INSTALLATION CLIP, ESPECIALLY FOR INSTALLING PLANKS, AND ASSOCIATED INSTALLATION SYSTEM
20220010825 · 2022-01-13
Inventors
Cpc classification
E04F15/02183
FIXED CONSTRUCTIONS
F16B5/0092
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
E04F15/04
FIXED CONSTRUCTIONS
E04F15/02044
FIXED CONSTRUCTIONS
E04F2015/02122
FIXED CONSTRUCTIONS
International classification
F16B5/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
E04F13/08
FIXED CONSTRUCTIONS
E04F15/02
FIXED CONSTRUCTIONS
Abstract
An installation clip for installing assembly pieces includes a holding arrangement with a first holding element and a second holding element that are arranged symmetrically inside the holding arrangement. The first holding element is configured to interlock with a first receiving element of a first assembly piece and the second holding element is configured to interlock with a second receiving element of a second assembly piece. The first holding element and the second holding element are configured elastically to be held by a preload inside the first receiving element and the second receiving element.
Claims
1. An installation clip for installing assembly pieces comprising: a holding arrangement with a first holding element and a second holding element, wherein the first holding element and the second holding element are arranged symmetrically inside the holding arrangement, wherein the first holding element is configured to interlock with a first receiving element of a first assembly piece and the second holding element is configured to interlock with a second receiving element of a second assembly piece; wherein the first holding element and the second holding element are configured elastically to be held by a preload inside the first receiving element and the second receiving element.
2. The installation clip according to claim 1, further comprising: a fastening arrangement having a fastening recess.
3. The installation clip according to claim 2, wherein the first holding element is configured as a first wing and the second holding element is configured as a second wing.
4. The installation clip according to claim 3, wherein the first wing comprises a first upper preloading element and a first lower preloading element, and the first upper preloading element and the first lower preloading element are disposed opposite one another in order to create the preload for the first holding element upon being received into the first receiving element; and wherein the second wing comprises a second upper preloading element and a second lower preloading element, and the second upper preloading element and the second lower preloading element are disposed opposite one another in order to create the preload for the second holding element upon being received into the second receiving element.
5. The installation clip according to claim 1, wherein the first holding element comprises a first spacing element and the second holding element comprises a second spacing element, wherein the first spacing element is configured to set a penetration depth of the first holding element into the first receiving element and the second spacing element is configured to set a penetration depth of the second holding element into the second receiving element in order to define a spacing between the assembly pieces.
6. The installation clip according to claim 1, wherein the first receiving element comprises a first groove and the second receiving element comprises a second groove, wherein the first holding element and the second holding element are configured to interact with the first groove and the second groove in order to respectively create the preload.
7. The installation clip according to claim 1, wherein the holding arrangement further comprises a third holding element and a fourth holding element, wherein the third holding element and the fourth holding element are arranged symmetrically inside the holding arrangement, wherein the third holding element is configured to interlock with the first receiving element of the first assembly piece and the fourth holding element is configured to interlock with the second receiving element of the second assembly piece; wherein the third holding element and the fourth holding element are configured elastically to be held by a preload inside the first receiving element and the second receiving element.
8. The installation clip according to claim 1, wherein an installation height of the installation clip is variable, said variability being obtained by setting the at least one fastening element in the fastening recess of the at least one installation clip.
9. An installation system for installing assembly pieces comprising: an installation clip including a holding arrangement with a first holding element and a second holding element, wherein the first holding element and the second holding element are arranged symmetrically inside the holding arrangement, wherein the first holding element is configured to interlock with a first receiving element of a first assembly piece and the second holding element is configured to interlock with a second receiving element of a second assembly piece, wherein the first holding element and the second holding element are configured elastically to be held by a preload inside the first receiving element and the second receiving element, the installation clip further including a fastening arrangement having a fastening recess; and a fastening element configured to be received into the fastening recess.
10. The installation system according to claim 9, wherein the fastening element is further configured to set a height of the first assembly piece and of the second assembly piece.
11. The installation system according to claim 9, wherein the fastening element comprises a screw.
12. The installation system according to claim 9 further comprising at least two assembly pieces, wherein the at least two assembly pieces can be installed using the at least one installation system in a horizontal or vertical orientation.
