TEMPORARY SUSPENSION OF COMPLETED HYDROCARBON WELLS
20230340856 · 2023-10-26
Inventors
Cpc classification
E21B33/04
FIXED CONSTRUCTIONS
E21B33/1208
FIXED CONSTRUCTIONS
International classification
E21B33/04
FIXED CONSTRUCTIONS
Abstract
In the process of suspending a subsea hydrocarbon well (1) after finalizing the completion operation and prior to stimulation of the well and putting the well on production, preinstalled upper and lower glass plugs (11, 12) are used as temporary barriers in the tubing. The plugs allow various tests to be performed before the lower plug (12), below the production packer (10), is broken; the upper plug (11) located above the downhole safety valve (13) then forms one of the barriers required to suspend the well whilst the Blow Out Preventer (BOP) is removed and Xmas tree installed, at which point the upper plug (11) is broken.
Claims
1. A process for suspending a hydrocarbon well, wherein the process comprises: a) installing and completing casing and liner in the hydrocarbon well; b) running into the well a tubing string and hanging the tubing string from a tubing hanger in a wellhead; c) wherein the tubing string is fitted with pre-installed upper and a lower frangible plugs, and wherein the frangible plugs have selectively closable bypass channels in an initial open configuration; c) performing pressure tests on the tubing hanger and other downhole components; d) whilst the upper frangible plug creates a seal in the tubing, removing a blowout preventer from the wellhead and installing a Xmas tree.
2. The process according to claim 1, wherein the upper and lower frangible plugs include are breakable by application of respective first and second predetermined sequences of pressure pulses.
3. The process according to claim 2, wherein the upper and lower frangible plug each has a bypass channel including a valve and wherein the valves are closable by means of respective third and fourth predetermined sequences of pressure pulses.
4. The process according to claim 3, wherein step (c) involves the bypass channel of the lower frangible plug being closed by applying the fourth predetermined sequence of pressure pulses prior to setting of a production packer and pressure testing of the tubing string.
5. The process according to claim 4, wherein step (c) involves shattering the lower frangible plug by applying the second predetermined sequence of pressure pulses prior to pressure testing the production packer.
6. The process according to claim 5, wherein step (c) involves the bypass channel of the upper frangible plug being closed by applying the third predetermined sequence of pressure pulses prior to pressure testing the upper frangible plug.
7. The process according to claim 6, wherein following pressure testing of the upper frangible plug a blowout preventer is removed from the wellhead and the Xmas tree installed.
8. The process according to claim 7, wherein following installation of the Xmas tree the upper frangible plug is shattered by applying the first predetermined sequence of pressure pulses.
9. The process according to claim 1, wherein the upper frangible plug is located in the tubing above a downhole safety valve.
10. The process according to claim 1, wherein the lower frangible plug is located in the tubing below a production packer.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0024] A more complete understanding of the present invention and benefits thereof may be acquired by referring to the follow description taken in conjunction with the accompanying drawings in which:
[0025]
[0026]
DETAILED DESCRIPTION
[0027] Turning now to the detailed description of the preferred arrangement or arrangements of the present invention, it should be understood that the inventive features and concepts may be manifested in other arrangements and that the scope of the invention is not limited to the embodiments described or illustrated. The scope of the invention is intended only to be limited by the scope of the claims that follow.
[0028] As shown in
[0029] Suspended from a tubing hanger 8 in the wellhead 5 is a length of production tubing 9, which extends inside the casing 6. A production packer 10 is installed between the production tubing 9 and casing 6. During the well construction a Blowout Preventer (BOP) is the last barrier for well control. The BOP (Not shown) is connected to the wellhead 5. The BOP will be removed to enable installation of a Xmas tree for well production/injection purposes. However, to remove the BOP two independent tested barriers are required.
[0030] Upper and lower glass plugs 11, 12 are installed in the tubing, respectively above and below the conventional downhole safety valve 13. The lower plug 12 is also below the production packer 10.
[0031] A glass plug is in essence a barrier made from a material that may be broken intentionally by some means at a chosen time. The barrier element or elements of such plugs are frequently made from glass, which is a material that can have considerable strength in certain circumstances but is easy to shatter. Features are included in the plug design for breaking the glass—this might be by means of pressure or application of a pointed tool to create a stress multiplier in the glass or a combination of these, or by other means. The plug also includes design features to allow the time at which the glass is broken to be chosen. For example, a timing device may be included that activates the glass breaking feature after a set time. Alternatively, a device may be included that senses pressure and activates the glass breaking feature when a certain pattern of pressure pulses is detected. In this way, a “signal” comprising pulses of pressure in the well fluid may be sent from the surface to initiate breaking the of the glass. Once the glass is broken, the fragments simply fall to the bottom of the well where they have no effect on operations.
