Bridge displacement measurement method
11713993 · 2023-08-01
Assignee
Inventors
Cpc classification
International classification
Abstract
A measurement method include a step to obtain observation point information, including physical quantities in association of a plurality of times, via observation devices at observation points of a structure on which a moving object moves, a step to calculate a correction coefficient that corrects the physical quantities based on a plurality of time periods and a reference time periods, a step to calculate a plurality of deflection waveforms of the structure generated by a plurality of parts of the moving object, a step to calculate a second deflection waveform of the structure generated by the moving object by adding the plurality of deflection waveforms, and a step to calculate a displacement of the structure based on the second deflection waveform. The structure is a superstructure of a road bridge or a railway bridge.
Claims
1. A measurement method of a measurement device, the measurement device including: a first observation device disposed adjacent to a first observation point of a structure on which a moving object moves along a first direction, the first observation device being configured to obtain first observation point information, the first observation point information including a plurality of first physical quantities in association of a first plurality of times, each of the plurality of first physical quantities corresponding to a response to an action of each of a plurality of parts of the moving object that passes on the first observation point at each of the first plurality of times; a second observation device disposed adjacent to a second observation point of the structure, the second observation device being spaced apart from the first observation device along the first direction, the second observation device being configured to obtain second observation point information the second observation point information including a plurality of second physical quantities in association of a second plurality of times, each of the plurality of second physical quantities corresponding to a response to an action of each of the plurality of parts of the moving object that passes on the second observation point at each of the second plurality of times; a memory configured to store a program; and a processor configured to execute the program, the measurement method comprising executing on the processor the steps of: acquiring the first observation point information from the first observation device; acquiring the second observation point information from the second observation device; calculating a plurality of first time periods and a first reference time period, each of the plurality of first time periods corresponding to a time period between a first leading time of the first plurality of times to each of remaining times of the first plurality of times, the first leading time being a time at which a leading part of the plurality of parts passes the first observation point, the first reference time point corresponding to a time period between the first leading time and a time at which a total sum of the plurality of first physical quantities is distributed at a first predetermined distribution ratio; calculating a correction coefficient that corrects the plurality of first physical quantities based on the plurality of first time periods and the first reference time period; calculating a plurality of first deflection waveforms of the structure generated by the plurality of parts based on the first observation point information, the second observation point information, a predetermined coefficient, the correction coefficient, and an approximate expression of deflection of the structure; calculating a second deflection waveform of the structure generated by the moving object by adding the plurality of first deflection waveforms; and calculating a displacement of the structure based on the second deflection waveform, wherein the structure is a superstructure of a road bridge or a railway bridge.
2. The measurement method according to claim 1, further comprising: calculating a plurality of second time periods and a second reference time period, each of the plurality of second time periods corresponding to a time period between a second leading time of the second plurality of times to each of remaining times of the second plurality of times, the second leading time being a time at which the leading part of the plurality of parts passes the second observation point, the second reference time period corresponding to a time period between the second leading time and a time at which a total sum of the plurality of second physical quantities is distributed at a second predetermined distribution ratio, wherein the correction coefficient is calculated based on the plurality of first time periods, the first reference time period, the plurality of second time periods, the second reference time period, and the correction coefficient corrects the plurality of first physical quantities and the plurality of second physical quantities.
3. The measurement method according to claim 1, wherein when the first predetermined distribution ratio is R:1−R, R is 0.4 or more and 0.6 or less.
4. The measurement method according to claim 1, wherein the first observation point is set at a first end portion of the structure, and the second observation point is set at a second end portion of the structure different from the first end portion.
5. The measurement method according to claim 1, wherein the superstructure is a structure across any one of a bridge abutment and a bridge pier adjacent to each other, two adjacent bridge abutments, or two adjacent bridge piers, and both and portions of the superstructure re located at positions of the bridge abutment and the bridge pier adjacent to each other, at positions of the two adjacent bridge abutments, or at positions of the two adjacent bridge piers.
6. The measurement method according to claim 1, wherein the moving object is a railroad vehicle, an automobile, a tram, a construction vehicle, or a military vehicle, and the plurality of parts are axles or wheels.
7. The measurement method according to claim 1, wherein the approximate expression of deflection of the structure is an expression based on a structural model of the structure.
8. The measurement method according to claim 7, wherein the structural model is a simple beam that supports both ends.
9. The measurement method according to claim 1, wherein the approximate expression of deflection of the structure is an expression normalized by a maximum amplitude of deflection at a central position between the first observation point and the second observation point.
10. The measurement method according to claim 1, wherein each of the first observation device and the second observation device is an acceleration sensor.
11. The measurement method according to dam 1, wherein each of the first observation device and the second observation device is one of an impact sensor, a microphone, a strain gauge, or a load cell.
12. The measurement method according to claim 1, wherein the structure is a structure in which bridge weigh in motion (BWIM) functions.
13. A measurement device comprising: a memory configured to store a program; and a processor configured to execute the program so as to: acquire first observation point information from a first observation device, the first observation device being disposed adjacent to a first observation point of a structure on which a moving object moves along a first direction, the first observation device being configured to obtain the first observation point information, the first observation point information including a plurality of first physical quantities in association of a first plurality of times, each of the plurality of first physical quantities corresponding to a response to an action of each of a plurality of parts of the moving object that passes on the first observation point at each of the first plurality of times; acquire second observation point information from a second observation device, the second observation device being disposed adjacent to a second observation point of the structure, the second observation device being spaced apart from the first observation device along the first direction, the second observation device being configured to obtain the second observation point information, the second observation point information including a plurality of second physical quantities in association of a second plurality of times, each of the plurality of second physical quantities corresponding to a response to an action of each of the plurality of parts of the moving object that passes on the second observation point at each of the second plurality of times; calculate a plurality of first time periods and a first reference time period, each of the plurality of first time periods corresponding to a time period between a first leading time of the first plurality of times to each of remaining times of the first plurality of times the first leading time being a time at which a leading part of the plurality of parts passes the first observation point the first reference time period corresponding to a time period between the first leading time and a time at which a total sum of the plurality of first physical quantities is distributed at a first predetermined distribution ratio; calculate a correction coefficient that corrects the plurality of first physical quantities based on the plurality of first time periods and the first reference time period; calculate a plurality of first deflection waveforms of the structure generated by the plurality of parts based on the first observation point information, the second observation point information, a predetermined coefficient, the correction coefficient, and an approximate expression of deflection of the structure; calculate a second deflection waveform of the structure generated by the moving object by adding the plurality of first deflection waveforms; and calculate a displacement of the structure based on the second deflection waveform, wherein the structure is a superstructure of a road bridge or a railway bridge.
