Method and apparatus for two-lift concrete flatwork placement
11203840 ยท 2021-12-21
Assignee
Inventors
Cpc classification
E01C11/14
FIXED CONSTRUCTIONS
International classification
Abstract
A method of manufacturing a concrete substrate includes placing a first concrete layer on a support base configured to support the concrete substrate, positioning a concrete slab load transfer apparatus on a top surface of the first concrete layer, wherein the top surface of the first concrete layer supports the concrete slab load transfer apparatus, and placing a second concrete layer on the top surface of the first concrete layer such that the second concrete layer covers the concrete slab load apparatus.
Claims
1. A method of manufacturing a concrete substrate, the method comprising: placing a first concrete layer on a support base configured to support the concrete substrate; positioning a concrete slab load transfer apparatus on a top surface of the first concrete layer such that the top surface of the first concrete layer supports the concrete slab load transfer apparatus, wherein the concrete slab load transfer apparatus includes a plurality of planar load transfer dowels attached to an elongated basket; and placing a second concrete layer on the top surface of the first concrete layer such that the second concrete layer covers the concrete slab load transfer apparatus.
2. The method of claim 1, wherein positioning the concrete slab load transfer apparatus includes positioning the concrete slab load transfer apparatus at an area where a contraction joint will be formed in the concrete substrate.
3. The method of claim 1, which includes fastening the concrete slab load transfer apparatus to the top surface of the first concrete layer prior to placing the second concrete layer.
4. The method of claim 1, wherein positioning the concrete slab load transfer apparatus includes seating the basket of the concrete slab load transfer apparatus in the first concrete layer.
5. The method of claim 1, wherein positioning the concrete slab load transfer apparatus includes seating the basket but not the planar load transfer dowels of the concrete slab load transfer apparatus in the first concrete layer.
6. The method of claim 1, wherein the basket and load transfer dowels are metal.
7. The method of claim 1, wherein the load transfer dowels are attached to the basket by a plurality of welds.
8. The method of claim 1, wherein the basket includes an elongated first leg and an elongated second leg, wherein each of the load transfer dowels is detachably attached to one of the first leg and the second leg.
9. The method of claim 1, wherein the basket includes an elongated first leg and an elongated second leg, wherein each of the load transfer dowels is alternately detachably attached to one of the first leg and the second leg.
10. The method of claim 1, wherein the basket and load transfer dowels are steel, wherein the basket includes an elongated steel first member and a spaced apart elongated steel second member, wherein the load transfer dowels are planar tapered steel plates, wherein the load transfer dowels are attached to the elongated steel first member and the elongated steel second member by a plurality of line welds and a plurality of breakable welds that temporarily attach the load transfer dowels to the basket.
11. The method of claim 1, which includes rolling and compacting the first concrete layer prior to placing the second concrete layer.
12. The method of claim 11, wherein the concrete slab load transfer apparatus is positioned on the top surface of the first concrete layer after rolling and compacting the first concrete layer.
13. The method of claim 12, which includes a second rolling and compacting of the first concrete layer after the concrete slab load transfer apparatus is positioned on the top surface of the first concrete layer.
14. The method of claim 13, wherein the second rolling and compacting the first concrete layer seats the concrete slab load transfer apparatus partially in the first concrete layer.
15. The method of claim 13, wherein the second rolling and compacting the first concrete layer seats the basket of the concrete slab load transfer apparatus in the first concrete layer.
16. The method of claim 13, wherein the second rolling and compacting the first concrete layer seats the basket but not the load transfer dowels of the concrete slab load transfer apparatus in the first concrete layer.
17. The method of claim 1, wherein the load transfer dowels are attached to the basket by a plurality of line welds and a plurality of breakable welds that temporarily attach the load transfer dowels to the basket.
18. The method of claim 17, wherein the basket includes an elongated first member and a spaced apart elongated second member.
Description
BRIEF DESCRIPTION OF THE FIGURES
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
DETAILED DESCRIPTION OF EXAMPLE EMBODIMENTS
(13) While the features, devices, and apparatus described herein may be embodied in various forms, the drawings show and the specification describe certain exemplary and non-limiting embodiments. Not all of the components shown in the drawings and described in the specification may be required, and certain implementations may include additional, different, or fewer components. Variations in the arrangement and type of the components; the shapes, sizes, and materials of the components; and the manners of connections of the components may be made without departing from the spirit or scope of the claims. Unless otherwise indicated, any directions referred to in the specification reflect the orientations of the components shown in the corresponding drawings and do not limit the scope of the present disclosure. Further, terms that refer to mounting methods, such as mounted, attached, connected, and the like, are not intended to be limited to direct mounting methods but should be interpreted broadly to include indirect and operably mounted, attached, connected and like mounting methods. This specification is intended to be taken as a whole and interpreted in accordance with the principles of the present disclosure and as understood by one of ordinary skill in the art.
