PT ferromagnetic resonance elimination method implemented by actively inputting resistance through electronic load
11824348 · 2023-11-21
Assignee
Inventors
- Xiaohong Zhu (Qujing, CN)
- Yin Yang (Qujing, CN)
- Sirao Lu (Qujing, CN)
- Yuan Shan (Qujing, CN)
- Juntao Zeng (Qujing, CN)
- Weirong Yang (Qujing, CN)
- Zhe Li (Qujing, CN)
- Yu Gong (Qujing, CN)
- Wenfei Feng (Qujing, CN)
- Shoudong Xu (Qujing, CN)
- Yongsheng Ning (Qujing, CN)
- Rong Zhang (Qujing, CN)
- Qibin Mei (Qujing, CN)
- Lianjing Yang (Qujing, CN)
- Dekai Chen (Qujing, CN)
Cpc classification
H02H1/0092
ELECTRICITY
H02H9/007
ELECTRICITY
International classification
H02H9/00
ELECTRICITY
Abstract
The present disclosure relates to the technical field of potential transformer (PT) ferromagnetic resonance elimination, in particular to a PT ferromagnetic resonance elimination method implemented by actively inputting resistance through an electronic load, including the following steps: setting up a PT, and determining a mapping relationship; constructing a resonance elimination control system; and designing the electronic load as an active resonance elimination device. The present disclosure overcomes a contradiction between a magnitude of resonance elimination resistance and winding overload in a PT open delta during single-phase-to-earth fault and fault clearance, and effectively avoids the technical problems of difficult distinguishing between single-phase-to-earth fault characteristics and power frequency resonance characteristics and causing resonance in a single-phase-to-earth fault process. Compared with previous disclosure designs, the present disclosure directly measures parameters, and is simple in algorithm, low in computational complexity, rapid in arithmetic speed, high in precision and less in error.
Claims
1. A PT ferromagnetic resonance elimination method implemented by actively inputting resistance through an electronic load, comprising the following steps: S1: setting up a PT comprising primary, secondary and open tertiary windings, and determining a mapping relationship between a secondary voltage and an open tertiary voltage; S2: based on a resistance matching algorithm and a PID control strategy, constructing a resonance elimination control system and presetting a resistance active-matching strategy; and S3: designing an engineering solution of using the electronic load to replace a DC motor and a circular rheostat for inputting resistance as an active resonance elimination device, the specific operating principle of the active resonance elimination device comprising the following steps: S3.1: accumulation of resonance energy: when in normal operation or when a three-phase load of the system is slightly unbalanced, not starting the active resonance elimination device; S3.2: slow energy consumption process: when the three-phase load of the system is unbalanced, the system has earth fault, starting the active resonance elimination device, inputting the resonance elimination resistance R.sub.0, and consuming electrostatic energy accumulated in a zero-sequence loop of the system; S3.3: resonance energy jump resonance excitation: if PT resonance excitation is caused by the disappearance of the earth fault of the system, lightning stroke, or operations such as a closing operation, allowing PT core characteristics to undergo an energy jump; S3.4: when a core tends to be saturated, converting the electrostatic energy stored in the zero-sequence loop capacitance of the system into electromagnetic energy in the PT core; S3.5: rapid energy consumption process I: inputting the minimum resonance elimination resistance R.sub.min into the open tertiary winding to consume the electromagnetic energy; and S3.6: rapid energy consumption process II: after the completion of R.sub.min input for 40 ms, entering the rapid energy consumption process II, inputting the initial resistance R.sub.i0 at this time, monitoring the current I.sub.s of the open tertiary winding, and adjusting a duty cycle of the I.sub.s by means of a metal oxide semiconductor field effect transistor (MOSFET) to achieve the real-time dynamic adjustment of R.sub.i, the R.sub.i is a magnitude of resistance input in real time; wherein according to the engineering solution of using the electronic load to replace the DC motor and the circular rheostat for inputting the resistance in step S3, the implementation principle of the electronic load is as follows: the electronic load selects the initial resistance R.sub.i0, the magnitude of which is the minimum when the resistance is put into operation; further, the electronic load performs full-wave rectification and transformation on the U.sub.s of the open tertiary winding by means of a rectifier bridge, thus becoming a pulsating signal with only positive polarity, U.sub.s is an effective value of a port voltage of the open tertiary winding that can be directly measured from an opening; and after being input, the initial resistance R.sub.i0 is modulated by the MOSFET controlled by a PWM signal of 50000 Hz, so that an equivalent matching resistance for resonance elimination is obtained; and in step S3.1, under the condition of U.sub.s=3U.sub.o<7V, the three-phase load of the system is slightly unbalanced, and the active resonance elimination device is not started, U.sub.o is an effective value of a neutral point-to-ground voltage, i.e., a zero-sequence voltage.
