PRE-HEATING METHODS FOR PERFORMING ELECTRON BEAM POWDER BED FUSION
20230347414 · 2023-11-02
Inventors
Cpc classification
B33Y10/00
PERFORMING OPERATIONS; TRANSPORTING
B22F10/28
PERFORMING OPERATIONS; TRANSPORTING
B33Y70/00
PERFORMING OPERATIONS; TRANSPORTING
B22F2203/11
PERFORMING OPERATIONS; TRANSPORTING
B22F12/41
PERFORMING OPERATIONS; TRANSPORTING
B22F2304/10
PERFORMING OPERATIONS; TRANSPORTING
Y02P10/25
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
B22F2301/205
PERFORMING OPERATIONS; TRANSPORTING
International classification
B22F1/05
PERFORMING OPERATIONS; TRANSPORTING
B22F10/28
PERFORMING OPERATIONS; TRANSPORTING
B22F12/41
PERFORMING OPERATIONS; TRANSPORTING
B33Y10/00
PERFORMING OPERATIONS; TRANSPORTING
Abstract
Electron beam powder bed fusion may be performed using waste powder from laser beam powder bed fusion by pre-heating a build chamber using stepped increases of electron beam current. To perform the pre-heating without smoking the powder, a plurality of predetermined interim temperatures, ranging from an ambient, resting temperature of the build chamber to a predetermined preheated temperature, are determined. A build plate within the build chamber is exposed to a plurality of streams of electrons, one at a time, while the build plate is surrounded by the waste powder. Each stream of electrons has a progressively increasing current, with the current being increased each time an actual temperature of the build chamber reaches or exceeds the next predetermined interim temperature. The actual temperature of the build chamber is monitored during the pre-heating, to compare the actual temperature of the build chamber to the plurality of predetermined interim temperatures.
Claims
1. A method of performing electron beam powder bed fusion (EB-PBF) additive manufacturing, comprising: determining a plurality of predetermined interim temperatures ranging from an ambient, resting temperature of a build chamber of an EB-PBF machine to a predetermined preheated temperature, wherein each subsequent predetermined interim temperature of the plurality of predetermined interim temperatures is greater than each previous predetermined interim temperature of the plurality of predetermined interim temperatures; and pre-heating the build chamber to the predetermined preheated temperature, wherein the pre-heating the build chamber comprises: exposing a build plate within the build chamber to a plurality of streams of electrons, one at a time, wherein the build plate is surrounded by waste powder that is leftover and obtained from a laser beam powder bed fusion system, wherein each stream of electrons of the plurality of streams of electrons has a different respective current, and wherein each stream of electrons of the plurality of streams of electrons is configured to raise an actual temperature of the build chamber; monitoring the actual temperature of the build chamber during the exposing the build plate to the plurality of streams of electrons; comparing the actual temperature of the build chamber to the plurality of predetermined interim temperatures; and increasing a power input of the EB-PBF machine a plurality of times, thereby exposing the build plate to a subsequent stream of electrons of the plurality of streams of electrons, wherein the subsequent stream of electrons has a greater current level than a previous stream of electrons of the plurality of streams of electrons, and wherein the increasing the power input is performed each time the actual temperature of the build chamber reaches a respective subsequent predetermined interim temperature of the plurality of predetermined interim temperatures, as determined during the comparing the actual temperature to the plurality of predetermined interim temperatures.
2. The method according to claim 1, wherein the pre-heating the build chamber to the predetermined preheated temperature comprises actively controlling the power input of the EB-PBF machine to deliver stepped increases of electron beam current.
3. The method according to claim 1, wherein the pre-heating the build chamber to the predetermined preheated temperature is sufficiently slow such that a static charge of the waste powder is substantially allowed to dissipate, thereby at least substantially preventing smoking of the waste powder.
4. The method according to claim 1, wherein the plurality of streams of electrons comprises at least seven different streams of electrons and at most twenty different streams of electrons.
5. The method according to claim 1, wherein the plurality of streams of electrons comprises at least one stream of electrons having a current below 5 milliamp (mA).
6. The method according to claim 1, wherein the waste powder comprises a titanium alloy powder.
7. The method according to claim 1, wherein the waste powder has an average particle size of less than 60 micrometers (μm).
8. The method according to claim 1, further comprising deflecting an electron beam via an electromagnetic field, thereby selectively fusing portions of an initial layer of the waste powder by raising the actual temperature of the portions of the initial layer of the waste powder to above a melting point of the waste powder, wherein the selectively fusing portions of the initial layer of the waste powder is performed after the pre-heating the build chamber to the predetermined preheated temperature.
9. The method according to claim 8, further comprising: lowering the build plate; spreading a subsequent layer of the waste powder across a build area; selectively fusing portions of the subsequent layer of the waste powder by heating portions of the subsequent layer above the melting point of the waste powder; and repeating the lowering the build plate, the spreading the subsequent layer of the waste powder, and the selectively fusing portions of the subsequent layer a plurality of times, until a resulting additively manufactured part is completed.
10. The method according to claim 1, further comprising: performing laser beam powder bed fusion to create an object; and reserving the waste powder left over from the performing laser beam powder bed fusion to use in EB-PBF additive manufacturing.
11. The method according to claim 1, wherein the pre-heating the build chamber to the predetermined preheated temperature takes at least 60 minutes and at most 120 minutes.
12. The method according to claim 1, wherein the pre-heating the build chamber to the predetermined preheated temperature has an overall rate of temperature increase of between 6-8 degrees Celsius (° C.) per minute.
13. A method of performing electron beam powder bed fusion (EB-PBF) additive manufacturing, comprising: pre-heating a build chamber to a predetermined preheated temperature, wherein the pre-heating the build chamber comprises: exposing a build plate within the build chamber to a first stream of electrons at a first current for a first time period sufficient to pre-heat the build chamber to a predetermined first interim temperature, wherein the build plate is surrounded by waste powder that is leftover and obtained from a laser beam powder bed fusion system; monitoring an actual temperature of the build chamber to determine when the actual temperature of the build chamber reaches the predetermined first interim temperature; and exposing the build plate to a second stream of electrons once the actual temperature of the build chamber reaches the predetermined first interim temperature, wherein the second stream of electrons has a second current that is greater than the first current, wherein the build plate is exposed to the second stream of electrons for a second time period sufficient to pre-heat the build plate to a predetermined second interim temperature, wherein the predetermined second interim temperature is greater than the predetermined first interim temperature and less than the predetermined preheated temperature.
14. The method according to claim 13, further comprising determining a plurality of predetermined interim temperatures ranging from an ambient, resting temperature of the build chamber to the predetermined preheated temperature, wherein each subsequent predetermined interim temperature of the plurality of predetermined interim temperatures is greater than each previous predetermined interim temperature of the plurality of predetermined interim temperatures, and wherein the plurality of predetermined interim temperatures comprises the predetermined first interim temperature and the predetermined second interim temperature.
