Concrete forming tube
09758942 ยท 2017-09-12
Inventors
Cpc classification
E02D15/04
FIXED CONSTRUCTIONS
E02D5/34
FIXED CONSTRUCTIONS
International classification
E02D5/34
FIXED CONSTRUCTIONS
Abstract
A concrete forming tube formed from a thermoplastic material and having a first end, a second end, and a substantially uniform circumference from the first end to the second end.
Claims
1. A method comprising the steps of (a) obtaining at least two identical concrete forming tubes, each having a first longitudinal end, a second longitudinal end, a longitudinal bore, a substantially uniform outer circumference from the first longitudinal end to the second longitudinal end, and an integrally formed slide fit connector at the second longitudinal end, (b) serially connecting the at least two identical tubes by sliding the slide fit connector on one of the concrete forming tubes onto the first end of another concrete forming tube, and (c) pouring concrete into the connected concrete forming tubes with the slide fit connectors on each concrete forming tube vertically lower than the first longitudinal end of the same concrete forming tube.
2. The method of claim 1 further comprising the steps of (i) excavating earth to form a hole, (ii) inserting at least a portion of the connected forming tubes into the hole prior to pouring the concrete, and (iii) backfilling the hole.
3. The method of claim 2 wherein the earth is excavated below a frost line, and the method further comprises the step of inserting the connected forming tubes into the hole with at least a portion of at least one forming tube below the frost line.
4. The method of claim 1 wherein the concrete forming tubes have a smooth interior surface and a textured exterior surface.
5. The method of claim 1 wherein the concrete forming tubes are embedded with light reflective material.
6. A method comprising the steps of: (a) obtaining a concrete forming tube having (i) an open ended first longitudinal end, (ii) an open ended second longitudinal end opposite the first longitudinal end, (iii) a longitudinally extending bore, (vi) an integrally formed slide fit connector at the first longitudinal end of the tube adapted for slide fit connection onto a second longitudinal end of another identical concrete forming tube, and (v) an absence of any slide fit connector at the second longitudinal end, (b) orienting the concrete forming tube with the longitudinal bore extending in a vertical direction and the slide fit connector located vertically lower than the second longitudinal end of the concrete forming tube, and (c) pouring concrete into the oriented concrete forming tube.
7. The method of claim 6 further comprising the steps of (i) excavating earth to form a hole, (ii) inserting at least a portion of the concrete forming tube into the hole prior to pouring the concrete, and (iii) backfilling the hole.
8. The method of claim 7 wherein the earth is excavated below a frost line, and the method further comprises the step of inserting the concrete forming tube into the hole with at least a portion of the concrete forming tube below the frost line.
9. The method of claim 6 wherein the concrete forming tube has a smooth interior surface and a textured exterior surface.
10. The method of claim 6 wherein the concrete forming tube is embedded with light reflective material.
11. An inground deployed concrete forming tube, comprising (a) a concrete forming tube having an open ended first longitudinal end, an open ended second longitudinal end opposite the first longitudinal end, and a longitudinally extending bore, and (b) concrete filling the longitudinally extending bore, wherein (i) the concrete forming tube has an integrally formed slide fit connector at the first longitudinal end of the tube and no slide fit connector at the second longitudinal end, (ii) the slide fit connector, before deployment, is adapted for slide fit connection onto the second longitudinal end of another identical concrete forming tube, and (iii) the deployed concrete forming tube is deployed with the longitudinal bore extending in a vertical direction with the first longitudinal end of the concrete forming tube vertically lower that the second longitudinal end and the slide fit connector located below grade.
12. The deployed concrete forming tube of claim 11 wherein the concrete forming tube has a substantially uniform outer circumference.
13. The deployed concrete forming tube of claim 12 wherein the concrete forming tube has a smooth interior surface.
14. The deployed concrete forming tube of claim 12 wherein the concrete forming tube is unitary and rigid.
15. The deployed concrete forming tube of claim 12 further comprising an end cap over the second longitudinal end of the concrete forming tube.
16. The deployed concrete forming tube of claim 15 wherein the end cap has a central opening.
17. The deployed concrete forming tube of claim 11 further comprising a helical scoring line along the longitudinal length of the concrete forming tube.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
DETAILED DESCRIPTION OF THE INVENTION INCLUDING A BEST MODE
(6) Nomenclature
(7) 10 Forming tube 11a First end 11b Second end 12 Scoring lines 13 Interior surface 14 Exterior Surface 15 Longitudinal Length 16a Outer circumference 16b Inner circumference 17 End cap 17a Opening 20 Connector 100 Earth 200 Light pole
Construction
(8) The concrete forming tube 10 may be used to form pillars, posts, supports, piers, columns, shafts, pilings, or pier footings that serve as a foundation or prop for a structure or item such as outdoor sign posts, light poles, lamps posts, fence posts, pilings for decks and homes, play structures, gardens, and mailboxes. Deck pilings are one of the most common uses of supports in the residential industry. Therefore, the remainder of the discussion will be based upon a concrete forming tube 10 used to form deck pilings.
