GLASS OVERLAY FOR CONCRETE
20220177381 · 2022-06-09
Inventors
Cpc classification
C04B41/533
CHEMISTRY; METALLURGY
C04B41/71
CHEMISTRY; METALLURGY
C04B41/53
CHEMISTRY; METALLURGY
C04B41/52
CHEMISTRY; METALLURGY
C04B41/522
CHEMISTRY; METALLURGY
C04B28/02
CHEMISTRY; METALLURGY
C04B41/53
CHEMISTRY; METALLURGY
C04B41/4576
CHEMISTRY; METALLURGY
C04B41/5089
CHEMISTRY; METALLURGY
C04B41/52
CHEMISTRY; METALLURGY
C04B41/524
CHEMISTRY; METALLURGY
C04B41/5089
CHEMISTRY; METALLURGY
C04B41/72
CHEMISTRY; METALLURGY
C04B28/02
CHEMISTRY; METALLURGY
C04B41/524
CHEMISTRY; METALLURGY
International classification
C04B41/71
CHEMISTRY; METALLURGY
C04B41/00
CHEMISTRY; METALLURGY
C04B41/45
CHEMISTRY; METALLURGY
C04B41/52
CHEMISTRY; METALLURGY
C04B41/53
CHEMISTRY; METALLURGY
Abstract
An improved terrazzo process for applying terrazzo to an existing concrete surface comprising preparing the concrete surface, applying two layers of a primer agent, applying a terrazzo layer comprising calcium sulfoaluminate (CSA) cement, white milk glass, and one or more of broken mirrored glass and colored glass, cutting the terrazzo layer, applying a concrete densifier such that the concrete densifier penetrates into at least a portion of the concrete substrate, and grinding and polishing the densified terrazzo layer.
Claims
1. A method of forming a glass overlay on an existing concrete substrate, the method comprising: treating an upper surface of the concrete substrate by physical means; filling one or more cracks in the concrete substrate with a first joint filler; applying an anti-fracture membrane over the joint filler; applying a first primer layer over the upper surface, the joint filler, and the anti-fracture membrane; applying a second primer layer over the first primer layer; seeding the second primer layer before it hardens to form a seeded primer layer; applying a terrazzo layer over the seeded primer layer, the terrazzo layer comprising calcium sulfoaluminate (CSA) cement, white milk glass, and one or more of broken mirrored glass and colored glass; forming cuts in the terrazzo layer; filling the cuts with a second joint filler; performing a grinding process to the terrazzo layer and the second joint filler; applying a concrete densifier to the grinded terrazzo layer and the second joint filler, such that the concrete densifier penetrates into at least a portion of the concrete substrate; polishing the densified terrazzo layer and second joint filler; and applying a sealer to the polished terrazzo layer and second joint filler.
2. The method of claim 1, wherein the physical means comprising one or more of shot blasting and grinding.
3. The method of claim 1, wherein the first joint filler comprises a polyurea joint filler.
4. The method of claim 1, wherein the first joint filler and the second joint filler have a similar composition.
5. The method of claim 1, wherein the first joint filler has an upper surface that is substantial flush with the upper surface of the concrete substrate.
6. The method of claim 1, wherein the first primer layer is applied with a roller.
7. The method of claim 1, wherein the first primer layer and the second primer layer comprise an epoxy material.
8. The method of claim 1, wherein the terrazzo layer comprises, by weight, 57% of the CSA cement, 29% of the milk glass, and 14% of the broken mirrored glass.
9. The method of claim 1, wherein the terrazzo layer comprises, by weight, 57% of the CSA cement, 29% of the milk glass, and 14% of the colored glass.
10. The method of claim 1, wherein the terrazzo layer comprises, by weight, 57% of the CSA cement, 29% of the milk glass, 7% of the broken mirrored glass, and 7% of the colored glass.
11. The method of claim 1, further comprising: forming the terrazzo layer by: adding the CSA to a volume of water in a mixer, mixing the CSA and water for approximately 90 seconds, adding the white glass to the mixer, and adding the one or more of the broken mirrored glass and the colored glass to the mixer.
12. The method of claim 1, wherein one or more of the white glass, the broken mirrored glass, and the colored glass comprise pieces having a diameter of approximately ¼ inch.
13. The method of claim 1, wherein one or more of the white glass, the broken mirrored glass, and the colored glass comprise post-consumer glass.
14. The method of claim 1, wherein the terrazzo layer has a thickness of approximately ¾ inch.
15. The method of claim 1, wherein the forming cuts in the terrazzo layer comprises cutting the terrazzo layer using a saw to form one or more areas, each having an area of approximately 100 square feet.
16. The method of claim 1, wherein the grinding process comprises: performing a first grinding step using a 16/20 diamond grinding disc; performing a second grinding step using one or more metal bond grinding discs; and performing a third grinding step using one or more ceramic diamond grinding discs.