15. The method according to claim 14, further comprising: monitoring the actual temperature of the build chamber to determine when the actual temperature of the build chamber reaches the predetermined second interim temperature; and exposing the build plate to a third stream of electrons once the actual temperature of the build chamber reaches the predetermined second interim temperature, wherein the third stream of electrons has a third current that is greater than the second current, wherein the build plate is exposed to the third stream of electrons for a third time period sufficient to pre-heat the build chamber to a predetermined third interim temperature, wherein the predetermined third interim temperature is greater than the predetermined second interim temperature and less than the predetermined preheated temperature.
16. The method according to claim 15, further comprising repeating the monitoring the actual temperature of the build chamber a plurality of times for the plurality of predetermined interim temperatures, and repeating the exposing the build plate to a different respective stream of electrons of a plurality of streams of electrons each time the actual temperature of the build chamber reaches a subsequent respective interim temperature of the plurality of predetermined interim temperatures, until the actual temperature of the build chamber reaches or exceeds the predetermined preheated temperature.
17. The method according to claim 13, wherein the predetermined first interim temperature is 50° C. or lower, wherein the predetermined second interim temperature is 100° C. or lower, wherein a plurality of predetermined interim temperatures comprises a predetermined third interim temperature that is 200° C. or lower, a predetermined fourth interim temperature that is 250° C. or lower, a predetermined fifth interim temperature that is 400° C. or lower, a predetermined sixth interim temperature that is 550° C. or lower, a predetermined seventh interim temperature that is 650° C. or lower, and a predetermined eighth interim temperature that is 750° C. or lower.
18. The method according to claim 13, wherein the first current of the first stream of electrons is less than 5 mA, and wherein the second current of the second stream of electrons is between 5-15 mA.
19. The method according to claim 13, wherein the waste powder comprises a titanium alloy powder that has an average particle size of less than 60 μm.
20. A part made using the method of claim 13.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0011]
[0012]
[0013]
[0014]
[0015]
[0016]
[0017]
[0018]
DESCRIPTION
[0019]
[0020] In general, elements that are likely to be included in a given (i.e., a particular) example are illustrated in solid lines, while elements that are optional to a given example are illustrated in dashed lines. However, elements that are shown in solid lines are not essential to all examples, and an element shown in solid lines may be omitted from a particular example without departing from the scope of the present disclosure.
[0021] The present disclosure concerns methods of pre-heating EB-PBF machines 10 to enable the use of waste powder from laser bed powder bed fusion (LB-PBF) machines in EB-PBF machines 10. Disclosed methods solve the problem of wasting costly powder leftover from LB-PBF processes by finding a way to re-use, or re-purpose, this waste powder in EB-PBF machines 10 in a surprising and novel way, given that it is understood and accepted in the art that the same powder cannot be used in both EB-PBF machines 10 and LB-PBF machines, as it would be unstable to try to do so. Disclosed methods also may expand the usefulness and applicability of EB-PBF additive manufacturing in industry, and/or may create a new waste stream for LB-PBF to provide additional value.
[0022] With reference to
[0023] Before the layers of part 34 begin to be formed, build chamber 24 is pre-heated to a predetermined preheated temperature.
[0024] In
[0025]
[0026]
[0027] Pre-heating the build chamber at 50 also includes monitoring the actual temperature of the build chamber, at 74, during exposing the build plate to the plurality of streams of electrons at 73. For example, the temperature of the build chamber may be measured and monitored at 74 using one or more thermocouple sensors. Said thermocouple sensors may be positioned under and/or coupled to the build plate within the build chamber, and may be configured to measure the temperature of whatever it is in contact with (e.g., the build plate, the waste powder, etc.). Using information obtained during monitoring the actual temperature at 74, pre-heating the build chamber at 50 also includes comparing the actual temperature of the build chamber (as determined during the monitoring at 74) to the plurality of predetermined interim temperatures, at 76. Pre-heating the build chamber at 50 also includes increasing a power input of the EB-PBF machine a plurality of times, at 78, thereby exposing the build plate to a subsequent stream of electrons of the plurality of streams of electrons. Each time the power input is increased at 78, the resulting subsequent stream of electrons has a greater current level than the previous stream of electrons (at the previous, lower power input level). Increasing the power input at 78 is performed each time the actual temperature of the build chamber reaches a respective subsequent predetermined interim temperature of the plurality of predetermined interim temperatures, as determined during the comparing the actual temperature to the plurality of predetermined interim temperatures at 76. In this manner, pre-heating the build chamber at 50 is performed using stepped increases of electron beam current, rather than a single high power electron beam. Each current level of the electron beam is directed at the build plate for an amount of time necessary to increase the temperature of the build chamber to the next predetermined interim temperature, and then the current of the electron beam is stepped up to the next current level.
[0028] Generally, during the pre-heating the build chamber at 50, the build plate is surrounded by waste powder that is leftover and obtained from a LB-PBF system. For example,
[0029]
[0030] With continued reference to
[0031] Turning now to details of pre-heating the build chamber at 50, each successive stream of electrons of the plurality of streams of electrons sequentially used to preheat the build chamber generally has a different, increasing current from the previous stream of electrons used. For example, each stream of electrons of the plurality of streams of electrons may have a respective current that is at least 1 milliamp (mA) lower, at least 2 mA lower, at least 3 mA lower, at least 4 mA lower, at least 5 mA lower, at least 6 mA lower, at least 7 mA lower, at least 8 mA lower, at least 9 mA lower, and/or at least 10 mA lower than each subsequent stream of electrons of the plurality of streams of electrons. In some examples, each stream of electrons of the plurality of streams of electrons has a respective current that is between 5-10 mA higher than each previous stream of electrons of the plurality of streams of electrons. In pre-heating the build chamber at 50, the exposing the build plate to an electron stream at 73 may be performed a plurality of times, at least equal to the number of different electron streams that are used to pre-heat the build chamber. In some examples, at least 3 different streams of electrons, at least 4 different streams of electrons, at least 5 different streams of electrons, at least 6 different streams of electrons, at least 7 different streams of electrons, at least 8 different streams of electrons, at least 9 different streams of electrons, at least 10 different streams of electrons, and/or at most 20 different streams of electrons may be used during the pre-heating process. In some examples, at least one of the streams of electrons has a current below 10 mA, below 5 mA, and/or below 1 mA. In some examples, exposing the build plate to electron streams at 73 may include exposing the build plate to respective streams of electrons having respective currents of 1 mA, 5 mA, 10 mA, 15 mA, 20 mA, 25 mA, 30 mA, 35 mA, 40 mA, 45 mA, 48 mA, and/or 50 mA, though use of electron currents between these values is also within the scope of the present disclosure.
