Integrating wells in towable subsea units

11346185 · 2022-05-31

Assignee

Inventors

Cpc classification

International classification

Abstract

A drilling conductor supported within a suction anchor is installed by lowering the suction anchor through the top of a frame of a subsea processing unit. The base of the frame defines a landing area for the suction anchor and supports a fixing system for fixing the suction anchor to the frame. When the suction anchor has been embedded into the seabed beneath the processing unit, the frame is fixed to the suction anchor to form a structural unit that includes the conductor, the suction anchor and the frame. Additional equipment such as a blow-out presenter or a Christmas tree is lowered through the top of the frame and onto the conductor that is supported by the embedded suction anchor.

Claims

1. A method of installing a drilling conductor for a subsea well, the method comprising: providing a suction anchor that is arranged to support the conductor within; lowering the suction anchor toward a subsea processing unit at a seabed location, the processing unit having a frame defining a base that lies on the seabed and a top spaced from the base to accommodate equipment within the processing unit; lowering the suction anchor into the processing unit through an opening of the top of the frame; embedding the suction anchor into the seabed beneath the processing unit; fixing the frame to the embedded suction anchor to form a structural unit that comprises the conductor, the suction anchor and the frame; lowering additional equipment through the opening of the top of the frame and onto the conductor that is supported by the embedded suction anchor; and closing the opening in the top of the frame above the additional equipment on the conductor.

2. The method of claim 1, comprising lowering and embedding the suction anchor with the conductor already supported within.

3. The method of claim 1, further comprising the preliminary steps of: towing the processing unit to an offshore installation site; and landing the processing unit onto the seabed at the installation site.

4. The method of claim 1, comprising transferring weight load of the additional equipment to the embedded suction anchor.

5. The method of claim 1, comprising fixing the frame to the embedded suction anchor before lowering the additional equipment onto the conductor.

6. The method of claim 1, comprising: connecting one or more elongate guide elements to the embedded suction anchor; and lowering the additional equipment along the or each guide element.

7. The method of claim 6, comprising lowering the additional equipment through the top of the frame along the or each guide element, wherein the or each guide element extends upwardly from the embedded suction anchor and protrudes above the top of the frame.

8. The method of claim 1, comprising making power, control and/or fluid connections between the additional equipment and the equipment on board the subsea processing unit, after lowering the additional equipment onto the conductor.

9. The method of claim 1, comprising drilling a well through the conductor before lowering the additional equipment onto the conductor.

10. The method of claim 1, comprising fixing the frame to the embedded suction anchor by extending one or more clamps from the frame into clamping engagement with the suction anchor.

11. The method of claim 10, comprising extending two or more clamps into clamping engagement with the suction anchor, the clamps being extended fro the frame to different extents relative to each other.

12. The method of claim 1, comprising landing the suction anchor on the seabed within a landing area defined by the frame, before embedding the suction anchor into the seabed.

13. The method of claim 12, comprising aligning the suction anchor with the landing area by making aligning contact between the suction anchor and the frame while lowering the suction anchor toward the seabed.

14. The method of claim 12, wherein the landing area is wider than the suction anchor.

15. The method of claim 1, comprising resting a brace extending laterally from the suction anchor onto at least one member defining the frame.

16. A subsea processing unit, comprising: a frame having a base arranged to lie on a seabed; and on-board equipment mounted on the base; wherein the base of the frame defines a landing area for a suction anchor and supports a fixing system for fixing the suction anchor to the frame; and the frame further comprises a top spaced from the base, the top of the frame having an opening over the landing area for receiving the suction anchor, wherein the suction anchor is configured to be lowered through the opening in the top of the frame and embedded into the seabed beneath the processing unit, and wherein the opening in the top of the frame is configured to be closed above the suction anchor.

17. The unit of claim 16, wherein the fixing system comprises one or more clamp shoes that are extendable from the frame toward the landing area.

18. The unit of claim 17, wherein the fixing system comprises two or more clamp shoes that are extendable from the frame in mutually-opposed directions.

19. The unit of claim 18, wherein the clamp shoes are individually operable and extendable from the frame to if extents relative to each other.

20. The unit of claim 16, further comprising guide formations that are shaped to guide the suction anchor into alignment with the landing area.

21. The unit of claim 16, when installed on the seabed in combination with at least one suction anchor that is embedded into the seabed within the landing area and that is fixed by the fixing system to the frame, the or each suction anchor containing and supporting a tubular drilling conductor.

