MODEL TEST APPARATUS AND METHOD FOR SHIELD TUNNEL POST-WALL GROUTING AND TUBE SHEET UPLIFT UNDER HIGH WATER PRESSURE CONDITIONS
20230333279 · 2023-10-19
Assignee
Inventors
- Fei Sha (Shandong, CN)
- Hao Kong (Shandong, CN)
- Tao Liu (Shandong, CN)
- Rui Fan (Shandong, CN)
- Mingshuai Xi (Shandong, CN)
- Shijiu Gu (Shandong, CN)
- Meng Bu (Shandong, CN)
Cpc classification
E21D11/10
FIXED CONSTRUCTIONS
International classification
Abstract
This invention discloses a model test apparatus and method for shield post-wall grouting and tube sheet uplift under high water pressure conditions, comprising main body box, tension apparatus, shield system, grouting system, ground stress loading system, water injection system, and monitoring system. The main body box comprises the shield shell system and model soil inside. The ground stress loading system and water injection system realize the simulation of the complex underground soil and muddy water environment by applying stress and water pressure to the model soil inside the main box. While the tension apparatus makes the shield shell moving forward, the grouting system injects slurry into the gap between the shield shell and the tube sheet. The integrated model test of visual shield grouting and tube sheet uplift, the real-time multi-physical field responses, and the longitudinal deformation mechanism have been realized and revealed under high water pressure conditions.
Claims
1. A model test apparatus for shield post-wall grouting and tube sheet uplift under high water pressure conditions, comprising: a main body box, a tension apparatus, a shield system, a grouting system, a ground stress loading system, a water injection system, and a monitoring system, wherein an upper face of the main body box is open, the main body box is made up of a visual material, a front face of the main body box is equipped with a shield shell aperture, wherein the shield system includes a shield shell and multiple pipe sheets, the shield shell is located in the main body box, a front part of the shield shell is located in the shield shell aperture, and tube pieces are located inside the shield shell in sequence, wherein the main box is filled with model soil, a loading plate is located at an open position of the main box, the ground stress loading system achieves ground stress loading simulation to the model soil through the loading plate, the water injection system connects to the model soil which is located above the shield shell in the main box through a water pipeline, and a high water pressure mud and a water environment has been simulated, wherein the tension apparatus connects to the front part of the shield shell, a slurry delivery tube of the grouting system is installed within the shield shell, while the shield shell is moving outward in a horizontal boring motion by the tension apparatus, the grouting system injects slurry into a gap between the pipe sheet and the model soil through the slurry delivery pipe, wherein the monitoring system is used to monitor and collect relevant test parameters of the model soil in the main box, the shield shell is made up of annular steel plate, an inner wall of the shield shell is fixed with several adjustable pulleys along a circumferential direction, wheel surfaces of several adjustable pulleys support an outer wall of the pipe sheet, wherein the pipe sheet is composed of splicing ring-shaped structure, adjacent pipe sheets are connected with each other by bolts, the front part of the shield shell is equipped with a cover plate, and a third interface is provided on the cover plate and connects with the tension apparatus.
2. The model test apparatus according to claim 1, wherein each of the adjustable pulley comprises a pulley, a bolt cap, a torsion strut, and a chassis support, both sides of the chassis support connect to the inner wall of the shield shell by bolt holes IV, an upper part of the chassis support connects to the torsion strut, a screw thread on the torsion strut connects to the bolt cap, a top perimeter of the bolt cap connects to the pulley through bolt holes III.
3. The model test apparatus according to claim 2, wherein an inner wall of a rear end of the shield shell is provided with an annular barrier plate, multiple grouting ports are set on a face of the annular barrier plate in the circumferential direction, a delivery line of the water injection system connects to multiple slurry pipes, the slurry pipes are located in a gap between the shield shell and the tube sheet, and the slurry pipes connect to slurry injection ports one by one.