[0032] Some methods 70 include determining the predetermined preheated temperature, at 98. The predetermined preheated temperature may be at least partially dependent on a material composition of the waste powder. In other words, a different preheated temperature may be predetermined at 72 for each different powder composition or material used in a given method 70. For metallic powders, the predetermined preheated temperature may be between 700° C. and 800 degrees Celsius (° C.), though in some examples may be even lower than 700° C. or even higher than 800° C.
[0033] Generally, the pre-heating the build chamber at 50 may be configured such that it is sufficiently slow to at least substantially allow for dissipation of any static charge of the waste powder in the build chamber during pre-heating. Additionally or alternatively, the pre-heating the build chamber to the predetermined preheated temperature at 50 may be performed sufficiently slowly enough to at least substantially prevent smoking of the waste powder within the build chamber. In some examples, the pre-heating the build chamber to the predetermined preheated temperature at 50 takes at least 45 minutes, at least 50 minutes, at least 55 minutes, at least 60 minutes, at least 65 minutes, at least 70 minutes, at least 75 minutes, at least 80 minutes, at least 85 minutes, at least 90 minutes, at least 95 minutes, at least 100 minutes, and/or at most 120 minutes. Disclosed methods 50, 70 of pre-heating EB-PBF machines 10 thus may spend an hour, an hour and a half, or even longer, pre-heating according to the stepped electron beam current increases disclosed herein, while on the other hand, pre-heating EB-PBF machines 10 according to conventional methods is performed as quickly as possible, using a single stream of electrons (typically at a high current of 48 mA; see
[0034] Tables 1-4 below provide illustrative, non-exclusive examples of pluralities of currents of electron streams that may be used to pre-heat a build chamber according to methods 50, 70 of the present disclosure. In the tables, the build plate is impinged with an electron beam having the current shown in the left column, until the actual temperature within the build chamber reaches the predetermined interim temperature shown in the right column (the predetermined interim temperatures having been predetermined at 72). Then, according to disclosed methods, each time a respective predetermined interim temperature is reached or exceeded, the power input of the EB-PBF machine is increased at 78, thereby stepping up the electron beam current to the next level shown.
TABLE-US-00001 TABLE 1 Beam Predetermined Current Temp (mA) (° C.) 1 32 10 70 20 135 25 186 30 336 35 486 40 601 45 650 48 (default) 730
TABLE-US-00002 TABLE 2 Beam Predetermined Current Temp (mA) (° C.) 1 40 10 100 20 161 25 241 30 362 35 511 40 620 45 671 48 (default) 730
TABLE-US-00003 TABLE 3 Beam Predetermined Current Temp (mA) (° C.) 1 34 10 100 20 161 25 241 30 366 35 512 40 620 45 672 48 (default) 730
TABLE-US-00004 TABLE 4 Beam Predetermined Current Temp (mA) (° C.) 10 102 20 162 25 243 30 365 35 512 40 620 45 671 48 (default) 730
[0035] Disclosed methods of pre-heating a build chamber of an EB-PBF machine at 50 may include exposing the build plate to each respective stream of electrons until the desired predetermined interim temperature is reached, rather than for a predetermined period of time. Though in various examples of methods 50, 70, one or more of the respective beam currents may be applied to the build plate at 73 for at least 1 minute, at least 2 minutes, at least 3 minutes, at least 4 minutes, at least 5 minutes, at least 10 minutes, at least 15 minutes, at least 20 minutes, and/or at most 30 minutes before the power input is increased at 78 to increase the current of the electron beam to the next indicated level. In some examples, the exposing the build plate to the plurality of streams of electrons at 73 is performed for different respective amounts of time for each respective stream of electrons of the plurality of streams of electrons depending on how long it takes the build chamber to reach the desired predetermined interim temperature. For example, in the example shown in Table 1, a 1 mA electron beam is directed at the build plate and the temperature is monitored within the build chamber at 74. The actual temperature of the build chamber (determined by monitoring at 74) is compared to the predetermined interim temperatures at 76. In this example, the 1 mA electron beam is applied until the actual temperature of the build chamber is determined to be 32° C. or higher. Once the actual temperature of the build chamber reaches or exceeds 32° C., the power input is increased at 78, to apply the subsequent current level of the electron beam, which in this case is a 10 mA electron beam. The 10 mA electron beam is applied to the build plate until the actual temperature of the build chamber reaches or exceeds the next predetermined interim temperature, which in the example of Table 1 is 70° C. The amount of time the 1 mA electron beam is applied to the build plate may be less than, greater than, or approximately equal to the time the 10 mA electron beam is applied to the build plate, depending on how long it takes the actual temperature of the build chamber to reach the respective predetermined interim temperature.
[0036] The process of stepped increases in electron beam current is repeated for each of the predetermined interim temperatures that was determined at 72. In the example of Table 1, the predetermined interim temperatures are 32° C., 70° C., 135° C., 186° C., 336° C., 486° C., 601° C., and 650° C., and the predetermined preheated temperature is 730° C. In the other examples, the predetermined interim temperatures may be different, even for the same predetermined preheated temperature of 730° C. For example, in the example of Table 2, the predetermined interim temperatures are 40° C., 100° C., 161° C., 241° C., 362° C., 511° C., 620° C., and 671° C. These examples are non-limiting, and for illustrative purposes only. In general, each subsequent predetermined interim temperature of the plurality of predetermined interim temperatures is greater than each previous predetermined interim temperature of the plurality of predetermined interim temperatures. In some examples, the difference from one predetermined interim temperature to the next predetermined interim temperature may be at least 30 degrees ° C., at least 40° C., at least 50° C., at least 60° C., at least 70° C., at least 80° C., at least 90° C., at least 100° C., at least 110° C., at least 120° C., at least 130° C., at least 140° C., at least 150° C., and/or at most 200° C. Additionally or alternatively, each respective subsequent predetermined interim temperature of the plurality of predetermined interim temperatures may be greater than each respective previous predetermined interim temperature of the plurality of predetermined interim temperatures by a different respective amount. Other methods of pre-heating EB-PBF machines according to the present disclosure may include determining more or fewer predetermined interim temperatures at 72, and/or determining a greater or lower predetermined preheated temperature at 98 (which may vary depending on the material of powder being used and/or other desired parameters).
