WIND TRACING, ROTATIONAL, SEMI-SUBMERGED RAFT FOR WIND POWER GENERATION AND A CONSTRUCTION METHOD THEREOF
20170218919 · 2017-08-03
Inventors
Cpc classification
F05B2240/97
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B63B35/44
PERFORMING OPERATIONS; TRANSPORTING
B63B2035/446
PERFORMING OPERATIONS; TRANSPORTING
B63B2021/203
PERFORMING OPERATIONS; TRANSPORTING
F05B2270/20
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02E10/72
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
B63B1/125
PERFORMING OPERATIONS; TRANSPORTING
F03D13/25
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05B2240/95
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B63B1/107
PERFORMING OPERATIONS; TRANSPORTING
F03D7/0204
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05B2240/93
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B63B21/50
PERFORMING OPERATIONS; TRANSPORTING
F03D9/25
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02E10/727
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
F03D7/02
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F03D13/25
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B63B1/12
PERFORMING OPERATIONS; TRANSPORTING
B63B35/44
PERFORMING OPERATIONS; TRANSPORTING
F03D9/25
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
Disclosed are a semi-submersible raft wind power generation unit and a construction method therefor. The raft wind power generation unit includes at least three floaters (12) and at least three wind turbines (21) configured to be placed on the floaters (12). The raft is configured to turn about a vertical axis and be fixed to a seabed (2) by a mooring line (36). A force resultant from an incoming wind load passes closely around the center of geometry of the raft, which is a distance away from the center of rotation of the raft so that a yaw moment about the center of rotation is created that rotates the raft until the force resultant passes through the center of geometry and center of rotation
Claims
1. A semi-submergible raft wind power generation unit, comprising: at least three floaters, at least three wind turbines configured for placement on the floaters, wherein the raft wind power generation unit is adapted to turn about a vertical rotational axis and be fixed to a seabed by a mooring line, and a force resultant from a wind load on the raft wind power generation unit passes closely around the center of geometry thereof, which is a distance away from the center of rotation thereof so that a yaw moment about the center of rotation is created that rotates the raft wind power generation unit until the force resultant passes through the center of geometry and center of rotation.
2. The raft wind power generation unit of claim 1, wherein rotors of the wind turbines are in a perpendicular direction to the incoming wind when the force resultant from the wind load passes the center of rotation and center of geometry.
3. The raft wind power generation unit of claim 1, wherein the center of rotation is in front of the center of geometry as the raft wind power generation unit faces into the incoming wind.
4. The raft wind power generation unit of claim 1, wherein the at least three floaters are configured in a triangular shape of an equilateral triangle, the at least three floaters located at vertices of the triangle with turbines on two of the three floaters facing into wind and being at a windward side in an operational state.
5. The raft wind power generation unit of claim 1, wherein the at least three floaters are located at vertices of the triangle and are connected by a plurality of beams that meet at the center of geometry of the triangle, with turbines on two of the three floaters facing into the wind being at a windward side in an operational state, and the raft wind power generation unit further comprises a stabilizing cable connecting the floaters to enhance the strength of the raft.
6. The raft wind power generation unit of claim 1, wherein the at least three floaters are located at vertices of a triangle and are connected by a plurality of beams in a T framework, one beam connects two floaters that are at a windward side and the other beam connects the third floater in a leeward vertex to the midpoint of the first beam, the windward turbines of the two floaters facing into the wind in an operational state, and the raft wind power generation unit further comprises a stabilizing cable connecting the windward and leeward floaters to enhance the strength of the raft.
7. The raft wind power generation unit of claim 1, wherein the raft wind power generation unit includes nine floaters in a shape of a trapezoid in two rows, a windward row includes three floaters whereas a leeward row includes five floaters with a plurality of beams connecting each floater in a triangle pattern, and a wind turbine is located at alternate floaters so that there are two turbines in the windward side and three in the leeward side, and the raft wind power generation unit further comprises a rigid arm extended from the middle floater of the windward row into the incoming wind and connected at its tip to a floater.
8. The raft wind power generation unit of claim 1, further comprising three cable lines, each of which connects to a bottom of the floater and meets at a socket joint that provides sockets for fixing the cables thereto, the cables connected by a mooring line to a seabed anchor so that the raft wind power generation unit is able to rotate about its center of rotation.