22. The unit of claim 21, wherein the or each suction anchor is surmounted by an anchor brace that connects the drilling conductor to the suction anchor.

23. The unit of claim 22, wherein the anchor brace defines upwardly facing locating points for additional subsequently installable wellhead equipment.

24. The unit of claim 22, wherein the anchor brace overlaps and lies upon at least one adjacent member of the frame.

25. The unit of claim 21, further comprising at least one upwardly extending elongate guide element connected to the or each suction anchor.

26. The unit of claim 25, wherein the or each suction anchor is surmounted by an anchor brace that connects the drilling conductor to the suction anchor, the anchor brace overlapping and lying upon at least one adjacent member of the frame, and wherein the or each guide element is attached to a locating point of the anchor brace.

27. The unit of claim 22, further comprising additional wellhead equipment mounted on the conductor.

28. The unit of claim 27, wherein the additional wellhead equipment comprises a blow-out preventer or a Christmas tree.

29. The unit of claim 27, further comprising power, control and/or fluid connections between the additional wellhead equipment and the on-board equipment.

Description

(1) In order that the invention may be more readily understood, reference will now be made, by way of example, to the accompanying drawings in which:

(2) FIG. 1 is a perspective view of a suction anchor with an integrated conductor being lowered into a subsea processing unit on the seabed;

(3) FIG. 2 is a perspective view of the subsea processing unit showing the suction anchor and the conductor now embedded in the seabed and guide posts upstanding from the suction anchor;

(4) FIG. 3 is an enlarged detail perspective view showing the top of the suction anchor and the upstanding guide posts;

(5) FIG. 4 is a perspective view of the suction anchor and the conductor in central longitudinal section;

(6) FIG. 5 is a partially cut-away perspective view of a clamping mechanism for fixing the suction anchor to a frame of the subsea processing unit;

(7) FIG. 6 is a perspective view of a Christmas tree being lowered into the subsea processing unit along the guide posts;

(8) FIG. 7 is an enlarged detail perspective view showing the Christmas tree being lowered along the guide posts within the subsea processing unit; and

(9) FIG. 8 is a further enlarged detail perspective view showing the Christmas tree now settled atop the suction anchor within the subsea processing unit.

(10) Referring firstly to FIGS. 1 and 2 of the drawings, an SPU 10 in accordance with the invention comprises a structural box-section lattice frame 12 that is fabricated from hollow structural members of welded steel construction.

(11) In this example, the frame 12 is shaped as a regular trapezium in longitudinal section or in side view, with downwardly-tapering wedge-shaped ends. Thus, the shape of the SPU 10 defined by the frame 12 comprises a generally flat base 14 that lies upon the seabed 16 and a generally flat top 18 that is substantially parallel to the base 14 and hence also to the seabed 16.

(12) In principle, the SPU 10 could be transported to the installation site aboard an installation vessel before being lowered from the surface to the seabed 16. However, the SPU 10 is preferably towed to an installation site, for example in mid-water using the controlled depth towing method (CDTM) known in the art. The SPU 10 may be a discrete unit or may be a towhead of an elongate pipeline bundle, which may have another towhead at the opposite end of the bundle.

(13) When installed on the seabed 14, the SPU 10 is overtrawlable by virtue of its inclined ends and panels 20 that fit substantially flush to the top of the frame 12 to protect equipment housed within SPU 10.

(14) The panels 20 may be moved or removed like a hatch for access from above to install or remove individual items of equipment 22 that are housed by the SPU 10 under the top 18 of the frame 12. The sides of the frame 12 may conveniently be left open as shown, providing access to the equipment 22 for routine maintenance and other operations by subsea intervention, for example using an ROV.

(15) The equipment 22 on board the SPU 10 may include any apparatus or piping arrangement that interacts with, or controls the flow of, fluid flowing through pipework of the SPU 10. Thus, the equipment 22 may comprise a manifold and various items of processing apparatus. The processing apparatus may be arranged to process production fluids flowing from a subsea oil or gas well, or to process other fluids such as water used in, or resulting from, the production of oil or gas.

(16) The equipment 22 on board the SPU 10 may also comprise other items of equipment for powering and controlling the manifold and processing apparatus, and optionally also for controlling the buoyancy and stability of the SPU 10 when it is being transported and installed. Other equipment may be included for subsea power generation, transmission or distribution.

