A SUPPORT METHOD OF PRESET INTERNAL CABLE FOR IN-SITU TUNNEL EXPANSION RPOJECT
20230349293 · 2023-11-02
Assignee
Inventors
- Xuezhen WU (Fuzhou, Fujian, CN)
- Tao DENG (Fuzhou, Fujian, CN)
- Zhenchang GUAN (Fuzhou, Fujian, CN)
- Yujing JIANG (Fuzhou, Fujian, CN)
- Sihong LIU (Fuzhou, Fujian, CN)
Cpc classification
E21D20/021
FIXED CONSTRUCTIONS
E21D9/01
FIXED CONSTRUCTIONS
International classification
Abstract
The present invention relates to a support method of preset internal cable for in-situ tunnel expansion project, comprising a cable, lockset and an anchoring agent, wherein before the excavation of the newly-built tunnel, a borehole is drilled into the surrounding rock from the in-situ tunnel, and the cable is installed in the borehole and pre-stressed, so as to play a supporting role at the moment of excavation of the newly-built tunnel. The cable is fixed in the depth of the surrounding rock by the anchoring agent, and the lockset of the cable is set at the position of the excavation contour line of the newly-built tunnel inside the surrounding rock. The present invention provides a method that does not interfere with the excavation construction and can effectively support the surrounding rock of the expanded tunnel in advance. It breaks through the “excavation first and then supports” model in the previous tunnel construction, and uses the space of the in-situ tunnel for pre-support, and by applying prestress, the deformation of surrounding rock can be controlled to the maximum extent.
Claims
1. A support method of preset internal cable for in-situ tunnel expansion project, comprising a cable, a lockset and an anchoring agent, and is characterized in that: before the excavation of the newly-built tunnel, a borehole is drilled, into the surrounding rock from the in-situ tunnel, and the cable is installed in the borehole and pre-stressed, so as to play a supporting role at the moment of excavation of the tunnel. The cable is fixed in the depth of the surrounding rock by the anchoring agent, and the lockset of the cable is set at the position of the excavation contour line of the newly-built tunnel inside the surrounding rock the support method specifically comprises the following steps: (1) drilling small-aperture boreholes at the lining of the in-situ tunnel, and the small-aperture boreholes extend from the lining of the in-situ tunnel to the depth of surrounding rocks outside the excavation contour line of the newly-built tunnel; (2) constructing an expanded borehole at the position of the lining borehole of the in-situ tunnel, and the expanded borehole extends from the lining of the in-situ tunnel to the excavation contour line of the newly-built tunnel, and the diameter of the expanded borehole is larger than that the lockset of the cable, so that the lockset of the cable can be directly installed at the excavation contour line of the newly-built tunnel; (3) one end of the cable is anchored in the small-aperture borehole by means of the anchoring agent, and then the lockset of the cable is installed at the bottom end of the expanded borehole; (4) after the anchoring agent has reached a certain strength, the outer end of the cable is tensioned by the tensioning device, and the lockset is pushed internally by the retractable thrusting device to prevent the lockset from moving outwards, thus applying prestress to the cable; (5) after the excavation of the newly-built tunnel, the part of the cable remaining outside the surrounding rock is cut off, and the rest part is used as a permanent supporting structure.
2. The support method of preset internal cable for in-situ tunnel expansion project as claimed in claim 1, wherein when designing the cable layout, it should be arranged according to the excavation contour line of the newly-built tunnel to ensure that the preset cables are uniformly distributed at the excavation contour line of the newly-built tunnel, and the cables are basically perpendicular to the excavation contour line of the newly-built tunnel.
3. The support method of preset internal cable for in-situ tunnel expansion project as claimed in claim 1, wherein the anchoring agent is resin anchoring agent or mortar anchoring agent.
4. The support method of preset internal cable for in-situ tunnel expansion project as claimed in claim 1, wherein when the resin anchoring agent is adopted as the anchoring agent, first put the resin anchoring agent cartridge into the small-aperture borehole, and then the cable is rotationally drilled through a drilling machine, so that one end of the cable is anchored in the small-aperture borehole; the anchoring agent is required to be prevented from overflowing out of the small-aperture borehole after the cable is installed.
5. The support method of preset internal cable for in-situ tunnel expansion project as claimed in claim 1, wherein when the mortar anchoring agent is adopted as the anchoring agent, the grouting pipe and the cable are placed into the small-aperture borehole together, and the grouting pipe is pulled out while grouting, and ensure that the grouting pipe is always in cement slurry during the pipe pulling process, and the grouting is continued until the cement slurry flows out of an orifice; the small-aperture borehole is densely and fully grouted, so that the cable is anchored in the small-aperture borehole.