(9) As shown in
(10) As shown in
(11) The forming tube 10 may be manufactured using any suitable method for the material chosen. Preferably the forming tube 10 is manufactured so as to provide a smooth interior surface 13 allowing the cured concrete to slide along the longitudinal length 15 of the forming tube 10. A smooth interior surface 13 may also provide a smooth exterior surface of the finished pier when the tube 10 is removed. The exterior surface 14 of the forming tube 10 may be smooth or textured. Preferably the exterior surface 14 is substantially smooth to allow the earth 100 surrounding a tube 10 to not adhere to the tube 10 to help prevent frost heaving. As shown in
(12) The forming tube 10 thickness (not numbered), between the interior surface 13 and the exterior surface 14, may be any suitable thickness sufficient to hold the full hydrostatic pressure of the concrete poured into the forming tube 10. The preferred forming tube 10 thickness is between about one-eighth inch and three inches. The most preferred forming tube 10 thickness is about one-eighth inch.
(13) As shown in
(14) The forming tubes 10 may be connected using any suitable known means of connecting pieces of thermoplastic material. The preferred method of connection is a slide fit connector 20. The most preferred method of connection is an integrally formed slide fit connector 20 at the second end 11b of the forming tube 10.
(15) The forming tube 10 may also have an end cap 17. The end cap 17 may be configured and arranged to fit over the first end 11a of the tube 10. Preferably the end cap 17 is integrally formed with the tube 10 over the first end 11a of the tube 10. The cap 17 may be used to prevent water and debris from entering the tube 10 prior to filling the tube 10 with concrete. The end cap 17 may also have an opening 17a through the end cap 17 to allow a light pole 200 to be mounted on the finished pier (not numbered). The end cap 17 may be any shape that allows the end cap 17 to fit over the first end 11a of the tube 10. Preferably the end cap 17 is a spherical sector.
(16) Use
(17) One method of use of the forming tube 10 may be to form pilings or pier footings for decks in a desired location. The forming tube 10 may be placed in the location desired for a piling (not shown). The piling may be above grade or below grade. Most pilings are at least partially below grade to provide added support for the piling.
(18) A hole (not numbered) may be excavated for at least a portion of the forming tube 10 to be inserted below grade. The hole may be just large enough to allow the forming tube 10 to be inserted. The hole may be larger to allow the insertion of a footing for the piling or even larger. If the longitudinal length of the piling is less than the longitudinal length 15 of the forming tube 10, the forming tube 10 may be cut to the desired length. If the longitudinal length of the piling is more than the longitudinal length 15 of a single forming tube 10, multiple forming tubes 10 may be connected to provide the desired longitudinal length of piling. As shown in
(19) Once the forming tube 10 is placed in the desired location, liquid concrete (not shown) may be poured into the forming tube 10. After the concrete has cured the proper amount of time, the forming tube 10 may be removed from the piling and reused or recycled. A series of scoring lines 12 evenly spaced along the longitudinal length 15 of the forming tube 10 may aid in removal of the forming tube 10 after the piling is poured.
(20) The forming tube 10 may also be left on the piling indefinitely. If the forming tube 10 is placed in the earth 100 so that at least a portion of the longitudinal length 15 is below grade, the forming tube 10 may provide an aid to prevent frost heaving of the piling.
(21) A portion of the longitudinal length 15 of the forming tube 10 may be placed below grade. The liquid concrete is then poured into the forming tube 10. The portion of the longitudinal length 15 of the filled forming tube 10 below grade is surrounded with earth 100 (either as the hole the forming tube 10 was inserted into was just large enough for the forming tube 10 or the hole was back filled with earth 100 after the forming tube 10 was placed in the hole). Over time the filled forming tube 10 and surrounding earth 100 may be subject to the effects of water (not shown) freezing within the earth 100. As the water in the earth 100 around the forming tube 10 freezes it exerts a gripping force on the portion of the longitudinal length 15 of the filled forming tube 10 that is above the frost line. The smooth interior surface 13 of the forming tube 10 may allow the forming tube 10 to move upward without moving the portion of the piling inside the forming tube 10. The frozen earth 100 may also slide up the longitudinal length 15 of the exterior surface 14 of the forming tube 10 without moving the pillar or the forming tube 10. Thus the forming tube 10 may reduce the effects of friction frost heaving on the piling. A portion of the longitudinal length 15 of the forming tube 10 may also be placed below the frost line to further help reduce the effects of frost heaving on the piling.
(22) Another method of use of the forming tube 10 may be to form a permanent bollard. The forming tube 10 may be partially below grade to provide added strength to the bollard. A hole may be excavated for insertion of the forming tube 10. The forming tube 10 may then be inserted into the hole. Concrete may then be poured into the tube 10. After the concrete has cured the tube 10 may be removed to provide a smooth bollard. The tube 10 may also be left in place around the finished bollard. An end cap 17 may be inserted over the first end 11a of the forming tube 10 to provide a finished look to the bollard. The forming the tube 10 may be manufactured with thermoplastic material having reflective, colored, or UV inhibitor properties to improve the look or maintainability of the bollard. For example, the bollard may have a forming tube 10 that is colored yellow and incorporates reflective material that provides a clear reflective appearance of the bollard to the headlights of oncoming vehicles.
(23) As shown in