System comprising construction machine, transport vehicle with loading space and image-recording device, and method for displaying an image stream during the loading or unloading of a transport vehicle
11787337 ยท 2023-10-17
Assignee
Inventors
Cpc classification
H04N7/181
ELECTRICITY
B60R2300/80
PERFORMING OPERATIONS; TRANSPORTING
B60R1/00
PERFORMING OPERATIONS; TRANSPORTING
B60R2300/50
PERFORMING OPERATIONS; TRANSPORTING
International classification
B60R1/00
PERFORMING OPERATIONS; TRANSPORTING
Abstract
In a system comprising construction machine, transport vehicle with loading space and image-recording device, wherein the image-recording device is arranged at the construction machine and aligned, as a minimum, also towards the loading space of the transport vehicle, it is specified for the following features to be achieved: that a reception and display device is arranged at or in the transport vehicle, wherein the data recorded by the image-recording device are transmitted to the reception and display device via a transmission device arranged at the construction machine.
Claims
1. A system comprising: a construction machine having a machine frame and a conveyor arranged to pivot at the machine frame, and an image-recording device aligned to provide a field of view comprising at least a loading space of a transport vehicle; and a processor configured to identify the transport vehicle based on a unique identifier associated with the transport vehicle and within the field of view of the image-recording device; wherein data recorded by the image-recording device are transmitted to a reception and display device arranged at or in the transport vehicle, via a transmission device arranged at the construction machine.
2. The system of claim 1, wherein the unique identifier is determined by the processor from an image captured of a vehicle registration plate for the transport vehicle.
3. The system of claim 1, wherein the recorded and transmitted data comprise image data.
4. The system of claim 3, wherein the processor is configured to adjust whether and/or to what extent further image data is made available based on the unique identifier.
5. The system of claim 3, wherein the processor is configured to adjust a quality of the image data based on the unique identifier.
6. The system of claim 1, wherein the reception and display device comprises at least one portable computer having a programmed application associated with the unique identifier and configured to receive the data transmitted via the transmission device at least while the unique identifier is within the field of view of the image-recording device.
7. The system of claim 6, wherein the programmed application is configured to display a reference image on a screen of the at least one portable computer and to generate a signal responsive to a specified deviation of an image stream associated with the received data from the reference image.
8. The system of claim 1, wherein the image-recording device is aligned towards the conveyor.
9. The system of claim 1, wherein the image-recording device is arranged at the conveyor.
10. The system of claim 1, wherein the image-recording device comprises one or more of: a video camera with a wide-angle lens, an infrared camera, a stereoscopic camera, and a PMD camera.
11. The system of claim 1, further comprising: an evaluation unit configured to ascertain data relating to a milling material, and/or a location associated with the milling material, and/or operating parameters of the construction machine; wherein the transmission device is configured to transmit the further data to the reception and display device.
12. The system of claim 11, wherein the processor is further configured to determine whether to transmit the further data, and/or to adjust a scope of the further data transmitted, to the reception and display device based on the unique identifier.
13. The system of claim 11, further comprising a first storage device arranged at the construction machine, wherein the reception and display device comprises a second storage device, and wherein at least the further data transmitted to the reception and display device is stored: in the first storage device in association with the unique identifier; and/or in the second storage device.
14. The system of claim 11, wherein the evaluation unit is configured to evaluate the data of the image-recording device and determine one or more of: a filling level in the loading space; a distance between the construction machine and the transport vehicle; and a point of impingement of material in the loading space.
15. The system of claim 14, wherein the evaluation unit is configured to determine, as a function of a point of impingement of the material in the loading space and/or as a function of a distance between the construction machine and the transport vehicle, a start or stop signal which is transmitted to the reception and display device via the transmission device.
16. The system of claim 1, wherein the processor is configured to determine an original position and/or alignment of the image-recording device and, pursuant to a change in the position or alignment, to direct display of the image stream according to the original alignment.
17. A method of selectively transmitting data from a construction machine to a transport vehicle, wherein the construction machine has a machine frame, a conveyor arranged to pivot at the machine frame, and an image-recording device aligned to provide a field of view comprising at least a loading space of a transport vehicle, the method comprising: identifying the transport vehicle based on a unique identifier associated with the transport vehicle and within the field of view of the image-recording device; and transmitting data recorded by the image-recording device to a reception and display device arranged at or in the transport vehicle, via a transmission device arranged at the construction machine.
18. The method of claim 17, wherein the unique identifier is determined from an image captured of a vehicle registration plate for the transport vehicle.
