Method of Maintaining Constant and Elevated Flowline Temperature of Well
20210396096 · 2021-12-23
Inventors
Cpc classification
International classification
Abstract
Methods concerning the thermal insulation of oil and gas wells are disclosed herein. In some embodiments a thermal insulating fluid is inserted into the well completion sequence for thermally insulating a well at a desired depth to reduce paraffin and precipitate formation, improve oil flow rate, and reduce pressure build up in one or more annuli of the well. In other embodiments, the casing of a desired annulus in a completed well is perforated to permit a thermally insulating fluid to be pumped into the annulus and spotted at a desired depth.
Claims
1. A method for insulating a well annulus during cementing, comprising: forming a thermally insulating fluid having a hydrocarbon base fluid, and a thermally dependent viscosifying gel; and pumping the fluid down a string to a desired depth.
2. The method of claim 1 wherein the desired depth is equal to a depth of a surface casing shoe of the well.
3. The method of claim 1 wherein the well annulus is a production annulus.
4. The method of claim 1 wherein the well annulus is an intermediate annulus.
5. The method of claim 1 wherein the thermally insulating fluid has a viscosity at or about the viscosity of diesel when at an operating temperature of above 130 degrees Fahrenheit.
6. The method of claim 1 wherein the thermally insulating fluid has a thermal conductivity between about 0.007 and 0.30 BTU/(hr*ft*° F.).
7. A method for insulating a completed well having a first annulus and a second annulus disposed within the first annulus and separated from the first annulus by a casing, comprising: identifying a hydrocarbon layer and a cement boundary in the first annulus; perforating the casing proximate to the cement boundary to create a perforation; draining the hydrocarbon layer through the perforation in the casing into the second annulus, and subsequently removing hydrocarbons from the well, thereby leaving a void in the first annulus; injecting a thermal insulating fluid into the void in the first annulus; draining the thermal insulating fluid through the perforation into the second annulus; and cementing the perforation.
8. The method of claim 7, wherein the first annulus is a production annulus.
9. The method of claim 8 wherein the second annulus is an intermediate annulus.
10. The method of claim 7 wherein the thermally insulating fluid has a viscosity at or about the viscosity of diesel when at an operating temperature of above 130 degrees Fahrenheit.
11. The method of claim 7 wherein the thermally insulating fluid has a thermal conductivity between about 0.007 and 0.30 BTU/(hr ft*° F.).
Description
DESCRIPTION OF THE FIGURES
[0018]
[0019]
[0020]
[0021]
[0022]
DESCRIPTION OF THE INVENTION
[0023] Disclosed herein is a method for insulating a well during drilling or completion procedures, and for providing insulating fluid to a previously completed well.
[0024] Well Design
[0025] Constructing a well has several phases. First the well is drilled to a target depth. If it is determined that the well will be used for production, then portions of the well are cemented and completed. Following well completion, oil and gas production may commence.
[0026] To drill the well, a first section is drilled to a first target depth. Casing pipe is lowered into the first section and set into place with a cement mixture or slurry. The slurry is pumped into one or more annuli created by the space between the set casing and the geologic formation. This casing-cementing process is repeated until the target depth is reached. Multi-bore wells have two to five sets of bores concentrically arranged. Each concentrically interior bore has a smaller diameter than the bore concentrically exterior and adjacent to it. The bores are arranged such that the deepest bore has the smallest diameter and is set in the middle, with each successively concentrically exterior bore being wider and shallower. Thus, the diameter of a well formation decreases as the well is drilled deeper.
[0027] The outermost casing of the wellbore 2 is typically known as the surface casing 14 or conductor casing. The innermost casing is the production casing 4. In between the surface casing 14 or conductor casing and the production casing 4 may be one or more intermediate casings 10. Casing is pipe sized to be slightly smaller than the bored hole at a given depth and which is cemented in place. The casing provides structural integrity to a well and prevents collapsing of the hole. Casing also keeps fluids and gases in the well from seeping into the geologic formation, and vice versa.
[0028] Surface casing 14 runs from the surface of the well to some predetermined depth. Surface casing 14 serves as a conduit for drilling mud and permits the drilling mud to return to the surface as other drilling muds or fluids are pumped into the well.
[0029] Intermediate casing 10 may be provided at various radial intervals concentrically interior to the surface casing 14 and bored to a lower depth than the surface casing 14. Intermediate casing 10 provides structural integrity against internal or external pressures in the well and prevents the hole from caving. Intermediate casing 10 may also isolate zones within the well.
[0030] Production casing 4 is the innermost and deepest full string of casing pipe set within the well. It extends the full length of the wellbore 2. Because of this, production casing 4 may also be known as the “long string.” Production casing 4 encases the oil and gas production equipment. The production casing 4 is the conduit from the surface of the well to the formation's final target depth. Placement of the production casing 4, and other production equipment, known as completion operations, signifies that a well is ready for production.