(17) Typically, apparatus for processing production fluid will comprise at least a water separator for removing water from the production fluid. More generally, processing apparatus housed by the SPU 10 may perform a variety of tasks including any of: gas/liquid separation; subsea boosting; subsea gas compression; gas treatment including dewpoint control; pipeline heating; seawater treatment and injection; and/or injection of chemicals. Chemicals may also be stored in the SPU 10, ready for injection.

(18) FIG. 1 shows a suction anchor assembly 24 being supported in the water column by a winch or crane wire 26 hanging from a surface vessel (not shown) and being lowered into the SPU 10 from above. For this purpose, an appropriate one of the panels 20 on the top 18 of the SPU 10 is about to be moved aside, or removed as shown in FIG. 2, to provide access to the interior of the SPU 10 from above.

(19) The suction anchor assembly 24 comprises a tubular suction pile or suction anchor 28. The suction anchor 28 is surmounted by a cruciform frame or anchor brace 30 and contains an integrated tubular conductor 32 that is free to move axially. The conductor 32 may, for example, have an internal diameter of thirty inches (762 mm).

(20) As best appreciated in the sectional view of FIG. 4, the conductor 32 is concentric and coaxial with the surrounding tubular wall of the suction anchor 28, about a common central longitudinal axis 34. The conductor 32 hangs centrally from the anchor brace 30, which extends radially beyond the diameter of the suction anchor 28 to provide a spread of lifting points 36 for the wire 26.

(21) The suction anchor assembly 24 is shown here being aimed into a dedicated slot or bay 38 within the SPU 10, where the base 14 of the SPU 10 is open to the seabed 16. Thus, shortly after the suction anchor assembly 24 enters the bay 38 through the top 18 of the frame 12, the edge of the skirt at the lower end of the suction anchor 28 will encounter the seabed 16.

(22) Initially, the skirt of the suction anchor 28 embeds slightly into the seabed under self-weight. A suction pump can then be activated, for example by ROV or diver intervention, to draw water from within the suction anchor 28 to embed the suction anchor 28 and the conductor 32 more deeply into the seabed 16.

(23) When the suction anchor 28 and the conductor 32 have reached the intended depth in the seabed 16 as shown in FIG. 2, an ROV or diver fits upright guide posts 40 into sockets 42 in the anchor brace 30 as shown in more detail in FIG. 3. FIG. 2 shows that the guide posts 40 extend upwardly from the anchor brace 30 and through an opening 44 in the top of the SPU 10 left by removing a panel 20 above the bay 34.

(24) In FIG. 2, there are two guide posts 40 that extend from diagonally-opposed sockets 42 and hence are mutually opposed about the conductor 32. In FIGS. 3 and 4, there are more guide posts 40 and they are arranged differently in the sockets 42.

(25) FIGS. 3 and 4 show the arrangement of the suction anchor assembly 24 in more detail, including the relationship between the suction anchor 28, the anchor brace 30 and the conductor 32. Here, it will be apparent that the anchor brace 30 comprises cross-members 46 that intersect centrally at a tubular support collar 48. The support collar 48 receives the conductor 32 telescopically. Opposed radially-extending arms of each cross-member 46 each support a respective one of the lifting points 36 and, inboard of the lifting point 36, one of the sockets 42 that receive one of the guide posts 40.

(26) FIG. 3 also shows other features at the top of the suction anchor assembly 24, in particular: a vent hatch 50 that can also be used for contingency grouting; and a ‘hot stab’ connector 52 that enables suction pump operations with a high flow rate of, for example, 1500-2000 l/min.

(27) Whilst not shown here, the suction anchor assembly 24 can also be fitted with survey equipment to capture and record accurate information as to heading, position and tilt of the suction anchor 28. Also, an analogue manometer can give direct pressure readings inside the suction anchor 28.

(28) A clamping system comprising multiple individually-operable clamps 54 around the suction anchor 28 is also evident in FIGS. 3 and 4. One of those clamps 54 is shown in detail in FIG. 5.

(29) There are four clamps 54 in this example, equi-angularly spaced around the central longitudinal axis 34 of the suction anchor assembly 24. Clamp shoes 56 of the clamps 54 act radially inwardly upon the tubular wall of the suction anchor 28 in mutually-opposed pairs.