17. The method of claim 16, wherein the one or more metal bond grinding discs comprise discs of 30, 70, and 120 grit.
18. The method of claim 16, wherein the one or more ceramic diamond grinding discs comprise discs of 50, 100, and 200 grit.
19. The method of claim 16, wherein the grinding process further comprises: for each of the 16/20 diamond grinding disc, the one or more metal bond grinding discs, and the one or more ceramic diamond grinding discs used: performing a first pass back and forth perpendicular (90 degrees) to a horizontal axis X, performing a second pass back and forth along the horizontal axis X, performing a third pass back and forth at a 45 degree angle from the horizontal axis X, and performing a fourth pass back and forth at a 135 degree angle from the horizontal axis X.
20. The method of claim 1, wherein the portion of the concrete substrate has a thickness greater than approximately 3 inches.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0004] The drawings described below are for illustration purposes only. The drawings are not intended to limit the scope of the present disclosure.
[0005]
[0006]
[0007]
[0008]
[0009]
[0010]
[0011]
[0012]
[0013]
[0014]
[0015]
[0016]
[0017]
DETAILED DESCRIPTION
[0018] Today, terrazzo floors are usually constructed by embedding marble chips and other aggregate (e.g., colored rock or pebbles, recycled glass, shaped metal, bolts and screws, and medallions) in concrete and then exposing the marble chips and other fine aggregates on the surface of finished concrete or by grinding and polishing the concrete surface. Conventional marble-chip, cementious terrazzo, rustic terrazzo, requires three layers of materials. First, a solid, level concrete pad or flooring foundation, 3 to 4 inches thick, is laid. Before the concrete has set up, the concrete surface is raked to give the surface bite for the next step. Then, and before the concrete has set up, a 1-inch layer of sandy concrete topping is applied to the raked concrete surface. For the final layer, a mixture of cement and fine aggregate is blended and placed on the top of the concrete mortar topping layer before it sets up to from a surface layer. While this surface layer is still wet, additional aggregate is broadcast on the surface to insure adequate coverage and uniform density of chips. A lightweight roller is then rolled over the entire surface to give a flat surface. When design elements are incorporated in the terrazzo finish, the different color mixtures of concrete and aggregate are prepared and then applied over the mortar topping layer in prescribed sections to create the design. Then matching aggregate is hand seeded into the different sections to achieve a uniform density of aggregate and color. When the terrazzo is thoroughly dry, the upper surface is ground with a terrazzo grinder to give a smooth even finish. The surface is then cleaned, polished with a terrazzo polisher, and/or sealed.
[0019] Terrazzo design flooring is very labor intensive. In addition, a major limitation to conventional cementious terrazzo is that it may only be applied to a fresh, new, clean concrete surface, (i.e., the raked concrete surface of a new pad or flooring). The installation of exterior cementious terrazzo on the surface of an existing concrete pad or flooring is very difficult. Cracking and delamination are common problems. Because of such problems, most construction companies will refuse to apply terrazzo over an existing concrete surface, or will refuse to furnish a warranty for a terrazzo finish over an existing concrete surface.
[0020] The following description includes a process that allows users to apply a terrazzo finish to an existing horizontal concrete surface with an insignificant thickness and weight penalty. Thus, the present method permits the application of a terrazzo finish to an existing concrete structure and does not require the laying of a new concrete pad or floor. In addition, the composition of the terrazzo and the unique process described herein may provide a terrazzo overlay that has a visually pleasing three-dimensional pattern that is deeper than conventional products. Further, the curing process described herein may reduce cracking in both the terrazzo overlay and the underlying concrete substrate and may improve the strength of the concrete substrate.
[0021] Referring now to
[0022] The top surface 104 may be cleaned to virgin concrete. The top surface 104 may be swept clean of all loose debris and then physically treated or mechanically contoured to expose the upper layer of the concrete substrate together and remove all dirt, paint, oil, grease, and the like (collectively dirt 106 herein), to expose a fresh clean virgin surface of the concrete substrate 102. A virgin concrete surface is a concrete surface that has never been previously exposed as a surface. Although more concrete can be removed, in an example, less than a 1/16 inch layer of concrete may be removed. The top surface 104 may be treated with one or more of a sander, a mechanical wire brush, a grinder, a shot blaster for shot blasting, glass bead gun, sand blaster, mechanical scrapper, high pressure water jet, or other devices for scarifying the concrete surface. Any device that will remove dirt, paint, tar, asphalt, wax, oil grease, latex compounds, form release agents, laitance, loose toppings, foreign substances and any other material that will interfere with bonding may be used. The treatment may open the pores of the concrete substrate 102 for the deposition of layers described below.
[0023] Referring now to
[0024] The one or more cracks 108 in the concrete substrate 102 may be filled with a joint filler 202. The joint filler 202 may be a conventional joint filler composed of polyurea. In an example, the joint filler 202 may be deposited such an upper surface of the joint filler is substantially flush with the top surface 104. In another example, the joint filler 202 may be deposited such that the upper surface of the joint filler is approximately ½ inch above the top surface 104.
