FAULT DIAGNOSIS IN AN ELECTRICITY SUPPLY NETWORK
20210349158 · 2021-11-11
Assignee
Inventors
Cpc classification
H02J3/0012
ELECTRICITY
H02J3/0073
ELECTRICITY
Y02E60/60
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
H02M1/32
ELECTRICITY
Y04S10/52
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
Abstract
An SOP for connection to a first feeder in an electricity distribution network, the SOP being configured to, when a feeder connected to the SOP is faulty, apply a diagnostic voltage to the feeder and make current and voltage measurements at the connection of the SOP to the feeder while the diagnostic voltage is being applied.
Claims
1. A soft open point (SOP) for an AC electricity distribution network comprising a first and second voltage source converters (VSCs), and a DC link connecting the two VSCs, wherein: each VSC is configured to apply voltage corrections to a respective AC feeder of an AC electricity distribution network while the AC feeders are operating normally; and the first VSC is configured to, when a first AC feeder connected to the first VSC is faulty, apply a diagnostic AC voltage to the first AC feeder and make current and voltage measurements at the connection of the first VSC to the first AC feeder while the diagnostic AC voltage is being applied.
2. The SOP of claim 1, wherein, the first VSC is configured to generate the diagnostic AC voltage from a DC voltage applied to the DC link, and the second VSC is configured to generate the DC voltage from a voltage picked up from a second AC feeder to which the second VSC is operatively coupled.
3. The SOP of claim 1, further comprising one or more processors configured to do one or more of: determining from the measurements the presence of a fault on the first AC feeder; estimating from the measurements and a per-unit-length impedance or resistance of the first AC feeder the distance along the first AC feeder from the point of application of the diagnostic AC voltage to a fault along the first AC feeder; and determining from the measurements the type of a fault on the first AC feeder.
4. The SOP of claim 3, wherein the one or more processors are arranged to, in response to determining that the fault has cleared, send a command for a feeder isolation device to close.
5. The SOP of claim 3, wherein the one or more processors are arranged to, in response to determining that the fault persists a predetermined time after being detected, send a command for a feeder isolation device to open.
6. A system comprising: a SOP for an AC electricity distribution network comprising a first and second voltage source converters (VSCs), and a DC link connecting the two VSCs, wherein each VSC is configured to apply voltage corrections to a respective AC feeder of an AC electricity distribution network while the AC feeders are operating normally; and the first VSC is configured to, when a first AC feeder connected to the first VSC is faulty, apply a diagnostic AC voltage to the first AC feeder and make current and voltage measurements at the connection of the first VSC to the first AC feeder while the diagnostic AC voltage is being applied; and one or more processors; wherein the one or more processors are configured to do at least one of: estimating from the measurements and a per-unit-length impedance or resistance of the first AC feeder the distance along the first AC feeder from the point of application of the diagnostic AC voltage to a fault along the first AC feeder; determining from the measurements the type of a fault on the first AC feeder; and determining from the measurements the presence of a fault on the first AC feeder.
7. The system of claim 6, wherein the one or more processors are arranged to, in response to determining that the fault is of a temporary type, send a command for a feeder isolation device to close.
8. The system of claim 6, wherein the one or more processors are arranged to, in response to determining that the fault is of a permanent type, send a command for a feeder isolation device to open.
9. A method of fault assessment for an AC feeder in an AC electricity distribution network, the method comprising: ceasing to supply an AC feeder with a voltage correction from a voltage source converter, VSC, of a soft open point (SOP); generating a diagnostic AC voltage with the VSC; applying the diagnostic AC voltage to the AC feeder; making at least one voltage measurement at the connection of the VSC to the AC feeder; making at least one current measurement at the connection of the VSC to the AC feeder; and determining at least one characteristic of a fault on the AC feeder from the measurements.
10. The method of claim 9, wherein determining at least one characteristic comprises at least one of: calculating from the voltage and current measurements the distance along the first AC feeder from the point of application of the diagnostic AC voltage to the fault along the AC feeder; determining from the voltage and current measurements the type of the fault; and determining from the measurements the continuing presence of a fault on the first AC feeder.