4. The model test apparatus according to claim 1, wherein the water injection system comprises a first air compressor, an air delivery pipe I, an air pressure regulator I, a water storage tank, a water pressure gauge, and a water delivery pipe, the water storage tank and the first air compressor are connected through the air delivery pipe I, the air pressure regulator I is installed on the air delivery pipe I, an outlet of water storage tank connects to the water pipeline, the delivery pipe is inserted into the model soil after penetrating through the loading plate, the delivery pipe is installed with a valve I, and a water pressure gauge connects to an upper part of the water storage tank.
5. The model test apparatus according to claim 1, wherein the ground stress loading system comprises a jack and a test frame, the test frame is a gantry type structure, the main body box is located in a doorway of the test frame, the jack connects to a top of test frame, and the loading plate connects to a loading part of the jack.
6. The model test apparatus according to claim 1, wherein the monitoring system comprises a monitoring element, a signal line, and a data acquisition processor, the monitoring element comprises a displacement sensor, a soil pressure sensor, and a dynamic water pressure sensor, the monitoring element is placed within the model soil, and the monitoring element connects to the data acquisition processor via the signal line.
7. The model test apparatus according to claim 1, wherein the main body box comprises a detachable front and rear main boards, a left-side panel, a right-side panel, and the left-side panel and the right-side panel are each provided with grid lines on the panels.
8. A model test method for shield post-wall grouting and tube sheet uplift under high water pressure conditions, wherein a test is carried out using a model test apparatus for shield post-wall grouting and tube sheet uplift under high water pressure conditions according to claim 1, comprising the following steps: step 1: install the main body box and the ground stress loading system, step 2: install the shield system, embedding the shield shell into the main body box at a shield shell hole, embedding a plurality of pipe pieces into a rear position of the shield shell, connecting the last pipe piece with the rear main board of the main body box with bolts, and connecting the tension apparatus with the front part of the shield shell, step 3: install the grouting system, step 4: install the water injection system, step 5: fill the main body box with the model soil, burying the displacement sensor, the soil pressure sensor, and a dynamic water pressure sensor in the model soil, and install the loading plate in an upper part of the model soil, the loading plate connects to the ground stress loading system, step 6: apply water pressure, the water injection system injects water into the model soil through the water pipeline, step 7: apply ground stress, the ground stress loading system makes a load transfer evenly in the model soil through the loading plate, stop loading after the ground stress reaches a desired stress value of the water environment, step 8: start the tension apparatus to move the shield shell outward for a horizontal digging movement, while the shield shell is moving, the grouting system injects slurry into the gap between the pipe piece and the model soil through a slurry delivery pipe, when the shield shell advances one ring, release a constraint between the pipe piece at the last end and the main board behind the main body box, step 9: after the grouting is finished, collect data through the monitoring system, summarize a pipe piece uplift law and a grouting diffusion reinforcement pattern of the pipe piece in different rings, and evaluate an effect of shield post-wall synchronous grouting, step 10: repeat the above steps from step 1 to step 9, set different parameters of ground stress pressure, water pressure, slurry type, grouting volume, grouting pressure, gap parameter between the shield shell and the pipe sheet, and shield boring speed to complete a shield post-wall synchronous grouting test under different conditions.
9. The model test apparatus according to claim 2, wherein the main body box comprises a detachable front and rear main boards, a left-side panel, a right-side panel, and the left-side panel and the right-side panel are each provided with grid lines on the panels.
10. The model test apparatus according to claim 3, wherein the main body box comprises a detachable front and rear main boards, a left-side panel, a right-side panel, and the left-side panel and the right-side panel are each provided with grid lines on the panels.
11. The model test apparatus according to claim 4, wherein the main body box comprises a detachable front and rear main boards, a left-side panel, a right-side panel, and the left-side panel and the right-side panel are each provided with grid lines on the panels.
12. The model test apparatus according to claim 5, wherein the main body box comprises a detachable front and rear main boards, a left-side panel, a right-side panel, and the left-side panel and the right-side panel are each provided with grid lines on the panels.