14. A measurement system comprising: the measurement device according to claim 13; the first observation device; and the second observation device.
15. A non-transitory computer-readable storage medium storing a measurement program, the measurement program causing a computer to execute a process by a processor so as to perform the steps of: acquiring first observation point information from a first observation device, the first observation device being disposed adjacent to a first observation point of a structure on which a moving object moves along a first direction, the first observation device being configured to obtain the first observation point information, the first observation point information including a plurality of first physical quantities in association of a first plurality of times, each of the plurality of first physical quantities corresponding to a response to an action of each of a plurality of parts of the moving object that passes on the first observation point at each of the first plurality of times; acquiring second observation point information from a second observation device, the second observation device being disposed adjacent to a second observation point of the structure, the second observation device being spaced apart from the first observation device along the first direction, the second observation device being configured to obtain the second observation point information, the second observation point information including a plurality of second physical quantities in association of a second plurality of times, each of the plurality of second physical quantities corresponding to a response to an action of each of the plurality of parts of the moving object that passes on the second observation point at each of the second plurality of times; calculating a plurality of first time periods and a first reference time period, each of the plurality of first time periods corresponding to a time period between a first leading time of the first plural of times to each of remaining times of the first plurality of times, the first leading time being a time at which a leading part of the plurality of parts passes the first observation point, the first reference time period corresponding to a time period between the first leading time and a time at which a total sum of the plurality of first physical quantities is distributed at a first predetermined distribution ratio; calculating a correction coefficient that corrects the plurality of first physical quantities based on the plurality of first time periods and the first reference time period; calculating a plurality of first deflection waveforms of the structure generated by the plurality of parts based on the first observation point information, the second observation point information, a predetermined coefficient, the correction coefficient, and an approximate expression of deflection of the structure; calculating a second deflection waveform of the structure generated by the moving object by adding the plurality of first deflection waveforms; and calculating a displacement of the structure based on the second deflection waveform, wherein the structure is a structure of a road bridge or a railway bridge.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)
(26)
(27)
(28)
(29)
(30)
(31)
(32)
(33)
(34)
DESCRIPTION OF EXEMPLARY EMBODIMENTS
(35) Hereinafter, embodiments of the present disclosure will be described in detail with reference to the drawings. The embodiments described below do not in any way limit contents of the present disclosure described in the appended claims. Not all configurations described below are necessarily essential components of the present disclosure.
1. First Embodiment
(36) 1-1 Measurement System
(37) Hereinafter, a measurement system for implementing a measurement method according to the present embodiment will be described by taking a case where a structure is a superstructure of a bridge and a moving object is a vehicle as an example. The vehicle passing through the bridge according to the present embodiment is a vehicle having a large weight such as a railroad vehicle, an automobile, a tram, a construction vehicle, or a military vehicle, and can be measured by bridge weigh in motion (BWIM). The BWIM is a technology that uses a bridge as a “scale” and that measures the weight and the number of axles of the vehicle passing through the bridge by measuring deformation of the bridge. The superstructure of the bridge, which enables analysis of the weight of the vehicle passing by based on a response such as deformation and strain, is a structure in which the BWIM functions. A BWIM system, which applies a physical process between an action on the superstructure of the bridge and the response, enables the measurement of the weight of the vehicle passing by.
(38)
(39) The bridge 5 is formed of the superstructure 7 and a substructure 8. The superstructure 7 includes abridge floor 7a formed of a floor plate F, a main girder G, a cross girder which is not shown, and bearings 7b. The substructure 8 includes bridge piers 8a and bridge abutments 8b. The superstructure 7 is a structure across any one of the bridge abutment 8b and the bridge pier 8a adjacent to each other, two adjacent bridge abutments 8b, or two adjacent bridge piers 8a. Both end portions of the superstructure 7 are located at positions of the bridge abutment 8b and the bridge pier 8a adjacent to each other, at positions of the two adjacent bridge abutments 8b, or at positions of the two adjacent bridge piers 8a.
(40) The measurement device 1 and the sensors 21 and 22 are coupled by, for example, a cable which is not shown and communicate with one another via a communication network such as a controller area network (CAN). Alternatively, the measurement device 1 and the sensors 21 and 22 may communicate with one another via a wireless network.
(41) For example, each sensor 21 outputs data representing an impact caused by entry of the vehicle 6 which is a moving object to the superstructure 7. Each sensor 22 outputs data representing an impact caused by exit of the vehicle 6 from the superstructure 7. In the present embodiment, each of the sensors 21 and 22 is an acceleration sensor, and may be, for example, a crystal acceleration sensor or a micro electro mechanical systems (MEMS) acceleration sensor.
(42) In the present embodiment, each sensor 21 is installed at a first end portion of the superstructure 7 in a longitudinal direction. Each sensor 22 is installed at a second end portion of the superstructure 7 which is different from the first end portion in the longitudinal direction.
