Abstract
A method for the offshore installation of a construction laid by gravity on the seabed, comprising: the provision of a concrete base (1) delimited by a lower slab (8), a roof (2) and a perimeter wall (5), the interior whereof comprises vertical walls (6, 6′) forming cells (7, 12, 22); connecting at the periphery of the roof (2) a plurality of hollow metal floats (3) formed by a column with a circular or polygonal base; towing the assembly to the offshore location where the construction is to operate; allowing seawater to enter the cells (12) located below the roof (2), maintaining the cells (22) located below the metal floats (3) empty, in such a way that when the cells (12) located below the roof (2) are totally full, both the base and the metal floats (3) are submerged; once the cells located below the roof (2), but not those located below the metal floats (3) are full of water, allowing water to enter the cells (22) located below the metal floats (3) in such a way that the immersion of the assembly is completed, the base thereof resting on the seabed; and removing the metal floats. A gravity-based structure comprising a concrete base (1) and a plurality of hollow metal floats (3) connectable thereto.
Claims
1. A method for the offshore installation of a construction laid by gravity on the seabed, comprising: providing a concrete base delimited by a lower slab, a roof and a perimeter wall, wherein the interior of the concrete base comprises a plurality of vertical walls forming cells, connecting at the periphery of the roof of said concrete base a plurality of hollow metal floats, wherein each metal float of said plurality of metal floats is formed by a column with a circular or polygonal base, towing the assembly formed by the concrete base and the plurality of metal floats to the offshore location where it is to operate, allowing seawater to enter the cells located below the roof, maintaining the cells located below the metal floats empty, in such a way that when the cells located below the roof are totally full, both the concrete base and the metal floats are submerged, once the cells located below the roof, but not those located below the metal floats, are full of seawater, allowing seawater to enter the cells located below the metal floats, in such a way that the immersion of the assembly is completed, the concrete base resting on the seabed, removing said plurality of metal floats.
2. The method of claim 1, wherein the step of allowing seawater to enter the cells of the concrete base, which are located below the roof, comprises: first allowing seawater to enter the outer cells, and then allowing seawater to enter the inner cells.
3. The method of claim 2, wherein the step of allowing seawater to enter the outer cells is carried out as follows: allowing seawater to enter from outside the concrete base, through an intake and an access pipe that connects the intake with a central pipe, from the central pipe, distributing the water towards a first plurality of distribution pipes towards a corresponding group of outer cells, in each group of outer cells, allowing the water to enter between the cells through perforations in the vertical walls that separate adjacent cells, as the cells in each group of outer cells are filled, emptying the cells of air.
4. The method of claim 3, wherein the step of allowing seawater to enter the inner cells is carried out as follows: allowing seawater to enter from outside the concrete base, through the intake and the access pipe to the central pipe, from the central pipe, distributing the water towards a second plurality of distribution pipes towards at least one group of inner cells, in the at least one group of inner cells, allowing the water to enter between the cells through perforations in the vertical walls that separate adjacent cells, as the cells in each group of inner cells are filled, emptying the cells of air.
5. The method of claim 1, wherein the step of allowing seawater to enter the cells located below the metal floats is carried out as follows: allowing seawater to enter from outside the concrete base, through an intake and an access pipe that connects the intake with a central pipe, from the central pipe, distributing the water towards a third plurality of distribution pipes towards a corresponding group of cells below floats, in each group of cells below floats, allowing the water to enter between the cells through perforations in the vertical walls that separate adjacent cells, as the cells in each group of cells are filled, emptying the cells of air.
6. The method of claim 1, wherein the step of towing the assembly formed by the concrete base and the plurality of metal floats to the offshore location where the construction is to operate is carried out with the concrete base and metal floats completely empty of ballast.
7. The method of claim 1, wherein the step of towing the assembly formed by the concrete base and the plurality of metal floats to the offshore location where the construction is to operate further comprises towing the construction or a portion thereof, which has been previously installed on the concrete base.
8. The method of any one of the preceding claims claim 1, wherein the metal floats are designed so that they fulfil the following equation:
9. The method of claim 8, wherein the metal floats are designed so that the volume of each one also fulfils the following equation:
Volume of the cells below the roof>Total weight of empty structure/1.025×0.5
10. The method of claim 1, wherein as the cells are filled with water, the air occupying the cells before filling with water is released through perforations in the walls that separate the cells and through air pipes.
