Ventilation controller
11199334 · 2021-12-14
Assignee
Inventors
Cpc classification
F24F11/77
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24F2120/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24F2110/50
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24F2011/0006
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24F11/30
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24F7/007
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24F11/46
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24F11/0001
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02B30/70
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
F24F7/06
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24F7/007
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24F11/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
G05B13/00
PHYSICS
Abstract
A ventilation system for a building in some cases includes a main HVAC blower for moving temperature-conditioned air through the building plus a smaller ventilation blower for providing fresh air. A controller regulates the ventilation blower's speed to provide a target ventilation flow rate regardless of changes in the pressure differential between the indoor and outdoor air. To ensure that the target rate is appropriate for a particular building, the target flow rate is determined based on a ventilation setting that reflects a specified number of bedrooms and a specified amount of floor space of the building.
Claims
1. A ventilation system for a building, the building defines an outdoor area and an indoor area, the ventilation system comprising: a ventilation blower configured to deliver air along a ventilation path from at least one of: the indoor area to the outdoor area, and the outdoor area into the indoor area; and a controller operatively coupled to the ventilation blower, wherein the controller comprises a manual input for selection of one of a plurality of normal modes, each of the plurality of normal modes corresponds with a target ventilation flow rate that can be associated with at least one combination of a number of rooms of the building and an amount of floor space of the building, wherein, when in a selected normal mode, a rotational speed of the ventilation blower is varied to provide substantially constant ventilation of air past the ventilation blower at the target ventilation flow rate of the selected normal mode in response to a change in a static pressure differential along the ventilation path, wherein the controller comprises a sensor such that the controller is capable of deactivating the ventilation blower in response to a sensed condition, thereby placing the ventilation blower into a first alternate mode and overriding the constant ventilation of air at the target ventilation flow rate of the selected normal mode.
2. The ventilation system of claim 1, wherein the sensed condition comprises sensing that the building is unoccupied.
3. The ventilation system of claim 2, wherein the sensor comprises at least one of a motion sensor and a light sensor.
4. The ventilation system of claim 1, wherein the sensor assists in determining an indoor air temperature, an outdoor air temperature, or a relative difference therebetween.
5. The ventilation system of claim 4, wherein the controller is capable of operating the ventilation blower in a second alternate mode when the indoor air temperature is greater than the outdoor air temperature, the second alternate mode comprises delivering ventilation air from the outdoor area into the indoor area at a higher flow rate than the target ventilation flow rate of the selected normal mode.
6. The ventilation system of claim 1, wherein the controller is configured to emit an alarm signal if the ventilation blower fails to provide the target ventilation flow rate while the ventilation system operates in the selected normal mode.
7. An HVAC system for a building that defines an outdoor area and an indoor area, comprising: a ventilation system according to claim 1; and a main blower, wherein the main blower has a maximum blower flow rate that is larger than a maximum ventilation flow rate of the ventilation blower of the ventilation system, wherein the main blower is configured to deliver temperature-conditioned air into the indoor area through a supply path, wherein the supply path is independent from the ventilation path.
8. A ventilation system for a building, the building defines an outdoor area and an indoor area, the ventilation system comprising: a ventilation blower configured to deliver air along a ventilation path from at least one of: the indoor area to the outdoor area, and the outdoor area into the indoor area; and a controller operatively coupled to the ventilation blower, wherein the controller comprises a manual input for selection of one of a plurality of normal modes, each of the plurality of normal modes corresponds with a target ventilation flow rate, wherein, when in a selected normal mode, a rotational speed of the ventilation blower is varied to provide substantially constant ventilation of air past the ventilation blower at the target ventilation flow rate of the selected normal mode in response to a change in a static pressure differential along the ventilation path, wherein the controller comprises a sensor such that the controller is capable of deactivating the ventilation blower in response to a sensed condition, thereby placing the ventilation blower into a first alternate mode and overriding the constant ventilation of air at the target ventilation flow rate of the selected normal mode, and wherein the controller is configured to emit an alarm signal if the ventilation blower fails to provide the target ventilation flow rate while the ventilation system operates in the selected normal mode.
9. The ventilation system of claim 8, wherein the sensed condition comprises sensing that the building is unoccupied.
10. The ventilation system of claim 9, wherein the sensor comprises at least one of a motion sensor and a light sensor.
11. The ventilation system of claim 8, wherein the sensor assists in determining an indoor air temperature, an outdoor air temperature, or a relative difference therebetween.