[0037] Additionally or alternatively, different currents of electron beams may be used for the pre-heating of the EB-PBF machine at 50 than shown in the examples of above. For example, while the examples shown in Tables 1-3 use 1 mA electron beam to pre-heat the build chamber to the initial predetermined interim temperature, the example shown in Table 4 uses a 10 mA electron beam to pre-heat the build chamber to the initial predetermined temperature. In other examples, electron beams between 1 mA and 10 mA may be used in addition to or instead of the 1 mA and/or 10 mA electron beams shown in the examples provided above. In some examples, pre-heating the build chamber to the predetermined preheated temperature at 50 may have an overall rate of temperature increase of less than 20° C. per minute (° C./min), less than 15° C./min, less than 10° C./min, and/or less than 5° C./min. In a specific example, pre-heating the build chamber to the predetermined preheated temperature may have an overall rate of temperature increase of between 6-8° C./min. In the example shown in Table 1 above, the total elapsed time to reach the predetermined preheated temperature of 730° C. was 1 hour, 39 minutes, and 21 seconds, and thus had an overall rate of temperature increase of about 7.1° C./min. In the example shown in Table 2 above, the total elapsed time to reach the predetermined preheated temperature of 730° C. was 1 hour, 32 minutes, and 16 seconds, and thus had an overall rate of temperature increase of about 7.6° C./min. In the example shown in Table 3 above, the total elapsed time to reach the predetermined preheated temperature of 730° C. was 1 hour, 30 minutes, and 22 seconds, and thus had an overall rate of temperature increase of about 7.8° C./min. Finally, in the example shown in Table 4 above, the total elapsed time to reach the predetermined preheated temperature of 730° C. was 1 hour, 44 minutes, and 31 seconds, and thus had an overall rate of temperature increase of about 6.7° C./min.
[0038] Pre-heating the build chamber at 50 may be actively and/or manually controlled, in some examples. For example, the pre-heating the build chamber to the predetermined preheated temperature at 50 may include actively and/or manually controlling the power input of the EB-PBF machine to deliver stepped increases of electron beam current, such as by actively and/or manually modifying one or more machine parameters of the EB-PBF machine each time a respective predetermined interim temperature is reached, and/or by actively and/or manually setting custom parameters on the EB-PBF machine that are different from the manufacturer's instructions for operation. In other examples, pre-heating the build chamber at 50 may be passively controlled, and/or automated. In some examples, pre-heating the build chamber at 50 is not pre-programmed. Additionally or alternatively, pre-heating the build chamber to the predetermined preheated temperature at 50 is not based on predetermined time intervals, in some examples, though other examples may be based on predetermined time intervals for each level of power input (e.g., for each different current of the electron beam).
[0039] The waste powder used in disclosed methods 70 may be a metallic powder. In specific examples, the waste powder may be a titanium alloy powder, such as Ti-6Al-4V powder, though other materials are also within the scope of the present disclosure. For example, other suitable powders may include nickel, cobalt, steel (e.g., stainless steel, tool steel, etc.), aluminum, and/or tungsten-based powders. The waste powder used in disclosed methods may have an average particle size of less than 60 micrometers (μm), less than 50 μm, and/or less than 40 μm in diameter. In other words, presently disclosed methods 70 may enable, or may be configured to utilize, powders having a smaller size than is recommended or possible to use in EB-PBF machines in conventional methods of pre-heating.
[0040]
[0041] Pre-heating the build chamber at 50 in methods 100 also may include continuing to monitor the actual temperature of the build chamber at 108 and increasing a current level of the electron beam output by the EB-PBF machine, at 110, each time the build chamber reaches a subsequent predetermined interim temperature, and until the build chamber reaches the predetermined preheated temperature. In other words, the continuing to monitor the actual temperature of the build chamber at 108 and then increasing the current of the electron beam at 110 may each be performed a plurality of times, according to the plurality of predetermined temperatures, until the build chamber is sufficiently pre-heated to the predetermined preheated temperature. With reference again to the example from Table 1 above, once the actual temperature of the build chamber reaches the second predetermined interim temperature of 70° C., the power input is increased at 110 to increase the current of the electron beam to the next level, which is 20 mA in this example. The 20 mA electron beam is applied for a time period sufficient to raise the actual temperature of the build chamber to the next predetermined interim temperature, which is 135° C. in this example. Meanwhile, the actual temperature of the build chamber is then continued to be monitored at 108 until it reaches or exceeds the next predetermined interim temperature (135° C.), at which point the power input is increased again at 110 to the next current level of 25 mA. This process is repeated for each electron beam current level and each predetermined interim temperature, until the actual temperature of the build chamber reaches or exceeds the predetermined preheated temperature (730° C. in this example).
[0042] Like methods 70, methods 100 also may include determining a plurality of predetermined interim temperatures at 112, with the predetermined interim temperatures ranging from an ambient, resting temperature of the build chamber to the predetermined preheated temperature. Each subsequent predetermined interim temperature of the plurality of predetermined interim temperatures determined at 112 is greater than each previous predetermined interim temperature of the plurality of predetermined interim temperatures. Likewise, methods 100 also may include determining the predetermined preheated temperature, at 114.
[0043] Specifically speaking, the continuing to monitor the temperature at 108 typically includes monitoring the actual temperature of build chamber to determine when the actual temperature of the build chamber reaches the predetermined second interim temperature. Then, the increasing the current at 110 includes exposing the build plate to a third stream of electrons once the actual temperature of the build chamber reaches the predetermined second interim temperature. The third stream of electrons has a third current that is greater than the second current, and the build plate may be exposed to the third stream of electrons at 110 for a third time period sufficient to pre-heat the build chamber to a predetermined third interim temperature, wherein the predetermined third interim temperature is greater than the predetermined second interim temperature and less than the predetermined preheated temperature. As noted, steps 108 and 110 may be repeated a plurality of times (e.g., each time the actual temperature of the build chamber reaches a subsequent respective interim temperature of the plurality of predetermined interim temperatures), until the actual temperature of the build chamber reaches or exceeds the predetermined preheated temperature.
[0044] As with methods 70, methods 100 may include actively and/or manually controlling the power input of the EB-PBF machine (e.g., actively and/or manually modifying one or more machine parameters of the EB-PBF machine) to deliver the stepped increases of electron beam current according to methods 50. Similarly, pre-heating the build chamber to the predetermined preheated temperature at 50 in methods 100 may be configured to be sufficiently slow such that a static charge of the waste powder is substantially allowed to dissipate, and/or sufficiently slow enough to at least substantially prevent smoking of the waste powder within the EB-PBF machine.
