METAL DROP EJECTING THREE-DIMENSIONAL (3D) OBJECT PRINTER AND METHOD OF OPERATION FOR FORMING SUPPORT STRUCTURES IN 3D METAL OBJECTS
20230278103 · 2023-09-07
Inventors
- Christopher T. Chungbin (Webster, NY, US)
- PriyaankaDevi Guggilapu (Webster, NY, US)
- Daniel R. Cormier (Pittsford, NY, US)
- David G. Tilley (Williamson, NY, US)
- David A. Mantell (Rochester, NY, US)
- Michael F. Dapiran (Webster, NY, US)
Cpc classification
B33Y10/00
PERFORMING OPERATIONS; TRANSPORTING
B33Y30/00
PERFORMING OPERATIONS; TRANSPORTING
B22F2999/00
PERFORMING OPERATIONS; TRANSPORTING
B22F10/85
PERFORMING OPERATIONS; TRANSPORTING
B22F10/47
PERFORMING OPERATIONS; TRANSPORTING
B22F2005/005
PERFORMING OPERATIONS; TRANSPORTING
B22D23/003
PERFORMING OPERATIONS; TRANSPORTING
B22F10/22
PERFORMING OPERATIONS; TRANSPORTING
B22F12/50
PERFORMING OPERATIONS; TRANSPORTING
B22F2999/00
PERFORMING OPERATIONS; TRANSPORTING
B22F12/90
PERFORMING OPERATIONS; TRANSPORTING
B33Y50/02
PERFORMING OPERATIONS; TRANSPORTING
B22F10/47
PERFORMING OPERATIONS; TRANSPORTING
International classification
B22F10/22
PERFORMING OPERATIONS; TRANSPORTING
B22D23/00
PERFORMING OPERATIONS; TRANSPORTING
B22F10/85
PERFORMING OPERATIONS; TRANSPORTING
B22F12/50
PERFORMING OPERATIONS; TRANSPORTING
B33Y10/00
PERFORMING OPERATIONS; TRANSPORTING
B33Y30/00
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A metal object manufacturing apparatus is configured to eject melted metal drops to form a continuous metal line over a line of spatially separated pillars in a single pass. The ejection frequency for forming the continuous metal line is different than the frequency used to form the pillars. In one embodiment, the ejection frequency for forming the pillars is about 100 Hz and the frequency used to form the continuous metal line over the line of spatially separated pillars is about 300 Hz with a drop spacing of about 0.2 mm. Continuous metal lines are formed to extend the continuous metal lines over the pillars laterally to fill the gaps between the continuous metal lines over the pillars. These continuous metal lines that fill the gaps are formed while operating the ejection head at the 300 Hz frequency with a drop spacing of 0.28 mm.
Claims
1. A metal drop ejecting apparatus comprising: an ejector head configured to eject melted metal drops through a nozzle; planar member positioned to receive melted metal drops ejected from the ejector head; and a controller operatively connected to the ejector head, the controller being configured to operate the ejector head to eject melted metal drops to form a continuous metal line over a first line of spatially separated pillars in a single pass of the ejector head over the first line of spatially separated pillars.
2. The apparatus of claim 1, the controller being further configured to operate the ejector head to form the first line of spatially separated pillars with the pillars being spatially separated from one another by a predetermined distance.
3. The apparatus of claim 2 wherein the predetermined distance is 0.85 mm.
4. The apparatus of claim 2, the controller being further configured to: operate the ejector head at a first ejection frequency to eject melted metal drops to form the first line of spatially separated pillars; and operate the ejector head at a second ejection frequency that is different than the first ejection frequency to form the continuous metal line over the first line of spatially separated pillars.
5. The apparatus of claim 4 wherein the first ejection frequency is about 100 Hz and the second ejection frequency is about 300 Hz.
6. The apparatus of claim 4, the controller being further configured to: operate the ejector head with a melted metal drop spacing of about 0.2 mm to form the continuous metal line over the first line of spatially separated pillars.