19. The method of claim 17, further comprising: ascertaining data relating to a milling material, and/or a location associated with the milling material, and/or operating parameters of the construction machine; and deciding whether to transmit the further data to the reception and display device, and/or to adjust a scope of the further data transmitted to the reception and display device, based on the unique identifier.
20. The method of claim 19, further comprising evaluating the data of the image-recording device and determine further data comprising one or more of: a filling level in the loading space; a distance between the construction machine and the transport vehicle; and a point of impingement of material in the loading space.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) Taking one embodiment as an example, first the loading of a transport vehicle and then the unloading of a transport vehicle are hereinafter explained in more detail with reference to the drawings. The following is shown:
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
DETAILED DESCRIPTION:
(13)
(14) In the embodiment shown, the construction machine 2 is preferably a milling machine for milling a section of a ground pavement. The ground pavement is milled by means of the milling machine, and the removed material or milling material, respectively, is loaded onto the transport vehicle 3 via the at least one belt conveyor 7. The milling machine may comprise, as a minimum, a machine frame. Furthermore, the milling machine may comprise a height-adjustable milling drum for working the ground pavement. The milling drum is driven by a drive unit. The drive unit is preferably a drive motor, specifically, a combustion engine. The milling machine comprises traveling devices 44. Said traveling devices 44 may be wheels or tracked ground-engaging units. The traveling devices 44 may be connected to the machine frame 8 via lifting columns. The milling machine or the machine frame 8, respectively, can be adjusted in height relative to the ground pavement by means of the lifting columns. The machine frame 8 is adjusted in height by adjusting the lifting columns, and as a result, the not-depicted milling drum mounted in the machine frame 8 is adjusted in height as well. Alternatively or additionally, the milling drum may be adjustable in height relative to the machine frame 8.
(15) A reception and display device 18 is arranged at or in the transport vehicle 3, where the data recorded by the image-recording device 5 are transmitted to the reception and display device 18 by means of a transmission device 46 arranged at the construction machine. Alternatively, the reception and display device 18 may be designed as a mobile unit and carried along, for example, by the driver of the transport vehicle.
(16) The image-recording device 5 may additionally detect a registration plate, for example, the vehicle registration plate of the transport vehicle. The information concerning the registration plate may also be transmitted to the reception and display device by means of the transmission device 46.
(17) The transmission device 46 may transmit further data to the reception and display device 18 in addition to the data recorded by the image-recording device.
(18) Said further data may be other machine information, in particular, data relating to the milling material and/or messages from the driver of the construction machine 2 to the driver of the transport vehicle 3, preferably start or stop signals specified by the driver of the construction machine 2 for the driver of the transport vehicle 3.
(19) The reception and display device 18 may comprise a second transmission device 50, and a second reception device 51 may be arranged at the construction machine 2 so that messages can be sent from the driver of the transport vehicle 3 to the driver of the construction machine 2 via the second transmission device 50. It is therefore possible to exchange messages between the driver of the transport vehicle and the operator of the construction machine.
(20) The second transmission device 50 and the reception and display device may be designed as a unit. The second reception device and the transmission device 46 may also be designed as a unit.
(21) The system 1 may comprise an evaluation unit 13 for evaluating the data recorded with the image-recording device 5 by means of, for example, a unit for image analysis 14.
(22) The evaluation unit 13 may determine the filling level in the loading space and/or the distance between the construction machine 2 and the transport vehicle 3 and/or the point of impingement of material in the loading space 4 by evaluating the image data.
(23) An imminent collision of the construction machine 2 and the transport vehicle 3 can be determined by means of the distance between the construction machine 2 and the transport vehicle 3.
(24) The point of impingement of the material may be the actual point of impingement of the material in the loading space 4 and also, in the case of the conveying device being switched off, the potential point of impingement in the loading space 4 when the belt conveyor 6 is driven again. To determine the potential point of impingement, further parameters such as, for example, the inclination of the belt conveyor 6 may also be included.
(25) It may be determined based on the actual point of impingement of the material in the loading space 4 whether the material is still discharged within the loading space 4 and whether the point of impingement is in the peripheral area of the loading space 4 and the transport vehicle 3 therefore needs to move again soon in relation to the construction machine 2.
(26) The further data which are transmitted by the transmission device 46 to the reception and display device 18 in addition to the data recorded by the image-recording device 5 may be data determined by the evaluation unit 13, in particular, start or stop signals for the driver of the transport vehicle 3 and/or the mass of the milling material loaded and/or a collision warning.