11. The method of claim 1, wherein when the outer and inner cells below the roof have been filled, but the cells below the metal floats have not, the critical point of lowering stability has been reached, at which point the metal floats are completely submerged.
12. The method of claim 1, wherein the step of removing said plurality of metal floats is carried out by remote control.
13. The method of claim 1, wherein the step of removing said plurality of metal floats comprises allowing water from the outside to enter inside the metal floats to reduce the vertical thrust of the floats and thus better control the rise thereof.
14. A method of re-floating a construction laid by gravity on the seabed, which has been installed by following the method of claim 1, comprising: allowing compressed air from the outside to enter inside the concrete base through air pipes.
15. A maritime structure for offshore laying of a construction by gravity, comprising: a concrete base comprising a lower slab, an upper roof and a perimeter wall that delimits the concrete base from the lower slab thereof to the upper roof thereof, the inside of the concrete base comprising a plurality of vertical walls that form or delimit cells, a plurality of hollow metal floats configured to connect to and disconnect from the roof, wherein each metal float of said plurality of metal floats is formed by a column with a circular or polygonal base, wherein the metal floats are designed so that the volume of each one fulfils the following equation:
16. The structure of claim 15, wherein the metal floats are designed so that the volume of each one also fulfils the following equation:
Volume of the cells below the roof>Total weight of empty structure/1.025×0.5.
17. The structure of claim 15, wherein the lower slab and the upper roof of the concrete base are square or rectangular, in which case the number of metal floats is 4, the floats being located at the corners of the roof.
18. The structure of claim 15, wherein the lower slab and the upper roof of the concrete base are triangular, in which case the number of metal floats is 3, the floats being located at the corners of the roof.
19. The structure of claim 15, wherein the lower slab and the upper roof of the concrete base are circular, in which case the number of metal floats is at least 3, the floats being located equidistant from each other in the outermost portion of the roof.
20. The structure of claim 15, further comprising a water filling system comprising: at least one access pipe that connects the outside of the concrete base with the inside of the concrete base, at least one inner pipe connected to said at least one access pipe, from which the following start: a first plurality of distribution pipes communicated with a plurality of groups of outer cells for, when using the structure, filling the outer cells below the roof with water from the at least one inner pipe, a second plurality of distribution pipes communicated with at least one group of inner cells for, when using the structure, filling the inner cells below the roof with water from the at least one inner pipe, a third plurality of distribution pipes communicated with at least one group of cells below floats for, when using the structure, filling the cells below floats with water from the at least one inner pipe and a plurality of air pipes configured to, during the immersion of the structure, remove the air from the cells as they fill with water and, during the refloating of the structure, allow compressed air to enter the cells.
21. (canceled)
Description
BRIEF DESCRIPTION OF THE FIGURES
[0069] As a complement to the description, and for the purpose of helping to make the features of the invention more readily understandable, in accordance with a practical exemplary embodiment thereof, said description is accompanied by a set of figures which, by way of illustration and not limitation, represent the following:
[0070]
[0071]
[0072]
[0073]
[0074]
[0075]
[0076]
[0077]
[0078]
[0079]
[0080]
[0081]
[0082]
DESCRIPTION OF AN IMPLEMENTATION OF THE INVENTION
[0083] The description that follows should not be taken in a limited sense, but is provided solely for the purpose of describing broad principles of the invention. The following embodiments of the invention will be described by way of example, with reference to the figures mentioned above, which show apparatuses and results according to the invention.
[0084]
[0085] The lower slab 8 is very thick, for example between 0.50 and 1 metre. The lower slab is responsible for transmitting the loads to the seabed. The thickness of the roof 2 preferably varies between 0.20 and 0.75 metres. The perimeter wall 5 that is arranged vertically between the lower slab 8 and the roof 2 of the concrete base is very resistant, to withstand the energy of the swell and the hydrostatic pressure. The thickness thereof preferably varies between 0.30 and 0.80 metres. Preferably, a concrete base 1 is selected with a height that varies between 7 and 13 metres, such as between 8 and 12 metres, or between 9 and 11 metres, for example about 10 metres. The height has been calculated to optimise the draft, floatability, navigability and lowering thereof. The value thereof must be adjusted to suit the particular conditions of each specific application. At the chosen height, the structure offers very low resistance to swell, this resistance also being reduced since the floats are removed in the operating phase.
