Multi-layered wellbore completion for methane hydrate production
09725990 · 2017-08-08
Assignee
Inventors
Cpc classification
International classification
Abstract
In a completion for producing methane the bottom hole assembly has a base pipe with porous media surrounding it for equalizing flow along the base pipe. A shape memory polymer foam surrounds the porous media. The borehole can be reamed to reduce produced methane velocities. Surrounding the shape memory polymer is an exterior layer of consolidated proppant or sand that can self-adhere and/or stick to the polymer foam. The proppant or sand can be circulated or squeezed into position although, circulation is preferred. The borehole may enlarge due to shifting sands in an unconsolidated formation as the methane is produced. The bottom hole assembly helps in fluid flow equalization and protects the foam and layers below from high fluid velocities during production.
Claims
1. A method of creating an artificial reservoir to allow for production of methane from an unconsolidated wellbore formation surrounding an open hole borehole comprising methane hydrate, sand or other sediments, said method comprising: delivering a consolidated artificial barrier to the open hole borehole near the unconsolidated wellbore formation using a bottom hole assembly; wherein the artificial barrier is adapted to reduce erosion of the surrounding formation by equalizing through the use of depressurization devices the disassociation of methane hydrate across an interval of the bottom hole assembly while not stressing the surrounding formation; using a shape memory porous member whose dimension increases radially in the open hole borehole and at least one of a porous media and consolidated proppant in said artificial barrier; and enlarging the artificial barrier to leave an annular gap to the open hole that remains during subsequent methane production; producing methane.
2. The method of claim 1, comprising: said artificial barrier has multiple layers at least one of which are delivered with or after the delivery of said bottom hole assembly.
3. The method of claim 1, comprising: using a prepack screen in said artificial barrier.
4. The method of claim 1, comprising: allowing said shape memory porous member to enlarge while leaving room in the borehole for delivery of consolidated proppant.
5. The method of claim 1, comprising: reaming the borehole before or during delivery of said bottom hole assembly.
6. The method of claim 1, comprising: using said consolidated proppant to protect other layers of said artificial barrier from erosion from velocity effects of producing methane.
7. The method of claim 1, comprising: balancing flow through a plurality of base pipe openings in said bottom hole assembly.
8. The method of claim 1, comprising: adhering said consolidated proppant to itself or to said shape memory porous member.
9. The method of claim 1, comprising: putting a wire screen, prepack screen or bead pack under said shape memory porous member and covering said shape memory porous member with said consolidated proppant.
10. The method of claim 1, comprising: maintaining the size of said artificial barrier despite hole enlargement caused by production of methane.
11. The method of claim 1, comprising: using foam for said porous shape memory barrier.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
(5) In broad terms the preferred embodiment can be described as a filtration assembly and method of producing methane from methane hydrate in an unconsolidated formation containing sand and other sediments. The filtration assembly comprises a bottom hole assembly comprising a sand control assembly and a base pipe. The sand control assembly comprises a shape memory porous material, which is adapted to surround the base pipe and form a first discrete filtration layer. In one embodiment, to assist in filtering sand and other sediments from the methane a second discrete filtration layer is placed over the first discrete filtration layer comprising consolidated proppant, gravel or sand, or any combination thereof, that can adhere either to each other, the first discrete filtration layer, or both, and remain adhered should reservoir conditions change. The second discrete filtration layer may be circulated or squeezed into position after the bottom hole assembly has been positioned near the formation, or run in as part of the bottom hole assembly, although circulation is preferred. In an alternative embodiment, the third discrete filtration layer is located under the first discrete filtration layer and comprises one or more filtration assurance devices adapted to support the first discrete filtration layer, assist in filtering sediment from the methane, or aid in depressurization of the formation, or any combination thereof, such as wire mesh, prepack screen or beadpack.
(6) In a preferred embodiment, the shape memory porous material is an open-cell shape memory foam, such as the foam described in the list of memory foam patents and patent applications referenced above, and the memory foam marketed by Baker Hughes Incorporated under the trademark GEOFORM™. The memory foam is adapted to help manage sand production by inhibiting the formation of a flow path through the filtration layer in which sand may be produced and by providing borehole stability without having to depend on containment by the surrounding borehole.
(7) To dissociate methane from methane hydrate, a depressurization method is employed by applying a differential pressure across the reservoir interface between the bottom hole assembly and the formation, using, for example, an electric submersible pump. As the methane dissociates from methane hydrate it passes through the filtration assembly, which filters sand and other sediments from the methane and allows the methane to enter the base pipe. In one embodiment, the base pipe comprises a depressurization device designed to help equalize flow along at least one interval of the base pipe and protect the filtration layers from high fluid velocities during production. As previously mentioned, however, the third discrete filtration layer when located under the first discrete filtration layer may also serve as a means of assisting in the depressurization of the formation. The borehole may also be reamed to reduce methane production velocities.
(8) When the borehole subsequently enlarges or the space between the formation and the bottom hole assembly increases due to changing reservoir conditions (e.g., shifting of sands or other sediments in an unconsolidated formation as the methane is produced) the geometric configuration of the bottom hole assembly will not substantially change.
(9) Referring to
(10) In one embodiment, the base pipe comprises a depressurization device for balancing flow along at least one interval of the base pipe, or a selectively or automatically adjustable inflow control member (e.g., an adjustable valve or tubular housing having one or more inflow passages, preferably with a tortuous pathway). See for example, U.S. Pat. Pub. No. 2013/0180724 and flow control products marketed by Baker Hughes Incorporated (United States of America) under the trademark EQUALIZER™.
(11) In
(12) The combination of flow balancing with the self-adhering proppant or sand 9 covering the memory polymer foam 3 and to some extent adhering to the foam allows for a longer service life as the layers of filtration remain serviceable longer in adverse conditions such as borehole collapse and potential for erosion caused at least in part by flow imbalance induced high gas velocities.
(13) The proppant/sand 9 can be a commercially available product such as Sandtrol®. The foam is available as GeoFORM®. Alternatives can be alloy memory foam or screens of various designs that do not change dimension with thermal stimulus. The screens can be constructed so that they can be radially expanded for borehole support or to reduce the volume needed for the proppant/sand 9. The flow balancing feature can be a porous annular shape or insert plugs in the base pipe or screen materials that vary in mesh size at different opening locations.
(14) The above description is illustrative of the preferred embodiment and many modifications may be made by those skilled in the art without departing from the invention whose scope is to be determined from the literal and equivalent scope of the claims below: