A method for producing a metal article, in particular a slab, a pre-strip, a strip, or a sheet, in which the article is first conveyed in the conveying direction through a scale washer and then through a rolling mill, wherein the rolling mill has at least one roll stand, in particular a first roll stand in the conveying direction. The article is subjected in the scale washer to at least one upper row of nozzles, which descales the upper side of the article, and to at least one lower row of nozzles, which descales the lower side of the article.
Claims
1-14. (canceled)
15. A method for producing a metal article, in particular a slab, a pre-strip, a strip, or a sheet, in which the article is first conveyed in the conveying direction through a scale washer and then through a rolling mill, wherein the rolling mill has at least one roll stand, in particular a first roll stand in the conveying direction, wherein the article is subjected in the scale washer to at least one upper row of nozzles, which descales the upper side of the article, and to at least one lower row of nozzles, which descales the lower side of the article, the method comprising the steps of: a) determining the thickness (s.sub.upper) of a secondary scale layer on the upper side of the article which is present at the location of the at least one roll stand, in particular at the location of the first roll stand, or at a defined location in front of the at least one roll stand, in particular in front of the first roll stand, and determining the thickness (s.sub.lower) of a secondary scale layer on the lower side of the article which is present at the location of the at least one roll stand, in particular at the location of the first roll stand, or at the defined location in front of the at least one roll stand, in particular the first roll stand; b) defining the distance between the last upper row of nozzles in the conveying direction and the last lower row of nozzles in the conveying direction, so that the difference between the thickness (s.sub.upper) of the secondary scale layer on the upper side of the article and the thickness (s.sub.lower) of the secondary scale layer on the lower side of the article is below a specified value at the above location.
16. The method according to claim 15, wherein the definition according to step b) of claim 15 takes place by considering a defined article mix for the article and determining a mean distance for this purpose.
17. The method according to claim 15, wherein the determination of the thickness (s.sub.upper, s.sub.lower) of the upper and lower secondary scale layer is carried out by a measurement at the location of the at least one roll stand, in particular at the location of the first roll stand, or at the defined location in front of the at least one roll stand, in particular in front of the first roll stand.
18. The method according to claim 15, wherein the determination of the thickness (s.sub.upper, s.sub.lower) of the upper and lower secondary scale layer is carried out by numerical simulation using a process model.
19. The method according to claim 18, wherein the numerical simulation comprises the calculation of the temperature profile on the upper side and on the lower side of the material as it passes through the scale washer to the rolling mill.
20. The method according to claim 18, wherein the numerical simulation of the thickness (s.sub.upper, s.sub.lower) of the upper and lower secondary scale layer comprises a determination of the thickness (s.sub.upper, s.sub.lower) by the relationship:
s=k.sub.P.Math.√{square root over (t)} where s: thickness of the secondary scale layer k.sub.P: scale coefficient t: oxidation time from the completion of descaling.
21. The method according to claim 15, wherein the distance between the last upper row of nozzles in the conveying direction and the last lower row of nozzles in the conveying direction is selected to be at least 0.2 m, preferably at least 0.3 m.
22. The method according to claim 15, wherein the distance between the last row of nozzles in the conveying direction and the at least one roll stand, in particular the first roll stand, is at most 6.0 m, preferably at most 4.0 m.
23. The method according claim 15, wherein the specified value for the difference between the thickness (s.sub.upper) of the secondary scale layer on the upper side of the article and the thickness (s.sub.lower) of the secondary scale layer on the lower side of the article when entering the at least one roll stand, in particular the first roll stand, is determined according to the relationship:
|(s.sub.oben−s.sub.unten)|/s.sub.Mittel*100%≤15% where: s.sub.mean=(s.sub.upper+s.sub.lower)/2
24. The method according to claim 15, wherein the temperature of the article in the region between the scale washer and the at least one roll stand, in particular the first roll stand, is set so that for the temperature of the article on the upper side and for the temperature (T.sub.lower) of the article on the lower side when entering the at least one roll stand, in particular into the first roll stand, the following applies:
|(T.sub.oben−T.sub.unten)|/T.sub.Mittel*100%≤3% where: T.sub.mean=(T.sub.upper+T.sub.lower)/2 (temperatures in ° C.)
25. The method according to claim 15, wherein the article is additionally cooled using water in the region between the scale washer and the at least one roll stand, in particular the first roll stand.
26. The method according to claim 15, wherein different nozzle sizes are used in the scale washer on the upper side of the article and on the lower side of the article.
27. The method according to claim 15, wherein a further row of nozzles is provided for the lower side of the article in the scale washer, which is activated when necessary.
28. The method according to claim 15, wherein the amount of water and/or the pressure level of the discharged water in at least one of the rows of nozzles on the upper side and/or on the lower side of the material is set individually, in particular reduced, depending on the feed speed of the material into the rolling mill and/or the material of the article.
29. The method according to claim 16, wherein the determination of the thickness (s.sub.upper, s.sub.lower) of the upper and lower secondary scale layer is carried out by a measurement at the location of the at least one roll stand, in particular at the location of the first roll stand, or at the defined location in front of the at least one roll stand, in particular in front of the first roll stand.
30. The method according to claim 16, wherein the determination of the thickness (s.sub.upper, s.sub.lower) of the upper and lower secondary scale layer is carried out by numerical simulation using a process model.
31. The method according to claim 19, wherein the numerical simulation of the thickness (s.sub.upper, s.sub.lower) of the upper and lower secondary scale layer comprises a determination of the thickness (s.sub.upper, s.sub.lower) by the relationship:
s=k.sub.P.Math.√{square root over (t)} where s: thickness of the secondary scale layer k.sub.P: scale coefficient t: oxidation time from the completion of descaling.
32. The method according to claim 16, wherein the distance between the last upper row of nozzles in the conveying direction and the last lower row of nozzles in the conveying direction is selected to be at least 0.2 m, preferably at least 0.3 m.
33. The method according to claim 17 wherein the distance between the last upper row of nozzles in the conveying direction and the last lower row of nozzles in the conveying direction is selected to be at least 0.2 m, preferably at least 0.3 m.
34. The method according to claim 18, wherein the distance between the last upper row of nozzles in the conveying direction and the last lower row of nozzles in the conveying direction is selected to be at least 0.2 m, preferably at least 0.3 m.
Description
[0030] Exemplary embodiments of the invention are shown in the drawing. In the figures:
[0031]
[0032]
[0033] In the figures, a strip 1 (or a slab, a pre-strip, or a sheet) is indicated, which is descaled in a scale washer 2 on the upper side 6 of the strip 1 and on the lower side 8 of the strip 1. The strip cleaned or descaled in this way is fed in a conveying direction F to a rolling mill 3, where it is rolled. In the present exemplary embodiment, the rolling mill 3 has a number of roll stands 4, only one of which is shown in the figures, namely the first roll stand F1 of the rolling mill 3.
[0034] The scale washer 2 has an upper row of nozzles 5 and a lower row of nozzles 7, which are provided for the respective cleaning or descaling of the corresponding side of the strip 1. A pair of rollers 9 and a pair of rollers 10 are provided for conveying the strip. In the exemplary embodiment, the scale washer 2 also has a further upper row of nozzles 11 and a further lower row of nozzles 12. Using the various rows of nozzles, water W is applied to the upper side and the lower side of the strip 1.
[0035]
[0036] If one wishes to reduce the thickness differences of the scale layer between the upper side 6 of the strip 1 and the lower side 8 of the same or, ideally, to set them equal during the rolling process, thus—as shown in
[0037] The temperature curves for the upper side 6 of the strip 1 (T.sub.o) and for the lower side 8 of the strip 1 (T.sub.u) as well as the important scale growth with the scale layer thickness forming on the upper side 6 of the strip 1 (s.sub.o) and on the lower side 8 of strip 1 (s.sub.u) are shown in
[0038] A process model is used to describe the temperature change within the rolling train—also in the region of the scale washer 2 up to and within the rolling train 3. If the calculated temperature profile is known, the scale growth can be calculated using the following scale model or the following scale equation:
s=k.sub.p*(t).sup.0.5 [0039] where [0040] s: scale layer thickness (starts with 0 after the last descaling) [0041] t: oxidation time (begins after the last descaling) [0042] k.sub.P: scale coefficient, dependent on the strip surface temperature, the strip material, and the ambient conditions (water, air).
[0043] The rolling train 3 is designed in such a way that the following optimal defined conditions are settable for the feed speed and surface temperatures between the scale washer 2 and the rolling train 3, weighted by the article mix and averaged according to the production share:
[0044] The upper and lower scale washer spray bars 5 and 7 are arranged offset from one another (distance a) so that the lower spray bar is arranged last. The distance b between the last descaling bar 7 and the roll stand F1 as well as the distance a between the upper and lower spray bars 5 and 7 are chosen so that the scale thickness upon entry into the rolling train (in the example at the stand F1 of the finishing train 3) is on average preferably equal on the upper and lower side of the strip or the difference Δs of the calculated scale layer thicknesses (absolute value) between the upper and lower side is less than 15% of the average scale layer thickness (see the range for the distance of the roll stand F1 from the last descaling row 7 in
[0045] The relationships for the thickness of the secondary scale apply upon entry into the first roll stand F1
s.sub.mean=(s.sub.upper+s.sub.lower)/2
Δs=|(s.sub.upper−s.sub.lower)|/s.sub.mean*100%,
[0046] where
[0047] s.sub.mean: average scale layer thickness of the upper/lower side of the strip
[0048] s.sub.upper: scale layer thickness on the upper side
[0049] s.sub.lower: scale layer thickness on the lower side
[0050] Δs: percentage difference of the calculated scale layer thicknesses
[0051] For the purpose of further optimization of the scale growth on the upper and lower side and compliance with the above goals for the design and/or for daily use in the event of deviation from the average conditions (feed speed, temperatures), additional high pressure and/or low pressure cooling devices (not shown) are arranged between the scale washer 2 and the rolling train 3, which are activated depending on the results of the process model in order to approach the goal of the most equal possible scale layer thickness on the upper and lower side 6 and 8 of the strip 1 at the location of the roll stand F1 or at a defined reference location immediately in front of the roll stand F1.
[0052] Furthermore, the surface temperature profiles behind the scale washer 2 with or without additional strip cooling between the scale washer 2 and the rolling train 3 should result in the surface temperatures such that the temperature difference (absolute value) between the upper and lower side 6 and 8 of the strip 1 is less than 3% of the mean surface temperature at the roll stand.
[0053] The following relationships apply:
T.sub.mean=(T.sub.upper+T.sub.lower)/2
ΔT=|(T.sub.upper−T.sub.lower)|/T.sub.mean*100%
[0054] where
[0055] T.sub.mean: average strip temperature of upper/lower side
[0056] T.sub.upper: strip temperature on the upper side
[0057] T.sub.lower: strip temperature on the lower side
[0058] ΔT: percentage difference of the calculated strip temperatures at the roll stand
[0059] The temperatures are to be used in ° C.
[0060] The following distances preferably result from the calculations for the optimal conditions in the region of the scale washer 2 and the rolling train 3:
[0061] The distance a between the upper and lower spray rows 5 and 7 of the scale washer 2 is preferably greater than 0.2 m, particularly preferably greater than 0.3 m.
[0062] The distance b between the last scale washer spray row 7 and the following roll stand F1 is preferably less than or equal to 6 m and particularly preferably less than or equal to 4 m.
[0063] The following additional measures can be taken as a further control element in order to optimally set the scaling conditions and thus the ratio of the scale layer thicknesses:
[0064] The descaling nozzle for the strip upper side differs from the nozzle on the strip lower side; In particular, larger nozzles are used at the bottom than at the top. In this case, this means that a larger amount of water is applied to the lower side in order to be able to influence the temperatures on the surface of the strip in a desired manner.