12. The ventilation system of claim 11, wherein the controller is capable of operating the ventilation blower in a second alternate mode when the indoor air temperature is greater than the outdoor air temperature, the second alternate mode comprises delivering ventilation air from the outdoor area into the indoor area at a higher flow rate than the target ventilation flow rate of the selected normal mode.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
DESCRIPTION OF THE PREFERRED EMBODIMENT
(10)
(11) In the illustrated example, building 10 has two bedrooms 30 and 32, a bathroom 34, a kitchen area 36, and a living room area 38. An exterior wall 40 of building 10 defines an outdoor area 42 and an indoor area 44 (rooms 30, 32, 34, 36 and 38). Building 10 may also include windows 46 and doors 48.
(12) In some embodiments, such as the one shown in
(13) For illustration, primary system 50 comprises main blower 12, a heat exchanger 54, a network of supply air ducts 56, a network of return air ducts 58, and a thermostat 60. Heat exchange 54 may be part of various known systems including, but not limited to, an air conditioner, furnace, heat pump, de-humidifier, humidifier, and various adaptations and combinations thereof. In response to sensing the temperature or humidity in building 10, thermostat 60 controls the operation of blower 12 and heat exchanger 54 to meet the building's temperature or humidity demand. Blower 12 forces air 14 across heat exchanger 54, which heats, cools, or otherwise conditions the air before supply ducts 56 deliver the conditioned air to the various rooms of the building. After air 56 enters and circulates through the rooms, blower 12 draws the used air back out of the rooms via return air ducts 58. Blower 12 then forces air 14 back across heat exchanger 54 for reconditioning.
(14) To provide fresh air, ventilation system 52 comprises ventilation blower 16 and control system 20. Control system 20 comprises controller 26, manual input 22, and a drive unit 62 with an electrical output 64 for providing appropriate electrical power 66 to a motor 68 of blower 16. It should be appreciated by those of ordinary skill in the art that one or more of the motor's various drive components can be integrated within motor 68 itself or mounted separately, such as mounted within control system 20.
(15) Although ventilation blower 16 could be installed to discharge air 18 into or out of building 10, in this example, blower 16 draws outdoor air through a first opening 70 and discharges the air into building 10 via a second opening 72. This tends to build a slight positive pressure inside building 10. The positive pressure can force the indoor air outside by natural leakage through windows, doors, or other incidental cracks or openings in the building. The slightly pressurized indoor air, for example, may escape the building through a bathroom exhaust vent or through a kitchen exhaust hood.
(16)
(17) In
(18) In
(19) In
(20) Regardless of the installation of blower 16, ventilation system 52 needs to ensure that building 10 has adequate ventilation. To do this, system 52 should take into account the amount of floor space and the number of bedrooms in the building, as specified in ASHRAE Standard 62.2-2003. Under certain circumstances, that standard specifies that the ventilation flow rate may be specified by the equation, Q=0.01 A+7.5(N+1), where “Q” is the target ventilation flow rate in terms of cubic feet per minute, “A” is the specified amount of floor space in units of square-feet, and “N” is the specified number of rooms (e.g., one, two, three rooms, etc.). An approximation of that relationship can be tabulated as shown in table 74 of
(21) To avoid a technician having to manually calculate a building's ventilation requirements, adjust and calibrate the ventilation blower, and manually test the results, ventilation system 52 does this automatically by providing controller 26 with manual input 22. Manual input 22 enables a user to enter one or more parameters that reflect the building's amount of floor space and number of bedrooms. The parameter or parameters are represented by setup signal 28, which input 22 communicates to controller 26. Based on setup signal 28, controller 26 provides a command signal 76 that directs drive unit 62 to deliver appropriate electrical power 66 for blower 16 to provide the desired target ventilation flow rate.
(22) Control system 20 preferably (but not necessarily) regulates the ventilation flow rate at the target ventilation flow rate. This can be done in various ways including, but not limited to, regulating or varying the rotational speed of blower 16, adjusting a damper associated with blower 16, or cycling blower 16 on and off at a duty cycle that provides an average target ventilation flow rate over a predetermined period.