[0031] Tubing refers to moveable strings of pipe located within the bore or interior space of a casing.
[0032] The space between any two adjacent casings defines a casing annulus. Annular spaces are spaces through which fluid flows, for example, between the wellbore and casing or between casing and tubing. Casing assemblies comprising more than one casing string define one or more annular volumes between casing strings. Typically, during drilling operations each annular volume is filled, at least partially, with the fluid present in the wellbore when the casing string is installed.
[0033] Each wellbore annulus is bounded by the cemented or uncemented steel casings and/or tubing strings. Annuli are labeled starting from the inside to outside. The innermost annulus, the A annulus 18, is the annular space inside the production casing 4 and surrounding the production tubing 8 (which passes along, or substantially near and parallel to, the central axis of the well). All other annuli are referred to as outer or exterior annuli and proceed outward from the production tubing to the outermost casing. These annuli are conventionally identified alphabetically as the A annulus 18, B annulus 20, C annulus 22, etc.
[0034]
[0035] Surrounding the A annulus 18 are one or more intermediate annuli.
[0036] Surrounding the B annulus 20 and intermediate casing 10 (or, if more than one intermediate casing is used, all of the intermediate casings or annuli) is the surface annulus 22.
[0037] During the course of drilling, various fluids are introduced. During drilling operations drilling fluid is circulated outside a casing (e.g., between the casing and a geologic formation). Drilling fluid may also be circulated into one or more annuli, preventing the casing from collapsing under pressure and acting as a drilling lubricant. Fluid washes and spacers are pumped ahead, and behind, of cement to segregate drilling fluid from cement and to remove or displace as much other drilling fluid as possible. The front spacer displaces mud and ensures no contamination of cement with mud. The spacer behind the cement displaces the cement into the annular space and ensures that there is no mixing of mud and cement. This process is known as displacement.
[0038] After the wellbore is drilled and casing-cementing operations are finished the well is ready to be completed. Completion refers to the process of transforming a well from drilling efforts to a production unit, including the installation of equipment to allow for production flow. Completion operations may be distinguished from drilling operations by the installation of production casing and production tubing. During well completion the drilling fluid present in the annuli is replaced by lighter completion fluid.
[0039] Typically during well completions, a packer is set between the tubing and the casing just above the production interval. The production interval, or completion interval, is the portion of the production casing that is prepared for production of oil and gas, such as by being perforated to permit the flow of oil into the production annulus. Packers protect the casing from pressure and corrosive fluids, and isolate production intervals and other treating fluids. Packer fluids have been used during completion operations to prevent the conditions created during production operations from threatening overall well integrity. Aqueous or non-aqueous hydrocarbon-based fluids, known as packer fluids, are placed into a casing annulus above a packer, where the packer has been placed to isolate production fluid from the casing annulus. Packer fluids fill the annular space up to the surface. Although the packer fluid may perform satisfactorily, the high cost of the components and high transportation costs associated with the low bulk density hollow shapes render it economically prohibitive.
[0040] Instead of or in combination with using a packer fluid as described in the preceding paragraph, a thermally insulating fluid may be emplaced in an annulus prior to installation of the production casing and/or tubing at at least some depth intervals in the well. Alternatively, the insulating fluid may be introduced after completion as further described below. If used during completion, the thermally insulating fluid may be introduced in place of a spacer fluid that would otherwise be pumped in the sequence through the well.
[0041] Thermally insulating fluids may be aqueous or non-aqueous. In some embodiments the insulating fluid may be an oil-based fluid such as diesel containing a polymeric viscosifier, such as polymeric gels that have a temperature-dependent viscosity. Other agents may included, such as additives that reduce the freezing point of the fluid. The insulating fluid may have low corrosivity. A preferred insulating fluid has a thermal conductivity between about 0.007-0.30 btu/(hr*ft*° F.) (or 0.012-0.52 W/(m*K)). A preferred insulating fluid is typically thin and pumpable at temperatures in excess of 130 degrees Fahrenheit (54 degrees Celsius). When pumped into place as further described below, the fluid cools and thickens along the exterior walls of the annulus to insulate colder geologic formations surrounding the well (e.g., as in deep-sea wells or wells located in arctic or subarctic regions) from the warm production tubing.
[0042] Application of Thermally Insulating Fluid During Production
[0043] Once a well has been drilled and it is determined to be appropriate for production of oil and gas, the well must be completed. Completion is the process of introducing the production tubing and cementing the casings in place. During cementing, multiple fluids are run in and out of the well in a sequence to prepare the well and set the cement. The operations fluids are typically separated in sequence by spacer fluids, which are inert fluids with low corrosivity such as clear brine.
