Mining method
09739146 · 2017-08-22
Inventors
Cpc classification
E21C41/16
FIXED CONSTRUCTIONS
International classification
Abstract
The present invention provides a mining method. The method includes: dividing a mining region into a plurality of federated mining regions; performing an open-pit mining operation in each of the federated mining regions and forming a pit in each of the federated mining regions; performing an underground mining operation on a slope of the pit and forming a plurality of excavated tunnels; and backfilling a pit of a previous federated mining region with a spoil of a subsequent federated mining region.
Claims
1. A mining method, comprising: dividing a mining region into a plurality of federated mining regions; performing an open-pit mining operation in each of the federated mining regions and forming a pit having a slope in each of the federated mining regions, wherein the slope is formed into a stepped platform having a plurality of multistage platforms; performing an underground mining operation on the plurality of multistage platforms of the slope of the pit and forming a plurality of excavated tunnels; and backfilling a pit of a previous federated mining region with a spoil of a subsequent federated mining region; the backfilling comprising: processing the spoil into a paste; and filling the plurality of excavated tunnels with the paste.
2. The mining method of claim 1, further comprising: backfilling, after completing mining work in a last federated mining region, the last federated mining region with a spoil of a first federated mining region.
3. The mining method of claim 2, further comprising: performing a surface vegetation operation after backfilling the federated mining region is completed.
4. The mining method of claim 1, wherein the paste is filled through a filling pump and/or by gravity.
5. The mining method of claim 4, further comprising: performing a surface vegetation operation after backfilling the federated mining region is completed.
6. The mining method of claim 1, wherein the plurality of excavated tunnels are sequentially or randomly formed.
7. The mining method of claim 6, further comprising: performing a surface vegetation operation after backfilling the federated mining region is completed.
8. The mining method of claim 1, wherein a safety angle of the slope of the pit is equal to or less than approximately 40°.
9. The mining method of claim 8, further comprising: performing a surface vegetation operation after backfilling the federated mining region is completed.
10. The mining method of claim 1, wherein the underground mining operation is performed in an end-slope mining manner.
11. The mining method of claim 10, further comprising: performing a surface vegetation operation after backfilling the federated mining region is completed.
12. The mining method of claim 1, wherein the forming a plurality of excavated tunnels comprises: performing a horizontal mining operation or a vertical mining operation.
13. The mining method of claim 12, further comprising: performing a surface vegetation operation after backfilling the federated mining region is completed.
14. The mining method of claim 1, further comprising: performing a surface vegetation operation after backfilling the federated mining region is completed.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The drawings are provided for a further understanding of the solution proposed by the present application and constitute a part of the specification. The drawings serve to explain the present application together with the specific embodiments of the present application, but not to limit the present application. In the drawings:
(2)
(3)
(4)
(5)
(6)
(7) TABLE-US-00001 Reference numerals 1. Open-pit mining region 2. Mining region of end-slope coal mining machines 3. End-slope coal mining machine 4. Pasty grout 5. Vegetation 6. Surface soil layer 7. Filling station 8. Filler 9. Filling pipe 10. Blocking wall 11. Underground mining sequence number
DETAILED DESCRIPTION
(8) The particular embodiments of the present invention will be described in details hereinafter with reference to the accompanying drawings. It should be appreciated that the particular embodiments described herein serve to only illustrate and explain the present invention, but not to limit the present application.
(9) As shown in
(10) Next, an underground mining operation is performed on the slope of the pit and a plurality of excavated tunnels are formed. According to an embodiment of the present application, the slope of the pit may be formed as a stepped platform. As shown in
(11) Typically, an open-pit mining process is performed prior to an end-slope underground mining process for each federated mining region. However, according to actual mining conditions, the end-slope underground mining process may be performed after the open-pit mining process is completed, and the end-slope underground mining process may be performed concurrently with the open-pit mining process when the open-pit mining process is performed down to a certain depth, i.e. “multi-pit federated mining”.
(12)
(13) After the mining in the first federated mining region is completed, an open pit and tunnels are built in a second federated mining region and similar mining operations are performed therein.
(14) Next, the pit of the first federated mining region is filled with spoil, e.g., rock-soil, waste-residues and the like, generated through the mining work performed in the second federated mining region in order to recover the original landform in time during the mining process.
(15) Then, a third federated mining region undergoes mining in a similar way as mentioned above. The mined region of the second federated mining region is filled with the spoil generated through the mining operation performed in the third federated mining region. And so on, until all of the coal mining operations are completed. After the mining operation performed in the last federated mining region is completed, the last federated mining region is filled with the spoil of the first federated mining region in order to completely recover the original surface appearance. The spoil of the first federated mining region may be stacked at a temporary waste dump to be used as backfill for the last federated mining region. Vegetation, such as trees, may be planted after the pit is filled in order for further afforestation and protection of environment.
(16) According to an embodiment of the present application, the spoil may be further processed into paste, which is used to fill excavated tunnels through a filling pump and/or by gravity. Solid wastes, such as coal gangues, rock-soils and the like, may be, for example, processed into pasty grout on the ground, and then, as shown in
(17) A plurality of excavated tunnels may or may not be formed in sequence in order to ensure enough solidification time for the filler before the filler begins to function. For example, the underground mining may be performed in accordance with the skip mining sequence as shown in
(18) The mining method provided by the present application employs schemes of cyclical mine constructing, simultaneous mining, and alternate backfilling. Besides, the coal mining and paste filling techniques are suitably combined with the excavating technique. Accordingly, a higher rate of mine recovery is achieved while the backfilling is completed, the mining region is afforested and the ecological environment of the mining region is protected. Furthermore, the mining method provided by the present application reduces both the transport distance and the excavated volume and thus reduces the production cost of a mining enterprise.
(19) Therefore, the recovery multi-pit federated mining method provides an effective technical solution to resolve the conflict between resource exploit and environment protection and provides an example for the country to construct environment-friendly mining regions. This is of strategic importance to the promotion of resource exploit in ecologically fragile areas of the nation, as well as the development of environment protection techniques.
(20) Although the preferred embodiments of the present invention have been described above in details with reference to the drawings, the present application is not limited to the particular details of the above embodiments. A variety of simple variations may be made to the technical solutions of the present invention within the technical concept of the present application, and all of these simple variations fall into the scope of the present invention.