(43) Each sensor 21 detects an acceleration of the superstructure 7 generated when the vehicle 6 enters the superstructure 7. Each sensor 22 detects the acceleration of the superstructure 7 generated when the vehicle 6 exits the superstructure 7. That is, in the present embodiment, each sensor 21 is an acceleration sensor that detects the entry of the vehicle 6 to the superstructure 7. Each sensor 22 is an acceleration sensor that detects the exit of the vehicle 6 from the superstructure 7.
(44) The measurement device 1 calculates a displacement of bending of the superstructure 7 due to the traveling of the vehicle 6 based on acceleration data output from the sensors 21 and 22.
(45) The measurement device 1 and the server 2 can communicate with each other via, for example, a wireless network of a mobile phone and a communication network 4 such as the Internet. The measurement device 1 transmits, to the server 2, information such as a time point when the vehicle 6 travels on the superstructure 7 and the displacement of the superstructure 7 due to the traveling of the vehicle 6. The server 2 may store the information in a storage device which is not shown, and may perform, based on the information, processing such as monitoring of an overloaded vehicle or determination of an abnormality in the superstructure 7.
(46) In the present embodiment, the bridge 5 is a road bridge, for example, a steel bridge, a girder bridge, or a reinforced-concrete (RC) bridge.
(47)
(48) As shown in
(49) In the examples shown in
(50) When the sensors 21 and 22 are provided on the floor plate F of the superstructure 7, the sensors may be destroyed by a traveling vehicle, and measurement accuracy may be influenced by local deformation of the bridge floor 7a. Therefore, in the examples shown in
(51) In the present embodiment, N observation points P.sub.1 to P.sub.N are set in association with the N sensors 21. The observation points P.sub.1 to P.sub.N are N observation points for the superstructure 7 arranged along a second direction intersecting a first direction in which the vehicle 6 moves along the superstructure 7. In the examples shown in
(52) In the present embodiment, N observation points Q.sub.1 to Q.sub.N are set in association with the N sensors 22. The observation points Q.sub.1 to Q.sub.N are N observation points for the superstructure 7 arranged along a third direction intersecting the first direction in which the vehicle 6 moves along the superstructure 7. In the examples shown in
(53) In the present embodiment, the N observation points P.sub.1 to P.sub.N are associated with the lanes L.sub.1 to L.sub.N, respectively. Similarly, the N observation points Q.sub.1 to Q.sub.N are associated with the lanes L.sub.1 to L.sub.N, respectively. The observation point P.sub.j and the observation point Q.sub.j, which are set in association with the lane L.sub.j, are arranged along the first direction in which the vehicle 6 moves along the superstructure 7. In the examples shown in
(54) The number and installation positions of the N sensors 21 and 22 are not limited to the examples shown in
(55) The measurement device 1 acquires, based on the acceleration data output from each of the sensors 21 and 22, an acceleration in a fourth direction which intersects the X direction, which is the first direction, and the Y direction, which is the second direction and the third direction. The observation points P.sub.1 to P.sub.N and Q.sub.1 to Q.sub.N are displaced by an impact in a direction orthogonal to the X and Y directions. Therefore, in order to accurately calculate a magnitude of the impact, it is desirable for the measurement device 1 to acquire the acceleration in the fourth direction orthogonal to the X and Y directions, that is, in a normal direction of the floor plate F.
(56)
(57) In order to detect the impact applied to the observation points P.sub.1 to P.sub.N due to the entry of the vehicle 6 to the superstructure 7, each sensor 21 is installed such that one of three detection axes, which are an x axis, a y axis, and a z axis, intersects the first direction and the second direction. Similarly, in order to detect the impact applied to the observation points Q.sub.1 to Q.sub.N due to the exit of the vehicle 6 from the superstructure 7, each sensor 22 is installed such that one of the three detection axes, which are the x axis, the y axis, and the z axis, intersects the first direction and the third direction. In the examples shown in
(58) When the sensors 21 and 22 are installed on the superstructure 7, an installation location may be inclined. In the measurement device 1, even if one of the three detection axes of each of the sensors 21 and 22 is not installed in the normal direction of the floor plate F, since the direction is substantially oriented in the normal direction, an error is small and thus can be ignored. The measurement device 1 can correct a detection error due to the inclination of the sensors 21 and 22 by a three-axis combined acceleration that combines the accelerations in the x axis, the y axis, and the z axis even if one of the three detection axes of each of the sensors 21 and 22 is not installed in the normal direction of the floor plate F. Each of the sensors 21 and 22 may be a one-axis acceleration sensor that detects the acceleration generated in a direction at least substantially parallel to the vertical direction or the acceleration in the normal direction of the floor plate F.
(59) Hereinafter, details of the measurement method according to the present embodiment executed by the measurement device 1 will be described.
(60) 1-2. Generation of Axle Information
(61) In the present embodiment, the measurement device acquires, based on the acceleration data, which is observation information obtained by the N sensors 21 as the observation device, first observation point information including a time point when each of a plurality of parts of the vehicle 6 which is the moving object passes the observation point P and a first physical quantity which is a response to an action of each of the plurality of parts on the observation point P.sub.j. Similarly, in the present embodiment, the measurement device 1 acquires, based on the acceleration data, which is observation information obtained by the N sensors 22 as the observation device, second observation point information including a time point when each of the plurality of parts of the vehicle 6 passes the observation point Q.sub.j and a second physical quantity which is a response to an action of each of the plurality of parts on the observation point Q.sub.j. Here, j is an integer of 1 or more and N or less.
(62) In the present embodiment, it is considered that a load generated by a plurality of axles or wheels of the vehicle 6 is applied to the superstructure 7. Accordingly, each of the plurality of parts for which the first observation point information and the second observation point information are to be acquired is an axle or a wheel. Hereinafter, in the present embodiment, it is assumed that each of the plurality of parts is an axle.