7. The apparatus of claim 6, the controller being further configured to: operate the ejector head to eject melted metal drops and form a second line of spatially separated pillars that is separated from and parallel to the continuous metal line over the first line of spatially separated pillars; and operate the ejector head at the frequency of 300 Hz and the melted metal drops spacing of 0.2 mm to form a continuous metal line over the second line of spatially separated pillars in a single pass.
8. The apparatus of claim 7, the controller being further configured to: operate the ejector head to form a continuous metal line adjacent to the continuous metal line over the first line of spatially separated pillars to extend the continuous metal line over the first line of spatially separated pillars toward the continuous metal line over the second line of spatially separated pillars.
9. The apparatus of claim 8, the controller being further configured to: operate the ejector head to form the continuous metal line adjacent to the continuous metal line over the first line of spatially separated pillars in a single pass.
10. The apparatus of claim 9, the controller being further configured to: operate the ejector head at the ejection frequency of 300 Hz with a melted metal drop spacing of 0.28 mm to form the continuous metal line adjacent to the continuous metal line over the first line of spatially separated pillars.
11-20. (canceled)
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0008] The foregoing aspects and other features of a method that forms support structures quickly that have adequate strength for supporting a metal layer and a 3D metal object printer that implements the method are explained in the following description, taken in connection with the accompanying drawings.
[0009]
[0010]
[0011]
[0012]
[0013]
[0014]
[0015]
[0016]
[0017]
[0018]
DETAILED DESCRIPTION
[0019] For a general understanding of the 3D metal object printer and its operation as disclosed herein as well as the details for the printer and its operation, reference is made to the drawings. In the drawings, like reference numerals designate like elements.
[0020]
[0021] With further reference to
[0022] The ejector head 140 is movably mounted within Z-axis tracks for movement of the ejector head with respect to the platform 112. One or more actuators 144 are operatively connected to the ejector head 140 to move the ejector head along a Z-axis and are operatively connected to the platform 112 to move the platform in an X-Y plane beneath the ejector head 140. The actuators 144 are operated by a controller 148 to maintain an appropriate distance between the orifice 110 in the baseplate 114 of the ejector head 140 and a surface of an object on the platform 112.
[0023] Moving the platform 112 in the X-Y plane as drops of molten metal are ejected toward the platform 112 forms a swath of melted metal drops on the object being formed. Controller 148 also operates actuators 144 to adjust the distance between the ejector head 140 and the most recently formed layer on the substrate to facilitate formation of other structures on the object. While the molten metal 3D object printer 100 is depicted in
[0024] A controller 148 operates the switches 152. One switch 152 can be selectively operated by the controller to provide electrical power from source 156 to the heater 160, while another switch 152 can be selectively operated by the controller to provide electrical power from another electrical source 156 to the coil 164 for generation of the electrical field that ejects a drop from the nozzle 108. Because the heater 160 generates a great deal of heat at high temperatures, the coil 164 is positioned within a chamber 168 formed by one (circular) or more walls (rectilinear shapes) of the ejector head 140. As used in this document, the term “chamber” means a volume contained within one or more walls within a metal drop ejecting printer in which a heater, a coil, and a removable vessel of a 3D metal object printer are located. The removable vessel 104 and the heater 160 are located within such a chamber. The chamber is fluidically connected to a fluid source 172 through a pump 176 and also fluidically connected to a heat exchanger 180. As used in this document, the term “fluid source” refers to a container of a liquid having properties useful for absorbing heat. The heat exchanger 180 is connected through a return to the fluid source 172. Fluid from the source 172 flows through the chamber to absorb heat from the coil 164 and the fluid carries the absorbed heat through the exchanger 180, where the heat is removed by known methods. The cooled fluid is returned to the fluid source 172 for further use in maintaining the temperature of the coil in an appropriate operational range.