13. A method for producing an installation clip for installing assembly pieces comprising: providing a holding arrangement with a first holding element and a second holding element; symmetrically arranging the first holding element and the second holding element inside the holding arrangement; shaping the first holding element in order to interlock with a first receiving element of a first assembly piece; shaping the second holding element in order to interlock with a second receiving element of a second assembly piece; and configuring the first holding element and the second holding element as elastic elements that are configured to be held inside the first receiving element and the second receiving element by a preload.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0035]
[0036]
[0037]
[0038]
[0039]
[0040]
[0041]
[0042]
DETAILED DESCRIPTION
[0043] As required, detailed embodiments of the present invention are disclosed herein; however, it is to be understood that the disclosed embodiments are merely exemplary of the invention that may be embodied in various and alternative forms. The figures are not necessarily to scale; some features may be exaggerated or minimized to show details of particular components. Therefore, specific structural and functional details disclosed herein are not to be interpreted as limiting, but merely as a representative basis for teaching one skilled in the art to variously employ the present invention.
[0044]
[0045] The first holding element 11 comprises a first upper preloading element 12 and a first lower preloading element 13. The holding element 11 further comprises a first spacing element 14. In the embodiment according to
[0046] Likewise, the second holding element 21 comprises a second upper preloading element 22 and a second lower preloading element 23, as well as a second spacing element 14. The second holding element 21 is also designed as a wing in the embodiment according to
[0047] As shown in
[0048]
[0049] In the specific embodiment according to
[0050] For installation, the first holding element 11 is inserted into the first receiving element 71 until the first holding element 11 strikes, with the spacing element 14, the outer side of the first receiving element 71 of the first assembly piece 70. At this point, the insertion of the holding element 11 is stopped. The first upper preloading element 12 and the first lower preloading element 13 are brought closer together upon insertion, i.e., are pressed together, by mechanical pressure. The direction of this mechanical compressive force is labeled in
[0051] It is now possible to arrange a second assembly piece (not shown in
[0052] By stopping the insertion of the first holding element 11 into the first receiving element 71 of the first assembly piece 70 by way of the first spacing element 14 and by stopping the insertion of the second holding element 21 into the second receiving element of the second assembly piece by way of the second spacing element 24, it is ensured that the assembly pieces installed using the installation clip 1 have a defined spacing relative to one another. In the specific embodiment according to
[0053] After arranging the two assembly pieces 70 on the holding arrangement 10, the fastening means 52 is tightened for fastening. In the specific embodiment according to
[0054]
[0055] The functioning of all four holding elements resembles that of the others and is as described in connection with
[0056] In the second embodiment according to
[0057] The fastening arrangement 50 of the second embodiment according to
[0058] The functioning of the installation clip 1′ according to
[0059] Here as well, the fastening means 52 is implemented as a screw. The installation clip comprises four holding elements 11, 21, 31, 41, whereby in the embodiment according to
[0060] Both the second holding element 21 as well as the fourth holding element 41 are implemented as wings with a second upper preloading element and a second lower preloading element, as well as a second spacing element (none shown) and a fourth upper preloading element 42 and a fourth lower preloading element 43, as well as a fourth spacing element 44, which may be formed as described in connection with
[0061] For installation, the second holding element 21 and the fourth holding element 41 are inserted into the second receiving element 73 until both, with their respective spacing elements 24, 44, come into contact with the outer side of the second receiving element 73 of the second assembly piece 72 and are stopped there, as described in connection with
[0062] Here, the second upper preloading element 22 and the second lower preloading element 23, and the fourth upper preloading element 42 and the fourth lower preloading element 43 are pressed together through mechanical pressure upon insertion into the second receiving element 73. This compressive force is counteracted by a spring force of the two wings, which represent the second holding element 21 and the fourth holding element 41. Due to the spring force working against this pressing together, the corresponding preload that holds the second holding element 21 and the fourth holding element 41 in position is created inside the second receiving element 73. Analogously, the first assembly piece can be installed using the first holding element 11 and the third holding element 31.
[0063] One difference compared to the embodiment according to
[0064]
[0065] The functioning of all four holding elements 11, 21, 31, 41 is the same here as well for all four holding elements. This means that the holding elements 11, 21, 31, 41 function as described in connection with
[0066] In
[0067] A first difference compared to the second embodiment according to
[0068] The projections 55a, 55b, 55c and 55d also make it possible to adjust the height of the first and second assembly piece, similar to how it is described in connection with
[0069] Another difference compared to the second embodiment according to
[0070] Upon tightening, a force is exerted on the body from above, which ensures that the sharp edges 100a and 100b are pressed into the first receiving element 71 of the first assembly piece 70 and possibly penetrate into it. This provides an additional securing of the body 90 inside the first receiving element 71. Equally, upon fastening, the sharp edges 100c and 100d are pressed into and/or penetrate into the second receiving element 73 of the second assembly piece 72, whereby the body 90 is additionally secured inside the second receiving element 72.