[0045] Methods 100 also may include other steps of the additive manufacturing process, such as at least partially filling a build tank of the EB-PBF machine with waste powder obtained from a LB-PBF system, at 115. To this end, methods 100 may include performing LB-PBF to create an object at 116 and reserving the waste powder left over from the performing LB-PBF, at 118, to use in EB-PBF manufacturing. In other words, the waste powder reserved at 118 may be used to at least partially fill the build tank of an EB-PBF machine at 115 and/or to spread within the EB-PBF machine, at 120 (e.g., the waste powder may be spread across and/or around the build plate of the EB-PBF machine at 120). Once the EB-PBF machine is pre-heated at 50, methods 100 additionally or alternatively may include deflecting an electron beam via an electromagnetic field, thereby selectively fusing portions of an initial layer of the waste powder at 122, by raising the actual temperature of the portions of the initial layer of the waste powder to above a melting point of the waste powder. To continue the additive manufacturing process, methods 100 may include lowering the build plate at 124, spreading a subsequent layer of the waste powder across a build area at 126, and selectively fusing portions of the subsequent layer of the waste powder by heating the portions of the subsequent layer above the melting point of the waste powder at 128. Steps 124, 126, and 128 may be repeated any desired number of times until the desired part is completed, and then methods 100 may include removing excess material from internal channels and/or around the resulting additively manufactured part, at 130.
[0046] Parts made according to methods 50, 70, 100 of the present disclosure are also within the scope of the disclosure. Illustrative examples of parts that may be made in EB-PBF machines using waste powder from LB-PBF systems, may include parts or components (e.g., turbine blades or engine parts) for aircraft or other vehicles, topology optimized tapered box beams, medical devices, and many other applications.
[0047] Illustrative, non-exclusive examples of inventive subject matter according to the present disclosure are described in the following enumerated paragraphs:
[0048] A1. A method of performing electron beam powder bed fusion (EB-PBF) additive manufacturing, comprising: [0049] determining a plurality of predetermined interim temperatures ranging from an ambient, resting temperature of a build chamber of an EB-PBF machine to a predetermined preheated temperature, wherein each subsequent predetermined interim temperature of the plurality of predetermined interim temperatures is greater than each previous predetermined interim temperature of the plurality of predetermined interim temperatures; and [0050] pre-heating the build chamber to the predetermined preheated temperature, wherein the pre-heating the build chamber comprises: [0051] exposing a build plate within the build chamber to a plurality of streams of electrons, one at a time, wherein the build plate is surrounded by waste powder that is leftover and obtained from a laser beam powder bed fusion system, wherein each stream of electrons of the plurality of streams of electrons has a different respective current, and wherein each stream of electrons of the plurality of streams of electrons is configured to raise an actual temperature of the build chamber; [0052] monitoring the actual temperature of the build chamber during the exposing the build plate to the plurality of streams of electrons; [0053] comparing the actual temperature of the build chamber to the plurality of predetermined interim temperatures; and [0054] increasing a power input of the EB-PBF machine a plurality of times, thereby exposing the build plate to a subsequent stream of electrons of the plurality of streams of electrons, wherein the subsequent stream of electrons has a greater current level than a previous stream of electrons of the plurality of streams of electrons, and wherein the increasing the power input is performed each time the actual temperature of the build chamber reaches a respective subsequent predetermined interim temperature of the plurality of predetermined interim temperatures, as determined during the comparing the actual temperature to the plurality of predetermined interim temperatures.
[0055] A1.1. The method of paragraph A1, further comprising at least partially filling a build tank of the EB-PBF machine with the waste powder obtained from the laser beam powder bed fusion system.
[0056] A1.2. The method of paragraph A1 or A1.1, further comprising spreading an initial layer of the waste powder on a build plate within the build chamber, after the pre-heating the build chamber to the predetermined preheated temperature.
[0057] A2. The method of any of paragraphs A1-A1.2, wherein the pre-heating the build chamber to the predetermined preheated temperature comprises actively controlling the power input of the EB-PBF machine to deliver stepped increases of electron beam current.
[0058] A2.1. The method of any of paragraphs A1-A2, wherein the pre-heating the build chamber to the predetermined preheated temperature comprises manually controlling a/the power input of the EB-PBF machine to deliver stepped increases of electron beam current.
[0059] A3. The method of paragraph A2, wherein the actively controlling the power input of the EB-PBF machine comprises modifying one or more machine parameters of the EB-PBF machine each time a respective predetermined interim temperature is reached.
[0060] A3.1. The method of paragraph A2.1 and/or A3, wherein the manually controlling the power input of the EB-PBF machine comprises modifying one or more machine parameters of the EB-PBF machine each time a respective predetermined interim temperature is reached.
[0061] A4. The method of any of paragraphs A1-A3.1, wherein the pre-heating the build chamber to the predetermined preheated temperature is not based on predetermined time intervals.
[0062] A4.1. The method of any of paragraphs A1-A4, wherein the pre-heating the build chamber to the predetermined preheated temperature is not pre-programmed.
[0063] A5. The method of any of paragraphs A1-A4.1, wherein the pre-heating the build chamber to the predetermined preheated temperature is sufficiently slow such that a static charge of the waste powder is dissipated.
[0064] A6. The method of any of paragraphs A1-A5, wherein the pre-heating the build chamber to the predetermined preheated temperature is sufficiently slow enough to at least substantially prevent smoking of the waste powder.
[0065] A7. The method of any of paragraphs A1-A6, wherein each stream of electrons of the plurality of streams of electrons has a respective current that is at least 1 milliamp (mA) lower, at least 2 mA lower, at least 3 mA lower, at least 4 mA lower, at least 5 mA lower, at least 6 mA lower, at least 7 mA lower, at least 8 mA lower, at least 9 mA lower, and/or at least 10 mA lower than each subsequent stream of electrons of the plurality of streams of electrons.
[0066] A8. The method of any of paragraphs A1-A7, wherein each stream of electrons of the plurality of streams of electrons has a respective current that is between 5-10 mA higher than each previous stream of electrons of the plurality of streams of electrons.
[0067] A9. The method of any of paragraphs A1-A8, wherein the plurality of streams of electrons comprises at least 3 different streams of electrons, at least 4 different streams of electrons, at least 5 different streams of electrons, at least 6 different streams of electrons, at least 7 different streams of electrons, at least 8 different streams of electrons, at least 9 different streams of electrons, at least 10 different streams of electrons, and/or at most 20 different streams of electrons.
[0068] A10. The method of any of paragraphs A1-A9, wherein the plurality of streams of electrons comprises at least one stream of electrons having a current below 10 mA.
[0069] A11. The method of any of paragraphs A1-A10, wherein the plurality of streams of electrons comprises at least one stream of electrons having a current below 5 mA.
[0070] A12. The method of any of paragraphs A1-A11, wherein the plurality of streams of electrons comprises a stream of electrons having a current of 1 mA or less.
[0071] A13. The method of any of paragraphs A1-A12, wherein the plurality of streams of electrons comprises respective streams of electrons having respective currents of 1 mA, 5 mA, 10 mA, 15 mA, 20 mA, 25 mA, 30 mA, 35 mA, 40 mA, 45 mA, 48 mA, and/or 50 mA.
