Delayed drop assembly
11346184 · 2022-05-31
Assignee
Inventors
Cpc classification
E21B37/00
FIXED CONSTRUCTIONS
International classification
E21B37/00
FIXED CONSTRUCTIONS
Abstract
A method of perforating a wellbore is described herein. The method includes lowering a perforating wellbore tool into the wellbore proximate a formation to be perforated, anchoring the perforating wellbore tool by setting an anchoring tool, perforating the formation, creating a low pressure chamber in the perforating wellbore tool, and unsetting the anchoring tool after a time delay.
Claims
1. A method of perforating a wellbore, comprising: lowering a perforating wellbore tool into the wellbore proximate a formation to be perforated; anchoring the perforating wellbore tool by setting an anchoring tool; perforating the formation; creating a low pressure chamber in the perforating wellbore tool; and releasing the perforating wellbore tool by unsetting the anchoring tool after a time delay after perforating the formation.
2. The method of claim 1, wherein the low pressure chamber is created by opening ports in the perforating wellbore tool.
3. The method of claim 2, wherein the ports are opened by detonation of underbalance charges in the perforating wellbore tool.
4. The method of claim 2, wherein the ports are opened by actuation of valves in the perforating wellbore tool.
5. The method of claim 1, wherein an underbalance state results from creating the low pressure chamber.
6. The method of claim 5, wherein the underbalance state results in a flow surge from the perforated formation to the low pressure chamber.
7. The method of claim 1, wherein a ballistic delay fuse in the perforating wellbore tool provides the time delay for unsetting the anchoring tool.
8. The method of claim 1, wherein the unsetting the anchoring tool is delayed until the perforations in the formation are cleaned.
9. A wellbore tool comprising: a gun anchor system with one or more explosive type anchor releases; a perforating gun having one or more shaped charges for forming perforation tunnels in a formation, one or more ports, and a surge chamber, wherein the one or more ports can be actuated to allow surge flow from the perforation tunnels into the surge chamber; an explosive train, wherein said explosive train is connected to both a detonating cord in said perforating gun, and a ballistic time delay system connected to the explosive type anchor releases.
10. The wellbore tool of claim 9, wherein the one or more ports are actuated by detonation of underbalance charges.
11. The wellbore tool of claim 9, wherein the one or more ports are actuated by a valve.
12. The wellbore tool of claim 9, wherein actuation of the one or more ports creates an underbalance condition in the wellbore.
13. The wellbore tool of claim 12, wherein the underbalance condition results in the flow surge from the perforation tunnels in the formation.
14. The wellbore tool of claim 9, wherein said ballistic time delay system utilizes a ballistic delay fuse.
15. The wellbore tool of claim 9, wherein said ballistic time delay system delays the release of the gun anchor system until after detonation of its shaped charges.
16. The wellbore tool of claim 15, wherein said ballistic time delay system delays the release of the gun anchor system until after surge flow from the perforation tunnels enters the surge chamber.
17. The wellbore tool of claim 9, comprising multiple perforating guns.
18. A method of perforating a wellbore, comprising: lowering a perforating wellbore tool into the wellbore proximate a formation to be perforated, wherein said perforating wellbore tool comprises: a gun anchor with one or more explosive type anchor releases; a perforating gun having a plurality of shaped charges initiated by ignition of a detonating cord, an interior chamber, and one or more communication ports that when opened are in communication with the interior chamber; and a ballistic time delay system initiated by ignition of a fuse to release the one or more explosive type anchor releases; and an explosive train split into two paths, a first path for igniting the detonating cord of the perforating gun, and a second path for igniting the fuse of the ballistic time delay system; anchoring said perforating wellbore tool; activating the explosive train to ignite the plurality of shaped charges to perforate the formation and ignite the fuse of the ballistic time delay; and opening the one or more communication ports to create a flow surge from the perforated formation to the interior chamber.
19. The method of claim 18, further comprising the step of releasing the anchoring of the tool after the flow surge enters the interior chamber.