2. The PT ferromagnetic resonance elimination method implemented by actively inputting resistance through an electronic load according to claim 1, wherein in step S1, when the PT comprising the primary, secondary and open tertiary windings is set up, if it is first assumed that U.sub.a, U.sub.b, and U.sub.c are respectively effective values of a three-phase voltage at the side of the secondary winding of the PT under normal operation, U.sub.s is an effective value of a port voltage of the open tertiary winding that can be directly measured from an opening, U.sub.da, U.sub.db, and U.sub.dc are respectively effective values of the three-phase voltage at the side of the opening tertiary winding of the PT under normal operation, U.sub.o is an effective value of a neutral point-to-ground voltage, i.e., a zero-sequence voltage, and U.sub.s=U.sub.da+U.sub.db+U.sub.dc=3U.sub.o; and then, the mapping relationship between the secondary voltage and the open tertiary voltage is as follows:
U.sub.a=√{square root over (3)}U.sub.da, U.sub.b=√{square root over (3)}U.sub.db, U.sub.c=√{square root over (3)}U.sub.dc;
U.sub.max=max{U.sub.a,U.sub.b,U.sub.c};
U.sub.dmax=max{U.sub.da,U.sub.db,U.sub.dc};
U.sub.max=√{square root over (3)}U.sub.dmax.
3. The PT ferromagnetic resonance elimination method implemented by actively inputting resistance through an electronic load according to claim 1, wherein in step S3.2, the calculation formula of the resonance elimination resistance R.sub.0 is as follows:
4. The PT ferromagnetic resonance elimination method implemented by actively inputting resistance through an electronic load according to claim 3, wherein in step S3.3, the changes in the PT core characteristics before and after undergoing the energy jump are as follows: if ω.sub.1 is a harmonic angular frequency of a resonance point before the PT core characteristics undergo the energy jump, ω.sub.2 is a harmonic angular frequency of the resonance point after the PT core characteristics undergo the energy jump, and φ is a magnetic flux of the PT core, then:
5. The PT ferromagnetic resonance elimination method implemented by actively inputting resistance through an electronic load according to claim 4, wherein in step S3.5, the electromagnetic energy consumed in the rapid energy consumption process I is the electromagnetic energy in the PT core converted from the electrostatic energy stored in the zero-sequence loop capacitance of the system in step S3.4.
6. The PT ferromagnetic resonance elimination method implemented by actively inputting resistance through an electronic load according to claim 2, wherein in the rapid energy consumption process II of step S3.6, the calculation method for inputting the initial resistance R.sub.i0 is as follows:
I.sub.s.Math.U.sub.s=P.sub.e.
Description
BRIEF DESCRIPTION OF FIGURES
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
DETAILED DESCRIPTION
(13) The technical solutions in embodiments of the present disclosure will be described clearly and completely hereinafter with reference to the accompanying drawings in the embodiments of the present disclosure. Apparently, the described embodiments are only a part rather than all of the embodiments of the present disclosure. Based on the embodiments of the present disclosure, all other embodiments obtained by those of ordinary skill in the art without making creative efforts shall fall within the scope of the protection of the present disclosure.
Embodiment 1
(14) As shown in
(15) In this embodiment, as shown in
(16) then, the mapping relationship between the secondary voltage and the open (tertiary) voltage is as follows:
U.sub.a=√{square root over (3)}U.sub.da, U.sub.b=√{square root over (3)}U.sub.db, U.sub.c=√{square root over (3)}U.sub.dc;
U.sub.max=max{U.sub.a,U.sub.b,U.sub.c};
U.sub.dmax=max{U.sub.da,U.sub.db,U.sub.dc};
U.sub.max=√{square root over (3)}U.sub.dmax.
(17) In this embodiment, as shown in
(18) In the above-mentioned steps, the different situations of the PT in the power grid system include system single-phase non-metallic grounding, normal situations, system single-phase metal grounding, non-metallic grounding, system three-phase imbalance, etc. Specifically:
(19) Firstly, assuming that an effective value of a port voltage of the open delta winding that can be directly measured from the opening is U.sub.r, and its phasor is expressed as {dot over (U)}.sub.r, at this time, the voltage vector of the open delta three-phase winding is as shown in
(20) A neutral point is O, and a single-phase non-metallic grounding point on the primary side is G (in
(21)
is a phase voltage angle formed by the zero-sequence voltage and the open delta corresponding to the grounded phase.