(27) The evaluation unit 13 may determine, as a function of the point of impingement of the material in the loading space and/or as a function of the distance between the construction machine 2 and the transport vehicle 3, a start or stop signal which is transmitted to the reception and display device 18 via the transmission device 45.
(28) The camera lens 9 is preferably a wide-angle lens of a camera 11 which, as a video camera, records an original image stream 12. The data recorded may be forwarded to the evaluation unit 13. Alternatively or additionally, an infrared camera and/or a stereoscopic camera and/or a PMD camera may also be used.
(29) The camera 11 may, as a video camera, forward an original image stream 12 to the evaluation unit 13 which covers information from the entire viewing angle 10. It may, however, also forward subset image streams on subset viewing angles 16, 17 to the evaluation unit 13. Subset image streams from an original image stream 12 may, however, also be generated in the evaluation unit 13, or subset image streams from the original image stream 12 may also only be generated in the reception and display device 18 and be displayed on a screen 19 of the reception and display device 18 as images 20 and 21. Subset image streams may therefore be already generated at the image-recording device 5 by means of two cameras 22, 23, with the evaluation unit 13 or the reception and display device 18. In the embodiment shown in
(30) The camera 11 is fastened at the belt conveyor 7 of the conveying device 6 in such a fashion that the alignment always points directly downwards independent of the angle of inclination 27 of the belt conveyor relative to the machine frame 8 of the construction machine 2. It is thus ensured that the camera always records the loading surface and that section of the belt conveyor where the loading space 4 of the transport vehicle 3 could collide with the conveying device 6.
(31) A first storage device 52 may be arranged at the construction machine 2, and/or the reception and display device 18 may comprise a second storage device 53. The data recorded by the image-recording device 5, and/or the further data which are transmitted to the reception and display device 18 in addition to the data recorded by the image-recording device 5, may be stored in the first and/or the second storage device 52, 53.
(32) A preferred embodiment variant specifies for the reception and display device 18 to be a portable computer, preferably a mobile telephone. A mobile telephone has the advantage that the same is carried along by every driver of a transport vehicle, and that it is therefore not necessary to specify an own reception and display device 18 for each transport vehicle. An application program may be installed on such mobile telephone by means of which the data of the transmission device can be received and displayed on the screen of the mobile telephone.
(33) When using the system for loading a transport vehicle 3 with the construction machine 2, first, as shown in
(34)
(35) In the present case, the construction machine 2 can pivot the conveying device 6, and the construction machine can be moved forward and backward in alignment of the transport vehicle 3. The proper loading of the transport vehicle 3 therefore depends not only on the absolute position of the transport vehicle 3 but on the relative position of the transport vehicle 3 to the conveying device 6 and to the machine frame 8 of the construction machine 2.
(36) Since the camera 11 moves with the construction machine 2, the vehicle driver always obtains, via the camera, an image of the situation which shows the transport vehicle 3 and in particular the loading surface 4 of the same in relation to the construction machine 2 and from the direction of the construction machine 2 in order to move the transport vehicle 3 into the correct position relative to the construction machine 2.
(37)
(38) A construction machine 2 according to
(39) Both the loading surface and the receptacle 34 can thus be observed by means of the camera also during unloading in order to, on the one hand, prevent a severe collision during the docking phase in particular in the case of a movement of the construction machine 2 and the transport vehicle 3 and in order to, on the other hand, let the material slide into the trough of the receptacle 34 at different speeds. This is of advantage in particular when the construction machine collects the material at different speeds.
(40) The construction machine 2 according to
(41) Just as the transport vehicle 3 according to
(42) The entire loading and unloading process also requires a communication between the parties involved. For this purpose, message streams may be transmitted via the reception and display device 18 and/or the second transmission device 50 and the transmission and reception device 46, 51 arranged on the construction machine. Furthermore, it is advantageous if the message streams can be stored in one or both storage devices 52, 53.
(43) On the screen 19, at least on one image 20, 21, reference images may be displayed which, for example, show the optimal position of the transport vehicle 3 relative to the construction machine 2. Said optimal position remains unchanged even when the transport vehicle 3 and the construction machine 2 move, since the optimal position of the transport vehicle, for example, during docking to the construction machine 2, remains unchanged from the perspective of the camera arranged at the construction machine 2. In the case of a strong deviation of the image 20, 21 from the displayed reference image, a message may be sent to the reception and display device 18 or a signal generated so that, for example, the horn 15 is sounded.