(63) In the present embodiment, each sensor 21, which is the acceleration sensor, detects the acceleration due to the action of each of the plurality of axles on the observation point P.sub.j. Similarly, each sensor 22, which is the acceleration sensor, detects the acceleration due to the action of each of the plurality of axles on the observation point Q.sub.j.
(64) In the present embodiment, as shown in
(65) Therefore, in the present embodiment, the first observation point information includes an entry time point of each axle of the vehicle 6 to the lane L.sub.j and acceleration intensity as the first physical quantity that is the response to the action when each axle enters the lane L.sub.j. The second observation point information includes an exit time point of each axle of the vehicle 6 from the lane L.sub.j and acceleration intensity as the second physical quantity that is the response to the action when each axle exits the lane L.sub.j.
(66) Further, since the entry and the exit of each axle of the vehicle 6 correspond to each other, the first observation point information and the second observation point information can be stratified. The first observation point information, the second observation point information, and stratified information thereof are collectively referred to as axle information.
(67) That is, in addition to the first observation point information and the second observation point information, the axle information includes correspondence information on the entry time point to the lane L.sub.j and the acceleration intensity at the time of entry, the exit time point from the lane L.sub.j and the acceleration intensity at the time of exit for each axle, and correspondence information between the vehicle 6 and the above corresponding information for each axle. Therefore, with the axle information, for each vehicle 6 passing through the superstructure 7, the time points when each axle passes the lane L.sub.j and the observation points P.sub.j and Q.sub.j, and the acceleration intensities at the time of passing are identified.
(68)
(69) Information in fifth and sixth rows is information related to the vehicle 6 whose vehicle number is 2. The information in the fifth row is the correspondence information related to the leading axle whose axle number is 1. The information in the sixth row is the correspondence information related to the second axle whose axle number is 2. For example, the correspondence information in the fifth row shows that, for the leading axle, whose axle number is 1, of the vehicle 6 whose vehicle number is 2, the entry time point to the lane L.sub.1 is ti21, the acceleration intensity at the time of the entry is pai21, the exit time point from the lane L.sub.1 is to21, and the acceleration intensity at the time of the exit is pao21.
(70) Information in seventh and eighth rows is information related to the vehicle 6 whose vehicle number is 3. The information in the seventh row is the correspondence information related to the leading axle whose axle number is 1. The information in the eighth row is the correspondence information related to the second axle whose axle number is 2. For example, the correspondence information in the seventh row shows that, for the leading axle, whose axle number is 1, of the vehicle 6 whose vehicle number is 3, the entry time point to the lane L.sub.1 is ti31, the acceleration intensity at the time of the entry is pai31, the exit time point from the lane L.sub.1 is to31, and the acceleration intensity at the time of the exit is pao31.
(71) As an example,
(72)
(73)
(74) The measurement device 1 acquires a time point when the acquired acceleration intensity exceeds a predetermined threshold value as time points when the leading axle and subsequent axles successively pass the observation points P.sub.2 and Q.sub.2, that is, the entry time point of each axle to the lane L.sub.2 and the exit time point of each axle from the lane L.sub.2.
(75)
(76) Further, the measurement device 1 compares a pattern 1 of the entry time point of each of the four axles to the lane L.sub.2 and a pattern 2 of the exit time point of each of the four axles from the lane L.sub.2, and determines whether the two patterns are generated by the passage of the same vehicle 6. Since intervals among the four axles do not change, if the vehicle 6 travels on the superstructure 7 at a constant speed, the patterns 1 and 2 coincide with each other. For example, the measurement device 1 slides one of the time points of the patterns 1 and 2 so as to coincide the entry time point and the exit time point of the leading axle. When a difference between the entry time point and the exit time point of each of the second to fourth axles is less than or equal to a predetermined threshold value, the measurement device 1 determines that the patterns 1 and 2 are generated by the passage of the same vehicle 6. When the difference is greater than the predetermined threshold value, the measurement device 1 determines that the patterns 1 and 2 are generated by the passage of two vehicles 6. When two vehicles 6 continuously travel on one lane at the same speed, an erroneous determination that the plurality of axles of a preceding vehicle 6 and the plurality of axles of a rear vehicle 6 all belong to the axles of one vehicle 6 may occur. In order to avoid the erroneous determination, when an interval between the entry time point and the exit time point of two adjacent axles is a time difference more than or equal to a predetermined time, the measurement device 1 may distinguish that the entry time point and the exit time point of the two axles belong to two vehicles 6.
(77)
(78) Then, by associating the four entry time points to the lane L.sub.2 shown in
(79) Based on the axle information, the measurement device 1 can identify, for any vehicle 6 passing through the lane L.sub.j of the superstructure 7, the entry time point of each axle of the vehicle 6 to the observation point P.sub.j, the acceleration intensity at the observation point P.sub.j by each axle, the exit time point of each axle from the observation point Q.sub.j, and the acceleration intensity at the observation point Q.sub.j by each axle.
(80) 1-3. Generation of Deflection Waveform
(81) In the present embodiment, considering that in the superstructure 7 of the bridge 5, one or more bridge floors 7a constituted by the floor plate F and the main girders G.sub.1 to G.sub.K are continuously arranged, the measurement device 1 calculates a displacement of one bridge floor 7a as a displacement at a central portion in the longitudinal direction. The load applied to the superstructure 7 moves from one end to the other end of the superstructure 7. At this time, a position of the load on the superstructure 7 and a load amount can be used to express a deflection amount, which is the displacement at the central portion of the superstructure 7. In the present embodiment, in order to express, as a trajectory of a deflection amount due to the movement on a beam with a one-point load, the deflection deformation when the axles of the vehicle 6 move on the superstructure 7, a structural model shown in
(82) In the structural model shown in
(83)
(84) In Equation (1), a function H.sub.a is defined as in Equation (2).