[0025] The controller 148 of the 3D metal object printer 100 requires data from external sources to control the printer for metal object manufacture. In general, a three-dimensional model or other digital data model of the object to be formed is stored in a memory operatively connected to the controller 148. The controller can selectively access the digital data model through a server or the like, a remote database in which the digital data model is stored, or a computer-readable medium in which the digital data model is stored. This three-dimensional model or other digital data model is processed by a slicer implemented with a controller to generate machine-ready instructions for execution by the controller 148 in a known manner to operate the components of the printer 100 and form the metal object corresponding to the model. The generation of the machine-ready instructions can include the production of intermediate models, such as when a CAD model of the device is converted into an STL data model, a polygonal mesh, or other intermediate representation, which in turn can be processed to generate machine instructions, such as g-code, for fabrication of the object by the printer. As used in this document, the term “machine-ready instructions” means computer language commands that are executed by a computer, microprocessor, or controller to operate components of a 3D metal object additive manufacturing system to form metal objects on the platform 112. The controller 148 executes the machine-ready instructions to control the ejection of the melted metal drops from the nozzle 108, the positioning of the platform 112, as well as maintaining the distance between the orifice 110 and a surface of the object on the platform 112.
[0026] Using like reference numbers for like components and removing some of the components not used to form metal support structures, a new 3D metal object printer 100′ is shown in
[0027] A 3D metal object 204 manufactured by the printer 100′ after removal of the support structure for the overhang 208 is shown in
[0028] The construction of the previously known support structures require the building of a front wall, a rear wall, and foundational walls having pillars formed on top of them that extend between the front wall and rear wall. The walls are typically formed with several drops adjacent to one another in the X and Y directions to provide an adequate base for the weight bearing to be endured by the structure. Additional drops are ejected onto the bases of the walls to build the walls to a predetermined height in a known manner. This known manner requires the building of the walls to be conducted with multiple passes around the perimeter of the support structure with the drops forming the bases of the wall being ejected at spaced intervals. The interval between drops in a pass is sufficient to distance the drops from one another so the drops in the same pass do not land on each other. Each subsequent pass ejects melted metal drops into spaces between previously ejected drops. The final few passes eject drops onto previously ejected drops to complete the base for a foundational wall. This procedure continues for building each layer of the foundational walls. The melted metal drops that form the foundational walls are ejected at a frequency of about 100 Hz with a drop spacing of about 0.28 mm. This frequency and drop spacing ensures that the drops are able to freeze and that the thermal load of the landed melted metal drops does not adversely impact the formation of the bases of the walls or the building of the solid metal walls.
[0029] In this same known method, pillars are built on top of the front wall, the back wall, and the foundational walls. That is, multiple passes of the ejector head 140 are used to form the bases for the pillars on the front wall, the back wall, and the foundational walls at a predetermined interval from one another and then subsequent passes eject one or more drops in multiple passes onto the solidified drops previously ejected for each pillar to extend each pillar above the wall.
[0030] In previously known printers, such as the one shown in
[0031] The printer 100′ of
[0032] The controller 148′ can be implemented with one or more general or specialized programmable processors that execute programmed instructions. The instructions and data required to perform the programmed functions can be stored in memory associated with the processors or controllers. The processors, their memories, and interface circuitry configure the controllers to perform the operations previously described as well as those described below. These components can be provided on a printed circuit card or provided as a circuit in an application specific integrated circuit (ASIC). Each of the circuits can be implemented with a separate processor or multiple circuits can be implemented on the same processor. Alternatively, the circuits can be implemented with discrete components or circuits provided in very large scale integrated (VLSI) circuits. Also, the circuits described herein can be implemented with a combination of processors, ASICs, discrete components, or VLSI circuits. During metal object formation, image data for a structure to be produced are sent to the processor or processors for controller 148′ from either a scanning system or an online or work station connection for processing and generation of the signals that operate the components of the printer 100′ to form an object and the requisite support structures on the platform 112.
[0033] A process for operating the 3D metal object printer 100′ to form continuous metal lines over pillars in metal support structures and to join the continuous metal lines to one another is shown in
[0034]
[0035] Continuing with reference to
[0036] It will be appreciated that variants of the above-disclosed and other features and functions, or alternatives thereof, may be desirably combined into many other different systems, applications or methods. Various presently unforeseen or unanticipated alternatives, modifications, variations or improvements may be subsequently made by those skilled in the art that are also intended to be encompassed by the following claims.