[0072] A14. The method of any of paragraphs A1-A13, further comprising determining the predetermined preheated temperature, wherein the predetermined preheated temperature is at least partially dependent on a material composition of the waste powder.
[0073] A15. The method of any of paragraphs A1-A14, wherein the waste powder comprises a metallic powder.
[0074] A16. The method of any of paragraphs A1-A15, wherein the waste powder comprises a titanium alloy powder.
[0075] A17. The method of any of paragraphs A1-A16, wherein the waste powder comprises Ti-6Al-4V powder.
[0076] A18. The method of any of paragraphs A1-A17, wherein the waste powder has an average particle size of less than 60 micrometers (μm), less than 50 μm, and/or less than 40 μm in diameter.
[0077] A19. The method of any of paragraphs A1-A18, further comprising deflecting an electron beam via an electromagnetic field, thereby selectively fusing portions of an/the initial layer of the waste powder by raising the actual temperature of portions of the initial layer of the waste powder to above a melting point of the waste powder, wherein the selectively fusing the portions of the initial layer of the waste powder is performed after the pre-heating the build chamber to the predetermined preheated temperature.
[0078] A20. The method of any of paragraphs A1-A19, further comprising: [0079] lowering the build plate; [0080] spreading a subsequent layer of the waste powder across a build area such that the subsequent layer of the waste powder at least partially overlaps a previous layer of the waste powder; and [0081] selectively fusing portions of the subsequent layer of the waste powder to the previous layer of the waste powder by heating the portions of the subsequent layer above the melting point of the waste powder.
[0082] A21. The method of paragraph A20, further comprising repeating the lowering the build plate, the spreading the subsequent layer of the waste powder, and the selectively fusing portions of the subsequent layer a plurality of times, until a resulting additively manufactured part is completed.
[0083] A22. The method of any of paragraphs A1-A21, further comprising removing excess material from internal channels and/or around a/the resulting additively manufactured part.
[0084] A23. The method of any of paragraphs A1-A22, further comprising: [0085] performing laser beam powder bed fusion to create an object; and [0086] reserving the waste powder left over from the performing laser beam powder bed fusion to use in EB-PBF additive manufacturing.
[0087] A24. The method of any of paragraphs A1-A23, wherein the pre-heating the build chamber to the predetermined preheated temperature takes at least 45 minutes, at least 50 minutes, at least 55 minutes, at least 60 minutes, at least 65 minutes, at least 70 minutes, at least 75 minutes, at least 80 minutes, at least 85 minutes, at least 90 minutes, at least 95 minutes, at least 100 minutes, and/or at most 120 minutes.
[0088] A25. The method of any of paragraphs A1-A24, wherein the exposing the build plate to the plurality of streams of electrons is performed for at least 1 minute, at least 2 minutes, at least 3 minutes, at least 4 minutes, at least 5 minutes, at least 10 minutes, at least 15 minutes, at least 20 minutes, and/or at most 30 minutes for each respective stream of electrons of the plurality of streams of electrons.
[0089] A26. The method of any of paragraphs A1-A25, wherein the exposing the build plate to the plurality of streams of electrons is performed for different respective amounts of time for each respective stream of electrons of the plurality of streams of electrons.
[0090] A27. The method of any of paragraphs A1-A26 wherein each subsequent predetermined interim temperature of the plurality of predetermined interim temperatures is greater than each previous predetermined interim temperature of the plurality of predetermined interim temperatures by at least 30 degrees Celsius (° C.), at least 40° C., at least 50° C., at least 60° C., at least 70° C., at least 80° C., at least 90° C., at least 100° C., at least 110° C., at least 120° C., at least 130° C., at least 140° C., at least 150° C., and/or at most 200° C.
[0091] A28. The method of any of paragraphs A1-A27 wherein each respective subsequent predetermined interim temperature of the plurality of predetermined interim temperatures is greater than each respective previous predetermined interim temperature of the plurality of predetermined interim temperatures by a different respective amount.
[0092] A29. The method of any of paragraphs A1-A28, wherein the pre-heating the build chamber to the predetermined preheated temperature has an overall rate of temperature increase of between 6-8° C. per minute.
[0093] A30. The method of any of paragraphs A1-A29, wherein the pre-heating the build chamber to the predetermined preheated temperature has an overall rate of temperature increase of less than 20° C. per minute (° C./min), less than 15° C./min, less than 10° C./min, and/or less than 5° C./min.
[0094] B1. A method of performing electron beam powder bed fusion (EB-PBF) additive manufacturing, comprising: [0095] pre-heating a build chamber of an EB-PBF machine to a predetermined preheated temperature, wherein the pre-heating the build chamber comprises: [0096] exposing a build plate within the build chamber to a first stream of electrons at a first current for a first time period sufficient to pre-heat the build chamber to a predetermined first interim temperature, wherein the build plate is surrounded by waste powder that is leftover and obtained from a laser beam powder bed fusion system; [0097] monitoring an actual temperature of the build chamber to determine when the actual temperature of the build chamber reaches the predetermined first interim temperature; and [0098] exposing the build plate to a second stream of electrons once the actual temperature of the build chamber reaches the predetermined first interim temperature, wherein the second stream of electrons has a second current that is greater than the first current, wherein the build plate is exposed to the second stream of electrons for a second time period sufficient to pre-heat the build plate to a predetermined second interim temperature, wherein the predetermined second interim temperature is greater than the predetermined first interim temperature and less than the predetermined preheated temperature.
[0099] B2. The method of paragraph B1, further comprising at least partially filling a build tank of a/the EB-PBF machine with the waste powder obtained from the laser beam powder bed fusion system.
[0100] B3. The method of paragraph B1 or B2, further comprising: [0101] continuing to monitor the actual temperature of the build chamber; and [0102] increasing a current level of electron output by the EB-PBF machine each time the build chamber reaches a subsequent predetermined interim temperature, until the build chamber reaches the predetermined preheated temperature.
[0103] B4. The method of any of paragraphs B1-B2, further comprising determining a plurality of predetermined interim temperatures ranging from an ambient, resting temperature of the build chamber to the predetermined preheated temperature, wherein each subsequent predetermined interim temperature of the plurality of predetermined interim temperatures is greater than each previous predetermined interim temperature of the plurality of predetermined interim temperatures.