(85)
(86) Equation (3) is obtained by transforming Equation (1).
(87)
(88) Meanwhile, the bending moment M is expressed by Equation (4). In Equation (4), θ is an angle, I is a secondary moment, and E is a Young's modulus.
(89)
(90) Equation (4) is substituted into Equation (3), and Equation (5) is obtained.
(91)
(92) Equation (6) is obtained by integrating Equation (5) with respect to the observation position x, and Equation (7) is obtained by calculating Equation (6). In Equation (7), C.sub.1 is an integral constant.
(93)
(94) Further, Equation (8) is obtained by integrating Equation (7) with respect to the observation position x, and Equation (9) is obtained by calculating Equation (8). In Equation (9), C.sub.2 is an integral constant.
(95)
(96) In Equation (9), θx represents a deflection amount. Equation (10) is obtained by replacing θx with a deflection amount w.
(97)
(98) Based on
(99)
(100) Since the deflection amount w=0 when x=0, and H.sub.a=0 based on x≤a, Equation (12) is obtained by substituting x=w=H.sub.a=0 into Equation (11).
C.sub.2=0 (12)
(101) Since the deflection amount w=0 when x=1, and H.sub.a=1 based on x>a, Equation (13) is obtained by substituting x=1, w=0, and H.sub.a=1 into Equation (11).
(102)
(103) Equation (14) is obtained by substituting b=l−a into Equation (13).
(104)
(105) Equation (15) is obtained by substituting the integral constant C.sub.1 in Equation (12) and the integral constant C.sub.2 in Equation (13) into Equation (10).
(106)
(107) Equation (15) is transformed and the deflection amount w at the observation position x when the load P is applied to the position a is expressed by Equation (16).
(108)
(109)
(110) When the load position a is on the left side of the observation position x=l/2, since H.sub.a=1 based on x>a, Equation (17) is obtained by substituting x=l/2 and H.sub.a=1 into Equation (16).
(111)
(112) Equation (18) is obtained by substituting l=a+b into Equation (17).
(113)
(114) Substituting a+b=l into Equation (18), a deflection amount w.sub.L at the observation position x when the position of the load P is on the left side of the central observation position x=l/2 is as shown in Equation (19).
(115)
(116) On the other hand, when the load position a is on the right side of the observation position x=l/2, since H.sub.a=0 based on x≤a, Equation (20) is obtained by substituting x=l/2 and H.sub.a=0 into Equation (16).
(117)
(118) Substituting l=a+b into Equation (20), a deflection amount w.sub.R at the observation position x when the position of the load P is on the right side of the central observation position x=l/2 is as shown in Equation (21).
(119)
(120) When the load position a is the same as the observation position x=l/2, since H.sub.a=0 based on x≤a, Equation (22) is obtained by substituting H.sub.a=0 and a=b=l/2 into Equation (16).
(121)
(122) Further, substituting a=l/2 into Equation (22), the deflection amount w at the observation position x when the position of the load P is the same as the central observation position is as shown in Equation (23).
(123)
(124) In the simple beam with the fulcrums at both ends, a maximum deflection displacement is obtained when the load P is at the center. Therefore, according to Equation (23), a maximum deflection amount w.sub.max is expressed by Equation (24).
(125)
(126) When the deflection amount w.sub.L at the observation position x when the position of the load P is on the left side of the central observation position x=l/2 is divided by the maximum deflection amount w.sub.max and normalized by the maximum deflection amount w.sub.max, Equation (25) is obtained based on Equation (19) and Equation (24).
(127)
(128) Equation (26) is obtained by setting a/l=r in Equation (25).
(129)
(130) On the other hand, when the deflection amount w.sub.R at the observation position x when the position of the load P is on the right side of the central observation position x=l/2 is divided by the maximum deflection amount w.sub.max and normalized by the maximum deflection amount w.sub.max, Equation (27) is obtained based on Equation (21) and Equation (24).
(131)
(132) Here, since b=l×(1−r) based on a/l=r and a+b=l, Equation (28) is obtained by substituting b=l×(1−r) into Equation (27).
(133)
(134) By summarizing Equation (25) and Equation (27), a normalized deflection amount w.sub.std normalized by the maximum deflection amount observed at the central portion when the load P moves on the simple beam is expressed by Equation (29).
(135)
(136) In Equation (29), r=a/l and 1−r=b/l indicate a ratio of the position of the load P to the distance l between the fulcrums of the simple beam, and a variable R is defined as shown in Equation (30).
(137)
(138) Equation (29) is replaced by Equation (31) using Equation (30).
w.sub.std=3R−4R.sup.3 (31)
(139) Equation (30) and Equation (31) indicate that, when the observation position is at the center of the simple beam, the deflection amount is symmetrical on the right side and the left side of the center of the position of the load P.
(140)
(141) The above-described axle information includes the entry time point of each axle of the vehicle 6 to the lane L.sub.j and the exit time point of each axle of the vehicle 6 from the lane L.sub.j, that is, the time points when the vehicle 6 passes the positions at both ends of the superstructure 7. Therefore, the positions at both ends of the superstructure 7 correspond to the entry time point and the exit time point of the axle, and the load positions a and b are replaced with time. It is assumed that the speed of the vehicle 6 is substantially constant and the position and the time point are substantially proportional.
(142) When the load position at the left end of the superstructure 7 corresponds to an entry time point t.sub.i, and the load position at the right end of the superstructure 7 corresponds to an exit time point t.sub.o, the load position a from the left end is replaced with an elapsed time point t.sub.p from the entry time point t.sub.i. The elapsed time point t.sub.p is expressed by Equation (32).
t.sub.p=t−t.sub.i (32)
(143) The distance l between the fulcrums is replaced by a time t.sub.s from the entry time point t.sub.i to the exit time point t.sub.o. The time t.sub.s is expressed by Equation (33).
t.sub.s=t.sub.o−t.sub.i (33)
(144) Since the speed of the vehicle 6 is constant, a time point t.sub.c when the load position a is at the center of the superstructure 7 is expressed by Equation (34).