(22) Therefore, when single-phase-to-earth fault occurs in the system, the characteristics of the single-phase-to-earth fault are very similar to those of power frequency resonance.
(23) Under normal circumstances, there is no voltage at both ends of the opening of the open delta, i.e., {dot over (U)}.sub.r={dot over (U)}.sub.a*+{dot over (U)}.sub.b*+{dot over (U)}.sub.c*=0 V.
(24) When single-phase metal grounding occurs in the system, there will be no voltage on a certain phase in the primary winding of the PT, which results in no voltage on the corresponding phase in the secondary winding of the PT, so that a voltage of 100 V will appear on the open delta, i.e., U.sub.r=100 V.
(25) Taking
(26) When non-metallic grounding occurs: in
(27)
(28) Considering U.sub.r=3U.sub.o, and U.sub.a*=100 V/3, it is obtained that:
(29)
(30) In
(31) The magnitude of the resonance elimination resistance is R.sub.x, and the current at the open delta is I.sub.r. Then, I.sub.r=U.sub.r/R.sub.x; and S is the rated power of each phase winding of the open delta, and U.sub.m is the maximum value of the phase voltage of the three phases of the open delta winding (tertiary winding). In
(32) The excitation characteristics of the conventional potential transformers are designed according to 1.9 times of a phase rated voltage. This multiple proportion is represented by K. The K of the conventional potential transformers is 1.9, indicating that the overload capacity of the conventional potential transformers can reach 1.9 times their apparent power. If overloading is within 1.9 times, core saturation will not be caused. There is also a potential transformer that is resistant to saturation resonance, and its K value can be taken as 2.5.
(33) In the open delta, under the premise of not overloading, according to the power relationship, it can be obtained:
U.sub.mI.sub.r≤KS or U.sub.mU.sub.r/R.sub.x≤KS,
(34) that is:
(35)
(36)
(37) For example, when the phase C is subjected to metallic grounding, and U.sub.r is 100 V, θ is 0°, and then the value of R.sub.x at this time is:
(38)
(39) Further, the disappearance of earth faults is also a way to excite ferromagnetic resonance, but there must be a transitional process between grounding and resonance. During this transition process, there will be significant changes in voltage. When a voltage change is detected in the transition process, the input of the resonance elimination resistance must be corrected and matched before being put back into operation.
(40) Therefore, when the three phases of the system are unbalanced, the neutral point of the system will drift, and there will be a power frequency voltage in the open delta. During actual operation, the power frequency voltage generally does not exceed 15 V. Considering that a resonance point of the power frequency resonance will not fall within the triangle of a line voltage (i.e., the triangle formed by the three points a*, b* and c* in
(41) Therefore, if U.sub.r is less than or equal to 15 V, it may be caused by the three-phase imbalance in the system, or it may be caused by single-phase non-metallic earth fault, or it may be caused by high-order harmonic ferromagnetic resonance or frequency division ferromagnetic resonance. If U.sub.r is greater than 15 V and less than 50 V, it may be caused by the single-phase non-metallic earth fault, or it may be caused by the high-order harmonic ferromagnetic resonance or the frequency division ferromagnetic resonance.
(42) Then, when U.sub.r is less than or equal to 15 V, considering the possibility of three-phase imbalance in the system, active resonance elimination matching resistance needs to ensure that the open delta three-phase winding is never overloaded. At this time, the overload prevention condition is estimated based on the imbalance relationship of the three phases of the system. According to the actual grid system operation result U.sub.r≤15 V, the maximum phase voltage at the secondary winding side of the corresponding potential transformer is:
(43)
(44) Thus, when the three phases of the system are unbalanced, the value of the resonance elimination resistance R.sub.x that is actively input is the minimum value R.sub.x15, which is:
(45)
(46) Specifically, the basic prerequisites for compiling the resistance matching algorithms are as follows: a two-phase or three-phase short circuit will generally be quickly troubleshot by means of a microcomputer protection device in the running system within 700 ms, so matching the resistance with any magnitude in the open delta will not cause overload damage to the potential transformer within 700 ms.