[0071]
[0072] Different from the second and the third embodiment, the first holding element 11 and the third holding element 31, as well as respectively the second holding element 21 and the fourth holding element 41 are not symmetrical to one another along a second plane of symmetry 81. Instead, the first holding element 11 and the third holding element 31, as well as respectively the second holding element 21 and the fourth holding element 41, are arranged sequentially along a normal 82 passing through the first plane of symmetry 80. This means that the first holding element 11 is arranged closer to the plane of symmetry 80 running through the center of the holding arrangement 10 than the third holding element 31. In the same way, the second holding element 21 is arranged closer to the plane of symmetry 80 than the fourth holding element 41.
[0073] Another difference compared to the second and third embodiment consists in the forming of the holding elements, as described below based on the fourth holding element 41 as an example. The fourth holding element 41 comprises a first beveled surface 44 and a second beveled surface 45. The fourth holding element 41 further comprises a parallel surface 46. The beveled surface 44 is attached to the parallel surface 46 and the parallel surface 46 is attached to the beveled surface 45, in order to form the fourth holding element 41.
[0074] In the specific embodiment according to
[0075] In this embodiment, the body 90 of the installation clip 1″′ from the fourth embodiment is designed as two surfaces 93 and 94 running parallel to one another, wherein the spacing between the first surface 93 and the second surface 94 corresponds to the width of the parallel surface of the third holding element 31 and the width of the parallel surface 46 of the fourth holding element 41.
[0076] The fourth embodiment according to
[0077] The functioning of the installation clip 1″′ is now explained in connection with
[0078] To this end, the installation clip 1′, with the first holding element and the third holding element, is received in the first receiving element 71 of the first assembly piece 70, and with the second holding element and the fourth holding element, is received into the second receiving element 73 of the second assembly piece 72. Here, the first receiving element 71 exerts a force on the first and the third holding element, and the second receiving element 73 exerts a force on the second and the fourth holding element, such that the beveled surfaces of the holding elements are pressed in the direction of the body 90. This pressure direction is indicated schematically in
[0079] The extent to which the beveled surfaces of the holding element are curved in the direction of the body 90 depends on how large the first receiving element 71 and the second receiving element 73, respectively, are. For instance, in the second fastening position 200, the beveled surfaces lie almost on the body 90, whereas in the first fastening position 100, the beveled surfaces are almost in their original position. In this case as well, the final fastening is done by means of the fastening element 52, which is fastened inside the fastening recess 51. The height of the planks is automatically set in the case of the installation clip 1″′ from the fourth embodiment. This enables an especially efficient installation.
[0080] One advantage of this fourth embodiment includes enabling an especially stable fastening for receiving elements designed to be flexible in size. In particular, one and the same installation clip 1″′ can be used for receiving elements, especially grooves, of different heights. This high degree of variability of the installation clip 1″′ has the effect that the installation clip 1″′ can be used universally. This simplifies not only the assembly—since a special installation clip 1″′ does not have to be specifically selected for the receiving element—but rather also has advantageous effects for inventory stocking, since here merely a universally-usable installation clip 1″′ that is suitable for working with all common receiving elements, especially grooves, has to be kept in stock.
[0081] The embodiments described above should be understood as examples and should not be understood to have a restrictive effect; in particular, the invention is not limited to these specific embodiments, but rather comprises all installation clips, the holding arrangements of which have multiple holding elements which themselves are configured to be held in position by means of a preloading inside the receiving elements of assembly pieces, especially in grooves of planks, before their final fastening, as well as all installation clips that make it possible to adjust the assembly piece height, especially the plank height, and/or enable a pre-setting of the spacing between the assembled assembly pieces, especially a pre-setting of the groove spacing.
[0082] While exemplary embodiments are described above, it is not intended that these embodiments describe all possible forms of the invention. Rather, the words used in the specification are words of description rather than limitation, and it is understood that various changes may be made without departing from the spirit and scope of the invention. Additionally, the features of various implementing embodiments may be combined to form further embodiments of the invention.