[0032] Glass plugs are provided with a bypass channel to allow fluids to flow past the plugs if desired. The opening or closing of the bypass channel can be controlled in a similar manner to the breaking of the plug, e.g. by pressure pulses.
[0033] A conventional glass plug is shown in highly stylised form in
[0034] The plug of
[0035] Also in the support member 21 is a bypass channel 30. The bypass channel 30 allows communication between the parts of the tubing 20 that are proximal and distal of the barrier plugs 22 a,b. At one end of the bypass channel 30 is a control unit 31 that allows control of whether the bypass channel is open or not. Again, the unit 31 is designed to respond to a predetermined sequence of pulses to initiate closing the bypass channel, which is open on installation of the plug.
[0036] A sequence of operations will now be described with reference to
[0037] Once the tubing hanger has been tested, a specific cycle of pressure pulses, or pressure signature, is then passed down the production tubing to activate a bypass closure valve in the lower glass plug 12, so that the plug now blocks the bore of the tubing 9 at a point near the end of the tubing. The production packer 10 is set by conventional means. An inflow test is then performed on downhole safety valve by managing the pressures in the tubing an annulus between the tubing and casing.
[0038] The next stage is to apply a specific sequence of pressure pulses, or pressure signature, in the tubing 9 to trigger the shattering of the lower glass plug 12. The production packer 10 is then tested in the directional flow. Next, the bypass of upper glass plug 11 is closed by applying a sequence of pressure pulses. The upper glass plug 11 is then tested by applying pressure from above.
[0039] If the upper glassplug is found to be effective then the downhole safety valve 13 can be closed, thereby forming with the upper glass plug 11 the required double barrier to allow the BOP to be removed. The wellhead can then be fitted with a Xmas tree to allow production to start. Once the Xmas tree is in place with its various valves, the upper glass plug can be shattered by applying a sequence of pressure pulses, or pressure signature. The downhole safety valve can be returned to its normal open position.
[0040] The use of a glass plug for the upper barrier means that the wireline operations can be dispensed-with entirely for the completion process, with considerable saving in time and cost.
[0041] The above sequence of steps would normally be performed using wireline plugs, therefore requiring the use of a wireline intervention vessel. By using glass plugs only, the need for a wireline intervention vessel is removed, thereby saving considerable time and cost.
[0042] In closing, it should be noted that the discussion of any reference is not an admission that it is prior art to the present invention, especially any reference that may have a publication date after the priority date of this application. At the same time, each and every claim below is hereby incorporated into this detailed description or specification as a additional embodiments of the present invention.
[0043] Although the systems and processes described herein have been described in detail, it should be understood that various changes, substitutions, and alterations can be made without departing from the spirit and scope of the invention as defined by the following claims. Those skilled in the art may be able to study the preferred embodiments and identify other ways to practice the invention that are not exactly as described herein. It is the intent of the inventors that variations and equivalents of the invention are within the scope of the claims while the description, abstract and drawings are not to be used to limit the scope of the invention. The invention is specifically intended to be as broad as the claims below and their equivalents.
REFERENCES
[0044] All of the references cited herein are expressly incorporated by reference. The discussion of any reference is not an admission that it is prior art to the present invention, especially any reference that may have a publication data after the priority date of this application. Incorporated references are listed again here for convenience: [0045] 1. U.S. Pat. No. 3,901,314, Nutter, “Pressure Controlled Tester Valve,” Schlumberger Tech. Corp. (1975). [0046] 2. U.S. Pat. No. 9,835,023, Hallundbaek, et al., “Barrier Testing Method,” WellTec AS (2015). [0047] 3. U.S. Ser. No. 10/030,472, Fripp, “Frangible Plug to Control Flow Through a Completion,” Halliburton Energy Services (2016). [0048] 4. U.S. Ser. No. 10/544,654, Bjorgum & Hiorth, “Well Tool Device with a Frangible Disc,” Vosstech AS (2019). [0049] 5. U.S. Ser. No. 10/683,728, Kellner, et al., “Float Sub with Pressure-Frangible Plug,” Innovex Downhole Solutions Inc. (2018). [0050] 6. U.S. Ser. No. 10/808,489, Hiorth, “Well Tool Device with a Frangible Glass Body,” Interwell Norway AS (2018). [0051] 7. U.S. Ser. No. 10/883,328, Brandsdal, “Holding and Crushing Device for Barrier Plug,” TCO AS (2018). [0052] 8. U.S. Ser. No. 10/934,802, Brandsdal, “Plug Arrangement,” Frac Tech AS (2019). [0053] 9. EP3303761, Brandsdal & Tveranger, “Destruction Mechanism for a Dissolvable Sealing Device,” TCO AS (2018). [0054] 10. WO2007/108701, Bjoergum, “Sealing Device,” Bjoergum Mekaniske AS (2007).