[0104] B5. The method of any of paragraphs B1-B4, further comprising: [0105] monitoring the actual temperature of build chamber to determine when the actual temperature build chamber reaches the predetermined second interim temperature; and [0106] exposing the build plate to a third stream of electrons once the actual temperature of the build chamber reaches the predetermined second interim temperature, wherein the third stream of electrons has a third current that is greater than the second current, wherein the build plate is exposed to the third stream of electrons for a third time period sufficient to pre-heat the build chamber to a predetermined third interim temperature, wherein the predetermined third interim temperature is greater than the predetermined second interim temperature and less than the predetermined preheated temperature.
[0107] B6. The method of paragraph B5, further comprising repeating the monitoring the actual temperature of the build chamber a plurality of times for a/the plurality of predetermined interim temperatures, and repeating the exposing the build plate to a different respective stream of electrons of a/the plurality of streams of electrons each time the actual temperature of the build chamber reaches a subsequent respective interim temperature of the plurality of predetermined interim temperatures, until the actual temperature of the build chamber reaches or exceeds the predetermined preheated temperature.
[0108] B7. The method of any of paragraphs B1-B6, wherein the pre-heating the build chamber to the predetermined preheated temperature comprises actively controlling a power input of the EB-PBF machine to deliver stepped increases of electron beam current.
[0109] B7.1. The method of any of paragraphs B1-B7, wherein the pre-heating the build chamber to the predetermined preheated temperature comprises manually controlling a/the power input of the EB-PBF machine to deliver stepped increases of electron beam current.
[0110] B8. The method of paragraph B7 or B7.1, wherein the actively controlling the power input of the EB-PBF machine comprises modifying one or more machine parameters of the EB-PBF machine each time a respective predetermined interim temperature is reached.
[0111] B9. The method of any of paragraphs B1-B8, wherein the pre-heating the build chamber to the predetermined preheated temperature is not pre-programmed.
[0112] B9.1. The method of any of paragraphs B1-B8, wherein the pre-heating the build chamber to the predetermined preheated temperature is not based on predetermined time intervals.
[0113] B10. The method of any of paragraphs B1-B9.1, wherein the pre-heating the build chamber to the predetermined preheated temperature is sufficiently slow such that a static charge of the waste powder is substantially allowed to dissipate.
[0114] B11. The method of any of paragraphs B1-B10, wherein the pre-heating the build chamber to the predetermined preheated temperature is sufficiently slow enough to at least substantially prevent smoking of the waste powder.
[0115] B12. The method of any of paragraphs B1-B11, wherein each stream of electrons of a/the plurality of streams of electrons has a respective current that is at least 1 milliamp (mA) lower, at least 2 mA lower, at least 3 mA lower, at least 4 mA lower, at least 5 mA lower, at least 6 mA lower, at least 7 mA lower, at least 8 mA lower, at least 9 mA lower, and/or at least 10 mA lower than each subsequent stream of electrons of the plurality of streams of electrons.
[0116] B13. The method of any of paragraphs B1-B12, wherein the first stream of electrons has a current that is at least 1 milliamp (mA) lower, at least 2 mA lower, at least 3 mA lower, at least 4 mA lower, at least 5 mA lower, at least 6 mA lower, at least 7 mA lower, at least 8 mA lower, at least 9 mA lower, and/or at least 10 mA lower than the second stream of electrons.
[0117] B14. The method of any of paragraphs B1-B13, wherein each stream of electrons of a/the plurality of streams of electrons has a respective current that is between 5-10 mA higher than each previous stream of electrons of the plurality of streams of electrons.
[0118] B15. The method of any of paragraphs B1-B14, wherein the second stream of electrons has a current that is between 5-10 mA higher than the first stream of electrons.
[0119] B16. The method of any of paragraphs B1-B15, wherein a/the plurality of streams of electrons comprises at least 3 different streams of electrons, at least 4 different streams of electrons, at least 5 different streams of electrons, at least 6 different streams of electrons, at least 7 different streams of electrons, at least 8 different streams of electrons, at least 9 different streams of electrons, at least 10 different streams of electrons, and/or at most 20 different streams of electrons.
[0120] B17. The method of any of paragraphs B1-B16, wherein a/the plurality of streams of electrons comprises at least one stream of electrons having a current below 10 mA.
[0121] B18. The method of any of paragraphs B1-B17, wherein the first current of the first stream of electrons is less than 10 mA.
[0122] B19. The method of any of paragraphs B1-B18, wherein the first current of the first stream of electrons is less than 5 mA.
[0123] B19.1. The method of any of paragraphs B1-B19, wherein the second current of the second stream of electrons is between 5-15 mA.
[0124] B20. The method of any of paragraphs B1-B19.1, wherein a/the plurality of streams of electrons comprises at least one stream of electrons having a current below 5 mA.
[0125] B21. The method of any of paragraphs B1-B20, wherein the first current of the first stream of electrons is 1 mA or less.
[0126] B22. The method of any of paragraphs B1-B21, further comprising determining the predetermined preheated temperature, wherein the predetermined preheated temperature is at least partially dependent on a material composition of the waste powder.
[0127] B23. The method of any of paragraphs B1-B22, wherein the waste powder comprises a metallic powder.
[0128] B24. The method of any of paragraphs B1-B23, wherein the waste powder comprises a titanium alloy powder.
[0129] B25. The method of any of paragraphs B1-B24, wherein the waste powder comprises Ti-6Al-4V powder.
[0130] B26. The method of any of paragraphs B1-B25, wherein the waste powder has an average particle size of less than 60 micrometers (μm), less than 50 μm, and/or less than 40 μm in diameter.
[0131] B27. The method of any of paragraphs B1-B26, further comprising deflecting an electron beam via an electromagnetic field, thereby selectively fusing portions of an initial layer of the waste powder by raising the actual temperature of the portions of the initial layer of the waste powder to above a melting point of the waste powder, wherein the selectively fusing portions of the initial layer of the waste powder is performed after the pre-heating the build chamber to the predetermined preheated temperature.
[0132] B28. The method of any of paragraphs B1-B27, further comprising: [0133] lowering the build plate; [0134] spreading a subsequent layer of the waste powder across a build area; and [0135] selectively fusing portions of the subsequent layer of the waste powder by heating the portions of the subsequent layer above a/the melting point of the waste powder.
[0136] B29. The method of paragraph B28, further comprising repeating the lowering the build plate, the spreading the subsequent layer of the waste powder, and the selectively fusing the portions of the subsequent layer a plurality of times, until a resulting additively manufactured part is completed.
[0137] B30. The method of any of paragraphs B1-B29, further comprising removing excess material from internal channels and/or around a/the resulting additively manufactured part.
[0138] B31. The method of any of paragraphs B1-B30, further comprising: [0139] performing laser beam powder bed fusion to create an object; and [0140] reserving the waste powder left over from the performing laser beam powder bed fusion to use in EB-PBF additive manufacturing.