(14) Various embodiments of the present disclosure provide a method of manufacturing a concrete substrate and a concrete slab load transfer apparatus used in the manufacture of the concrete substrate. For brevity, the concrete slab load transfer apparatus may sometimes be referred to herein as the load transfer apparatus or as the apparatus. Such abbreviations are not meant to limit the scope of the present disclosure.
Example Load Transfer Apparatus
(15) One example embodiment of the concrete slab load transfer apparatus that may be used in the manufacture of a concrete substrate in accordance with the present disclosure is generally illustrated in
(16) In this illustrated example embodiment, this concrete slab load transfer apparatus 100 generally includes: (a) a plurality of metal such as steel planar load transfer dowels 140, 142, 144, 146, and 148; (b) a metal such as a steel basket 110 configured to support the load transfer dowels 140, 142, 144, 146, and 148; (c) a plurality of breakable welds 150, 152, 154, 156, and 158 (best seen in
(17) The basket 110 in this illustrated example embodiment includes a first steel leg 112 and a spaced apart second steel leg 122. The first leg 112 includes an elongated steel member 116. Likewise, the second leg 122 includes an elongated steel member 126. In this illustrated example embodiment, the elongated member 116, and the elongated member 126, are both metal rods such as steel rods. It should be appreciated that such members can be made from other suitable materials. It should be appreciated that one or more of the legs can be alternatively formed.
(18) The first and second legs 112 and 122 are configured to co-act to hold and support the plurality of load transfer dowels 140, 142, 144, 146, and 148 at or along an area where a contraction joint will be formed as generally shown in
(19) The load transfer dowels 140, 142, 144, 146, and 148 are partly detachably attached to and supported by the basket 110, and specifically partly detachably attached to and supported by the first leg 112 and the second leg 122 in opposing fashion in this illustrated example embodiment. In the illustrated example, the load transfer dowels 140, 142, 144, 146, and 148 include a wider end and a narrower end that defines a taper of the load transfer dowels. More specifically, in this illustrated example embodiment: (a) the wider end of the load transfer dowel 140 is supported by and line welded at weld 160 to the elongated member 126; (b) the narrower end of the load transfer dowel 140 is supported by and spot welded at breakable weld 150 to the elongated member 116; (c) the narrower end of the load transfer dowel 142 is supported by and spot welded at breakable weld 152 to the elongated member 126; (d) the wider end of the load transfer dowel 142 is supported by and line welded at weld 162 to the elongated member 116; (e) the narrower end of the load transfer dowel 144 is supported by and spot welded at breakable weld 154 to the elongated member 116; (f) the wider end of the load transfer dowel 144 is supported by and line welded at weld 164 to the elongated member 126; (g) the narrower end of the load transfer dowel 146 is supported by and spot welded at breakable weld 156 to the elongated member 126; (h) the wider end of the load transfer dowel 146 is supported by and line welded at weld 166 to the elongated member 116; (i) the narrower end of the load transfer dowel 148 is supported by and spot welded at breakable weld 158 to the elongated member 116; and (j) the wider end of the load transfer dowel 148 is supported by and line welded at weld 168 to the elongated member 126. The load transfer dowels 140, 142, 144, 146, and 148 thus hold the legs 112 and 122 in the desired spaced apart relation until the load transfer dowels 140, 142, 144, 146, and 148 break off (via the breakable welds) from the legs 112 and 122 when in use.
(20) It should be appreciated that the directions of the respective tapers of the load transfer dowels 140, 142, 144, 146, and 148 alternate from one load transfer dowel to the adjacent load transfer dowel. For contraction joints, if the center of the contraction joint ends up positioned somewhat off-center relative to these load transfer dowels 140, 142, 144, 146, and 148, the alternating tapered pattern of load dowels 140, 142, 144, 146, and 148 compensates for this misalignment.
(21) In this illustrated embodiment, each of the load transfer dowels 140, 142, 144, 146, and 148 has a top tapered planar surface (respectively, surfaces 140a, 142a, 144a, 146a, and 148a) and a bottom tapered planar surface (respectively, surfaces 140b, 142b, 144b, 146b, and 148b). The top and bottom planar surfaces are substantially parallel to one another in this illustrated example embodiment. In this illustrated example embodiment, the top and bottom surfaces taper from approximately 4 inches (10.16 cm) wide to a narrow end approximately 1 inch (2.54 cm) wide over a length of approximately 12 inches (30.48). It should be appreciated that these sizes may vary in accordance with the present disclosure. Certain advantages provided by and load transfer operation of these tapered load transfer dowels are described in U.S. Pat. Nos. 7,716,890, 7,481,031, and 8,381,470.
