Railroad electric power management system
09809236 · 2017-11-07
Assignee
Inventors
Cpc classification
B61L27/04
PERFORMING OPERATIONS; TRANSPORTING
B61C3/00
PERFORMING OPERATIONS; TRANSPORTING
B61L27/16
PERFORMING OPERATIONS; TRANSPORTING
B60M3/00
PERFORMING OPERATIONS; TRANSPORTING
International classification
B61L27/04
PERFORMING OPERATIONS; TRANSPORTING
B61C3/00
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A railroad electric power management system includes a service management system, a station management system and a control system. The service management system performs service management of railroad vehicles. The station management system performs operation management of a station facility. The control system controls the service management system and the station management system such that a sum of first electric power consumption and second electric power consumption is to be equal to or less than a certain electric-power regulation value. the first electric power consumption is consumed by the railroad vehicles. The second electric power consumption is consumed by the station facility.
Claims
1. A railroad electric power management system comprising: a service management system that performs service management of railroad vehicles; a station management system that performs operation management of a station facility; and a control system that controls the service management system and the station management system such that a sum of first electric power consumption and second electric power consumption is to be equal to or less than a certain electric-power regulation value, the first electric power consumption being consumed by the railroad vehicles, the second electric power consumption being consumed by the station facility, wherein the service management system is configured to be able to change the first electric power consumption by switching a plurality of service patterns concerning service of the railroad vehicles, the station management system is configured to be able to change the second electric power consumption by switching a plurality of operation patterns concerning operation of the station facility, the control system is configured to determine the service pattern and the operation pattern with which the sum of the first electric power consumption and the second electric power consumption is equal to or less than the electric-power regulation value, and notify the service management system and the station management system of the determined service pattern and the determined operation pattern, and the control system is configured to select as priority an operation pattern of a least second electric power consumption out of the operation patterns, to select the service patterns in sequence in a state in which the operation pattern of the least second electric power consumption, and compare the electric-power regulation value with the sum corresponding to the selected service pattern and the operation pattern.
2. The railroad electric power management system of claim 1, wherein the control system is configured to select the service patterns in sequence in descending order of the first electric power consumption.
3. The railroad electric power management system of claim 1, wherein the control system is configured to switch the operation pattern to a first pattern when the sum corresponding to the determined service pattern and the determined operation pattern is smaller than the electric-power regulation value by a certain value or more, the first pattern being the operation pattern that is of greater second electric power consumption in a range for which the sum is equal to or less than the electric-power regulation value.
4. The railroad electric power management system of claim 3, wherein the station facility includes a plurality of station facilities, and the control system is configured to switch the operation pattern to a second pattern, the second pattern being the operation pattern that is of greater second electric power consumption in sequence from the station facilities of higher priority out of the station facilities.
Description
BRIEF DESCRIPTION OF DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
DETAILED DESCRIPTION
(8) The following describes an exemplary embodiment based on the accompanying drawings.
(9) In general, according to an embodiment, a railroad electric power management system comprises a service management system, a station management system and a control system. The service management system performs service management of railroad vehicles. The station management system performs operation management of a station facility. The control system controls the service management system and the station management system such that a sum of first electric power consumption and second electric power consumption is to be equal to or less than a certain electric-power regulation value. the first electric power consumption is consumed by the railroad vehicles. The second electric power consumption is consumed by the station facility.
(10) First, with reference to
(11) As illustrated in
(12) The service EMS 10 is configured to perform service management of railroad vehicles 11. Specifically, the service EMS 10 is configured to be able to control electric power consumed by the railroad vehicles 11 (first electric power consumption) by performing the control on a service timetable of the railroad vehicles 11 (such as partial service and shuttle service). The railroad vehicles 11 are configured to perform service based on the electric power (feeding electric power) supplied from a transformation installation 40.
(13) A plurality of station systems 20 are provided to correspond to a plurality of stations (in
(14) The station EMS 22 is configured to perform operation management of the station facilities 21. Specifically, the station EMS 22 is configured to be able to control electric power consumed by the station facilities 21 (second electric power consumption) by performing thinning of lighting included in the station facilities 21 and temperature adjustment of air conditioning. The station facilities 21 are configured to be operated based on the electric power supplied from the transformation installation 40.
(15) In the present embodiment, the railroad EMS 30 is configured to control the service EMS 10 and the station EMS 22 such that the sum of the first electric power consumption consumed by the railroad vehicles 11 and the second electric power consumption consumed by the station facilities 21 will be equal to or less than a certain electric-power regulation value. The electric-power regulation value is a value that is input to the railroad EMS 30 from an electric power company 50 and is the one for controlling the amount of energy consumption of the entire system including the service side and the station side.
(16) In the present embodiment, the service EMS 10 and the station EMS 22 are configured to be able to calculate an estimate value of the first electric power consumption and that of the second electric power consumption, respectively. The railroad EMS 30 is configured to compare the sum of these estimate values of the first electric power consumption and the second electric power consumption with the electric-power regulation value and control the service EMS 10 and the station EMS 22 such that the sum of the estimate values will be equal to or less than the electric-power regulation value.