11. The method of claim 9, further comprising: determining from the voltage and current measurements that the fault has cleared; and sending a command for a feeder isolation device to close.
12. The method of claim 9, the method further comprising: determining from the voltage and current measurements that the fault has not cleared within a predetermined period of being detected; and sending a command for a feeder isolation device to open.
13.-17. (canceled)
Description
BRIEF DESCRIPTION OF FIGURES
[0027] By way of example only, certain embodiments of the invention will now be described with reference to the accompanying drawings, in which:
[0028]
[0029]
[0030]
[0031]
[0032]
[0033]
[0034]
DETAILED DESCRIPTION
[0035]
[0036] Other types of SOPs can also be connected to feeders, such as a multi-terminal SOP, or a unified power flow controllers (UPFC) SOP, but others are possible. Although it is shown in
[0037]
[0038] As shown in
[0039] Ignoring the power losses, the magnitude of real power flowing between the two VSCs 12, 14 is equal during steady state operation. This is illustrated by the power balance Eqn. (1):
P.sub.1=P.sub.2=P.sub.dc=V.sub.dc×I.sub.dc (1)
where P.sub.1 is the real power flowing through VSC 12 and P.sub.2 is the real power flowing through VSC 14.
[0040] As may also be seen from
[0041]
[0042] VSC 12 can be configured by the controller 28 to operate in at least one of three operational modes; power control mode, diagnostic mode, and/or restoration mode. However, the VSC 12 can only operate in one mode at a time.
[0043] The controller 28 operates the VSC 12 in the power control mode during an unfaulted, grid-connected condition. In the power control mode, the VSC 12 controls the flow of power between the feeder 18 and the DC link 16. Thus, the SOP 10 controls the flow of power between the two feeders. To control the flow of power, the controller 28 produces voltage reference signals using the inverse Park's transformation. The voltage reference signals can be used by the controller 28 to generate control signals 27 to fire the IGBTs 3, 4, 5, 6, 7 and 8 to generate the three voltage phases (Va, Vb, Vc) of the VSC 12 at point 38. Control of the power flow reduces the possibility that one feeder has a cable insulation failure caused by too much power in a feeder's cable.
[0044] The controller 28 operates the VSC 12 in the diagnostic mode during a fault condition. In a fault condition, the fault 36 is disconnected from the rest of the electricity distribution network by the feeder isolation device 32. In the diagnostic mode, the controller 28 can determine the presence of a fault 36 on the feeder 18, the type of fault 36, and/or the distance along the feeder 18 to a fault 36, from the connection of the VSC 12 to feeder 18.
[0045] The feeder 18 voltage under normal operating conditions is roughly the voltage of the electricity distribution network as a whole, and similar to the voltage the VSC 12 generates in the power control mode. In diagnostic mode, the controller 28 of the VSC 12 is configured to apply a diagnostic voltage to the feeder 18. The diagnostic voltage is an attenuated version of the feeder 18 voltage under normal operating conditions. For example, the diagnostic voltage could be 10% of the feeder 18 voltage under normal operating conditions. With the VSC 12 applying a diagnostic voltage it is possible to make current and voltage measurements on the feeder 18 using voltage and current sensors 23, 24 at the connection point 38 of the VSC 12 to the feeder 18.
[0046] The diagnostic voltage is used so as to not interfere with existing protection co-ordination, since protection in electricity distribution networks is largely current based. A diagnostic voltage also ensures no physical damage (e.g. wear) to connected components on the feeder 18 (e.g. power electronic switches, devices, etc.).
[0047] Phasors and phasor diagrams are a method of describing an AC voltage or a current in terms of its amplitude and its relative phase. For three-phase systems, the three phases a, b, c, can be plotted relative to each other. A three-phase system with three unbalanced phasors can be resolved into three symmetrical components: [0048] Positive Sequence: A balanced three-phase system with the same phase sequence as the original sequence. [0049] Negative sequence: A balanced three-phase system with the opposite phase sequence as the original sequence. [0050] Zero Sequence: Three phasors that are equal in magnitude and phase.
