The method of repairing a manhole begins with assembling concrete forms above ground to correspond to the shape of the manhole wall. Then, a plastic liner sheet is wrapped around the assembled forms and the seams are welded. The forming sections are then removed, and the liner is placed in the manhole. An annular space exists between the liner and the manhole wall. The forming sections are re-assembled inside the liner. Concrete is then poured into the annular space and allowed to cure. The forming sections are removed, leaving the liner anchored in a new monolithic concrete wall fully engaging the old manhole wall.
Claims
1. A method of rehabilitating a manhole having a wall with a lower cylindrical portion, an upper conical portion, and an upper access opening, comprising: preassembling a first set of forms into a cylindrical shape outside the manhole; wrapping a first liner sheet with outwardly projecting anchors around the cylindrically shaped first set of forms; preassembling a second set of forms into a conical shape on top of the cylindrically shaped first set of forms; wrapping a second liner sheet with outwardly projecting anchors around the conically shaped second set of forms; welding outside seams in the first and second liner sheets to create a liner body with cylindrical and conical portions; removing the first and second forms from the liner body; positioning the liner body into the manhole to create an annular space between the liner body and the manhole wall; and then re-assembling the first set of forms and the second set of forms inside the liner body; pouring concrete into the annular space so that the projections of the first and second liner sheets are embedded in the concrete; allowing the concrete to cure; and removing the forms from the manhole after the concrete has cured at least partially to leave a new concrete wall sandwiched between the manhole wall and the liner body.
2. The method of claim 1 wherein the manhole has a chimney on top of the conical portion, and the method further comprising: preassembling a chimney form on top of the preassembled second set of forms, wrapping the chimney form with a third liner sheet having outwardly projecting anchors, welding a vertical seam in the third liner sheet so that the third liner sheet becomes a part of the liner body, then removing the chimney form from the third liner sheet, re-assembling the chimney form inside the liner body before pouring the concrete into the annular space, and removing the chimney form from the manhole after the concrete has at least partially cured.
3. The method of claim 1 wherein the anchors are formed in pairs, with the anchors in each pair extending angularly from one another.
4. The method of claim 1 wherein the forms are not connected to the liner body.
5. The method of claim 1 further comprising welding inside seams in the liner body after the forms are removed from the manhole.
6. The method of claim 1 further comprising collapsing the liner body to fit downwardly through the access opening into the manhole.
7. The method of claim 6 further comprising opening the collapsed liner body inside the manhole.
8. The method of claim 1 wherein the forms are reusable for rehabilitation of another manhole.
9. The method of claim 1 wherein the forms are custom fit for the manhole.
10. The method of claim 1 wherein the annular space is approximately 3-8 inches thick.
11. A method of repairing a wall of a cavity below ground level, comprising: erecting forms above ground level to a shape approximating the cavity shape; adding a protective barrier around the erected forms, and the barrier having outwardly extending projections; disassembling the erected forms to leave the protective barrier in a shape matching the erected forms and having interior and exterior sides; moving the protective barrier to a position inside the cavity and with an annular space between the wall of the cavity and the barrier; erecting the forms inside the cavity adjacent the interior side of the barrier; pouring concrete in the annular space to form a new concrete wall between the barrier and the cavity wall with the projections embedded in the new concrete wall; and removing the forms from the cavity.
12. The method of claim 11 further comprising welding seams on the exterior side of the barrier before moving the barrier inside the cavity.
13. The method of claim 11 further comprising welding seams on the interior side of the barrier after the forms are removed.
14. The method of claim 11 wherein the forms engage the barrier inside the cavity to provide support to the barrier when the concrete is poured into the annular space.