(145)
(146) By replacing the position with the time as described above, the position of the load P is expressed by Equation (35) and Equation (36).
(147)
(148) Substituting Equation (35) and Equation (36) into Equation (29), the normalized deflection amount w.sub.std replaced by time is expressed by Equation (37).
(149)
(150) Alternatively, according to Equation (30) and Equation (31), the normalized deflection amount w.sub.std normalized by the maximum amplitude is expressed by Equation (38) by substituting the variable R with time.
(151)
(152) Considering that a relationship between the elapse of time and the normalized deflection amount is treated as observation data, the normalized deflection amount w.sub.std is replaced with a normalized deflection amount model w.sub.std(t) at the observation position at the center of the beam due to the movement of a single concentrated load on the simple beam with the fulcrums at both ends, and Equation (38) becomes Equation (39). Equation (39) is an approximate expression of deflection of the superstructure 7, which is a structure, and is an equation based on the structure model of the superstructure 7. Specifically, Equation (39) is an equation normalized by the maximum amplitude of deflection at the central position between the observation point P.sub.j and the observation point Q.sub.j in the lane L.sub.j where the vehicle 6 moves. The maximum value of the equation is 1.
(153)
(154) Time information required for the normalized deflection amount model w.sub.std(t) is obtained from the axle information described above. Since the normalized deflection amount model w.sub.std(t) has a maximum deflection amount w.sub.max at the central position of the superstructure 7, Equation (40) is obtained.
(155)
(156) Since the deflection amount w shown in the above Equation (23) is the deflection amount at the observation position x=l/2 when the position of the load P is the same as the central observation position, and the deflection amount w coincides with the maximum deflection amount w.sub.max, Equation (41) is obtained.
(157)
(158)
(159) It is assumed that the superstructure 7 which is the structure functions as bridge weigh in motion (BWIM), and is considered to be deformed in a manner of resembling a simple beam with both ends as fulcrums. Since the vehicle 6, which is a moving object, passes through the superstructure 7 substantially at a constant speed from one end portion and moves to the other end portion of the superstructure 7, an intermediate portion of the superstructure 7 and the end portion of the superstructure 7 receive the same load. Therefore, it can be considered that the observed displacement of the superstructure 7 is approximately proportional to an acceleration intensity a.sub.p of the axle obtained from the axle information.
(160) Assuming that a proportional coefficient is a product of the acceleration intensity a.sub.p of the axle obtained from the axle information and a predetermined coefficient p, a deflection waveform H(t) of the superstructure 7 generated by each axle is obtained by Equation (42). The acceleration intensity a.sub.p may be the acceleration intensity at the time of entry and the acceleration intensity at the time of exit, which are included in the axle information, or a statistical value such as an average value of the acceleration intensity at the time of entry and the acceleration intensity at the time of exit.
H(t)=pa.sub.pw.sub.std(t) (42)
(161) Substituting Equation (39) into Equation (42), the deflection waveform H(t) is expressed by Equation (43).
(162)
(163) Until now, the single load P is applied to the superstructure 7. However, since the load from each axle of the vehicle 6 is applied to the lane L on which the vehicle 6 travels, Equation (43) is replaced by a deflection waveform H.sub.jk(t) as in Equation (44). In Equation (44), k is an integer indicating the axle number, and j is an integer indicating the lane number. As shown in Equation (44), the deflection waveform H.sub.jk(t) is proportional to the product of the predetermined coefficient p and an acceleration intensity a.sub.pjk.
(164)
(165)
(166) 1-4. Calculation of Correction Coefficient
(167)
(168) Since the acceleration intensity a.sub.pjk of each axle of the vehicle 6 is influenced by a distance moment from the center of gravity of the vehicle 6 to each axle, the acceleration intensities generated by the loads of respective stationary axles may be significantly different. In this case, approximation between the deflection waveform H.sub.jk(t) calculated according to Equation (44) and the actually measured displacement waveform decreases. Here, in the present embodiment, the measurement device 1 replaces, based on the first observation point information, the deflection waveform H.sub.jk(t) obtained according to Equation (44) with a deflection waveform in consideration of the influence of the distance moment from the center of gravity of the vehicle 6 to each axle.
(169) When a leading time point, which is a time point when the leading axle whose axle number is 1 among the plurality of axles of the vehicle 6 passes the observation point P.sub.j, is set as t.sub.j1, the measurement device 1 calculates a time Δt.sub.jk from the leading time point t.sub.j1 to a time point t.sub.jk when the axle whose axle number is k passes the observation point P.sub.j as in Equation (45). k is an integer of 1 or more and last or less. The leading time point t.sub.j1 is an example of a “first leading time”.
Δt.sub.jk=t.sub.jk−t.sub.j1 (45)
(170)
(171) Next, the measurement device 1 calculates a normalized time Δt.sub.jstdk obtained by normalizing the time Δt.sub.jk expressed by Equation (45) with the time Δt.sub.jlast obtained according to Equation (46). The Δt.sub.jlast is a time from the leading time point t.sub.j1 to a time point when the last axle passes the observation point P.sub.j.
(172)
(173) Next, according to Equation (47), the measurement device 1 calculates an addition normalized impact power .sub.add {a.sub.pj_stdk} which is obtained by normalizing an integrated value of acceleration intensities a.sub.pj1 to a.sub.pjk at the observation point P.sub.j generated by each axle from the leading axle whose axle number is 1 to the axle whose axle number is k with a total sum of the acceleration intensities a.sub.pj1 to a.sub.pjlast at the observation point P.sub.j generated by each axle from the leading axle whose axle number is 1 to the last axle whose axle number is last.
