Patent classifications
F24H15/174
Modular manifold for a tankless water heater
A modular manifold for a tankless water heater includes a first cavity member having a first opening, a second opening, and a base wall; a second cavity member coupled to the first cavity member, the second cavity member having a first opening, a second opening, and a base wall; a first cover plate coupled to either the first cavity member or the second cavity member; and a second cover plate coupled to either the first cavity member or the second cavity member, wherein two openings in the first and second openings are covered by the first and second cover plates, respectively, and wherein the base walls of the first and second cavity members, the first and second cover plates, and the two openings in the first and second openings not covered by the first and second cover plates define a fluid flow path in the modular manifold.
Gas furnace to produce heated air and optionally hot water via a bypass pipe
Provided is a gas furnace including a primary heat exchanger and a secondary heat exchanger through which a combustion gas produced by the combustion of a fuel gas flows. The gas furnace includes: a coupling box serving as an intermediary to connect the primary heat exchanger and the secondary heat exchanger; a collect box connected to the secondary heat exchanger, for letting in the combustion gas passed through the secondary heat exchanger; an inducer connected to the collect box, for inducing a flow of the combustion gas; and a bypass pipe connected to one side of the coupling box and including a bypass pipe for guiding the combustion gas passed through the primary heat exchanger to a hot water supply tank for supplying hot water to an indoor space.
Instant hot water delivery system
An instant hot water delivery system includes a thermal storage bin that receives hot water from a water heater via a hot water supply conduit and stores the hot water therein. The thermal storage bin is disposed adjacent a point of demand to deliver the hot water instantly to the point of demand responsive to a demand. The thermal storage bin is configured to retain a thermal energy of the hot water for a prolonged period using a phase change material. When the hot water stored in the thermal storage bin cools down below a threshold temperature, the cooled down hot water is recirculated to the water heater via a cold water supply conduit using a crossover valve. The recirculation is based on thermosiphon. Fresh hot water from the water heater replaces the cooled down hot water that is displaced from the thermal storage bin.
Tankless water heater and method of controlling a tankless water heater
A tankless water heater comprising a bare wire heating element is disclosed which is connected to an electronic temperature control system. At least one sensor is furthermore connected to the electronic temperature control system. A fluid heating chamber is made of insulating non conductive material wherein the heating element is located. At least one switch is connected to at least one bare wire heating element and to a phase of an AC line. An electrode system and an electronic detecting circuit are interconnected. The electrode system is arranged in a fluid channel, in a short distance from the bare wire heating element which acts like electrode 1. The electrode 2 of the electrode system is made from a conductive tube material hydraulically connected to a throttle valve made from non conductive material to insulate the electrode 2 from the grounded collector. The electrode 2 is electrically connected to a electronic control system via a conductive material.
DISCONNECT LOAD CONTROL RECEIVER FOR RESISTIVE HEATING LOADS
An electrical power distribution control system configured to issue a demand response signal to cut power to a plurality of electrical power consuming loads within an electrical power distribution network to reduce a peak power demand within an electrical power grid during a peak power demand. Unlike conventional demand response systems, the controller in each consumer residence includes both a distributed control based on the ability to track individual 24 hour usage patterns and selectively delay the demand response signal on individual resistive heating loads based on usage patterns for the purpose of reducing a likelihood of consumers experiencing effects of the reduced peak power demand.
Methods and system for controlling a combination boiler
A combination boiler provides heated water to a boiler loop and domestic hot water (DHW) to a domestic water loop. The combination boiler includes a primary heat exchanger (PHE) connected to the boiler loop and a burner to provide heat to the primary heat exchanger. A secondary heat exchanger (SHE) transfers heat energy from the boiler loop to the domestic water loop. A controller monitors a PHE inlet temperature and a DHW output temperature, obtains a pre-heat initialization temperature threshold and a pre-heat cancellation temperature threshold, and detects a low temperature condition. A pre-heat operation is initiated responsive to the low temperature condition by circulating heated water from the PHE to the SHE. The burner is selectively fired at least in part according to an outlet temperature of the PHE.
Boiler for heating and hot-water control method therefor
The present invention provides a combined heating and hot-water boiler for heating and hot-water. The combined heating and hot-water boiler comprises: a main heat exchanger which heats heating water through heat exchange; a hot-water heat exchanger to which the heating water heated by the main heat exchanger is supplied, and which heats tap water into hot water through heat exchange with the heating water; and a control unit which controls the flow of the heating water having passed through the hot-water heat exchanger to control the formation of at least one of a first flow path for supplying, to an object to be heated, the heating water having passed through the hot-water heat exchanger, and a second flow path for supplying, to the main heat exchanger, the heating water having passed through the hot-water heat exchanger.
Gas heater for water and a gas water heater
The present invention provides a method of operating a gas heater for water including the steps of: restricting a water flow to the gas heater; determining a first rate of a first gas heating for the restricted water flow; adjusting the gas heating to the restricted water flow; repeating the previous steps until a heated water has a temperature above a temperature threshold; removing the restriction to the water flow to increase the water flow; and determining a second rate of a second gas heating for the increased water flow. The present invention also provides a gas water heater which utilises such a method.
Tankless water heater system
A tankless water heater system (100), with a heat exchanger device (20) comprising at least one hollow chamber (21, 22, 23, 24) and at least one electrical heating element (52, 53, 54), and a controller device (30) with a temperature control unit (35), a tap event counter unit (32), a down-time counter unit (33) and a time delay unit (34); an electrical switching element (41, 42, 43) for connecting or is connecting one or several heating elements (52, 53, 54) to/from a power supply; an outlet temperature sensor (27) linked with the temperature control unit (35); a flow rate sensor (29); wherein: the tap counter unit (32) is connected to the flow rate sensor (29) and is triggered when water flow rate exceeds a tap indication threshold the down-time counter unit (33) is triggered and retriggered by the tap counter unit (32) and both provide a down-time event signal after any inactivity period with no water flow and records the duration of inactivity; the time delay unit (34) is connected to and triggered by the tap counter unit (32) starting a delay period which duration is switched from a short default delay period to a long delay period by the down-time signal provided by the down-time counter unit (33); and the switching elements (41, 42, 53) are triggered by the time delay unit (34) only after the delay period has elapsed.
Systems and methods for flame monitoring in gas powered appliances
A gas powered water heater includes a storage tank, a main burner, a flame sensor assembly, and a controller communicatively coupled to the flame sensor assembly. The flame sensor assembly includes a probe positioned proximate the main burner to couple an electric current to the main burner through a flame on the main burner and not to couple an electric current to the main burner when the flame is not present on the main burner, and a detector that provides signals representative of the electric current provided through the probe. The controller is programmed to determine a length of time taken for a transition between a signal representative of no electric current and a signal representative of a steady state electric current, and determine, based at least in part on the determined length of time, a strength of the flame on the main burner.