(17) More specifically, the service EMS 10 is configured to be able to achieve power saving of the first electric power consumption by switching a plurality of service patterns (see
(18) The service pattern P1 is a normal service pattern with no partial service and no shuttle service. The service pattern P2 is a service pattern in which partial service is partially performed on the service pattern P1. The service pattern P3 is a service pattern in which partial service and shuttle service are further performed on the service pattern P2. As illustrated in
(19) Furthermore, as with the above-described service EMS 10, the station EMS 22 is configured to be able to achieve power saving of the second electric power consumption by switching a plurality of operation patterns (see
(20) In the present embodiment, the railroad EMS 30 is configured to determine, out of a plurality of above-described service patterns and operation patterns, the service pattern and the operation patterns with which the sum of the estimate values of the first electric power consumption and the second electric power consumption will foe equal to or less than the electric-power regulation value, and operate the service EMS 10 and the station EMSs 22 with the determined service pattern and operation patterns, respectively.
(21) More specifically, the railroad EMS 30 is configured to first select, in a state in which the operation patterns of the least second electric power consumption (for example, the operation patterns P13 and P23 in
(22) When a plurality of service patterns are selected in sequence in descending order of the first electric power consumption as in the foregoing, there may be a case in which the first electric power consumption corresponding to the selected service pattern is smaller than an electric power value necessary to provide minimum service. Thus, in the present embodiment, the railroad EMS 30 is configured to determine whether the first electric power consumption is equal to or greater than the electric power value necessary to provide the minimum service when the service patterns are selected in sequence and, in the case the first electric power consumption becomes smaller than the electric power value necessary to provide the minimum service, notify the electric power company 50 that it is difficult to accept the electric-power regulation value. Consequently, in the present embodiment, for an example, it can be changed to a higher rate plan, and thus it is possible to provide the railroad electric power management system 100 dealing with a demand response that does not impair the stability of a power network and the convenience of users of the railroad vehicles 11 and the station facilities 21. The electric power value necessary to provide the minimum service may be the one that a company inputs as appropriate and may be the one like a threshold defined in advance.
(23) Furthermore, in the present embodiment, the railroad EMS 30 is configured to switch the operation pattern to the one that is of greater second electric power consumption in a range for which the sum of the estimate values is equal to or less than the electric-power regulation value when the sum of the estimate values corresponding to the service patterns and operation patterns that have been determined as in the foregoing is smaller than the electric-power regulation value by a certain value or more. That is, the railroad EMS 30 is configured to compare the electric-power regulation value with the estimate value of the electric power consumption of the entire system corresponding to the determined service patterns and operation patterns (the sum of the estimate value of the first electric power consumption on the service side and the estimate value of the second electric power consumption on the station side) after having determined the service patterns and operation patterns and determine whether a margin value is present with respect to the electric-power regulation value. The railroad EMS 30 is configured to switch (alleviate) the operation pattern to the one that is of greater electric power consumption (the second electric power consumption) when it is determined that the margin value with respect to the electric-power regulation value is present. At this time, the railroad EMS 30 is configured to alleviate the operation patterns in sequence from the station facilities 21 of higher priority (for example, the station facilities in a station with many users) out of a plurality of station facilities 21.
(24) With reference to
(25)
(26) Meanwhile,
(27) Furthermore, at the time zone of 10:00 to 11:00, the operation pattern of the A station, which is of the first priority, is alleviated to P11 from P13, whereby the margin value “1” that was present in
(28) Next, with reference to
(29) In this sequence of processing, as illustrated in
(30) Next, at Step S2, the processing of acquiring, from the service EMS 10, the electric-power consumption estimate values (the estimate values of the first electric power consumption) corresponding to all of a plurality of service patterns defined in advance in the service EMS 10 is performed, and the sequence is advanced to Step S3.
(31) Next, at Step S3, the processing of acquiring, from all of a plurality of station EMSs 22, the electric-power consumption estimate values (the estimate values of the second electric power consumption) corresponding to all of a plurality of operation patterns defined in advance in the station EMSs 22 is performed, and the sequence is advanced to Step S4.
(32) Next, at Step S4, the processing of selecting, out of the above-described operation patterns defined in advance, the operation pattern of the least electric power consumption (the second electric power consumption) (the operation pattern P13 of the A station, the operation pattern P23 of the B station, and the operation pattern P33 of the C station in the examples illustrated in
(33) Next, at Step S5, the processing of selecting, out of the above-described service patterns defined in advance, the service pattern of the most electric power consumption (the first electric power consumption) (the service pattern P1 in the example illustrated in
(34) Next, at Step S6, the processing of determining whether the estimate value of the entire system calculated at the above-described Step S5 (or Step S10, which will be described later) is equal to or less than the electric-power regulation value input at the above-described Step S1 is performed.