(174)
(175)
(176) Next, a predetermined distribution ratio for distributing the load of the vehicle 6 to a load before the center of gravity of the vehicle 6 and a load after the center of gravity of the vehicle 6 is set as R:1−R=.sub.imagR.sub.F:(1−.sub.imagR.sub.F). The measurement device 1 calculates a shift addition normalized impact power .sub.shift_add{a.sub.pj_stdk} obtained by subtracting .sub.imagR.sub.F from the addition normalized impact power .sub.add{a.sub.pj_stdk} as in Equation (48).
.sub.shift_add{a.sub.pj_std.sub.
(177) Since the distribution ratio .sub.imagR.sub.F:(1−.sub.imagR.sub.F) is an unknown number that cannot be measured, for example, a load distribution ratio before and after the center of gravity recommended in terms of steering stability of a general vehicle is assumed. For example, when the distribution ratio is 0.4:0.6, .sub.imagR.sub.F is 0.4. The .sub.imagR.sub.F assumed in terms of the steering stability of the general vehicle is 0.4 or more and 0.6 or less.
(178)
(179) Next, the measurement device 1 interpolates a reference time Δt.sub.jGOC when the shift addition normalized impact power .sub.shift_add{a.sub.pj_stdk} is zero based on the correlation between the normalized time Δt.sub.jstdk and the shift addition normalized impact power .sub.shift_add{a.sub.pj_stdk}.
(180) Next, the measurement device 1 obtains an axle number s in which the shift addition normalized impact power .sub.shift_add{a.sub.pj_stds} for the axles whose axle numbers are 1 to s is a negative value and the shift addition normalized impact power .sub.shift_add{a.sub.pj_stds} for the axles whose axle numbers are s+1 to last is a positive value.
(181) As in Equation (49), coordinates indicating the normalized time Δt.sub.jstds and the shift addition normalized impact power .sub.shift_add{a.sub.pj_stds}, which is a negative value, for the axle whose axle number is s are set as (x.sub.s, y.sub.s).
point.sub.n(Δt.sub.jstd.sub.
(182) Similarly, as in Equation (50), coordinates indicating the normalized time Δt.sub.jstds and the shift addition normalized impact power .sub.shift_add{a.sub.pj_stds+1}, which is a positive value, for the axle whose axle number is s+1 are set as (x.sub.s+1, y.sub.s+1).
point.sub.p(Δt.sub.jstd.sub.
(183) A straight line passing through the point of the coordinates (x.sub.s, y.sub.s) and the point of the coordinates (x.sub.s+1, y.sub.s+1) is given by Equation (51).
(184)
(185) According to Equation (52) the measurement device 1 calculates, an x coordinate of an intersection between the straight line expressed by Equation (51) and y=0, and sets the calculated x coordinate as the reference time Δt.sub.jGOC.
(186)
(187) Here, when the time point when the total sum of the acceleration intensities a.sub.pj1 to a.sub.pjlast from the leading axle whose axle number is 1 to the last axle whose axle number is last is distributed at the predetermined distribution ratio .sub.imagR.sub.F:(1−.sub.imagR.sub.F) is defined as the reference time point t.sub.jGOC, the reference time Δt.sub.jGOC is a time from the time point when the leading axle passes the observation point P.sub.j to the reference time point t.sub.jGOC. The reference time point t.sub.jGOC is a time point when the center of gravity of the vehicle 6 is estimated to pass the observation point P.sub.j.
(188)
(189) Next, the measurement device 1 calculates a normalized time difference Δt.sub.jstd-GOCk, which is a time difference between the normalized time Δt.sub.jstdk of each axle and the reference time Δt.sub.jGOC, as in Equation (53).
Δt.sub.jstd-GOC.sub.
(190) Next, according to Equation (54), the measurement device 1 calculates a ratio of the normalized time difference Δt.sub.jstd-GOCk of axles whose axle numbers are 1 to s, in which the shift addition normalized impact power .sub.shift_add{a.sub.pj_stdk} is a negative value, to a sum of the normalized time differences Δt.sub.jstd-GOC1 to Δt.sub.jstd-GOCs of axles whose axle numbers are 1 to s, and uses the ratio as a correction coefficient R.sub.jk. k is an integer of 1 or more and s or less.
(191)
(192) Similarly, according to Equation (55), the measurement device 1 calculates a ratio of the normalized time difference Δt.sub.jstd-GOCk of axles whose axle numbers are s+1 to last, in which the shift addition normalized impact power .sub.shift_add{a.sub.pj_stdk} is a positive value, and a sum of the normalized time differences Δt.sub.jstd-GOCs+1 to Δt.sub.jstd-GOClast of axles whose axle numbers are s+1 to last, and uses the ratio as a correction coefficient R.sub.jk. k is an integer of s+1 or more and last or less.
(193)
(194) According to Equations (54) and (55), correction coefficients R.sub.j1 to R.sub.jlast of the axles whose axle numbers are 1 to last are obtained. The correction coefficient R.sub.jk is a coefficient for correcting the acceleration intensity a.sub.pjk so as to reduce the influence of the distance moment. The above Equation (44) for calculating the deflection waveform H.sub.jk (t) is replaced with Equation (56) using the correction coefficient R.sub.jk.
(195)
(196) The measurement device 1 calculates the deflection waveform H.sub.jk (t) of the superstructure 7 generated by the axle whose axle number is k according to Equation (56).
