apparatus controlling the movement of the moving platform on the surface of a dam concrete panel; the positioning apparatus transmits a detection position, the work cabin is a pressure cabin, the work cabin being connected to the pressure drainage apparatus, and a drill apparatus and grouting apparatus being arranged in the work cabin; the moving platform moves into the cavity region, and the pressure drainage apparatus starts up to drain the water in the work cabin, a partially closed waterless space being formed inside the work cabin, the drill apparatus drilling the concrete panel at the upper end of the cavity region and the grouting apparatus subsequently implementing grouting to complete the repair.
HANDLING DEVICE AND METHOD FOR GRIPPING AND INSERTING A PILE TUBE INTO A BOREHOLE
The invention relates to a handling device for gripping and inserting a pile tube into a borehole in the ground to form a foundation pile, comprising a base frame, a gripping device for gripping and holding the pile tube, and a holding element for releasably connecting the base frame to a hoist, in particular a suspension rope. According to the invention, it is provided that at least one inlet device for supplying a curable medium is arranged on the base frame in an upper region and at least one outlet device for the curable medium to the pile tube is arranged in a lower region.
OFF-SHORE PREPARATION SYSTEM
A waterborne facility on a body of water includes a primary spoolable pipe and a pump. The end of the primary spoolable pipe may be guided from the waterborne facility to a location proximate to a selected site. The pump may be used to discharge a flowable material through the primary spoolable pipe. The waterborne facility may include a ready-mix concrete preparation system. However, the waterborne facility may deliver any flowable material to a selected site, which may be a land surface, underground, on a water surface, or underwater. Illustrative flowable materials include seawater, grout, cement, and sediment/mud.
OFF-SHORE PREPARATION SYSTEM
A waterborne facility on a body of water includes a primary spoolable pipe and a pump. The end of the primary spoolable pipe may be guided from the waterborne facility to a location proximate to a selected site. The pump may be used to discharge a flowable material through the primary spoolable pipe. The waterborne facility may include a ready-mix concrete preparation system. However, the waterborne facility may deliver any flowable material to a selected site, which may be a land surface, underground, on a water surface, or underwater. Illustrative flowable materials include seawater, grout, cement, and sediment/mud.
Cleaning device for cleaning an underwater ground-working apparatus and method
The invention relates to a method for ground-working at a bottom of a body of water and a cleaning device for cleaning an underwater ground-working apparatus. The cleaning device has an enclosing body which extends substantially from a bottom of a body of water to above the water surface and enclosing an inner space, along which the ground-working apparatus can be moved, and a separating device, through which in the enclosing body an upper portion of the inner space can be separated off to form a cleaning area, in which the ground-working apparatus can be received and soil and contamination cleaned from it.
Cleaning device for cleaning an underwater ground-working apparatus and method
The invention relates to a method for ground-working at a bottom of a body of water and a cleaning device for cleaning an underwater ground-working apparatus. The cleaning device has an enclosing body which extends substantially from a bottom of a body of water to above the water surface and enclosing an inner space, along which the ground-working apparatus can be moved, and a separating device, through which in the enclosing body an upper portion of the inner space can be separated off to form a cleaning area, in which the ground-working apparatus can be received and soil and contamination cleaned from it.
PAC-BASED CAP DELIVERY METHODS
Disclosed are novel remedial capping methods comprising: (a) providing an organic adsorption ingredient and an organic polymer delivery ingredient; (b) providing a non-organic silica carrier ingredient; (c) blending the organic adsorption ingredient, the organic polymer delivery ingredient, and the non-organic silica carrier ingredient to form a capping composition layer mixture; (d) delivering the capping composition layer mixture to a delivery means; and (e) distributing the capping composition layer mixture throughout a distribution pool and forming a capping composition layer in an area in need of remediation.