(35) At the above-described Step S6, when it is determined that the estimate value of the electric power consumption of the entire system is equal to or less than the electric-power regulation value, the sequence is advanced to Step S7. At Step S7, the processing of determining whether a margin value with respect to the electric-power regulation value is present (whether the estimate value of the electric power consumption of the entire system is smaller than the electric-power regulation value by a certain value or more) is performed. At this Step S7, when it is determined that a margin value with respect to the electric-power regulation value is present, the sequence is advanced to Step S8. At Step S8, the processing of alleviating the operation patterns of the respective station facilities 21 in order of priority (see
(36) Meanwhile, at the above-described Step S6, when it is determined that the estimate value of the electric power consumption of the entire system is greater than the electric-power regulation value, the sequence is advanced to Step S9. At Step S9, the processing of determining whether it is possible to provide the minimum service even when the service pattern of the railroad vehicles 11 is switched to the one that is of smaller electric power consumption is performed. Specifically, when the present service pattern is switched to the one that is of smaller electric power consumption, performed is the processing of determining whether the electric power consumption corresponding to the service pattern after the switching is equal to or greater than the electric power value necessary to provide the minimum service.
(37) At the above-described Step S9, when it is determined that it is possible to provide the minimum service even when the service pattern is switched, the sequence is advanced to Step S10. At Step S10, the processing of switching the present service pattern to the one that is of smaller electric power consumption, and calculating again the estimate value of the electric power consumption of the entire system (the sum of the estimate value of the first electric power consumption on the service side and the estimate values of the second electric power consumption on the station side) is performed. The service pattern of the switching target may be the service patterns defined in advance in the service EMS 10 (for example, the service pattern P2 in
(38) At the above-described Step S9, when it is determined that it is not possible to provide the minimum service when the service pattern is switched, the sequence is advanced to Step S1. At Step S11, the processing of notifying the electric power company 50 that further power saving than the present situation is not performed, (that it is difficult to accept the electric-power regulation value) is performed, and the processing is finished.
(39) As in the foregoing, in the present embodiment, for an example, the railroad EMS 30 is configured to control the service EMS 10 and the station EMS 22 such that the sum of the first electric power consumption consumed by the railroad vehicles 11 and the second electric power consumption consumed by the station facilities 21 will be equal to or less than a certain electric-power regulation value. Consequently, for an example, unlike the case in which the energy saving on the service side and the energy saving on the station side are manually performed separately from each other, the energy saving on the service side and the energy saving on the station side can be performed by the railroad EMS 30 automatically in a unified manner.
(40) Furthermore, in the present embodiment, for an example, the service EMS 10 and the station EMS 22 are configured to be able to calculate the estimate value of the first electric power consumption and that of the second electric power consumption, respectively, and the railroad EMS 30 is configured to control the service EMS 10 and the station EMS 22 such that the sum of the estimate values of the first electric power consumption and the second electric power consumption will be equal to or less than the electric-power regulation value. Consequently, for an example, based on the estimate values calculated by the service EMS 10 and the station EMS 22, the energy saving on the service side and the station side can be performed quantitatively and accurately.
(41) In the present embodiment, for an example, the service EMS 10 is configured to be able to achieve the power saving of the first electric power consumption by switching a plurality of service patterns (the service patterns P1 to P3 in the example illustrated in
(42) In the present embodiment, for an example, the railroad EMS 30 is configured to select, in a state in which the operation patterns of the least second electric power consumption (the operation pattern P13 of the A station, the operation pattern P23 of the B station, and the operation pattern P33 of the C station in the examples illustrated in
(43) In the present embodiment, for an example, the railroad EMS 30 is configured to select in sequence a plurality of service patterns in descending order of the first electric power consumption. Consequently, for an example, because the service pattern with which the sum of the estimate values of the first electric power consumption and the second electric power consumption will be equal to or less than the electric-power regulation value can be searched in sequence from the service patterns that enable high quality service to be provided (service patterns of greater first electric power consumption), degrading the quality of service due to performing the energy saving can be suppressed.
(44) In the present embodiment, for an example, the railroad EMS 30 is configured to switch (alleviate) the operation pattern to the one that is of a greater second electric power consumption in a range for which the sum of the estimate values is equal to or less than the electric-power regulation value when the sum of the estimate values of the first electric power consumption and the second electric power consumption corresponding to the determined service pattern and operation patterns, respectively, is smaller than the electric-power regulation value by a certain value or more. Consequently, for an example, even when the energy saving on the service side and the station side is performed, the quality of service provided in the station facilities 21 can be improved in the range for which the sum of the estimate values is equal to or less than the electric-power regulation value.
(45) In the present embodiment, for an example, the railroad EMS 30 is configured to switch (alleviate) the operation pattern to the one that is of greater second electric power consumption in sequence from the station facilities 21 of higher priority out of a plurality of station facilities 21. Consequently, for an example, the quality of service provided in the station facilities 21 of high priority can be improved.
(46) While the present embodiment of the invention has been exemplified in the foregoing, the above-described embodiment is a mere example and is not intended to limit the scope of the invention. The foregoing embodiment can be implemented in various forms and various omissions, substitutions, and modifications can be made without departing from the scope of the invention. The foregoing embodiment and modifications thereof are included in the scope and spirit of the invention and are included in the scope of the invention stated in the claims and the scope of equivalents thereof.