9. The raft wind power generation unit of claim 1, further comprising a rudder located at the leeward floater of the triangular layout and at the leeward middle floater of the trapezoidal layout to counter balance ocean currents in the water so as to eliminate current effects on the yaw movement of the raft wind power generation unit.
10. The raft wind power generation unit of claim 8, wherein a connection point is provided for the cables and mooring line so that rotation of the raft wind power generation unit is effected by twisting the mooring line connected between the raft wind power generation unit and the seabed anchor.
11. The raft wind power generation unit of claim 8, wherein a power cable from each of the grouped turbines is coupled to a final power output cable attached to and running down along a corresponding cable line and the mooring line to the seabed, the final power output cable arranged in a form of loosened coils that absorb a degree of twisting about the vertical axis along the mooring line.
12. The raft wind power generation unit of claim 1, further comprising a ship's anchor provided at each floater.
13. The raft wind power generation unit of claim 1, wherein each floater bottom includes an optional downward pointing conic object.
14. The raft wind power generation unit of claim 1, wherein outermost turbines on the raft wind power generation unit are equipped with a yaw rotating mechanism enabling the turbines to turn under instruction, wherein other turbines on the raft wind power generation unit are configured in a fixed direction and aligned to the axis joining the center of geometry and the rotation center, without a yaw rotating mechanism.
15. The raft wind power generation unit of claim 1, wherein a wake shadow created by the front windward turbines will not cast on the leeward turbines.
16. The raft wind power generation unit of claim 1, wherein the raft wind power generation unit is adapted to be pulled down into water by the mooring line to a designed depth.
17. The raft wind power generation unit of claim 8, wherein the seabed anchor is configured as a gravity-type anchor in the seabed.
18. A wind farm adapted to generate electricity by the action of wind in the open sea, comprising a plurality of semi-submergible raft wind power generation units as recited in claim 1.
19. A construction method for fabrication of a semi-submergible raft wind power generation unit, the method comprising: match casting a plurality of beam segments that make up at least three floaters and their associated connection beams, sealing ends of the beam segments and transporting the connection beam and floater segments to an assembly site at a harbor by land or by sea, sinking at least three piles per floater at a location where a floater is to be positioned at the assembly site, the at least three piles serving as guiding piles to confine the location of the floater, temporarily fixing a first bottom floater segment inside a space bounded by the guiding piles, assembling the floater and connection beam segments either on land or in the water, bringing assembled beams to a joint position of the floaters temporarily fixing the assembled beams to the guiding piles, setting up a steel mold and sealing a gap between the steel mold and the floater and beam surfaces, pumping water out of the steel mold, fixing reinforcement in the joint at the floaters, casting concrete in the mold and curing the wet concrete, wherein, once the concrete has reached its design strength, freeing the floater and connection beams that have been temporarily fixed at the guiding piles, loading a next floater segment onto the first bottom segment and connecting them with an epoxy coated joint together with pre-stressed steel bars, repeating the loading and connecting steps until the last floater segment has been connected, installing a wind turbine on the floater, attaching a cable to the bottom end of each floater and bringing free ends of the cables to a meeting point, wherein the meeting point is at the center of a socket joint for the connection of the cables and a mooring line to the floater bottom and a seabed anchor, and the location of the meeting point does not coincide with the center of gravity of the formed raft wind power generation unit but is offset from the center of gravity at a distance into the windward side of the raft wind power generation unit.
20. The method of claim 19, further comprising: excavating a ditch in the seabed to accommodate a caisson, measuring, on site, the actual length of the raft wind power generation unit in conjunction with the pre-sunk depth needed for the mooring line, attaching the mooring line to the caisson, sinking the raft wind power generation unit by taking in water until the caisson is sitting on the leveled seabed of the ditch, filling the caisson with stones or concrete and the ditch with sand and gravel to complete the installation, and pumping water out of the raft wind power generation unit to introduce tension in the mooring line as in the case of a single tension leg structure.