(30) The clamp shoe 56 of each clamp 54 is movable relative to a respective clamp box 58. The clamp boxes 58 are fixed to respective beam members 60 of the frame 12 at the base 14 of the SPU 10. Four such beam members 60 form a rectangle or square around the suction anchor 28.

(31) The suction anchor 28 is guided into a generally central position between the clamp boxes 58 by mutually-opposed, downwardly-converging guide formations 62 supported by the clamp boxes 58. For this purpose, the guide formations 62 define inwardly- and downwardly-inclined guide surfaces. The guide formations 62 thereby ensure that the suction anchor 28 is landed within tolerance for effective clamping, for example within a target box of ±0.2 m.

(32) The lateral spacing between the opposed clamp boxes 58 exceeds the diameter of the tubular wall of the suction anchor 28. Consequently, there is a clearance between the clamp boxes 58 and the suction anchor 28. This clearance eases insertion of the suction anchor assembly 24 into the SPU 10.

(33) The clearance around the suction anchor 28 may vary between the clamps 54, depending upon how centrally the suction anchor 28 is positioned between them. Differential clearance between the clamp boxes 58 and the suction anchor 28 is dealt with by advancing the clamp shoes 56 in radially inward directions to different extents.

(34) Each clamp box 58 contains and supports a clamping mechanism that effects radial movement of the clamp shoes 56 in response to rotation of an upwardly-facing drive socket 64 that protrudes from the clamp box 58. The drive socket 64 is arranged to be engaged and turned by a standard Class 4 torque tool, which may conveniently be held by an ROV or diver in a routine manner.

(35) Rotation of the drive socket 64 turns an upright threaded drive screw 66 that is fixed to the drive socket 64 to turn on a common axis. For this purpose, the drive screw 66 is supported by bearings that are fixed to the clamp box 58. Preferably, the drive screw 66 has a buttress thread for maximum strength.

(36) A nut 68 is engaged with the drive rod 66 but is held against rotation. The nut 68 is thereby driven up or down the drive rod 66 depending upon the direction of rotation of the drive rod 66. The nut 68 is pivotably engaged with a bell crank 70, which therefore turns about a pivot 72 in response to movement of the nut 68 along the rod 66.

(37) More specifically, a first arm of the bell crank 70 receives the nut 68 in a slot, whose elongation allows for variation in radius between the nut 68 and the pivot 72 of the bell crank 70 as the nut 68 moves along the straight rod 66.

(38) A second arm of the bell crank 70 extends at about 90° to the first arm about the pivot 72. The second arm is pivotably engaged with a pin 74 near its free end opposite the pivot 72. The pin 74 is attached to a rod 76 that is constrained for straight radial movement with respect to the suction anchor 28. The clamp shoe 56 is fixed to a radially inner end of the rod 76.

(39) The second arm also receives the pin 74 in a slot. The elongation of the slot allows for variation in radius between the pin 74 and the pivot 72 as the pin 74 and the rod 76 follow their straight path.

(40) For strength and stability, the bell crank 70 in this example is bifurcated into two parallel plates, one each side of the drive rod 66, nut 68, pin 74 and rod 76.

(41) It will be apparent that the bell crank 70 converts movement of the nut 68 along the drive rod 66, caused by rotating the drive socket 64, into radial movement of the rod 76 and hence of the clamp shoe 56 that is fixed to the rod 76.

(42) By clamping the suction anchor 28 in this way, the frame 12 of the SPU 10 can be fixed or locked to the suction anchor assembly 24 when the suction anchor 28 and conductor 32 have been embedded into the seabed 16 to a desired extent as shown in FIGS. 2 and 3. Precise alignment between the suction anchor assembly 24 and the frame 12 of the SPU 10 is not necessary.

(43) Locking the frame 12 to the suction anchor assembly 24 allows the base 14 of the SPU 10 to interact beneficially with the suction anchor 28 to form a more effective foundation than either structure could provide in isolation. Thus, for example, the base 14 of the SPU 10 spreads weight loads across a wider area of the seabed 16 and so relieves the suction anchor 28 from having to bear all of those loads. This means that the suction anchor 28 need not be as large and the integrated conductor 32 need not be as long as in prior art solutions.