15. The method of claim 11 wherein the erected forms have a cylindrical lower portion.
16. The method of claim 11 wherein the erected forms have a conical upper portion.
17. The method of claim 11 wherein ground around the cavity wall remains intact during the repair.
18. The method of claim 11 the further comprising covering the forms with a lid before the concrete is poured.
19. The method of claim 11 wherein the projections anchor the barrier in the poured concrete.
20. The method of claim 11 wherein the projections are arranged in spaced pairs, with each pair being V-shaped.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
DETAILED DESCRIPTION OF THE INVENTION
(9) The method of the invention produces an in-situ, trenchless monolithic concrete structural relining with a corrosion barrier for the rehabilitation of underground utility components, such as a manhole, vaults, and tanks. The integrated thermoplastic liner provides long-term protection to the newly formed concrete layer from corrosive attack and degradation caused by chemically caustic and/or acidic fluids and gases, such as those present in industrial, municipal wastewater sewer systems and other environments. The benefits of high strength and stiffness of concrete, combined with the benefits of flexible, ductile, corrosion resistant thermoplastics produces a durable internal wall. The protective layer, integrated with the concrete, also prevents clear groundwater infiltration and exfiltration or the outward leaking of industrial and/or municipal wastewater contaminants, so as to protect the environment.
(10) As seen in
(11)
(12) The liner 30 of the present invention is shown in
(13) The process for rehabilitating a manhole or similar structure is illustrated in the flow chart of
(14) This form remains in place following construction. A removable form is also acceptable. The reason to remove the chimney is to allow the new liner wall to be constructed at a specified thicknesses without reducing access diameter into the structure after the wall and liner is constructed in place, as described in the following steps.
(15) The form sections 21 to form the cylindrical and conical portions 22, 24 of the forming system 20 are gathered and assembled above ground, apart from the manhole. After the forming system 20 is assembled, one or more sheets of the liner 30 are wrapped around the cylindrical body 22 and the conical portion 24 of the system 20, (and the chimney portion, if present or required), and the exposed outside vertical seams, which preferably overlap, are welded to secure the shape of the liner sheet. The liner sheets are not attached to the forming sections 21. Then, the forming system sections 21 are disassembled and removed from inside the liner 30, leaving the formed liner with a cylindrical body and conical upper portion (as well as a chimney portion, if needed). This formed liner body is flexible and can be partially collapsed so as to fit through the open top of the manhole 10 and set upon the floor of the manhole so as to be spaced from the sidewall 12 of the manhole 10. This installation of the formed liner body into the manhole and expansion of the liner body to it full diameter creates an annular space 40 between the liner body and the sidewall 12, with the anchors 34 residing within the annular space 40. Preferably, the annulus space 40 has a radial depth of approximately 3-8″.
(16) Next, the forming system sections 21 are re-assembled inside the liner 30 in the manhole, so that the sections engage the interior of the liner to provide radial support to the liner 30. Then, the pouring hat or lid 26 is secured to the top of the forming system 20 so as to close the interior of the system 20. Then, concrete is poured into the annular space or annulus 40 so as to fill the space from bottom to top to create the new inner concrete wall 42. After the concrete has cured at least sufficiently to preclude slumping, the forming system sections 21 are removed, leaving the new monolithic concrete wall 42 with the liner 30 integrally secured thereto by the anchors 34. Then, the inside vertical and radial seams of the liner 30 are welded, thereby completing the rehabilitation process.
(17) The method described for a manhole rehabilitation can also be used on other underground walls having other shapes, such as tanks or vaults, so as to repair such structures with a new interior wall having an integral anchored protective barrier.
(18) The anchoring system provides a secure, mechanical bond of the liner 30 to the concrete wall 42, even though plastic and concrete have different thermal expansion coefficients. The liner anchoring system also allows for use in areas of high groundwater back pressure. Also, the thickness of the liner base 32 may be increased or decreased, depending on the specific project requirements and local conditions. The height of the anchors 34 may also be increased or decreased, depending on the factors present for each application, such as the hydrostatic pressure. Depending on project requirements, the welding technologies may include butt welding, extrusion welding, and/or hot wedge welding, to provide secure and leak-proof joints and seams in the liner 30.
(19) The embodiment described hereinbefore is merely preferred embodiment of the present invention and not for purposes of any restrictions or limitations on the invention. It will be apparent that any non-substantive, obvious alterations or improvement by the technician of this technical field according to the present invention may be incorporated into ambit of claims of the present invention.