21. The method of claim 19, further comprising driving a plurality of raking piles into the seabed in a ring layout surrounding the seabed anchor, the raking piles protruding above the anchor.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Example embodiments will become more fully understood from the detailed description given herein below and the accompanying drawings, wherein like elements are represented by like reference numerals, which are given by way of illustration only and thus are not limitative of the example embodiments herein.
[0020]
[0021]
[0022]
[0023]
[0024]
[0025]
[0026]
[0027]
[0028]
[0029]
[0030]
[0031]
[0032]
[0033]
[0034]
[0035]
[0036]
[0037]
[0038]
[0039]
DETAILED DESCRIPTION
[0040] As used herein, the term “floater” refers to a floating structure in a body of water on which a wind power turbine may be mounted thereon.
[0041] The example embodiments to be more fully described hereafter are directed to a wind tracing, rotational semi-submerged raft wind power generation unit. The semi-submerged raft wind power generation unit or “raft” includes a plurality of at least three hollow, closed cylindrical columns known as floaters which are deposited in and float in a body of water. These floaters are interconnected by a plurality of underwater beams to form an underwater plane frame with the floater situated in the node of the plane frame, thus forming a semi-submerged raft supporting one or more wind turbines on the selected floaters.
[0042] The small water plane area of the raft with most of the floatation coming from the raft under the water greatly improves the stability of the raft, hence it is very stable. The raft may be safely anchored to a seabed by a single mooring line that enables the raft to turn along with the wind, so that the wind turbines on the raft are full time wind facing without casting their wake shadow on leeward turbines. The adjacent turbines may be placed in a closer manner, say 1.8D to 2.2D where D is the diameter of the rotor.
[0043] By grouping at least three turbines in a raft, an underwater marine power cable carrying the electricity generated by the turbines can be shortened up to 50%. Moreover, with this innovative but mature construction technology, the example semi-submerged rafts are very competitive in deep water zones for wind power generation development. By using pre-stressed concrete, the raft design life may exceed 100 years, as compared with a steel platform which is designed for only 25-30 years. Accordingly, the lifetime costs of the present example embodiments are even less expansive and drastically lower than that attributed to the steel platform. This will enable floating wind farms in far shore deep sea applications to be realized much earlier than expected.
[0044]
[0045]
[0046] Hereafter, the basic configurations of the example wind tracing rotational semi-submerged raft wind power generation units are described in four different types, namely a triangle, star and a tee(T) configuration as one group for three (3) wind turbines, and a trapezoidal configuration of five (5) wind turbines. It should be understood that any person skilled in the art may derive configurations other than these four basic types, and should be aware that the application of the present example embodiments is not limited to those outlined herein.
[0047] Parts List
[0048] 1. Sea surface 2. seabed/seafloor
[0049] 3. Ditch
[0050] 6. Conic object/Conic body
[0051] 10. Wind tracing rotational semi-submerged raft wind power generation unit
[0052] 12. Floater
[0053] 13. Connection beam
[0054] 14. Vertical diagonal strut
[0055] 15. Horizontal diagonal strut
[0056] 16. Raking pile
[0057] 17. Working platform
[0058] 21. Wind turbine
[0059] 22. Tension cable
[0060] 31. Cable line
[0061] 32. Cable line
[0062] 35. Socket joint
[0063] 36. Mooring line
[0064] 37. Seabed gravity anchor
[0065] 39. Rotational axis
[0066] 40. Cable meeting point
[0067] 41. Cable line
[0068] 42. Cable line
[0069] 48. Guiding pile
[0070] 49. Steel formwork
[0071] 50. Center of Geometry
[0072] 51. Insitu concrete
[0073] 52. Rudder
[0074] 53. Working rope for ship's anchor
[0075] 54. Ship's anchor
[0076] 60. Power output cable
[0077] 61. Concrete/stone
[0078] 62. Sand/gravel
[0079] 70. Rigid arm
[0080]
[0081] The tower of the wind turbine 21 is erected from a working platform 17 in each floater 12; the nacelles of the wind turbines 21 are then installed on the tower. In an operational state, two wind turbines 21 are in a front row to face the wind, leaving the third wind turbine 21 in the aft or leeward side. In one example, the triangle may be an equilateral triangle with the sides proportioned so that the wake shadow of the front turbine 21 does not cast on the third turbine 21 behind it. The wake shadow is thus dispersed at a gentle slope. According to this slope, separation between the turbines 21 can be determined. Apart from this, diagonal struts 14 and 15 are used at the corners between the floater 12 and the connection beams 13, to strengthen the corner.