(44) As will be appreciated from FIG. 3 of the drawings, cross-members 46 of the anchor brace 30 may rest upon horizontal flanges of the surrounding beam members 60 at the base 14 of the SPU 10 when the suction anchor 28 is embedded fully into the seabed 16. This locates the suction anchor 28 axially against weight loads applied to the suction anchor 28. In this way, axial load is transferred from the anchor brace 30 into the base 14 of the SPU 10, which then distributes the load across the seabed 16. This allows the clamps 54 to be simplified as they need to provide only lateral location rather than axial location.

(45) If the suction anchor 28 is not fully embedded in the seabed 16, some axial clearance could be left between the cross-members 46 of the anchor brace 30 and the horizontal flanges of the beam members 60. In any event, lateral clearance between the cross-members 46 and upright webs of the beam members 60 provides for tolerance in the lateral position of the suction anchor assembly 24 relative to the frame 12 of the SPU 10.

(46) It will be recalled that the guide posts 40 upstanding from the sockets 42 in the anchor brace 30 extend upwardly through an opening 44 in the top 18 of the SPU 10. The guide posts 40 thereby facilitate aligning and landing further equipment directly on top of the suction anchor assembly 24. To exemplify such equipment, the sequence of drawings in FIGS. 6, 7 and 8 shows a Christmas tree 78 being lowered through the opening 44 into the bay 38 underneath.

(47) Typically, a well will be drilled or completed before the Christmas tree 78 is installed into the SPU 10. The Christmas tree 78 can be installed either by a rig or a vessel.

(48) Initially, as shown in FIG. 6, the Christmas tree 78 is lowered toward the SPU 10 with the guidance of parallel guide wires 80. The guide wires 80 extend upwardly from the guide posts 40 and extend through parallel tubular passageways in the Christmas tree 78.

(49) FIG. 7 shows the Christmas tree 78 now engaged with the guide posts 40. The Christmas tree 78 has been lowered beneath the opening 44 in the top 18 of the SPU 10 and is approaching engagement with the top end portion of the conductor 32, which protrudes upwardly above the anchor brace 30 of the suction anchor assembly 24.

(50) Finally, FIG. 8 shows the Christmas tree 78 now lowered fully into engagement with the top end portion of the conductor 32. The weight load of the Christmas tree 78 is now taken by the anchor brace 30 of the suction anchor assembly 24. That weight load is then distributed between the suction anchor 28 and the base 14 of the SPU 10 by virtue of the clamped connection between the suction anchor 28 and the frame 12 of the SPU 10.

(51) It will be noted that any misalignment between the suction anchor 28 and the SPU 10 is immaterial. Not only do the clamps 54 compensate for any such misalignment but also the Christmas tree 78 needs only to be aligned accurately with the suction anchor 28 rather than with the SPU 10. The necessary alignment between the Christmas tree 78 and the suction anchor 28 is assured by the guide posts 40 being attached to the anchor brace 30 that surmounts the suction anchor 28. So, the weight of the Christmas tree 78 is supported directly by the suction anchor 28 and only indirectly by the base 14 of the SPU 10 via the clamps 54.

(52) Once the Christmas tree 78 has been installed into the SPU 10 in this way, power, control and fluid connections are made between the Christmas tree 78 and the manifold and other equipment 22 within the SPU 10. Such connections are made to convey power, control signals and fluids to and from the Christmas tree 78. The removed panel 20 is also replaced to close the opening 44 above the bay 34.

(53) In service, the conductor 32 will extend in length due to thermal expansion caused by the flow of hot fluids within and so will slide within the anchor brace 30 to move longitudinally relative to the surrounding suction anchor 28. Equipment atop the suction anchor assembly 24 that comprises the conductor 32, such as the Christmas tree 78, is therefore free to move to a limited extent relative to the surrounding frame 12 of the SPU 10. This requires some flexibility or slack in the connections between the Christmas tree 78 and the manifold and other equipment 22 within the SPU 10.

(54) It is possible to clamp the frame 12 to the suction anchor 28 before or after installing equipment such as the Christmas tree 78 on top of the suction anchor assembly 24.

(55) Many variations are possible within the inventive concept. For example, whilst the suction anchor is shown as being installed from a vessel into the SPU after tow-out of the SPU, a different installation sequence may be possible. In particular, the suction anchor could be pre-installed and secured in the SPU, whereupon a crane of a vessel may be used to lower that assembly to the seabed. In another approach, a suction anchor could be installed and used for drilling operations before the SPU is installed. The SPU can then be landed onto the guide base anchor.