(23) In a currently preferred embodiment of the invention, motor 68 of blower 16 is a variable speed motor that drives a fan wheel 16′ of blower 16. Fan wheel 16′ is schematically illustrated to represent any type of air-moving element including, but not limited to, a centrifugal blower, axial fan, etc. Depending on the type of variable speed motor, drive unit 62 may be an inverter, DC voltage regulator, electronically commutated motor drive, or some other appropriate conventional drive circuit that can respond to speed command signal 76 from controller 26. Controller 26 is schematically illustrated to represent any common control circuit that can provide an appropriate speed command signal in response to an input, such as setup signal 28.
(24) To create setup signal 28, manual input 22 may assume a variety of forms, thus manual input 22 is schematically illustrated to represent any type of human interface between a user and a controller. Examples of manual input 22 include, but are not limited to, one or more electrical switches (e.g., dipswitches), electrical jumpers, PDA, laptop, computer, remote control (e.g., radio, infrared, etc.), Internet communication, a dial (potentiometer, rotatable selector switch, etc.), and a touchpad (e.g., keyboard, pushbuttons, touchscreen, etc.).
(25) In
(26) In
(27) In
(28) Based on setup signal 28 (which in turn is based on a user-selected, manually-entered ventilation setting) controller 26 provides command signal 76 at a value that tells drive unit 62 to run blower 16 at the target ventilation flow rate. The actual flow rate, however, may tend to vary due to a variety of factors including but not limited to changes in the static pressure differential between the indoor and outdoor air. To ensure that blower 16 is actually delivering the target flow rate regardless of moderate changes (normal anticipated changes of less than a 0.3 inch column of water) in the static pressure differential between the outdoor area and the indoor area, in some embodiments, control system 20 regulates the blower's rotational speed to account for such changes. This can be accomplished in different ways.
(29) In some cases, the actual flow rate through blower 16 can be determined, estimated or perceived as being a function of the blower's rotational speed and the power consumption of motor 68. Such a relationship is readily determined by knowing the operating characteristics of fan wheel 16′. The motor's rotational speed can be measured directly or it can be calculated based on a known relationship between the motor's speed and, depending on the type of motor, the frequency or voltage of electrical power 66. The motor's power consumption can be calculated based on the voltage and current supplied to motor 68.
(30) Since control system 20 or drive unit 62 may “know” the voltage, current and frequency of electrical power 66, system 20 may be able to regulate the output of blower 16 without additional externally generated feedback. In some cases, however, controller 26 may be provided with feedback, such as a flow rate signal 90. Flow rate signal 90 may come from drive unit 62; flow, speed, or pressure sensors associated with blower 16; a current sensor associated with electrical power 66; and/or other conventional sources. Flow rate signal 90 can be generated internally within controller 26, generated internally within drive 62, or generated externally relative to control system 20. In
(31) To ensure adequate ventilation even when HVAC system 50 is inactive due to mild outdoor temperatures, ventilation system 52 can be controlled to operate substantially independently of primary HVAC system 50.
(32) Referring back to
(33) In the economizer mode, blower 16 delivers ventilation air at a higher volume than what is required for normally acceptable ventilation. The additional outside air could provide “free cooling” when the outside air is reasonably dry and cooler than the indoor air.
(34) In the occupancy mode, control system 20 may deactivate blower 16 upon sensing that the building is unoccupied or that the building's occupancy is below a certain occupancy level. A motion or light sensor, for example, could provide control system 20 with an indication of the building's occupancy.
(35) In the vacation or override mode, a user may deactivate blower 16 to save energy when the user knows that the building will be unoccupied for an extended period.
(36) In some cases, control system 20 may include an audio or visual alarm signal 91 that becomes automatically triggered upon blower 16 failing to provide the target ventilation flow rate. Signal 91, for example, may turn on when blower 16 is running at a maximum or a predetermined high speed yet is still unable to provide the target ventilation flow rate.
(37) Although the invention is described with reference to a preferred embodiment, it should be appreciated by those of ordinary skill in the art that other variations are well within the scope of the invention. It is conceivable, for instance, that blower 16 could not only be cycled on and off at a duty cycle that provides an average target ventilation rate, but the blower's rotation could be reversed at each cycle to help maintain a more neutral or predetermined pressure in building 10. Moreover, the equation or relationship between the required target ventilation rate and the building's parameters may be adjusted due to local climate, regulating the ventilation flow rate by cycling the ventilation blower on and off, or various other reasons.