[0082] The size of the connection beams 13 is dependent on the requirement of the stiffness of the connection beams 13 that are needed to limit the rotation of the floater 12 (i.e. the rotation of the wind turbine 21 tower). The rotation of the tower should not be greater than 10°. According to a USA NREL Laboratory report on a simulation analysis of a 5MW offshore wind turbine, the overturning moment at the base is about 250,000 kNM(25000 t-m). If the side of the triangle is 260 m long (i.e. 2.2 times the rotor blade diameter), the variation of the buoyancy in the floater 12 is estimated as 3×25000/260=288 t.
[0083] If the floater 12 is taken as having a 10m diameter, the floater 12 needs to move 3.7 m to generate 288 t in order to balance the wind load. The rigid body rotation is only 0.8°, the elastic rotation is 2°, and hence the combined rotation is 3°. If the two opposite floaters 12 move ±4 m by the wave, rotation thus calculated is 3° per floater 12, or a total is 6° which is still within the limit of 10° maximum. It can be seen that the raft 10 is very stable.
[0084] As shown in
[0085] Two methods for fixing the triangular semi-submerged raft 10 are used for different purposes. In an operational state a one point anchorage may be used. This may be a one-cable tension leg or just a cable without tension. The tension in the mooring line 36 and the cables 31, 32 are achieved by sinking the raft 10 to a pre-determined depth, tightening the mooring line 36 to the seabed anchor 37, and finally raising the raft 10 by pumping out the water ballast. The raft 10 is restrained by the length of the mooring line 36, thus setting up tension forces in the mooring line 36 and cables 31, 32. Horizontal loads on the turbines 21 cause the raft 10 to move sideways, whereby a reaction is induced in the mooring line 36 and the inclined tensioned mooring line 36 will have a horizontal component to counter balance the external horizontal loads. The overturning moment from the horizontal load is balanced by a pair of buoyancy forces generated by the up and down vertical displacements of the floaters 12.
[0086] During an attack of a typhoon, multiple anchor points are used to stabilize the raft 10. As best shown in
[0087] Optionally, to sink the raft 10 to the seabed 2 so that an extraordinary big wave cannot harm the connection beams 13, the bottom of the floater 12 is attached to a landing gear (not shown). Since the self weight of the raft 10 is balanced by the floatation, the sitting force is small and controllable, the landing gear is taken as a downward pointing conic object 6 such that it can penetrate into the seabed 2 to increase its resistance to horizontal forces (refer to
[0088] Further, cables 31, 32 and mooring line 36 are socketed into the socket joint 35. The socket joint 35 is located away from the center of geometry 50 and closer to the bisector side.
[0089]
[0090] Although
[0091] The latter is achieved by installing a rudder 52 in the leeward floater 12 (see
[0092] From the above, it can be seen that the example wind tracing rotational semi-submerged raft 10 does not require external power to turn the turbine 21 into the wind. The turbine 21 is turned by nature, i.e., by the wind. This configuration is thus economical and simple in its maintenance requirements.
[0093] Referring to
[0094]
[0095] As in the case of the triangle configuration, the layouts of the front turbines 21 also cause no wake effect on the leeward turbine 21. Also as in the case of the triangle configuration, cables 31 and 32 are each connected at one end to the bottom of the floater 12 and the other end is socketed into the socket joint 35, offset from the C.G. 50 at a distance to be designed and towards the windward side. The rotor plane of two turbines 21 on the windward side is normal to the wind direction, whereas the third turbine 21 is on the leeward side symmetrically placed between the windward turbines 21, see
[0096]
[0097]
[0098]
[0099] Cables 41 and 42 each have one end attached to the bottom of the floaters 12, with their free ends socketed into the socket joint 35 that is located in an offset position relative to the windward row, at a distance into the windward side that is approximately in the middle of the rigid arm 70. The mooring line 36 connects the socket joint 35 and the seabed gravity anchor 37, allowing turning of the raft 10′″ by twisting in the mooring line 36. As with the triangular configuration of
[0100]
[0101] A prior survey of the seabed 2 should be carried out, and the area cleared if necessary for landing. After the passing of the storm, the raft 10 is raised by pumping out the water and continues with power production. In a case where multiple ship's anchors 54 are employed to stabilize the raft 10 during the storm, the ship's anchors 54 are retracted and the raft 10 is turned by the natural wind in order to face the wind.