[0086] Throughout this specification, the metal columns 3 are also referred to as metal floats due to their function as floats. The floats 3 must be located at points on the roof 2 of the concrete base 1, as far from the centre of gravity of the concrete base as possible, for example at the vertices when the concrete base 1 has a polygonal shape. When the roof 2 (and lower slab 8) of the concrete base 1 is triangular or circular, as is the case of
[0087] The metal columns 3 are rigidly connected, usually at port, to the roof 2 of the concrete base 1 by means of connection means 4 located on the roof, which enable the connection and disconnection thereof. The columns 3 connected or able to be connected to the concrete base 1 are preferably equal to each other. The cross-section thereof can be circular (i.e., a cylindrical column) or polygonal (i.e., the column is shaped like a prism with a polygonal base), since they are designed to withstand significant hydrostatic pressures. For example, the columns of the concrete bases of
[0088] Preferably at the bottom thereof, each column 3 has a watertight compartment that houses the active connection and disconnection mechanisms 11, able to be connected to the connection means 4 of the roof 2.
[0089]
[0090]
[0091] The concrete base 1 forms a very robust and monolithic structure in order to withstand the significant actions that it will be subjected to in the marine environment. It can be built by concreting “in situ” at least the lower slab 8 and the perimeter walls 5. The lower slab 8 and the perimeter walls 5 can be built without joints of any type. If necessary, the inner walls 6 can be prefabricated.
[0092] Among the vertical walls 6, those that delimit and/or form the cells arranged below the floats 3 are reinforced walls 6′, as shown in
[0093] The rest of the walls 6 are usually thinner, such as between 0.15 and 0.35 metres. Some walls 6, 6′ may have perforations both at the bottom thereof and at the top, arranged for filling and emptying the cells they form with seawater. In addition, the cells and walls that define them can be passed through by pipes intended to enable water to enter during the lowering of the structure. This is explained later with regards to the method for lowering and refloating the structure.
[0094] The number of cells 7 defined inside the concrete base 1 depends on the size thereof, and is selected to adequately support the superstructure (base, floats and construction) that it will support. By way of example, the separation between consecutive vertical walls 6, 6′ can vary between 4 and 8 m, such as between 5 and 7 metres, depending on the installation depth, among other aspects. Furthermore, the concrete base 1 may have an alteration in the regular mesh of cells 7 forming the walls 6, 6′, to constitute a rigid joint with the upper construction.
[0095] Since the height of the concrete base 1 has been chosen to be between 7 and 13 metres, such as between 8 and 12 metres, or between 9 and 11 metres, for example about 10 metres, the concrete base 1 can be constructed using a “caisson” (standard system for manufacturing caissons for wharfs and dykes), if the dimensions can be adapted to the use thereof, or on the contrary, it can be carried out with both conventional formwork and climbing or sliding formwork, on a wharf, floating dyke or dry dyke. It can be carried out through an industrial process based on production and assembly lines, with processes being carried out simultaneously in different manufacturing areas (prefabs, formworks, concreting, floating, assembly of elements, mounting of floats, superstructures, etc.). This system enables lead times to be shortened and production to be increased at lower cost.
[0096] The roof 2 can be formed by a series of concrete pre-slabs 9, as illustrated in
[0097] In
[0098] The volume of the columns or floats 3, and therefore the height and diameter thereof, must be chosen in a way that provides great safety in the transport, lowering and refloating of offshore structures at great depths, such as at depths of up to 60 metres, such as between 30 and 60 metres, or between 40 and 60 metres, or between 50 and 60 metres. Furthermore, for a given naval stability, the lower the height of the columns 3, the less expensive the structure and the lower the centre of gravity, which in turn implies a smaller concrete base 1 for the same result. Thus, once the plan section (and therefore diameter) of the floats 3 has been defined, in order to adapt to the construction 13 to be lowered as well as possible, the height thereof is obtained from the following equation which establishes the volume for the optimal performance thereof:
wherein the “Volume of floats” represents the volume occupied by all the floats (for example, four in
[0099] Preferably, the following equation must also be true:
[0100] These two conditions minimise the volume of the floats, providing the following properties to the assembly: (1) The maximum pressure to which the roof of the concrete base 1 is subjected is equal to that of a water column at the height of the floats 3. (2) Lowering and refloating can be carried out without any type of auxiliary means, since it is ensured that at the critical moment, which is when the columns 3 are completely submerged, the centre of flotation is at least half a metre above the centre of gravity of the assembly, as required by the corresponding regulations on naval stability. In other words, the above conditions guarantee compliance with the regulations.