13. The model test apparatus according to claim 6, wherein the main body box comprises a detachable front and rear main boards, a left-side panel, a right-side panel, and the left-side panel and the right-side panel are each provided with grid lines on the panels.
14. A model test method for shield post-wall grouting and tube sheet uplift under high water pressure conditions, wherein a test is carried out using a model test apparatus for shield post-wall grouting and tube sheet uplift under high water pressure conditions according to claim 2, comprising the following steps: step 1: install the main body box and the ground stress loading system, step 2: install the shield system, embedding the shield shell into the main body box at a shield shell hole, embedding a plurality of pipe pieces into a rear position of the shield shell, connecting the last pipe piece with the rear main board of the main body box with bolts, and connecting the tension apparatus with the front part of the shield shell, step 3: install the grouting system, step 4: install the water injection system, step 5: fill the main body box with the model soil, burying the displacement sensor, the soil pressure sensor, and a dynamic water pressure sensor in the model soil, and install the loading plate in an upper part of the model soil, the loading plate connects to the ground stress loading system, step 6: apply water pressure, the water injection system injects water into the model soil through the water pipeline, step 7: apply ground stress, the ground stress loading system makes a load transfer evenly in the model soil through the loading plate, stop loading after the ground stress reaches a desired stress value of the water environment, step 8: start the tension apparatus to move the shield shell outward for a horizontal digging movement, while the shield shell is moving, the grouting system injects slurry into the gap between the pipe piece and the model soil through a slurry delivery pipe, when the shield shell advances one ring, release a constraint between the pipe piece at the last end and the main board behind the main body box, step 9: after the grouting is finished, collect data through the monitoring system, summarize a pipe piece uplift law and a grouting diffusion reinforcement pattern of the pipe piece in different rings, and evaluate an effect of shield post-wall synchronous grouting, step 10: repeat the above steps from step 1 to step 9, set different parameters of ground stress pressure, water pressure, slurry type, grouting volume, grouting pressure, gap parameter between the shield shell and the pipe sheet, and shield boring speed to complete a shield post-wall synchronous grouting test under different conditions.
15. A model test method for shield post-wall grouting and tube sheet uplift under high water pressure conditions, wherein a test is carried out using a model test apparatus for shield post-wall grouting and tube sheet uplift under high water pressure conditions according to claim 3, comprising the following steps: step 1: install the main body box and the ground stress loading system, step 2: install the shield system, embedding the shield shell into the main body box at a shield shell hole, embedding a plurality of pipe pieces into a rear position of the shield shell, connecting the last pipe piece with the rear main board of the main body box with bolts, and connecting the tension apparatus with the front part of the shield shell, step 3: install the grouting system, step 4: install the water injection system, step 5: fill the main body box with the model soil, burying the displacement sensor, the soil pressure sensor, and a dynamic water pressure sensor in the model soil, and install the loading plate in an upper part of the model soil, the loading plate connects to the ground stress loading system, step 6: apply water pressure, the water injection system injects water into the model soil through the water pipeline, step 7: apply ground stress, the ground stress loading system makes a load transfer evenly in the model soil through the loading plate, stop loading after the ground stress reaches a desired stress value of the water environment, step 8: start the tension apparatus to move the shield shell outward for a horizontal digging movement, while the shield shell is moving, the grouting system injects slurry into the gap between the pipe piece and the model soil through a slurry delivery pipe, when the shield shell advances one ring, release a constraint between the pipe piece at the last end and the main board behind the main body box, step 9: after the grouting is finished, collect data through the monitoring system, summarize a pipe piece uplift law and a grouting diffusion reinforcement pattern of the pipe piece in different rings, and evaluate an effect of shield post-wall synchronous grouting, step 10: repeat the above steps from step 1 to step 9, set different parameters of ground stress pressure, water pressure, slurry type, grouting volume, grouting pressure, gap parameter between the shield shell and the pipe sheet, and shield boring speed to complete a shield post-wall synchronous grouting test under different conditions.