[0102] The distance between two adjacent turbines 21 is taken as 1.8D to 2.2D, where D is the diameter of the rotor. For a 5 MW turbine where the rotor is 120 m, the distance will be in a range of about 216 m to 240 m. The distance between rows of floaters 12 is taken as 1.0D or the height of the tower, whichever is greater. The trapezoidal configuration shown in
[0103] Referring now to
[0104] In the above example, all power output cables from the individual turbines 21 of the raft 10′″ are grouped into one final power output cable 60. For the triangular, star and T-shapes rafts (10, 10′, 10″), the power output cable 60 comes out of the raft 10, 10′ and 10″ along one of the structural cables 31 or 32 and along the mooring line 36 to the seabed gravity anchor 37. In the case of the trapezoidal-shaped raft 10′″, the power output cable 60 comes out from the raft 10′″ and along one of the structural cables 41 and the mooring line 36 to the seabed gravity anchor 37. After that, the power output cable 60 runs over the seabed 2 to the shore or near shore substations.
[0105] A substantially extra long length of the power output cable 60 (in the form of loosened coils) is reserved for harmless twisting of the power output cable 60 when the raft 10′″ is turned around the vertical rotational axis 39. The raft 10′″ can also be designed with an active turning capability. The on-board computer of the raft 10′″ may record the circular angle that the raft 10′″ has turned, and, if the turn is close to the permissible limit and if the wind is predicted to change its direction to force the raft 10′″ to turn to the permissible limit, the action will be to check with the metrological data if the changing of wind direction lasts for certain period, e.g. days, and the computer will order the raft 10′″ to conduct an active turn.
[0106] The active turn will orientate one of the turbines 21 to catch the wind force and produce a yaw moment to turn the raft 10′″ back 360° so that the twisting of the power output cable 60 is released in preparation of the coming change of wind direction. During the storm period, a ship's anchor 54 that is installed in each floater 12 will be dropped into the seabed 2 so as to realize a multiple anchor system to prevent raft 10′″ from turning in the storm. In this respect, the power output cable 60 is protected from a damaging twisting action. Furthermore, the ship's anchor 54 is held by two working ropes 53, one being stronger and longer to serve a reserve role in case the other working rope 53 fails.
[0107]
[0108] As to the number of wind turbines 21 in the aforementioned example embodiments, the wind tracing rotational semi-submerged raft wind power generation unit theoretically has no restrictions. The only potential limitation is how large a floating structure that the technology can handle safely in the open sea.
[0109] The exemplary raft 10 structure may be composed of pre-stressed concrete hollow connection beams 13 and floaters 12; otherwise if using steel, heavy ballast is used in order to reach the semi-submerged state. The construction method is similar to that of a bridge using a segmental construction method. In general, a harbor with adequate water depth to receive the semi-submerged raft 10 is selected. Using the aforementioned assembly method, the raft 10 is assembled in the harbor with the help of temporary guiding piles 48. The completed raft 10 typically will have the turbines 21 installed before it is towed to the site.