20. The method of claim 19, wherein releasing the anchoring of the tool drops the perforating gun into the wellbore.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) Certain embodiments of the disclosure will hereafter be described with reference to the accompanying drawings, wherein like reference numerals denote like elements. It is emphasized that, in accordance with standard practice in the industry, various features are not drawn to scale. In fact, the dimensions of various features may be arbitrarily increased or reduced for clarity of discussion. It should be understood, however, that the accompanying figures illustrate the various implementations described herein and are not meant to limit the scope of various technologies described herein, and:
(2)
(3)
(4)
(5)
(6)
(7)
(8)
DESCRIPTION OF EMBODIMENTS OF THE DISCLOSURE
(9) In the following description, numerous details are set forth to provide an understanding of some embodiments of the present disclosure. It is to be understood that the following disclosure provides many different embodiments, or examples, for implementing different features of various embodiments. Specific examples of components and arrangements are described below to simplify the disclosure. These are, of course, merely examples and are not intended to be limiting. In addition, the disclosure may repeat reference numerals and/or letters in the various examples. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or configurations discussed. However, it will be understood by those of ordinary skill in the art that the system and/or methodology may be practiced without these details and that numerous variations or modifications from the described embodiments are possible. This description is not to be taken in a limiting sense, but rather made merely for the purpose of describing general principles of the implementations. The scope of the described implementations should be ascertained with reference to the issued claims.
(10) As used herein, the terms “connect”, “connection”, “connected”, “in connection with”, and “connecting” are used to mean “in direct connection with” or “in connection with via one or more elements”; and the term “set” is used to mean “one element” or “more than one element”. Further, the terms “couple”, “coupling”, “coupled”, “coupled together”, and “coupled with” are used to mean “directly coupled together” or “coupled together via one or more elements”. As used herein, the terms “up” and “down”; “upper” and “lower”; “top” and “bottom”; and other like terms indicating relative positions to a given point or element are utilized to more clearly describe some elements. Commonly, these terms relate to a reference point at the surface from which drilling operations are initiated as being the top point and the total depth being the lowest point, wherein the well (e.g., wellbore, borehole) is vertical, horizontal or slanted relative to the surface.
(11) Generally, the present disclosure provides a wellbore perforation tool that has a delayed drop post-perforation. The wellbore perforation tool of the present disclosure controls the downhole transient underbalance pressure during and after perforation while anchoring a tool string, delaying the release of the anchoring device, and dropping a perforating gun string to the bottom of the well after perforation. This allows for the creation of clean perforations in the reservoir, which reduces time and costs associated with perforation cleanup.
(12)
(13) If large volumes of cement filtrate invade the rock during perforation, the possibility of formation damage 104 exists. Further, the perforation process may also generate a tunnel full of rock debris mixed in with the perforator charge debris. Such outcomes reduce the productivity and injectivity of the perforation and well 10.
(14) Applicant previously developed a technology to create cleaner perforations for better performing wells. This technology, described in U.S. Pat. No. 6,598,682, which is incorporated herein in its entirety for all purposes, modifies a conventional perforating gun to control the underbalance effect experienced during perforations.
(15)
(16) It should be understood that in alternate embodiments of the present disclosure, depending on the application for creating the underbalance condition, the underbalance perforating charges 122 may be installed in either a gun alongside conventional charged 121 or in a perforating gun 120 alongside underbalance perforating charges only.
(17) An embodiment of a modified perforating gun 120 that can be used in embodiments of the present disclosure is depicted in
(18) In the embodiment shown, the underbalanced perforating charges 122 create an opening 123 in the second (surge) chamber 132 of the perforating gun 120, but not the casing 102 or formation 100. Unlike conventional perforating systems that rely on a large static pressure differential between the wellbore and the formation 100 to remove perforation debris and crushed-zone damage, the underbalanced perforating system fully exploits the transient underbalance that occurs immediately after perforating. This creates a large dynamic underbalance that results in flow into (shown by the arrows in
(19) In the embodiment of the perforating gun 120 shown in
(20) Underbalanced perforating technology is not easily combinable with automatic release anchoring technology. Typically, when using anchoring tools with automatic release, the perforating guns are automatically released and dropped to the bottom of the well at the instant of the detonation. This timing does not allow for the underbalance effect to be fully captured. As such, the perforation tunnels may not be fully cleaned, resulting in decreased production performance.