16. A model test method for shield post-wall grouting and tube sheet uplift under high water pressure conditions, wherein a test is carried out using a model test apparatus for shield post-wall grouting and tube sheet uplift under high water pressure conditions according to claim 4, comprising the following steps: step 1: install the main body box and the ground stress loading system, step 2: install the shield system, embedding the shield shell into the main body box at a shield shell hole, embedding a plurality of pipe pieces into a rear position of the shield shell, connecting the last pipe piece with the rear main board of the main body box with bolts, and connecting the tension apparatus with the front part of the shield shell, step 3: install the grouting system, step 4: install the water injection system, step 5: fill the main body box with the model soil, burying the displacement sensor, the soil pressure sensor, and a dynamic water pressure sensor in the model soil, and install the loading plate in an upper part of the model soil, the loading plate connects to the ground stress loading system, step 6: apply water pressure, the water injection system injects water into the model soil through the water pipeline, step 7: apply ground stress, the ground stress loading system makes a load transfer evenly in the model soil through the loading plate, stop loading after the ground stress reaches a desired stress value of the water environment, step 8: start the tension apparatus to move the shield shell outward for a horizontal digging movement, while the shield shell is moving, the grouting system injects slurry into the gap between the pipe piece and the model soil through a slurry delivery pipe, when the shield shell advances one ring, release a constraint between the pipe piece at the last end and the main board behind the main body box, step 9: after the grouting is finished, collect data through the monitoring system, summarize a pipe piece uplift law and a grouting diffusion reinforcement pattern of the pipe piece in different rings, and evaluate an effect of shield post-wall synchronous grouting, step 10: repeat the above steps from step 1 to step 9, set different parameters of ground stress pressure, water pressure, slurry type, grouting volume, grouting pressure, gap parameter between the shield shell and the pipe sheet, and shield boring speed to complete a shield post-wall synchronous grouting test under different conditions.
17. A model test method for shield post-wall grouting and tube sheet uplift under high water pressure conditions, wherein a test is carried out using a model test apparatus for shield post-wall grouting and tube sheet uplift under high water pressure conditions according to claim 5, comprising the following steps: step 1: install the main body box and the ground stress loading system, step 2: install the shield system, embedding the shield shell into the main body box at a shield shell hole, embedding a plurality of pipe pieces into a rear position of the shield shell, connecting the last pipe piece with the rear main board of the main body box with bolts, and connecting the tension apparatus with the front part of the shield shell, step 3: install the grouting system, step 4: install the water injection system, step 5: fill the main body box with the model soil, burying the displacement sensor, the soil pressure sensor, and a dynamic water pressure sensor in the model soil, and install the loading plate in an upper part of the model soil, the loading plate connects to the ground stress loading system, step 6: apply water pressure, the water injection system injects water into the model soil through the water pipeline, step 7: apply ground stress, the ground stress loading system makes a load transfer evenly in the model soil through the loading plate, stop loading after the ground stress reaches a desired stress value of the water environment, step 8: start the tension apparatus to move the shield shell outward for a horizontal digging movement, while the shield shell is moving, the grouting system injects slurry into the gap between the pipe piece and the model soil through a slurry delivery pipe, when the shield shell advances one ring, release a constraint between the pipe piece at the last end and the main board behind the main body box, step 9: after the grouting is finished, collect data through the monitoring system, summarize a pipe piece uplift law and a grouting diffusion reinforcement pattern of the pipe piece in different rings, and evaluate an effect of shield post-wall synchronous grouting, step 10: repeat the above steps from step 1 to step 9, set different parameters of ground stress pressure, water pressure, slurry type, grouting volume, grouting pressure, gap parameter between the shield shell and the pipe sheet, and shield boring speed to complete a shield post-wall synchronous grouting test under different conditions.