[0065] Optionally, a third row of scale washer nozzles can be provided on the lower side of the strip, which is activated by the process model depending on the boundary conditions.
[0066] Depending on the feed speed and the strip material, the first row of descaling nozzles can only be deactivated on top, only on the bottom, or on both sides (this applies to a multi-row scale washer).
[0067] Depending on the feed speed and the strip material, the amount of water and/or the pressure level of the first and/or second row of descaling nozzles (or also on a further row of nozzles) can be individually reduced on the upper and/or lower side.
[0068] The additional coolers between the scale washer 2 and the rolling train 3 are installed and activated if necessary.
[0069] The design of the plant, in particular the determination of the distances in the region scale washer—roll stand, takes place in the following steps:
[0070] In a first step, the distance between the last descaling row 7 up to the rolling train, i.e., up to the first roll stand F1, is first determined (distance b). This distance is preferably minimized in order to minimize the formation of secondary scaling.
[0071] Then, in a second step, the determination of the distance (a) between the upper and lower scale washer spray bars is established so that the conditions or objectives of the above scale and/or temperature relationships are met or the difference of the scale layer thickness between the upper and lower side is minimal.
[0072] If the difference of the scale layer thickness cannot be maintained within the desired range when designing the plant, additional coolers have to be provided between the scale washer 2 and the rolling train 3 and/or the above additional measures have to be carried out.
[0073] When operating the existing plant with given distances, the variable temperature or scale control elements (nozzle pressures, amounts of water) are used so that the above tolerances are adhered to.
[0074] For the indirect support of the scale model, the surface temperatures can be measured in front of and/or behind the (first) roll stand F1 and compared to the calculated values. The difference in roughness of the work rolls of the roll stand can also be indirectly deduced from the measured torque difference between the upper and lower drive spindles if a difference persists over multiple strips or increases in the course of a rolling program. This measured value can also be used as feedback for the scale model and the setting of the descaling parameters (water pressure and amount).
[0075] A process model is preferably provided that not only optimally controls the pressure level or the amount of water in the scale washer and the additional coolers (if present) behind the scale washer, so that one comes as close as possible to the goal of equal scale layer thicknesses on the upper and lower side, but the energy consumption (i.e., minimum water pressure and amount) and strip temperature losses (minimum water amount) can also be minimized. Piston pumps are favorable for varying the pressure level and for saving energy.
[0076] The proposed embodiment according to the invention makes it possible to select a position (Pos) for the position of the first roll stand F1, the extent of which is indicated in
[0077] In the optimal range (Opt), the required conditions for the ratio of the thicknesses of the secondary scale layers, as required above, are present.
[0078] The specified distances are thus advantageously designed according to the rolling portfolio.
[0079] In multi-row scale washers, the concept can be adapted so that the descaling rows can be switched on or off as required. The pressure level can be set differently for the upper or lower of the respective rows of nozzles depending on the process.
[0080] An additional cooler between the scale washer and the finishing train can be provided and activated if necessary.
LIST OF REFERENCE SIGNS
[0081] 1 metal article (slab, pre-strip, strip, sheet) [0082] 2 scale washer [0083] 3 rolling mill [0084] 4 mill stand [0085] 5 upper row of nozzles [0086] 6 upper side of the strip [0087] 7 lower row of nozzles [0088] 8 lower side of the strip [0089] 9 pair of rollers [0090] 10 pair of rollers [0091] 11 further upper row of nozzles [0092] 12 further lower row of nozzles [0093] F conveying direction [0094] F1 first roll stand [0095] a distance (in conveying direction) between the upper and the lower row of nozzles [0096] b distance (in conveying direction) between the last row of nozzles and the first roll stand [0097] s.sub.upper thickness of the secondary scale layer on the upper side of the strip [0098] s.sub.lower thickness of the secondary scale layer on the lower side of the strip [0099] T.sub.upper temperature of the strip on the upper side [0100] T.sub.lower temperature of the strip on the lower side [0101] W water [0102] Pos selected position of the first roll stand (F1) [0103] Opt optimal range for the arrangement of the roll stand (F1) following the scale washer