[0101] The method for the offshore installation of a construction laid by gravity on the seabed is described below. Due to the features of the structure (concrete base and floats) and of the method of installation, the assembly can be installed at great depths, such as at depths of up to 60 metres, such as between 30 and 60 metres, or between 40 and 60 metres, or between 50 and 60 metres. The aim of the entire method is for operations to be carried out in a reliable and safe manner, ensuring the stability of the structure at all times, minimising risks, increasing the windows of operability and doing all of this at a very low cost.
[0102] First, starting from a concrete base 1 such as the one described throughout this specification, i.e., delimited by a lower slab 8, a roof 2 and a perimeter wall 5, and the inside of which includes a plurality of vertical walls 6, 6′ forming cells 7, a plurality of metal floats 3 such as those described throughout this specification are connected at the periphery of the roof 8. In other words, each metal float 3 is formed by a column with a circular or polygonal base and is substantially hollow (i.e., except with regard to the thickness of the perimeter wall thereof, which provides resistance to hydrostatic pressure, and to elements necessary for installation and lowering, such as connection mechanisms 11 and/or valves which can facilitate the refloating step). When the concrete base 1 has a polygonal cross section, the floats 3 are placed at vertices of the roof, preferably one float per vertex. When the concrete base 1 has a circular cross section, the floats 3 are placed at points on the perimeter thereof, i.e., as far from the centre as possible, preferably equidistant from each other.
[0103] The assembly formed by the concrete base 1 and the plurality of metal floats 3 is towed to the offshore location where the construction 13 is to operate. The structure can be transferred to the location where it operates by means of conventional, high-availability tugboats 14, as illustrated for example in
[0104] In this step of transferring the structure, the concrete base 1 is preferably completely empty, so that naval stability is excellent and the freeboard thereof is high. Moreover, the floats 3 joined to the concrete base 1 provide very broad stability at high heel, a circumstance that is crucial to minimise risks and increase windows of operability.
[0105] Once at the offshore installation site, if necessary, the structure can be placed in its final position, for example by tugboats. By way of example,
[0106] Next, to begin lowering itself, seawater is allowed to enter the cells 12 of the concrete base located below the roof 2 of the concrete base 1, maintaining the cells 22 located below the metal floats 3 unfilled (empty), in such a way that when the cells 12 located below the roof are totally full, both the concrete base 1 and the metal floats 3 are submerged. In other words, the assembly is submerged approximately at the height of the top of the floats 3, these floats being submerged just below the sea surface.
[0107] Once the cells 12 located below the roof 2, but not those located below the metal floats 3, are full of seawater, seawater is allowed to enter the cells 22 located below the metal floats 3, in such a way that the immersion of the assembly is completed, the concrete base 1 resting on the seabed. In fact, the concrete base 1 rests on the seabed shortly after the cells 22 located below the floats begin to fill, cells which are completely filled once the concrete base 1 has rested on the seabed in order to make the assembly more stable. The cell filling process is carried out by means of a set of pipes, such as: access pipe from the outside to the inside, inner ring pipe and preferably radial pipes that distribute the water to groups of cells from the inner ring pipe; and auxiliary elements such as access valves, pumping systems and perforations for the passage of water.
[0108] Finally, the metal floats 3 are removed. In
[0109] As for the inlet of seawater into the cells 12 of the concrete base located below the roof 2 of the concrete base 1, maintaining the cells 22 located below the metal floats 3 unfilled (empty), this step can be divided into two phases: First, allowing seawater to enter the outer cells of the assembly of cells 12 below the roof 2; and secondly, allowing water to enter the inner cells of said assembly of cells 12. Filling the cells 12 in the aforementioned order can facilitate the outlet of air contained in the empty cells 12 as they are filled. Alternatively, the cells can be filled in another order.