[0141] B32. The method of any of paragraphs B1-B31, wherein the pre-heating the build chamber to the predetermined preheated temperature takes at least 45 minutes, at least 50 minutes, at least 55 minutes, at least 60 minutes, at least 65 minutes, at least 70 minutes, at least 75 minutes, at least 80 minutes, at least 85 minutes, at least 90 minutes, at least 95 minutes, at least 100 minutes, and/or at most 120 minutes.
[0142] B33. The method of any of paragraphs B1-B32, wherein the first time period is at least 1 minute, at least 2 minutes, at least 3 minutes, at least 4 minutes, at least 5 minutes, at least 10 minutes, at least 15 minutes, at least 20 minutes, and/or at most 30 minutes.
[0143] B34. The method of any of paragraphs B1-B33, wherein the second time period is at least 1 minute, at least 2 minutes, at least 3 minutes, at least 4 minutes, at least 5 minutes, at least 10 minutes, at least 15 minutes, at least 20 minutes, and/or at most 30 minutes.
[0144] B35. The method of any of paragraphs B1-B34, wherein the first time period is different than the second time period.
[0145] B36. The method of any of paragraphs B1-B35, wherein the predetermined second interim temperature is greater than the predetermined first interim temperature by at least 30 degrees Celsius (° C.), at least 40° C., at least 50° C., at least 60° C., at least 70° C., at least 80° C., at least 90° C., at least 100° C., at least 110° C., at least 120° C., at least 130° C., at least 140° C., at least 150° C., and/or at most 200° C.
[0146] B37. The method of any of paragraphs B1-B36, wherein the pre-heating the build chamber to the predetermined preheated temperature has an overall rate of temperature increase of between 6-8° C. per minute.
[0147] B38. The method of any of paragraphs B1-B37, wherein the pre-heating the build chamber to the predetermined preheated temperature has an overall rate of temperature increase of less than 20° C. per minute (° C./min), less than 15° C./min, less than 10° C./min, and/or less than 5° C./min.
[0148] C1. A part made using the method of any of paragraphs A1-A30 and/or any of paragraphs B1-B37.
[0149] D1. The use of the method of any of paragraphs A1-A30 and/or any of paragraphs B1-B37 to additively manufacture a part.
[0150] As used herein, the terms “selective” and “selectively,” when modifying an action, movement, configuration, or other activity of one or more components or characteristics of an apparatus, mean that the specific action, movement, configuration, or other activity is a direct or indirect result of dynamic processes and/or user manipulation of an aspect of, or one or more components of, the apparatus. The terms “selective” and “selectively” thus may characterize an activity that is a direct or indirect result of user manipulation of an aspect of, or one or more components of, the apparatus, or may characterize a process that occurs automatically, such as via the mechanisms disclosed herein.
[0151] As used herein, the terms “adapted” and “configured” mean that the element, component, or other subject matter is designed and/or intended to perform a given function. Thus, the use of the terms “adapted” and “configured” should not be construed to mean that a given element, component, or other subject matter is simply “capable of” performing a given function but that the element, component, and/or other subject matter is specifically selected, created, implemented, utilized, programmed, and/or designed for the purpose of performing the function. It is also within the scope of the present disclosure that elements, components, and/or other recited subject matter that is recited as being adapted to perform a particular function may additionally or alternatively be described as being configured to perform that function, and vice versa. Similarly, subject matter that is recited as being configured to perform a particular function may additionally or alternatively be described as being operative to perform that function.
[0152] As used herein, the phrase “at least one,” in reference to a list of one or more entities should be understood to mean at least one entity selected from any one or more of the entities in the list of entities, but not necessarily including at least one of each and every entity specifically listed within the list of entities and not excluding any combinations of entities in the list of entities. This definition also allows that entities may optionally be present other than the entities specifically identified within the list of entities to which the phrase “at least one” refers, whether related or unrelated to those entities specifically identified. Thus, as a non-limiting example, “at least one of A and B” (or, equivalently, “at least one of A or B,” or, equivalently “at least one of A and/or B”) may refer, in one example, to at least one, optionally including more than one, A, with no B present (and optionally including entities other than B); in another example, to at least one, optionally including more than one, B, with no A present (and optionally including entities other than A); in yet another example, to at least one, optionally including more than one, A, and at least one, optionally including more than one, B (and optionally including other entities). In other words, the phrases “at least one,” “one or more,” and “and/or” are open-ended expressions that are both conjunctive and disjunctive in operation. For example, each of the expressions “at least one of A, B, and C,” “at least one of A, B, or C,” “one or more of A, B, and C,” “one or more of A, B, or C” and “A, B, and/or C” may mean A alone, B alone, C alone, A and B together, A and C together, B and C together, or A, B, and C together, and optionally any of the above in combination with at least one other entity.
[0153] As used herein, the phrase “at least substantially,” when modifying a degree or relationship, includes not only the recited “substantial” degree or relationship, but also the full extent of the recited degree or relationship. A substantial amount of a recited degree or relationship may include at least 75% of the recited degree or relationship. For example, a first direction that is at least substantially parallel to a second direction includes a first direction that is within an angular deviation of 22.5° relative to the second direction and also includes a first direction that is identical to the second direction. As used herein, smoking of waste powder is at least substantially prevented if it is prevented to an extent sufficient to allow the pre-heating and additive manufacturing process to continue in the EB-PBF machine using the waste powder. Similarly, electric charge of the waste powder is at least substantially dissipated if it is dissipated to an extent sufficient to allow the pre-heating and additive manufacturing process to continue in the EB-PBF machine using the waste powder.
[0154] The various disclosed elements of apparatuses and steps of methods disclosed herein are not required to all apparatuses and methods according to the present disclosure, and the present disclosure includes all novel and non-obvious combinations and subcombinations of the various elements and steps disclosed herein. Moreover, one or more of the various elements and steps disclosed herein may define independent inventive subject matter that is separate and apart from the whole of a disclosed apparatus or method. Accordingly, such inventive subject matter is not required to be associated with the specific apparatuses and methods that are expressly disclosed herein, and such inventive subject matter may find utility in apparatuses and/or methods that are not expressly disclosed herein.
[0155] As used herein, the phrase, “for example,” the phrase, “as an example,” and/or simply the term “example,” when used with reference to one or more components, features, details, structures, examples, and/or methods according to the present disclosure, are intended to convey that the described component, feature, detail, structure, example, and/or method is an illustrative, non-exclusive example of components, features, details, structures, examples, and/or methods according to the present disclosure. Thus, the described component, feature, detail, structure, example, and/or method is not intended to be limiting, required, or exclusive/exhaustive; and other components, features, details, structures, examples, and/or methods, including structurally and/or functionally similar and/or equivalent components, features, details, structures, examples, and/or methods, are also within the scope of the present disclosure.