[0051] For the three-phase electricity distribution network in a normal operation, there are only positive sequence components, with no negative and zero sequence components, neglecting the imbalance introduced by the load. During a fault 36, the voltage and current phasors of the feeder 18 will be unbalanced and can thus be represented by the three symmetrical components. Negative sequence components are present for unbalanced faults. The zero sequence components exist in the network only if a ground path is available for the flow of currents.
[0052]
[0053] where x represents phase a, b, or c. V.sub.x RMS.sup.p is the root mean square (RMS) value of positive sequence voltage, and V.sub.x RMS.sup.n is the RMS value of the negative sequence voltage and V.sub.x RMS.sup.z is the zero sequence voltage. V.sub.x N.sup.p is the nominal RMS voltage of the VSC 12 during diagnostic mode.
[0054] It is necessary to clearly distinguish between voltage imbalance and a fault. The FI is a ratio that is equal to 1 when there is only the positive component (i.e. no voltage imbalance). In reality there will always be some voltage imbalance depending on the loads and the topology of the electricity distribution network so any threshold to distinguish between voltage imbalance and a fault will be tuned to the deployment environment. However, a value that is considered generally acceptable by the present inventors is FI.sub.threshold=0.9, and so any value of FI<0.9 may be used to indicate the presence of a fault in the network. This normalized, dimensionless FI is applicable for any network by using the measured sequence quantities and corresponding nominal voltage of the network under consideration. In the diagnostic mode, the controller 28 continuously calculates the fault index to determine whether the fault remains present.
[0055] The measured phase voltage and the line current at the grid connection point 38 depends on the type of fault. Each type of fault is uniquely characterised by three conditions of respective phase voltage and line currents. The table below shows the conditions for three types of faults; a) a line-to-ground fault (e.g. ‘L.sub.a-G’ when line ‘a’ is connected to ground); b) a line-to-line fault (e.g. ‘L.sub.a-L.sub.b’ when line ‘a’ and line ‘b’ are connected); c) a three-phase fault (e.g. ‘L.sub.a-L.sub.b-L.sub.c.sup.’ when line ‘a’, line ‘b’, and line ‘c’ are connected). Similar equations can be written for faults involving other phases. The apparent positive sequence impedance can be calculated by using the fault-loop applicable for the respective fault type. The fault-loop is a well-known fault analysis method. (An example of fault-loop in literature is in “network protection & automation guide” by Alstom—chapter 5 and chapter 11—Edition May 2011.) The corresponding equations to calculate the V.sub.g and I.sub.g values are shown in Table 1 below.
TABLE-US-00001 TABLE 1 Fault determination criteria and respective voltage and currents at grid connection point 38 Fault type determination Voltage and criteria (without loads) Current at grid Type of Voltage Current connection point 38 Fault conditions conditions V.sub.g I.sub.g L.sub.a − G V.sub.a = 0 I.sub.a = I.sub.b = 0 V.sub.a
[0056] In Table 1, the zero sequence line impedance is represented by Z.sub.l.sup.z and positive sequence line impedance is represented by Z.sub.l.sup.p. For line-to-ground faults, the phase to neutral voltage is used and the current includes zero sequence components (I.sub.g.sup.z). For phase faults, phase to phase voltages and currents are both used.
[0057] In the diagnostic mode, the controller 28 estimates the location of a fault by calculating the apparent impedance of the network with single end measurement (e.g. from sensors 23, 24). Algorithms based on impedance calculation using single end measurement are advantageous since they are simple to implement, do not require any communication or remote data and can deliver reasonably accurate results.
[0058] From Eqn. 3, the distance to the fault can be calculated by the controller 28. d is the per unit distance of the fault from grid connection point 38 defined with the total feeder length (D) as a base. For example, if the fault is a quarter of the way along the total feeder length,
The fault current at the location of the fault 36 is represented by I.sub.f. The fault resistance is represented by R, and the total feeder impedance is represented by Z.sub.total.
[0059] Other ways of determining fault location are possible and are known to the skilled person in the art, such as the travelling wave method, or a method using digital fault recorders for example.