(22) It should be appreciated that the other suitable tapered shapes and sizes, and/or other suitable shapes and sizes for the dowels may also be employed in accordance with the present disclosure. In certain such alternative embodiments, the dowels include a double tapered shape having tapers on both ends, and are therefore diamond or somewhat diamond shaped.
(23) It should thus be appreciated from the above and as shown in
(24) It should be appreciated that in this example embodiment, no other members or components connect the two legs 112 and 122 besides the breakable welds and the line welds formed on the respective bottom planar surfaces of the load transfer dowels. In other words, in various embodiments of the present disclosure the two legs 112 and 122 are only connected by the load transfer dowels 140, 142, 144, 146, and 148, the welds including the breakable welds 150, 152, 154, 156, and 158, and the line welds 160, 162, 164, 166, and 168. As a result, the concrete slab load transfer apparatus 100 may be positioned or otherwise placed directly on the top surface 212 of the first lift layer 210 of the concrete substrate 200.
(25) In other embodiments of the present disclosure, suitable clips such as suitable plastic clips are employed to at least partially attach the two legs 112 and 122 to the load transfer dowels 140, 142, 144, 146, and 148.
(26) In the illustrated embodiment, (a) the load transfer dowels are steel; and (b) the components of the basket are steel. It should be appreciated that one or more of these components can be made from other suitable materials in accordance with the present disclosure.
(27) It should also be appreciated that one or more of: (a) the plurality of load transfer dowels; and/or (b) the basket can be made in other suitable sizes, shapes, and configurations in accordance with the present disclosure.
(28) It should also be appreciated that the quantity of load transfer dowels may vary in accordance with the present disclosure.
Example Method of Manufacture of a Concrete Substrate
(29) Referring now to
(30) In one example embodiment, the method of manufacturing the concrete substrate 200 includes: (a) placing a first wet lift layer 210 (e.g., first concrete layer) on a support base that will support the concrete substrate 200; (b) positioning the concrete slab load transfer apparatus 100 on a top surface 212 of the first wet lift layer 210; and (c) placing a second wet lift layer 220 (e.g., second concrete layer) on top of the first lift layer 210. In the illustrated embodiment, the top surface 212 of the first concrete layer 210 supports the concrete slab load transfer apparatus 100. As such, positioning the concrete slab load transfer apparatus 100 may include placing the elongated members 116 and 126 and/or the load transfer dowels 140, 142, 144, 146, and 148 in direct contact with the top surface 212 of the first concrete layer 210. Furthermore, placing the second lift layer 220 on top of the first lift layer 210 covers or otherwise encloses the load transfer apparatus 100 within the concrete substrate 200.
(31) In various such embodiments, the method includes determining a desired total thickness for the concrete substrate prior to starting the paving process. In such embodiments, the desired total thickness includes a first lift thickness and a second lift thickness.
(32) For example, the illustrated example method includes determining a desired total thickness 230 for the concrete substrate 200 prior to starting the concrete substrate manufacture process. The desired total thickness 230 includes a first lift thickness 232 of first lift layer 210 and a second lift thickness 234 of second lift layer 220, as generally illustrated in
(33) In various embodiments, the desired total thickness 230 includes the first lift thickness 232 approximately equal to the second lift thickness 234. In other various embodiments, the desired total thickness 230 includes the first lift thickness 232 greater than the second lift thickness 234. In other various embodiments, the desired total thickness 230 includes the first lift thickness 232 that is less than the second lift thickness 234.
(34) In various embodiments, the illustrated example method includes placing the first lift layer 210 on the support base prepared for the concrete substrate 200. The first lift layer 210 of concrete is poured or otherwise dispensed from a bulk concrete supply (such as a concrete supply truck) along the base. A sufficient amount of concrete is dispensed from the bulk concrete supply to form the first lift layer 210 including the first lift thickness 232.
(35) In various embodiments, placing the first lift layer 210 further includes spreading the first lift layer 210 to shape and form the first lift layer 210. Shaping and forming the first lift layer may include forming the first lift layer thickness 232 of the first lift layer 210. In various embodiments, paving equipment such as a spreader, a roller, a compactor, and/or other suitable equipment may be used to place and spread the first lift layer 210. As such, the paving equipment spreads the first lift layer 210 to form a concrete layer having a uniform first lift layer thickness 232. In various embodiments, spreading the first lift layer 210 removes (e.g., strikes off) excess concrete that may have been placed on the base or support surface.
(36) Following placement of the first lift layer 210, a concrete slab load transfer apparatus 100 is positioned at a desired location on the top surface 212 of the first lift layer 210. In various embodiments, the concrete slab load transfer apparatus 100 is positioned at an area where a contraction joint will be formed in the concrete substrate 200. In the illustrated embodiment, the load transfer apparatus 100 includes the plurality of load transfer dowels 140, 142, 144, 146, and 148 connected to the legs 112 and 122 of the basket 110. In various embodiments, the legs 112 and 122 only include elongated members 116 and 126 that are connected to the load transfer dowels as described above. Thus, when the load transfer apparatus 100 is positioned on the first lift layer 210, the elongated members 116 and 126 and/or the load transfer dowels 140, 142, 144, 146, and 148 are adjacent to the top surface 212 of the first lift layer 210.