18. A model test method for shield post-wall grouting and tube sheet uplift under high water pressure conditions, wherein a test is carried out using a model test apparatus for shield post-wall grouting and tube sheet uplift under high water pressure conditions according to claim 6, comprising the following steps: step 1: install the main body box and the ground stress loading system, step 2: install the shield system, embedding the shield shell into the main body box at a shield shell hole, embedding a plurality of pipe pieces into a rear position of the shield shell, connecting the last pipe piece with the rear main board of the main body box with bolts, and connecting the tension apparatus with the front part of the shield shell, step 3: install the grouting system, step 4: install the water injection system, step 5: fill the main body box with the model soil, burying the displacement sensor, the soil pressure sensor, and a dynamic water pressure sensor in the model soil, and install the loading plate in an upper part of the model soil, the loading plate connects to the ground stress loading system, step 6: apply water pressure, the water injection system injects water into the model soil through the water pipeline, step 7: apply ground stress, the ground stress loading system makes a load transfer evenly in the model soil through the loading plate, stop loading after the ground stress reaches a desired stress value of the water environment, step 8: start the tension apparatus to move the shield shell outward for a horizontal digging movement, while the shield shell is moving, the grouting system injects slurry into the gap between the pipe piece and the model soil through a slurry delivery pipe, when the shield shell advances one ring, release a constraint between the pipe piece at the last end and the main board behind the main body box, step 9: after the grouting is finished, collect data through the monitoring system, summarize a pipe piece uplift law and a grouting diffusion reinforcement pattern of the pipe piece in different rings, and evaluate an effect of shield post-wall synchronous grouting, step 10: repeat the above steps from step 1 to step 9, set different parameters of ground stress pressure, water pressure, slurry type, grouting volume, grouting pressure, gap parameter between the shield shell and the pipe sheet, and shield boring speed to complete a shield post-wall synchronous grouting test under different conditions.
19. A model test method for shield post-wall grouting and tube sheet uplift under high water pressure conditions, wherein a test is carried out using a model test apparatus for shield post-wall grouting and tube sheet uplift under high water pressure conditions according to claim 7, comprising the following steps: step 1: install the main body box and the ground stress loading system, step 2: install the shield system, embedding the shield shell into the main body box at a shield shell hole, embedding a plurality of pipe pieces into a rear position of the shield shell, connecting the last pipe piece with the rear main board of the main body box with bolts, and connecting the tension apparatus with the front part of the shield shell, step 3: install the grouting system, step 4: install the water injection system, step 5: fill the main body box with the model soil, burying the displacement sensor, the soil pressure sensor, and a dynamic water pressure sensor in the model soil, and install the loading plate in an upper part of the model soil, the loading plate connects to the ground stress loading system, step 6: apply water pressure, the water injection system injects water into the model soil through the water pipeline, step 7: apply ground stress, the ground stress loading system makes a load transfer evenly in the model soil through the loading plate, stop loading after the ground stress reaches a desired stress value of the water environment, step 8: start the tension apparatus to move the shield shell outward for a horizontal digging movement, while the shield shell is moving, the grouting system injects slurry into the gap between the pipe piece and the model soil through a slurry delivery pipe, when the shield shell advances one ring, release a constraint between the pipe piece at the last end and the main board behind the main body box, step 9: after the grouting is finished, collect data through the monitoring system, summarize a pipe piece uplift law and a grouting diffusion reinforcement pattern of the pipe piece in different rings, and evaluate an effect of shield post-wall synchronous grouting, step 10: repeat the above steps from step 1 to step 9, set different parameters of ground stress pressure, water pressure, slurry type, grouting volume, grouting pressure, gap parameter between the shield shell and the pipe sheet, and shield boring speed to complete a shield post-wall synchronous grouting test under different conditions.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0040]