[0044] According to an embodiment of the process, at least one instance of the spacer fluids in the cementing sequence may be replaced by a thermal insulating fluid. In this manner the thermal insulating fluid may be introduced to the desired annulus and spotted to the desired depth. In general, prior to cementing, the drilling fluids are flushed from the well to prevent mixing with the cement. A train of spacer fluids (typically 3 different fluids in sequence, but more or less may be used) follow the cement in the annulus to prevent mixing with drilling fluids above the cement. The thermal insulating fluid may be substituted in place of one or more of these spacer fluids.
[0045]
[0046]
[0047]
[0048] Several advantages accrue from this method of thermally insulating a well prior to completion. Emplacing a thermally insulating fluid during the cementing fluid sequence introduces the thermal insulation protection at a time when the well may be particularly unstable due to thermal conductivity and serves to protect the well against damage caused by rapid thermal changes. In addition, by reducing heat transfer or loss through the sides of the well, the introduction of the thermally insulating fluid can reduce the accumulation of asphaltenes, paraffin, wax, tar, and gas hydrates, and thereby reduce costs associated with the chemical remediation or removal of such materials. This process may be used in connection with electronic submersible pumps and with pump jack completion wells.
[0049] Application of Thermally Insulated Fluid to a Completed Well
[0050] In a completed well and during production, at least a portion of the B annulus inside the annulus casing will have been blocked with cement 24 from the bottom up. While this is standard procedure for well production, it also blocks the ability to enter the A annulus deep underground. This becomes problematic when the production string becomes subject to thermal oscillations that inhibit production flow. In particular, the transfer of heat from the production tubing leads to the formation of gas hydrates and wax deposits within the annuli. These deposits may include, for example, paraffin and asphaltenes, precipitate and deposit, and can block the flow path of drilling muds or fluids, thereby affecting overall production and well integrity.
[0051] However, a thermal insulating fluid may be introduced into the space to reduce heat transfer into the annuli and to remove deposits present in the annuli.
[0052] First, the well operator should determine where paraffin and other deposits are present near or above the top of the cement 24 in the annulus closest to the production annulus (that is, the B annulus 20). As described above, paraffin and other precipitates typically form and are deposited in places where the surrounding geologic formation is significantly cooler than the production tubing, resulting in a high heat transfer gradient. If paraffin is present, the next step is to determine the depth of the top the cement 24. If paraffin is absent or not yet formed, then the depth of the top of the cement is typically known from the completion process.
[0053] Next, one or more holes 26 are punched into the casing 4 and/or string to perforate the casing 4 or string along the inner casing wall of the identified annulus at the depth of the top of the cement (which is also typically the lower bound of the accumulation of paraffin deposits). Once perforated, fluid may flow from the annulus having the deposits into the next inner annulus. In this example scenario, fluid may flow from the B annulus 20 into the A annulus 18.
[0054] In some embodiments there may be multiple perforations. For example, in some embodiments perforations may be located around the interior casing wall to increase and balance flow. In some embodiments the perforations may be spaced approximately 2-3 inches from each other. In some embodiments the perforations may be as large as approximately 2 inches in diameter. The number and size of perforations are primarily limited by the size of the holes that may be punched while maintaining the structural integrity of the casing wall. About 12 shots or punches per foot circumference provides a decent flow rate while not undermining the structural integrity of the casing.
[0055] When the casing 4 is perforated, the paraffin and other hydrocarbon deposits may be circulated through the perforations 26 and ultimately flushed out of the well. This leaves a void in the B annulus 20 that allows the injection of thermal insulating fluid into the void. The thermal insulating fluid enters the void in the B annulus 20, passes through the perforation 26, and enters the A annulus 18 surrounding the production string 8. The thermal insulating fluid is then spotted to a target depth 28 within the A annulus 18 using known techniques for removing drilling fluids and spotting spacer fluids or other fluids. The target depth 28 is selected based on the construction of the well, known flow rates through the production casing from historical well data, geologic formations, temperature and pressure data, etc.
[0056] Once the insulation fluid is spotted at the desired depth, the perforations in the casing are sealed off with cement. The well operator should then test the cement to confirm structural integrity.
[0057]
[0058] The above description is particular to the insertion of thermal insulating fluid into the A annulus 18 from the B annulus 20. However, the same technique may be applied in relation to other annuli in the well (e.g., from the C annulus 22 to the B annulus 20, or from a surface annulus to an intermediate annulus, or from one intermediate annulus to a second intermediate annulus).
[0059] Several advantages accrue from this method of thermally insulating a completed well. One advantage is that thermal insulating fluid may be used to regulate the heat transfer to or from the production string. This promotes consistent production and well operations. Another advantage is that the thermal insulating fluid may be introduced into existing wells, rather than only being advantageous for new wells. Another advantage is that the procedure allows for the internal space of the annuli to be cleared of paraffin or hydrocarbon deposits. Other advantages may be apparent to persons skilled in the art.