(47) The worst case is that the two phases located in different places are subjected to grounded short circuit through large resistance. Although the probability of this situation is small, due to the small short-circuit current, the microcomputer protection device cannot detect and timely remove the fault at this time, resulting in the fault remaining for a long time. In this case, there may be a situation where due to off-site shorting, the voltages of two phases decrease while the voltage of the other phase remains unchanged, and there is no increase in the voltages of the three phases. Considering that in the foregoing resistance matching algorithms, since the maximum phase voltage was used to match the resistance, it is obvious that even if this small probability situation occurs, after the matching resistance is put into operation, it will not overload the potential transformer.
(48) Further, the specific method for constructing the resonance elimination control system based on the PID control strategy is as follows:
(49) First of all, on the basis of active resonance elimination, PID control strategy is employed. Further PI control is mainly adopted according to the engineering characteristics of controlling a magnitude of resistance. That is, a proportional control algorithm and an integral control algorithm in a PID controller are used.
(50) This kind of PID automatically adjusts the resonance elimination resistance to run online for a full period of time, and gradually inputs the resonance elimination resistance via the proportional control algorithm. At the same time, the integral control algorithm is used to control and eliminate the steady-state error occurring in the proportional control algorithm, so that the resonance of the potential transformer approaches the minimum set target value or almost zero. That is, the ferromagnetic resonance of the potential transformer is actively prevented.
(51) Finally, the above ferromagnetic resonance elimination control system can dynamically adjust the resonance elimination matching resistance by tracking the changes of U.sub.r in real time at a cycle of 100 ms.
(52) Further, the resistance active-matching strategy is as follows:
(53) By detecting the voltage U.sub.r at the opening, if U.sub.r is 0 V, the three phases of the power grid system are balanced. At this time, inputting resistance with a matched magnitude has no effect on the open delta. Considering that during the actual operation of the power grid, the situation of three-phase imbalance is difficult to avoid, the matched magnitude of the input resistance is calculated according to a formula (6), and U.sub.r=5 V, that is, the magnitude of the input resistance is
(54)
(55) Further, if U.sub.r changes, adjustment is performed according to the following strategies.
(56) Strategy 1
(57) When U.sub.r is less than or equal to 15 V, according to the statistical results as shown in Table 1 below, it may be caused by load imbalance, or it may be caused by single-phase-to-earth fault, or it may be caused by high-order harmonic ferromagnetic resonance or frequency division ferromagnetic resonance. At this time, the above-mentioned resonance elimination control system will dynamically calculate according to the formula (6), and match the magnitude of the resistance at a cycle of 100 ms.
(58) TABLE-US-00001 Single-phase-to-earth Fault and PT Ferromagnetic Resonance Voltage 3U.sub.o or Line U.sub.r at an open voltage Phase voltage delta Single-phase Metallic The The phase voltage of 100 V grounding grounding magnitude, the grounding phase direction, is 0, and the other and two phases are raised symmetry to line voltage. Non-metallic remain The three-phase Less than 100 grounding unchanged. voltage varies with V the magnitude of the grounding resistance and the capacitance of the system to ground, and the effective values of the three phases are not equal PT Power Single phase or two The single- ferromagnetic frequency phases increase(s) by phase rise is resonance ferromagnetic an equivalent value less than 100 V resonance and exceed(s) the and greater than line voltage, and the 50 V, and the voltage magnitude(s) two-phase rise of the other two is greater than phases or the other 100 V. phase decrease(s). Frequency The voltages of the There is a zero- division three phases rise sequence ferromagnetic simultaneously and voltage with resonance oscillate varying simultaneously. magnitudes. High-order The voltages of the harmonic three phases rise ferromagnetic simultaneously. resonance
(59) If U.sub.r is caused by the single-phase-to-earth fault of the system or the three-phase imbalance of the system, under the condition that U.sub.r is less than or equal to 15 V, the resonance elimination control system will keep dynamically calculating the matching the magnitude of the resistance according to the formula (6) until the fault is eliminated. If the potential transformer is in a non-power frequency ferromagnetic resonance state, the energy will inevitably be released quickly until the resonance energy disappears. After the resonance energy is released, or after the fault is eliminated, the resistance with the magnitude of R.sub.x5 is input when U.sub.r is less than or equal to 5 V.