[0110] One possible way of allowing water to enter the outer cells below the roof is illustrated in
[0111] Once the water reaches the outer cells 12A of the cells 12 below the roof, also through perforations 19 located in the vertical walls separating the cells, preferably at the bottom thereof, the water passes from some cells to others, so that the outer cells below the roof are filled with water from the distribution pipes 18. In the case illustrated in
[0112] Although two rows of cells in each group of cells 12A are shown in
[0113] When the cells of the groups of outer cells 12A are full, the groups of cells corresponding to the central area 12B are filled, as illustrated in
[0114] When the entire central area 12B is filled, the critical point of lowering stability is reached, since at this time the floats 3 are completely submerged and the inertia of the floating surface decreases drastically, leaving the stability highly compromised. For this reason, conventional concrete caissons or bases, for example those with only 10 m of upright height, usually require some auxiliary means to stabilise them. On the contrary, the following occurs in the concrete base 1 of the present invention, mainly due to the design of volumes proposed for calculating the floats 3: (1) The centre of flotation of the submerged surface is more than half a metre above the centre of gravity of the entire assembly once the cells below the roof have been filled, as explained below. This entails the recovery of the stability that enables lowering to be continued with absolute safety. From this moment on, this distance increases even further. (2) At the critical moment of lowering stability, there are no free surfaces since there are no cells that are half-filled. This entails a great optimisation of resources to achieve maximum stability with minimal structure. (3) All the cells 12 that are below the roof 2 of the concrete base 1 are completely filled with water, so that by having to withstand much less pressure, significant cost-effectiveness of the structure for laying at great depths is achieved.
[0115] Seawater is then allowed to enter the cells 22 located below the floats 3, as shown for example in
[0116] As the cells 22 are filled, the concrete base 1 descends until the immersion of the assembly is completed, leaving the concrete base 1 resting on the seabed. When this occurs, the cells 22 below the floats 3 still have not been totally filled. These cells 22 are completely filled once the concrete base 1 rests on the seabed. It is worth noting that no water (or ballast, in general) has entered the floats 3, which are empty when they reach the seabed.
[0117] Once the concrete base 1 is completely filled with water, the structure is already perfectly stabilised on the seabed and the floats 3 can be removed to be reused with another structure. The decoupling can be carried out from the control centre, remotely actuating the connection and disconnection mechanisms 11. It can also be done by actuating the ROV, which serves to monitor the process. To facilitate the disconnection process, the floats 3 can have their own system of valves, which enable water from the outside to enter in order to reduce the vertical thrust of the float and thus better control the rise thereof.
[0118] The structure described in this specification has the additional advantage that it enables simple and safe refloating if necessary. The refloating method of the structure, and in general of the construction supported by it, laid by gravity on the seabed by following the method described, is carried out by allowing compressed air from the outside to enter inside the concrete base, through a plurality of air pipes. Preferably, the same pipes that were used during lowering are used to release the air from the cells as they are filled with water. In other words, refloating involves carrying out the reverse process to lowering, but instead of pumping water, compressed air is allowed to enter, for example from an outside vessel, preferably using the same ducts through which the air exited during lowering. This system has two important advantages: the first is that it significantly reduces the number of pipes to be installed in the concrete base; and the second is that the pumps used in the conventional refloating method can break down and stop working over time, such that the proposed method simplifies and ensures the success of the refloating process.
[0119] By way of example, and without limitation, a possible configuration of the structure of the invention is the following: The concrete base is made with a “caisson”, so the maximum beam of the concrete base must be less than 32 m, which is the maximum allowed by the “caisson” method. With this starting dimension, it is possible to carry a load of 850 tonnes with a centre of gravity located 26 metres from the roof, which corresponds, for example, to approximately the weight of a 60-metre jacket structure. The possible dimensions are: [0120] Dimensions of the concrete base: 32×32×10 m [0121] Dimensions of the cells: 4.50×4.50 m [0122] Thickness of outer walls (perimeter wall): 0.50 m [0123] Thickness of inner walls: 0.25 m [0124] Thickness of reinforced walls: 0.50 m [0125] Thickness of the lower slab: 0.80 m [0126] Width of the heel of the lower slab: 0.30 m [0127] Thickness of the upper slab (roof): 0.40 m [0128] Weight of the caisson (concrete base): 7,930 t [0129] Number of floats: 4 [0130] Diameter of the floats: 8.90 m [0131] Height of the floats: 12.65 m [0132] Total weight of the floats: 380 t [0133] Volume of cells below the roof: 4,470 m.sup.3 [0134] Occupation of the seabed: 1,063 m.sup.2
[0135] The maritime structure to be installed (construction, installation or element for obtaining energy 13) on the concrete base must be firmly joined to the caisson (concrete base) so that all the stresses to which the assembly is subjected are transmitted directly to the seabed. For this reason, the caisson may have an alteration in its configuration and therefore produce a change in the previously indicated values, which are not usually significant, but which should be reviewed.