[0041]
[0042]
[0043]
[0044]
[0045]
[0046]
[0047]
[0048]
[0049]
[0050]
[0051]
[0052]
[0053] In the Figures: 1. main body box; 2. shield shell hole; 3. shield shell; 4. adjustable pulley; 5. pipe piece; 6. loading plate; 7. jack; 8. test frame; 9. first outlet; 10. a signal line; 11. data acquisition processor; 12. cover plate; 13. the first interface; 14. the second interface; 15. the third interface; 16. The first air compressor; 17. air transmission pipe I; 18. air pressure regulator I; 19. water storage tank; 20. water pressure gauge; 21. the valve I; 22. water delivery pipe; 23. the second air compressor; 24. liquid storage tank I; 25. liquid storage tank II; 26. air pressure regulator II; 27. air pressure regulator III; 28. air delivery pipe II; 29. valve II; 30. valve III; 31. double liquid mixer; 32 liquid delivery pipe; 33. slurry injection port; 34. barrier plate; 35. flow recorder; 36. first slurry; 37. second slurry; 38. water; 39. pressure gauge I; 40. pressure gauge II; 41. fourth interface; 42. model soil; 43. displacement sensor; 44. soil pressure sensor; 45. dynamic water pressure sensor; 46 tension apparatus; 101. front main board; 102. side plate; 103. bolt hole I; 104. bolt hole II; 105. rear main board; 106. bolt hole V; 401 pulley; 402. bolt hole III; 403. bolt cap; 404. torsion strut; 405. bolt hole IV; 406 chassis support.
DETAILED DESCRIPTION OF THE EMBODIMENTS
[0054] The invention is further described below in conjunction with the accompanying drawings and examples.
[0055] It should be noted that the following detailed descriptions are illustrative and are intended to provide further clarification of the present application. Unless otherwise indicated, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which the present application belongs.
[0056] It is noted that the terms used herein are intended to describe specific embodiments only and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context indicates otherwise, the singular form is also intended to include the plural form, and it is also to be understood that when the terms “comprising” and/or “including” are used in this specification, they indicate the presence of features, steps, operations, apparatus, components, and/or combinations. The term “includes” and/or “includes” is used in this specification to indicate the presence of features, steps, operations, apparatus, components, and/or combinations.
[0057] In the present invention, the orientation or position relationship indicated by “top”, “bottom”, “left”, “right”, “front”, “back”, “vertical”, “horizontal”, “side”, “bottom”, etc. is based on the orientation or position relationship shown in the accompanying drawings, and is only a relationship term determined for facilitating the description of the structural relationship of the parts or components of the present invention, and does not refer specifically to any part or component of the present invention, and cannot be understood as a limitation of the present invention.
[0058] In the present invention, terms such as “fixed”, “connected”, etc. shall be understood in a broad sense, indicating that they can be connected fixedly, connected integrally, or connected detachably. It can be connected directly or indirectly through an intermediate medium. For the relevant scientific or technical personnel in the field, the specific meaning of the above terms in the present invention can be determined on a case-by-case basis and cannot be understood as a limitation of the present invention.
[0059] The present invention designs a model test apparatus for shield post-wall grouting and tube sheet uplift under high hydraulic pressure conditions, as shown in
[0060] As shown in
[0061] As shown in
[0062] As shown in
[0063] As shown in
[0064] As shown in
[0065] As shown in
[0066] As shown in
[0067] As shown in
[0068] In this embodiment, the monitoring elements are distributed in two forms, as shown in
[0069] In this embodiment, the model soil is divided into four layers, the model soil is silty powdery clay and powdery clay in the upper part of the shield shell, the model soil is medium coarse sand in the lower part of the shield shell, and the model soil for shield tunneling is powdery fine sand. It should be noted that in other embodiments, the type of model soil should be adjusted according to the specific actual working conditions. The type of model soil can be limestone, mudstone, siltstone, quartz sandstone, etc., or it can be a clay stratum such as chalk, silt, chalky clay, medium coarse sand, gravelly sand, medium sand, chalky fine sand, silty chalky, etc.
[0070] The selected model soil parameters are as follows.