(60) Strategy 2
(61) When U.sub.r is greater than 15 V and less than or equal to 100 V, according to the statistical results as shown in Table 1 above, there are various reasons for the change of U.sub.r, which can be roughly divided into two categories. One type is caused by ferromagnetic resonance. When U.sub.r is less than or equal to 50 V, the ferromagnetic resonance can only be non-power frequency ferromagnetic resonance. When U.sub.r is greater than 50 V, the ferromagnetic resonance can be both non-power frequency ferromagnetic resonance and power frequency ferromagnetic resonance are possible. The other type is caused by various faults represented by single-phase non-metallic grounding. At this time, the resonance elimination control system provided by the present disclosure will dynamically calculate according to the formula (4), and match the magnitude of the resistance at a cycle of 100 ms.
(62) If U.sub.r is caused by various faults of the system, under the condition that U.sub.r is greater than 15 V and less than or equal to 100 V, the resonance elimination control system will keep dynamically calculating the matching the magnitude of the resistance according to the formula (4) until the fault is eliminated. If the potential transformer is in a power frequency ferromagnetic resonance state, the energy will inevitably be released quickly until the resonance energy disappears. After the resonance energy is released, or after the fault is eliminated, it is processed according to Strategy 1 when U.sub.r is less than or equal to 15 V.
(63) Strategy 3
(64) When U.sub.r is greater than 100 V, considering that U.sub.r exceeds the calculation range of formula (4), and the overload pressure of the winding of each phase of the open delta is much larger than those under the conditions described in Strategy 1 and Strategy 2. Referring to Table 1 above, when the two phases of the power frequency ferromagnetic resonance increase by an equivalent value, U.sub.r will may be greater than 100 V. At this time, the above-mentioned resonance elimination control system will match the resonance resistance with twice the magnitude of R.sub.x100. At this time, the resonance matching resistance is a bit large, but it can ensure that all the phases of the open delta will not be overloaded. Meanwhile, the resonance elimination control system dynamically tracks the value of U.sub.r; and with the release of resonance energy, the value of U.sub.r will eventually be less than 100 V, and then it is executed according to Strategy 2.
(65) In addition, in order to avoid the system resonance which is easy to occur during fault recovery, an engineering solution of inputting resistance is used in the conventional technology, mainly as follows:
(66) The input resistance is a high-power porcelain disc-loaded adjustable sliding rheostat, and its power is converted according to the S value and K value of the open delta of the potential transformer as well as the magnitude of the resistance input when the opening voltage is 100 V. Generally, the selected power P is not less than 2.5×10000/R.sub.x100. The maximum magnitude of the resistance is not less than 2.5 times R.sub.x100.
(67) As long as the power meets the driving requirements, DC brushed gear motors can be employed as actuators. Through the connection between output shafts of the gear motors and a rotating shaft of the sliding rheostat, the DC motors are driven by a PI algorithm control mode to push the sliding rheostat to rotate until reaching the magnitude of the matching resistance.
(68) Further, in order to be applicable to a PT ferromagnetic resonance elimination system without a rheostat and actuators, as shown in
(69) The electronic load selects the initial resistance Rio, the magnitude of which is the minimum when the resistance is put into operation.
(70) Further, the electronic load performs full-wave rectification and transformation on the U.sub.s of the open (tertiary) winding by means of a rectifier bridge, thus becoming a pulsating signal with only positive polarity.
(71) After being input, the initial resistance R.sub.i0 is modulated by the MOSFET controlled by a PWM signal of 50000 Hz, so that an equivalent matching resistance for resonance elimination is obtained.
(72) The accuracy of the equivalent matching resistance is controlled by a PID closed loop. In the control closed loop, the loop current I.sub.Γ is collected by a Hall sensor; and after being subjected to amplification and conditioning, the current is handed over to a controller for AD (analog to digital) conversion.
(73) According to this embodiment, in step S3.1, under the condition of U.sub.s=3U.sub.o<7V, the three-phase load of the system is slightly unbalanced, and the active resonance elimination device is not started.
(74) Further, in step S3.2, the calculation formula of the resonance elimination resistance R.sub.0 is as follows:
(75)
(76) In the formula, P.sub.t is a rated power of the PT, and k is a voltage multiple of the excitation characteristic of the PT, which is generally 1.9.
(77) In this embodiment,
(78) In step S3.3, the changes in the PT core characteristics before and after undergoing the energy jump are as follows:
(79) If ω.sub.1 is a harmonic angular frequency of a resonance point before the PT core characteristics undergo the energy jump, ω.sub.2 is a harmonic angular frequency of the resonance point after the PT core characteristics undergo the energy jump, and φ is a magnetic flux of the PT core, then:
(80)
(81) In the formula, L is an inductance obtained before the PT core characteristics undergo the energy jump, L.sub.s is an inductance obtained after the PT core characteristics undergo the energy jump, C is a capacitance of the system, and U is a real-time voltage during the energy jump of the PT core characteristics, and t is a time point.