[0136] The proposed structure, and the method for the offshore installation thereof, has major advantages over other conventional installation structures and methods:
[0137] (1) It is the only towing, lowering and refloating system that, without requiring special auxiliary means, has a shallow draft and can be built next to wharfs only about 10 metres deep, which notably increases the availability of manufacturing points close to the site of implementation. This feature is very important because it lowers the cost of the process and increases the possibilities of simultaneous supply for large implementations.
[0138] (2) To install it, the structure is towed to the position where it is to operate, presenting great naval stability due to the high initial metacentric height and the perimeter floats that provide excellent stability at high heel, notably improving safety in adverse conditions.
[0139] (3) The lowering can be carried out at great depths, up to 60 m with the same concrete base structure, since the maximum pressure during the critical moment has been envisaged in the design thereof, which is why it is a very cost-effective type of foundation at these great depths.
[0140] (4) It is a foundation system that does not make noises that affect mammals and other marine animals and that can be carried out on practically all types of seabeds. For this reason, it is a very suitable system for laying jackets or monopiles since it eliminates the significant drawbacks thereof.
[0141] (5) The lowering process of the structure is done by means of ballasting of the cells thereof exclusively with seawater, without the need for any additional means, special large-capacity auxiliary vessels, or floating elements unrelated to the structure since, due to the design thereof, it complies with the requirements during all of the phases of the lowering process.
[0142] (6) The structure offers very low resistance to swell since it is only about 7-13 metres high and the floats are removed in the operation phase.
[0143] (7) For the dismantling thereof, it can be refloated and integrally transferred to the port without the need for auxiliary means to disassemble it.
[0144] (8) On the other hand, when the floats are submerged, the cells located below the roof are already completely ballasted with water. This means that the maximum hydrostatic pressure exerted on the walls and slabs of the base is that which corresponds to this depth. This feature enables the thicknesses of these walls dimensioned for this pressure to be maintained, regardless of the depth at which they rest on the seabed.
[0145] (9) The large support surface enables it to support the largest wind turbines (8 Mw, 10 Mw or higher). The configuration of the foundation and the lack of a solid ballast is favourable to low pressures on the seabed, in spite of the large total weight thereof, and this solves many of the geotechnical problems that other foundations must solve.
[0146] (10) By avoiding the need to use special vessels, which are rare on the market, and auxiliary means for towing and lowering, the manoeuvring times are reduced and the calendar for executing the available windows of good weather can be adjusted, thereby entirely optimising the execution process.
[0147] (11) It is a reinforced concrete structure, with a simple geometry made up only of vertical and horizontal walls (upper and lower slabs) that are not inclined, which allows the knowledge and experience of the technology for the execution of port caissons, which are widely developed, to be used in the constructive system thereof, thereby allowing these types of structures to be simplified, optimised and less expensive.
[0148] (12) The concrete provides a better behaviour against impacts than metal structures. Given the cyclical character of the loads to which these types or constructions are subjected (swell and wind), it also has significant advantages with respect to resistance to fatigue. All of this, along with the improved durability thereof in a saline medium, implies a useful life far superior to the majority of the existing structures.
[0149] (13) The long useful life of the structure, which can exceed 50 years, and the large capacity for absorbing large forces, could enable the substitution of the wind turbine at 20-25 years (approximately the useful life thereof) by another which has greater power. This re-powering can be done safely at the port, due to the efficient refloatation system thereof, and thus provide an efficiency that is far greater than the cost of the foundation.
[0150] As has become apparent throughout the present specification, the structure and method for the installation and refloating of the present disclosure provide several differentiating factors with respect to conventional structures and methods of the installation and refloating of maritime gravity-based structures.
[0151] In this specification, the term “comprises” and its derivations (such as “comprising”, etc.) should not be understood in an excluding sense, in other words, these terms should not be interpreted as excluding the possibility that what is described and defined may include additional elements, steps, etc.
[0152] In the context of the present invention, the term “approximately” and related terms (such as “approximate”, etc.) should be interpreted as indicating values very close to those that accompany said term. In other words, a deviation within reasonable limits from an exact value should be accepted, because a person skilled in the art will understand that such a deviation from the indicated values may be unavoidable due to measurement inaccuracies, etc. The same applies to the terms “some”, “about” and “substantially”.
[0153] The invention is obviously not limited to the specific embodiment(s) described, but also encompasses any variation that may be considered by any person skilled in the art (for example, in relation to the choice of materials, dimensions, components, configuration, etc.), within the general scope of the invention as defined in the claims.