TABLE-US-00001 Water Void Internal Soil layer Severe content ratio Cohesion friction angle name (KN/m.sup.3) (%) (e) (KPa) (°) Muddy silty 17.7 45 1.31 14.3 11.7 clay Silty Clay 17.2 40.1 1.23 7.4 14.8 Powder fine 18.7 27.4 0.8 0 29 sand Medium- 15.4 32.2 0.65 0 31 coarse Sand
[0071] The present invention also provides a model test method for shield post-wall grouting and tube sheet uplift under high water pressure condition, the steps are described as follows.
[0072] Step 1: Install the main body box and the ground stress loading system.
[0073] Step 2: Install the shield system, adjusting pulley 4 to the designated position of shield shell, embed a plurality of pipe pieces into the rear position of the shield shell, adjust the distance between the shield shell 3 and the tube sheet 5 by the adjustable pulley 4. After the adjustment, connect the slurry delivery pipe with the slurry injection port 33 of barrier plate 34. Embed the shield shell 3 at the main box shield shell hole 2. Bolt the rearmost tube piece to the rear main board of the main box. Install cover plate 12 to the front end of shield shell 3, and the third interface is connected to tension apparatus 46.
[0074] Step 3: Install the grouting system, and connect the liquid delivery pipe 32 to the liquid storage tanks I 24 and II 25. The liquid storage tank I 24 and liquid storage tank II 25 are connected to the second air compressor 23 through the air delivery pipe II 28. Further, the air pressure regulators II 26 and III 27 are installed on the air delivery pipe II 28. The valve II 29, valve III 30, the double liquid mixer 31, and the grouting recorder 35 are installed on the liquid delivery pipe 32. The first interface 13 and the second interface 14 of the cover plate 12 are connected to every slurry tube.
[0075] Step 4: Install the water injection system, connect the air delivery pipe I 17 and the water storage tank 19 with the first air compressor 16, install the air pressure regulator 18 on the air delivery pipe I 17, connect the water delivery pipe 22 with the fourth interface 41 and the water storage tank 19, and install the valve I 21 on the water delivery pipe 22.
[0076] Step 5: Fill the model soil 42 into the main box 1, and bury the displacement sensor 43, soil pressure sensor 44, and dynamic water pressure sensor 45 in the model soil 42. The signal lines 10 of the displacement sensor 43, soil pressure sensor 44, and dynamic water pressure sensor are drawn to the third interface 15 to connect to the data acquisition processor 11. and install loading plate 6 in the upper part of the model soil 42.
[0077] Step 6: Apply water pressure and open valve I 21. The first air compressor 16 pressurizes the water storage tank 19 to make water enter the model soil 42 through the delivery pipe to the fourth interface 41. When the specified pressure reaches, close valve I 21 and stop the water injection.
[0078] Step 7: Apply ground stress. Turn on jack 7 and press the load downward. Pass the load through the loading plate 6 to transfer the load evenly in the model soil 42, and stop the loading after reaching the desired environmental ground stress.
[0079] Step 8: Start the tension apparatus 46 to move shield shell 3 outward for horizontal digging movement, while shield shell 3 is moving, open the valve II 29 and valve III 30, and the second air compressor 23 applies pressure to the reservoir I 24 and reservoir II 25 to make the first slurry 36 and the second slurry 37 generate the double liquid slurry through the double liquid mixer 31, the double liquid slurry reaches the slurry injection port 33 through the liquid delivery pipe 32 and grouting is performed to the gap between the model soil and the pipe sheet 5. When advancing one ring, the bolt in bolt hole V 106 is removed to release the constraint between the rearmost tube sheet and the rear main board of the main box.
[0080] Step 9: After grouting, collect data, summarize the tube sheet uplift pattern and the diffusion reinforcement pattern of tube sheet grouting in different rings, and evaluate the effects of shield post-wall synchronous grouting.
[0081] Step 10: Repeat steps one to nine above and set different parameters such as ground stress pressure, water pressure, slurry type, grouting volume, grouting pressure, gap between shield shell 3 and pipe sheet 5, and shield boring speed, etc. Complete the shield post-wall synchronous grouting tests under different conditions.