(82) Further, as shown in
(83)
the core tends to be saturated at time t.sub.1, and the inductance is L.fwdarw.L.sub.s at this time; and then in step S3.4, the electrostatic energy stored in the zero-sequence loop (capacitance) of the system is converted into the electromagnetic energy in the PT core.
(84) Further, in step S3.5, the electromagnetic energy consumed in the rapid energy consumption process I is the electromagnetic energy in the PT core converted from the electrostatic energy stored in the zero-sequence loop (capacitance) of the system in step S3.4.
(85) Then, before performing step S3.5, it is necessary to determine whether ΔU.sub.max=Δ.sub.max{U.sub.a′, U.sub.b′, U.sub.c′}>5 V (where, ΔU.sub.max is the maximum voltage change difference); and if so, it is proceeded to the rapid energy consumption process 1, and the resistance (R.sub.min=4Ω) is input continuous for 40 ms.
(86) In this embodiment, as shown in
(87)
(88) In the formula, P.sub.c is a rated thermal load of the PT.
(89) Then, the basis for real-time dynamic adjustment of R.sub.i (the magnitude of the resistance input in real time) is as follows:
I.sub.s.Math.U.sub.s=P.sub.e.
(90) Through experiments, this solution overcomes a contradiction between a magnitude of resonance elimination resistance and winding overload in a PT open delta during single-phase-to-earth fault and fault clearance, and effectively avoids the technical problems of difficult distinguishing between single-phase-to-earth fault characteristics and power frequency resonance characteristics and causing resonance in a single-phase-to-earth fault process.
(91) The main purpose of this solution is to ensure that the PT is not overloaded and burned out. Therefore, the active resonance elimination device mainly based on the electronic load is actually implemented by inputting the resistance with a corresponding magnitude under the premise that the PT (potential transformer) is not overloaded. Therefore, the PID process, on which the active resonance elimination device is based, often only needs to focus on the voltage and current on the open (tertiary) winding. Further, a more intelligent resonance elimination method can be adopted based on this, which is to use the rated power of the PT as a target value of PID to dynamically adjust the magnitude of input resistance, thereby adjusting the current of the open (tertiary) winding, so that the open (tertiary) winding is not overloaded, and the purpose of preventing the ferromagnetic resonance of the PT in an active manner can be achieved at the fastest speed.
(92) As shown in
(93) The processor includes one or more processing cores. The processor is connected to the memory by means of a bus, and the memory is used to store program instructions. The processor is used to implement the steps of the PT ferromagnetic resonance elimination method implemented by actively inputting resistance through an electronic load when executing the program instructions in the memory.
(94) Optionally, the memory can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as a static random-access memory (SRAM), an electrically erasable programmable read-only memory (EEPROM), an erasable programmable read-only memory (EPROM), a programmable read-only memory (PROM), a read-only memory (ROM), a magnetic memory, a flash memory, a magnetic disk, or an optical disk.
(95) In addition, the present disclosure further provides a computer-readable storage medium, in which the computer program is stored. When the computer program is executed by the processor, the steps of the PT ferromagnetic resonance elimination method implemented by actively inputting resistance through an electronic load are implemented.
(96) Optionally, the present disclosure also provides a computer program product containing instructions that, when running on a computer, causes the computer to perform the steps of the PT ferromagnetic resonance elimination method implemented by actively inputting resistance through an electronic load in various aspects mentioned above.
(97) Those of ordinary skill in the art can understand that the process of implementing all or part of the steps of the above embodiments can be completed by means of hardware, or by instructing the relevant hardware via the program. The program can be stored in the computer-readable storage medium, which may be a read-only memory, a magnetic disk, an optical disk, or the like.
(98) The basic principles, main features and advantages of the present disclosure have been shown and described above. Those skilled in the art should understand that the present disclosure is not limited by the above-mentioned embodiments, and those described in the above-mentioned embodiments and Description are only exemplary examples of the present disclosure, and are not intended to limit the present disclosure. Without departing from the spirit and scope of the present disclosure, there may be various changes and improvements to the present disclosure, which shall all fall within the protection scope of the present disclosure as claimed. The protection scope of the present disclosure is defined by the appended Claims and their equivalents.