[0110] At the wind farm site, a number of the rafts 10 are installed as shown in
[0111] The seabed gravity anchor 37 is designed to ensure that it is not displaced substantially during the storm period. One of the possible methods as shown in
[0112]
[0113] Of note, the following method of fabrication is not limited to performing the steps in any specific order; the skilled artisan in the industry may derive any suitable organization of steps using known technologies. The example method of fabrication as described in
[0114] 1. match casting of segments for the floaters 12 and the connection beams 13 in the factory or casting yard;
[0115] 2. selecting a quiet harbor to assemble the connection beams 13 into several sections, i.e., 50 m sections, on land using traditional bridge construction methods;
[0116] 3. sealing the two ends of each section of the connection beams 13, transporting the beam sections to sea, and using known technologies to assemble the sections into the connection beams 13. A short length (e.g., about 1.5-2.0 m) of each connection beam 13 at its two ends joining the floaters 12 is left uncast with reinforcement protruding out for future connection to the floaters 12;
[0117] 4. driving at least three guiding piles 48 into the seabed 2 at the location where the floaters 12 are to be deployed. The piles 48 should extend above the sea level 1 a certain distance and the upper parts of the guiding piles 48 can then be dismantled;
[0118] 5. as shown in
[0119] 6. next, floating in the connection beam 13, aiming it at the first floater segment 12A, and temporarily fixing it to the piles 48. The connection beam 13 should be made shorter, e.g., 2 m shorter on each end for insitu concrete casting;
[0120] 7. erecting the formwork 49, the top of which should be above water, between the first floater segment 12A and the connection beam 13, and sealing a gap therebetween to make the formwork 49 water tight;
[0121] 8. pumping out the water in the formwork 49 and fixing steel reinforcement between the first floater segment 12A and the connection beam 13, cast concrete 51 and install pre-stressing (if needed);
[0122] 9. when all first floater segments 12A are connected by connection beams 13, free the first floater segments 12A and connection beams 13 from the guiding piles 48; the remaining or subsequent floater segments 12B, 12C, 12D are added and fixed on top of each one to complete the floater construction, see substeps (C)(2) to (C)(4) of
[0123] 10. installing turbines 21 after the completion of the raft 10 and at the same time, installing the cable lines 31, 32 at each completed floater 12;
[0124] 11. freeing the raft 10 from the guiding piles 48, and floating out the raft 10 for transportation to the site for installation;
[0125] 12. at the site of installation, preparing the foundation. The foundation could be a piled foundation, but a caisson foundation is more convenient and this requires the excavation of a large ditch in the seabed 2 to accommodate the caisson. Alternatively, employing a caisson inside a ring of raking piles 16 is another option;
[0126] 13. measuring, on site, the actual length of the mooring line 36 needed in conjunction with the pre-sunk depth (if any) and the caisson size. Attaching the anchor mooring line 36 to the caisson (empty), and sinking the raft 10 by taking in water until the caisson is sitting on the leveled seabed 2 of the ditch 3;
[0127] 14. filling the caisson with stones or concrete 61 and the ditch 3 with sand and gravel 62 to complete the installation. Pump out water (if needed) in the raft 10 to introduce tension in the anchor mooring line 36 as in the case of a single tension leg structure; and
[0128] 15. connecting the power output cable 60 so as to begin generating electricity.
[0129]
[0130] Therefore, in the example wind tracing rotational semi-submerged raft wind power generation units heretofore described, because of the semi-submerged raft 10, several wind turbines 21 may be grouped to form an integral floating wind power generation unit. Since the raft 10 can be turned into the wind full time, spacing between wind turbines 21 can be reduced, hence the construction of the raft 10 using pre-stressed concrete is feasible.
[0131] Using a concrete raft 10 as an example, the estimated installed rate is at par of the upper limit of land-based wind farms. Conventional fixed bottom, near shore, wind farms costs 1.5-2.0 times those of land-based ones to install complete. There is no example for the deep sea wind farm, but it should cost much more than it's near shore counterparts. From this, it is obvious that huge economic benefits may be attainable by employment of the example embodiments. The far shore option is open and can be deployed with a large number of floating wind farms.
[0132] The example embodiments are particularly suitable to the energy requirement of future ocean cities. The far shore wind speed is steady and strong and the number of utilization hours is high, thus power generation is also high and steady. The pre-stressed concrete structure can last more than 100 years, much more than the floating steel platform which has a design life of 25˜30 years. If using whole life costing as a bench mark, the same concrete structure can support four generations of wind turbines. The spread construction cost is even less. Accordingly, the example embodiments can aid realization of a far shore wind farm at a much fast pace. The zero emissions, the low cost, high efficiency, and environmental friendliness are some of the highlights of the example embodiments of the present invention.
[0133] The example embodiments being thus described, it will be obvious that the same may be varied in many ways. Such variations are not to be regarded as departure from the example embodiments, and all such modifications as would be obvious to one skilled in the art are intended to be included within the following claims.