6. The support method of preset internal cable for in-situ tunnel expansion project as claimed in claim 1, wherein in order to prevent damage to the surrounding rock of the extension tunnel inside the lockset during blasting excavation and further influence the supporting effect of the cable, after the step (2), a water jet device is inserted into the bottom of the expansion borehole to create a pie-crack at the excavation contour line of the newly-built tunnel, and the pre-crack can reduce the damage degree of blasting to the extension tunnel surrounding rock inside cable tray, thereby ensuring the effective anchoring of the outer anchoring end of the cable.
7. The support method of preset internal cable for in-situ tunnel expansion project as claimed in claim 1, wherein the tensioning device is contacted with the lining of the in-situ tunnel in a jacking mode; the thrusting device is a sleeve, one old of the sleeve props against the lockset, the ether end of the sleeve props against the tensioning device, and the cable passes through the middle of the sleeve.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0015]
[0016]
[0017]
[0018]
[0019]
DESCRIPTION OF THE EMBODIMENTS
[0020] In order to make the above-mentioned features and advantages of the present invention more comprehensible, the following specific examples are given in conjunction with the drawings, and detailed descriptions are made as follows.
[0021] As shown in
[0022] In the embodiment of the present invention, when designing the cable layout, it should be arranged according to the excavation contour line of the newly-built tunnel to ensure that the preset cables are uniformly distributed at the excavation contour line of the newly-built tunnel, and the cables are basically perpendicular to the excavation contour line of the newly-built tunnel.
[0023] In the embodiment of the present invention, the anchoring agent 11 is resin anchoring agent or mortar anchoring agent.
[0024] In the embodiment of the present invention, the support method specifically comprises the following steps: (1) drilling small-aperture boreholes at the lining of the in-situ tunnel, and the small-aperture boreholes extend from the lining of the in-situ tunnel to the depth of surrounding rocks 5 outside the excavation contour line of the newly-built tunnel; (2) constructing an expanded borehole 2 at the position of the lining borehole of the in-situ tunnel, and the expanded borehole extends from the lining of the in-situ tunnel to the excavation contour line 4 of the newly-built tunnel, and the diameter of the expanded borehole is larger than that the lockset of the cable, so that the lockset of the cable can be directly installed at the excavation contour line of the newly-built tunnel; (3) one end of the cable is anchored in the small-aperture borehole by the anchoring agent, and then the lockset of the cable is installed at the bottom end of the expanded borehole; (4) after the anchoring agent has reached a certain strength, the outer end of the cable is tensioned by the tensioning device 7, and the lockset is pushed internally by the retractable thrusting device 9 to prevent the lockset from moving outwards, thus applying prestress to the cable; (5) after the excavation of the newly-built tunnel, the part of the cable remaining outside the surrounding rock is cut off, and the rest part is used as a permanent supporting structure.
[0025] la the embodiment of the present invention, when the resin anchoring agent is adopted as the anchoring agent, first put the resin anchoring agent cartridge into the small-aperture borehole, and then the cable is rotationally drilled through a drilling machine, so that one end of the cable is anchored in the small-aperture borehole; the anchoring agent is required to be prevented from overflowing out of the small-aperture borehole after the cable is installed.
[0026] In the embodiment of the present invention, when the mortar anchoring agent is adopted as the anchoring agent, the grouting pipe and the cable are placed into the small-aperture borehole together, and the grouting pipe is pulled out while grouting, and ensure that the grouting pipe is always in cement slurry during the pipe pulling process, and the grouting is continued until the cement slurry flows cut of an orifice; the small-aperture borehole is densely and fully grouted, so that the cable is anchored in the small-aperture borehole,
[0027] In the embodiment of the present invention, in order to prevent damage to the surrounding rock of the extension tunnel inside the lockset during blasting excavation and further influence the supporting effect of the cable, after the step (2), a water jet device 12 is inserted into the bottom of the expansion borehole to create a pre-crack 13 at the excavation contour line of the newly-built tunnel, and the pre-crack can reduce the damage degree of blasting to the extension tunnel surrounding rock inside lockset, thereby ensuring the effective anchoring of the outer anchoring end of the cable.
[0028] In the embodiment of the present invention, the tensioning device is contacted with the lining of the in-situ tunnel in a jacking mode; the thrusting device is a sleeve, one end of the sleeve props against the lockset, the other end of the sleeve props against the tensioning device, and the cable passes through the middle of the sleeve.
[0029] The present invention is not limited to the above preferred embodiments, and any person can derive various other forms of the support method of preset internal cable for in-situ tunnel expansion project according to the teaching of the present invention. AU equivalent changes and modifications made according to the claims of the present invention should be covered by the present invention.