[0060] The VSC 12 operates in the restoration mode when there is a fault 36, and the fault 36 has been isolated from the rest of the electricity distribution network (e.g. by feeder isolation device 32) and from the VSC 12 (e.g. by feeder isolation device 34). The restoration mode is used to resume power supply to the un-faulted out-of-service loads, thus restoring power to some electrical consumers (e.g. large industry or homes).
[0061] The power control mode cannot be used since the voltage of the VSC 12 is no longer dictated by the electricity distribution network. Therefore, the controller 28 implements a strategy to generate and control the terminal voltage and the grid frequency to be within the standard operating range for an un-faulted feeder. The VSC 14 connected to the un-faulted feeder 20 continues to operate in the power control mode; controlling the flow of power between the second feeder 20 and the DC link 16. This is to maintain the DC link voltage as the VSC 12 draws power from the DC link voltage in order to supply the un-faulted out-of-service loads.
[0062]
[0063]
[0064] It can be seen in
[0065] If the fault 36 is of a permanent type 70, then after time ΔT.sub.p from the start of the diagnostic mode 52, a command 78 is sent (from controller 28) for the feeder isolation device 34 to open 76. Thus, isolating the fault 36 so the SOP 10 can operate in restoration mode 54 to reconnect customers that were disconnected due to the fault 36. The isolation of the fault 36 can also allow for further manual investigation and repair, while ensuring the maximum number of customers are connected to the electricity distribution network.
[0066] An advantage of a diagnostic mode being used by VSCs and SOPs is that in the event of a fault on a feeder, an improved feeder automation methodology can be implemented.
[0067] The main advantages in comparison to the restoration using auto-reclosers include the following: [0068] 1) No dead time: The diagnostic mode in a VSC/SOP is operable throughout fault conditions since the operation is carried out through IGBT switch operation. This eliminates the need for shots. [0069] 2) Reduction of network downtime: The operation of diagnostic mode directly translates to an improvement in the restoration time and consequently reduces the time the feeder is disconnected from the rest of the electricity distribution network. [0070] 3) Flexibility to choose restoration time: The pre-set time for permanent fault may be optimized to best suit the requirements of the network operator. Selection of the restoration time is no longer associated with the asset degradation. [0071] 4) Longer operation life of existing assets: The assets are predominantly operated within the normal operational limit in the diagnostic mode. Therefore the degradation of assets due to repeated exposure to fault current is eliminated. [0072] 5) Elimination of repeated voltage sag on adjacent networks: There is no stress on the adjacent feeder or on the SOP through the restoration process since the SOP operates within normal limits, and without repeated shots.
[0073] It is described above that the VSC 12 is connected at the end of a feeder, however, in an alternate embodiment, the VSC 12 could be connected at any point along the feeder. This embodiment would require extra feeder isolation devices while the VSC 12 is in a diagnostic mode, to ensure a single path to a fault.
[0074] The VSC 12 draws power from the DC link 16 in order to perform its operations in the power control, diagnostic and restoration modes. In an alternative embodiment, the VSC 12 does not have to be part of a SOP 10, as long as the VSC 12 is connected to suitable DC supply of some sort.
[0075] As described above, the controller 28 not only synthesises the drive signals 27 that control the IGBTs 3, 4, 5, 6, 7 and 8 to operate the VSC 12 in the power control, diagnostic and restoration modes, but also carries out the necessary analytic processing of the voltage and current measurements obtained by sensors 23 and 24 in order to determine the continuing presence, type and location of a fault. In other embodiments, some or all of this analytic processing is done outside the SOP 10 in another computer or processor, to which one or more of the voltage and current measurements, or one or more values synthesised therefrom, have been sent. Such a variant is shown, at a high level, in
[0076] In the VSC shown in
[0077] It is to be understood that although the foregoing description has been described with reference to one or more preferred embodiments, it will be appreciated that it is intended to illustrate and not to limit the scope of the invention, such that various changes or modifications may be made without departing from the scope of the invention which is defined by the appended claims. Other embodiments are within the scope of the following claims.