(21) To overcome this pressure issue and inability to create the full underbalance effect, the delayed drop assembly of the present disclosure combines an anchoring device having an explosive type release mechanism with a ballistic delay fuse. Traditionally, ballistic delay fuses have been used to delay the detonation for individual perforating guns. In embodiments of the present disclosure, however, ballistic delay fuses are being used to delay the release and drop of perforating guns. This allows for the surge chamber to fill with fluid and create the dynamic underbalance needed to clean the perforations before it drops to the bottom of the well.
(22)
(23) As noted above, and as illustrated in
(24) An overview of an embodiment of the delayed drop assembly 400 of the present disclosure is shown in
(25) The ballistic time delay system 403, however, has a ballistic time delay fuse (BTDF) that will delay the release of the anchor slips 201 on the anchoring tool 401. This, in turn, delays the dropping of the perforating gun post-perforation such that there is sufficient time for the underbalance effect to be obtained and for fluids and debris to flow in the communication ports 123 of the surge chamber 132. The BTDF explosive path will then continue to a break plug 203 and follow typical anchoring tool release mechanisms to release the slips 201 anchoring the tool 401. This will cause the anchoring tool 401 and perforating guns below to fall to the bottom of the well. Because of the delayed drop, the perforations in the wellbore will be cleaned by the dynamic underbalance pressure created by the opening of the communication ports 123 of the surge chamber 132.
(26)
(27) Embodiments of the present disclosure combine anchoring technology, underbalance perforation technology, and ballistic delay systems in to a single tool to clean perforations as they are made. The delay drop assembly tool reduces the cost and time needed for perforating services while improving the wellbore's productivity and injectivity by removing debris to minimize or eliminate crushed zone damage.
(28) In embodiments of the present disclosure, minimal or no initial static underbalance is required. Fluctuations in the wellbore pressure immediately after shaped charge detonation actually governs the perforation cleanup. The underbalance technology utilizes this understanding of dynamic wellbore pressure to control surge flow. Further, embodiments of the present disclosure enhance acidizing and hydraulic fracturing treatments. Near wellbore washes with acid may be eliminated in most perforation operations. Additionally, remedial perforation was acid jobs may be eliminated.
(29) Embodiments of the present disclosure improve isolation resulting from minimal cement sandface hydraulic bond disruption. Additionally, embodiments of the present disclosure reduce rig time and equipment costs associated with perforation washes, acid stimulation, pumping nitrogen and reservoir cleanup.
(30) Although a few embodiments of the disclosure have been described in detail above, those of ordinary skill in the art will readily appreciate that many modifications are possible without materially departing from the teachings of this disclosure. For instance, it should be understood that the perforating shaped charges and the underbalance charges may be located alongside each other, with the surge chamber resulting along the interior of the perforating gun. Further, it should be understood that the present disclosure in not limited to a single perforating gun. In alternate embodiments, multiple perforating guns may be deployed and detonated in succession through use of the same explosive train.
(31) Such modifications are intended to be included within the scope of this disclosure as defined in the claims. The scope of the invention should be determined only by the language of the claims that follow. The term “comprising” within the claims is intended to mean “including at least” such that the recited listing of elements in a claim are an open group. The terms “a,” “an” and other singular terms are intended to include the plural forms thereof unless specifically excluded. In the claims, means-plus-function clauses are intended to cover the structures described herein as performing the recited function and not only structural equivalents, but also equivalent structures. It is the express intention of the applicant not to invoke 35 U.S.C. § 112, paragraph 6 for any limitations of any of the claims herein, except for those in which the claim expressly uses the words “means for” together with an associated function.