[0025] Referring now to
[0026] Referring now to
[0027] Referring now to
[0028] Referring now to
[0029] Referring now to
TABLE-US-00001 TABLE 1 Example Compositions of the Terrazzo Layer (w %) Ingredient Example 1 Example 2 Example 3 CSA Cement 57% 57% 57% Milk Glass 29% 29% 29% Mirrored Glass 14% 0 7% Colored Class 0 14% 7%
[0030] In an example, the terrazzo layer 702 may be composed of 100 lbs of white CSA cement, 50 lbs of white milk glass, and 25 lbs of broken mirrored glass. One or more of the milk glass, the broken mirrored glass, and the colored glass may be recycled/reclaimed glass. In an example, the glasses used may be regional post-consumer glass. In an example, the glasses used may be pieces having a diameter of approximately ¼ inch.
[0031] The terrazzo layer 702 may be formed by mixing the ingredients for approximately 3 minutes in, for example, a conventional concrete mixer. In example, the white CSA cement may be added to a volume of water (approximately 1 quart to every 10 lbs of white CSA) and mixed thoroughly for approximately 90 seconds. The chosen glasses may be added next. The white glass may be added first, followed by the mirrored glass and/or the colored glass. The mixture may be continuously stirred so as to prevent clumping of the chosen glasses.
[0032] After the materials are thoroughly mixed, the terrazzo layer 702 may be poured onto the seed layer 602. In an example, the terrazzo layer 702 may be poured such that the glass aggregate is spread evenly over the concrete substrate 102, especially in corners and edges. The terrazzo layer 702 may be poured so that is has a thickness of approximately % inch. A gage rake may be uses to smoothing and flatting the terrazzo layer 702.
[0033] Referring now to
[0034] Referring now to
[0035] Referring now to
[0036] In a second grinding step, a series of metal bond grinding discs may be used. For example, passes may be made using 30, 70, and 120 grit metal bond grinding discs. For each metal bond grinding discs used, four passes may be made as described above. The first pass 1002 may be back and forth perpendicular (90 degrees) to a horizontal axis X. The second pass 1004 may be back and forth along the horizontal axis X. The third pass 1006 may be back and forth at a 45 degree angle from the horizontal axis X. The fourth pass 1008 may be back and forth at a 135 degree angle from the horizontal axis X.
[0037] In a third grinding step, a series of ceramic diamond grinding discs may be used. For example, passes may be made using 50, 100, and 200 grit ceramic diamond grinding discs. For each ceramic diamond grinding discs used, four passes may be made as described above. The first pass 1002 may be back and forth perpendicular (90 degrees) to a horizontal axis X. The second pass 1004 may be back and forth along the horizontal axis X. The third pass 1006 may be back and forth at a 45 degree angle from the horizontal axis X. The fourth pass 1008 may be back and forth at a 135 degree angle from the horizontal axis X. In an example, grinding may be done in opposite directions between each ceramic diamond disc used.
[0038] In an example, the grinding process may remove ¼ inch thickness from the terrazzo layer 702 and the joint filler 902. The terrazzo layer 702 may be grouted one or more times during the grinding process. For example, the terrazzo layer 702 may be ground between 100-200 passes and again at 200 passes. The edges of the terrazzo layer 702 may be done by hand prior to machine grinding. After the grinding process, excess dust/material may be removed by, for example, sweeping and/or vacuuming.
[0039] Referring now to
[0040] The concrete densifier 1102 may penetrate through the terrazzo layer 702, the seed layer 602, the second primer layer 502, and the first primer layer 402 into the concrete substrate 102 up to a certain depth 1104. In conventional techniques, a densifier may be applied to a terrazzo layer in a volume such that it penetrates approximately 1/16.sup.th of an inch. In an example, the depth 1104 may be greater than approximately 3 inches. In some examples, the concrete densifier 1102 may penetrate through an entire thickness of the concrete substrate 102. This may result in a more robust and aesthetically pleasing final product.
[0041] After the concrete densifier 1102 has dried, it may be polished with one or more ceramic discs. In an example, the concrete densifier may be polished with a 400 grit ceramic disc. For each ceramic disc used, four passes may be made as described above. The first pass 1002 may be back and forth perpendicular (90 degrees) to a horizontal axis X. The second pass 1004 may be back and forth along the horizontal axis X. The third pass 1006 may be back and forth at a 45 degree angle from the horizontal axis X. The fourth pass 1008 may be back and forth at a 135 degree angle from the horizontal axis X.
[0042] Referring now to
[0043] Referring now to
[0044] Although features and elements are described above in particular combinations, one of ordinary skill in the art will appreciate that each feature or element can be used alone or in any combination with the other features and elements.