(37) In various embodiments, the load transfer dowels 140, 142, 144, 146, and 148 are only connected to and supported by the elongated members 116 and 126 of the legs 112 and 122. As such, the concrete slab load transfer apparatus 100 includes less material because the basket 110 of the load transfer apparatus 100 does not include a side support frame and/or vertical riser to support and elevate the load transfer dowels and elongated members. Such material reduction in the load transfer apparatus 100 provides a cost savings in the method of concrete substrate manufacture of the present disclosure.
(38) In various embodiments, after the spreading of the first lift layer 210, the concrete slab load transfer apparatus 100 is positioned at the desired location on the top surface 212 of the first lift layer 210. As a result, the top surface 212 of the first lift layer 210 supports or otherwise holds the concrete slab load apparatus 100. As best illustrated in
(39) In various embodiments, the concrete slab load transfer apparatus 100 may be held by or otherwise fastened to the top surface 212 of the first lift layer 210 by one or more fasteners. In such embodiments, a plurality of stakes or other such fasteners (not shown) may be used to hold the load transfer apparatus 100 to the first lift layer 210. The stakes or other such fasteners position the load transfer apparatus 100 at the desired location on the first lift layer 210.
(40) Once the concrete slab load transfer apparatus 100 is positioned on the first lift layer 210, the method includes placing the second lift layer 220 on the top surface 212 of the first lift layer 210. In various embodiments, the second lift layer 220 is placed directly over the concrete slab load transfer apparatus 100. The second lift layer 220 covers the top surface 212 of the first lift layer 210. Thus, the second lift layer 220, and the underlying first lift layer 210, enclose the load transfer apparatus 100 within the concrete substrate 200. In various embodiments, the concrete slab load transfer apparatus 100 is suspended within the first lift layer 210 and/or the second lift layer 220 of the concrete substrate 200.
(41) In various embodiments, spreading the first lift layer 210 and/or the second lift layer 220 includes rolling, and/or compacting the concrete layers. As such, the concrete slab load transfer apparatus 100 may be placed on the top surface 212 of the first lift layer 210 prior to spreading, rolling, and/or compacting the second lift layer 220. In such embodiments, spreading, rolling, and/or compacting the first lift layer 210 helps to seat or otherwise hold the concrete slab load transfer apparatus 100 at the desired position in the first lift layer 210 prior to placing the second lift layer 220.
(42) In various embodiments, prior to placing the concrete slab load transfer apparatus 100, the first lift layer 210 may be partially spread, rolled, and/or compacted. The load transfer apparatus 100 is then positioned at the desired location on the top surface 212 of first lift layer 210. Once the load transfer apparatus 100 is positioned, the spreading, rolling and/or compacting operations are completed. In various embodiments, the spreading rolling, and/or compacting operations are completed on the first lift layer 210 prior to placing the second lift layer to help seat or otherwise hold the load transfer apparatus 100 at the desired position in the first lift layer 210.
(43) For example, eight cycles of the spreading, rolling, and/or compacting operations may be performed on the first lift layer 210 before positioning the concrete slab load transfer apparatus 100. The load transfer apparatus 100 is then positioned on the top surface 212 of the first lift layer 210. Two or more additional cycles of the spreading, rolling, and/or compacting operations are performed on the first lift layer 210 including the load transfer apparatus 100. The second lift layer 220 is then placed on top of the first lift layer 210 and the load transfer apparatus 100 to complete the concrete substrate 200. While a total of ten spreading, rolling and/or compacting operations are provided on the first lift layer 210 in the above example, it should be appreciated that the spreading, rolling, and/or compacting operations for the first and second lift layers 210 and 220 may be performed an alternative quantity of times.
(44) It should be appreciated that in various embodiments, the illustrated example method includes using breakable spot welds and the line welds between the elongated members 116 and 126 of the legs 112 and 122 and the load transfer dowels 140, 142, 144, 146, and 148 (as best seen in
(45) It should also be appreciated from the above that the apparatus of various embodiments of the present disclosure include load transfer dowels and legs that have a relatively short height. This facilitates ease of manufacture, ease of storage and shipping, ease of placement on the first concrete layer, and ease of seating of the legs into the first concrete layer.
(46) Various changes and modifications to the above-described embodiments described herein will be apparent to those skilled in the art. These changes and modifications can be made without departing from the spirit and scope of this present subject matter and without diminishing its intended advantages.