Power plant with gas turbine intake air system
11162390 · 2021-11-02
Assignee
Inventors
Cpc classification
F05D2260/2322
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F02C6/18
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K17/025
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01D17/145
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05D2220/72
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05D2270/303
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K13/02
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02E20/14
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02E20/16
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
F01K23/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
A power plant including a gas turbine, a waste heat steam generator and an intermediate circuit having a first heat exchanger, which is connected to an air inlet of the gas turbine, and a second heat exchanger, which is connected to a condensate circuit, having a condensate preheater in the waste heat steam generator. A first and a second high load valve, and parallel with these a first and a second low load valve for lower volume flows than through the first and second high load valve, are arranged on either side of the second heat exchanger. An associated method for optimizing efficiency and extending the operating range of a power plant.
Claims
1. A power plant comprising: a gas turbine, a heat recovery steam generator, an intermediate circuit with a first heat exchanger, which is connected into an air inlet of the gas turbine, and a second heat exchanger, which is connected into a condensate circuit and comprises a condensate preheater in the heat recovery steam generator, and a first high-load valve and second high-load valve and, parallel thereto, a first low-load valve and second low-load valve, for smaller throughflows than the first high-load valve and second high-load valve, which are arranged on both sides of the second heat exchanger.
2. The power plant as claimed in claim 1, wherein the condensate circuit comprises a first recirculation line which connects an outlet of the condensate preheater to an inlet of the condensate preheater, wherein redundant recirculation pumps are arranged in the first recirculation line and wherein a first branch line branches from the first recirculation line and opens into the second heat exchanger and a second branch line connects the second heat exchanger to the inlet of the condensate preheater.
3. The power plant as claimed in claim 2, wherein the first branch line branches from the first recirculation line downstream of the recirculation pumps in the flow direction.
4. The power plant as claimed in claim 2, wherein the first high-load valve is arranged in the first branch line and the first low-load valve is arranged in a first bypass line around the first high-load valve.
5. The power plant as claimed in claim 2, wherein the first high-load valve is arranged in the second branch line and the first lowload valve is arranged in a first bypass line around the first high-load valve.
6. The power plant as claimed in claim 5, wherein a second recirculation line branches from the second branch line and opens into the first recirculation line upstream of the redundant recirculation pumps in the flow direction of a condensate.
7. The power plant as claimed in claim 5, wherein a second recirculation line branches from the first bypass line and opens into the first recirculation line upstream of the redundant recirculation pumps in the flow direction of a condensate.
8. The power plant as claimed in claim 2, wherein a third recirculation line leads from the second branch line into the first branch line and a pump is connected into the third recirculation line.
9. The power plant as claimed in claim 2, wherein the condensate preheater has at least two heating surfaces of which at least one has a bypass.
10. The power plant as claimed in claim 1, wherein the second high-load valve is arranged in the intermediate circuit and the second low-load valve is arranged in a second bypass line around the second high-load valve, wherein a third bypass line around the second heat exchanger, followed by a static mixer, is also arranged in the intermediate circuit, wherein the second high-load valve fulfills a function of a three-way valve and an outlet of the second high-load valve is connected to an inlet of the second heat exchanger and the third bypass line branches from a further outlet of the second high-load valve.
11. The power plant as claimed in claim 1, further comprising: a device for controlling the first and second high-load valves and first and second low-load valves.
12. The power plant as claimed in claim 1, wherein the second heat exchanger is at least one fully-welded plate heat exchanger.
13. A method for efficiency optimization and operating range extension of a power plant, the power plant comprising a gas turbine and a heat recovery steam generator, the method comprising: conducting a fluid in an intermediate circuit and in the process heat is transferred via a first heat exchanger to air which is inducted by the gas turbine, transferring heat of a preheated condensate from the heat recovery steam generator via a second heat exchanger to the fluid, wherein, depending on heat demand, directing the condensate via a first high-load valve or via a first low-load valve which is connected in parallel to the first high-load valve and designed for smaller throughflows than the first high-load valve wherein, depending on heat demand, the fluid is directed via a second high-load valve or via a second low-load valve which is connected in parallel to the second high-load valve and designed for smaller throughflows than the second high-load valve.
14. The method as claimed in claim 13, wherein at least some of the condensate, after yielding heat to the fluid, bypassing a preheating, is admixed with a flow of preheated condensate and the mixture is fed to the second heat exchanger.
15. The method as claimed in claim 13, further comprising: using a heating margin of the intermediate circuit as a control variable for a condensate mass flow through the second heat exchanger.
16. The method as claimed in claim 13, further comprising: using a valve position of the second high-load valve as a control variable for a condensate mass flow through the second heat exchanger.
17. The method as claimed in claim 13, further comprising: continuously adjusting a temperature setpoint value for intake air in dependence of a gas turbine proportion of an established power setpoint value of the power plant.
18. The method as claimed in claim 13, further comprising: banking up a low-pressure stage in the heat recovery steam generator in order to shift heat in the heat recovery steam generator to the condensate preheater.
19. The method as claimed in claim 13, further comprising: opening a high-pressure preheater bypass in the heat recovery steam generator in order to shift heat to the condensate preheater.
20. The method as claimed in claim 13, further comprising: partially shutting down burners of the gas turbine.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The invention is explained in more detail by way of example with reference to drawings. In the drawings, schematically and not to scale:
(2)
(3)
DETAILED DESCRIPTION OF INVENTION
(4)
(5) The condensate circuit 8 comprises a condensate preheater 9 in the heat recovery steam generator 3, and also a first recirculation line 14 which connects an outlet 15 of the condensate preheater 9 to an inlet 16 of the condensate preheater 9, wherein redundant circulating pumps 17 are arranged in the first recirculation line 14. The second heat exchanger 7 is incorporated into the condensate circuit 8 by a first branch line 18 branching from the first recirculation line 14 downstream of the recirculation pumps 17 in the flow direction and opening into the second heat exchanger 7, and by a second branch line 19 connecting the second heat exchanger 7 to the inlet 16 of the condensate preheater 9.
(6) The first high-load valve 10 and the first low-load valve 12, which is arranged in a first bypass line 20 around the first high-load valve 10, can be arranged either together in the first branch line 18 (
(7) For recirculation of a condensate which is cooled in the second heat exchanger 7 without further heating in the condensate preheater 9 there are different possibilities. According to the embodiment according to
(8) Finally,
(9) In addition to the first heat exchanger 5 and the second heat exchanger 7, the second high-load valve 11 is arranged in the intermediate circuit 4 and the second low-load valve 13 is arranged in a second bypass line 23 around the second high-load valve 11. Also, a third bypass line 24 around the second heat exchanger 7, followed by a static mixer 25, is arranged in the intermediate circuit 4. The second high-load valve 11 is designed as a three-way valve in
(10)
(11) If the heat quantity in the region of the condensate preheater 9 is no longer sufficient for the intake air preheating, then a low-pressure stage 30 can be banked up in the heat recovery steam generator 3 in order to shift heat in the heat recovery steam generator 3 to the condensate preheater 9.
(12) If this measure should still not be sufficient, a high-pressure preheater bypass 31 can be opened in the heat recovery steam generator 3 in a further step in order to shift still more heat to the condensate preheater 9. This functions both for high-pressure regions with high-pressure drums 40, as shown in
(13) Also shown in