(197)
(198) As shown in Equation (57), a deflection waveform CP.sub.jm(t) of the superstructure 7 generated by the vehicle 6 traveling on the lane L.sub.j is obtained by adding the deflection waveform H.sub.jk(t) of the superstructure 7 generated by each axle. In Equation (57), m is an integer indicating the vehicle number, k is an integer indicating the axle number, and j is an integer indicating the lane number.
(199)
(200) The measurement device 1 calculates the deflection waveform CP.sub.jm(t) of the superstructure 7 generated by the vehicle 6, whose vehicle number is m, traveling on the lane L.sub.j according to Equation (57).
(201) In
(202) 1-5. Calculation of Displacement
(203) The correlation between the deflection waveform CP.sub.jm(t) shown in Equation (57) and an observed displacement CU(t) is approximated by a polynomial equation. For example, as in Equation (58), the displacement CU(t) is approximated by a linear equation of the deflection waveform CP.sub.jm(t). In Equation (58), s is a first-order coefficient, and i is a zero-order coefficient.
CU(t)≅sCP.sub.jm(t)+i (58)
(204) The first-order coefficient s and the zero-order coefficient i are calculated by, for example, a load test performed on a plurality of test vehicles. For example, a displacement meter is installed at the center of the lane L.sub.j, and each of the plurality of test vehicles independently travels on the lane L.sub.j. The measurement device 1 generates the axle information and acquires the displacement measured by the displacement meter. Then, the measurement device 1 plots the maximum value of the measured displacement as CU.sub.max and the maximum value of the deflection waveform CP.sub.jm(t) obtained according to Equation (57) and from the axle information as CP.sub.jm-max on a graph, and obtains a first-order coefficient s.sub.cu and a zero-order coefficient i.sub.cu of an approximate straight line.
(205)
(206) The measurement device 1 calculates a displacement CU.sub.est (t) at the center of the lane L according to Equation (59) and using the first-order coefficient s.sub.cu, the zero-order coefficient i.sub.cu, and the deflection waveform CP.sub.jm(t) obtained according to Equation (57) from the axle information of an unknown vehicle 6.
CU.sub.est(t)=s.sub.cuCP.sub.jm(t)+i.sub.cu (59)
(207)
(208) In Equation (59), the zero-order coefficient i.sub.cu is a small value. By substituting i.sub.cu=0 into Equation (59), Equation (60) is obtained based on Equation (56) and Equation (57).
(209)
(210) According to Equation (60), since the predetermined coefficient p and the first-order coefficient s.sub.cu can be exchanged, the predetermined coefficient p is a coefficient having the same function as the first-order coefficient s.sub.cu. That is, the predetermined coefficient p is a coefficient of a function that approximates the correlation between a deflection of a portion of the superstructure 7 and a displacement of the portion of the superstructure 7 between the observation point P and the observation point Q
(211) 1-6. Measurement Method
(212)
(213) As shown in
(214) Next, based on the observation information obtained by the N sensors 22 that observe the observation points Q.sub.1 to Q.sub.N, the measurement device 1 acquires the second observation point information including the time point when each of the plurality of axles of the vehicle 6 passes each of the observation points Q.sub.1 to Q.sub.N, and the acceleration intensity as the second physical quantity which is the response to the action of each of the plurality of axles on each of the observation points Q.sub.1 to Q.sub.N (step S2). As described above, the N sensors 22 are acceleration sensors. The observation information obtained by the N sensors 22 is detection information on the acceleration generated at the observation points Q.sub.1 to Q.sub.N. The measurement device 1 acquires the second observation point information based on the acceleration detected by each of the N sensors 22. The step S2 is a second observation point information acquisition step.
(215) Next, using the first observation point information acquired in step S1, the measurement device 1 calculates the normalized times Δt.sub.jstd1 to Δt.sub.jstdlast, which are times from the leading time point t.sub.j1 when the leading axle among the plurality of axles passes the observation point P.sub.j to the time points t.sub.j1 to t.sub.jlast when each of the plurality of axles passes the observation point P.sub.j, and the reference time Δt.sub.jGOC, which is the time from the leading time point t.sub.j1 to the reference time point t.sub.jGOC, which is the time point when the total sum of acceleration intensities a.sub.pj1 to a.sub.pjlast generated by the plurality of axles is distributed at the predetermined distribution ratio .sub.imagR.sub.F:(1−.sub.imagR.sub.F) (step S3). Specifically, the measurement device 1 calculates the normalized times Δt.sub.jstd1 to Δt.sub.jstdlast and the reference time Δt.sub.jGOC according to the above Equations (45) to (52). The step S3 is a first time calculation step.
(216) Next, based on the normalized times Δt.sub.jstd1 to Δt.sub.jstdlast and the reference time Δt.sub.jGOC calculated in step S3, the measurement device 1 calculates the correction coefficients R.sub.j1 to R.sub.jlast for correcting the acceleration intensities a.sub.pj1 to a.sub.pjlast generated by the plurality of axles (step S4). Specifically, the measurement device 1 calculates the correction coefficients R.sub.j1 to R.sub.jlast according to the above Equations (53) to (55). The step S4 is a correction coefficient calculation step.
(217) Next, based on the first observation point information acquired in step S1, the second observation point information acquired in step S2, the predetermined coefficient p, the correction coefficient R.sub.jk calculated in step S4, and the approximate expression of deflection of the superstructure 7, the measurement device 1 calculates the deflection waveform H.sub.jk(t) of the superstructure 7 generated by each of the plurality of axles (step S5). Specifically, the measurement device 1 calculates the deflection waveform H.sub.jk (t) of the superstructure 7 generated by each axle of the vehicle 6 traveling on each lane L according to the above Equation (56). The step S5 is a deflection waveform calculation step.
(218) Next, according to the above Equation (57), the measurement device 1 calculates the deflection waveform CP.sub.jm(t) of the superstructure 7 generated by the vehicle 6 by adding the deflection waveform H.sub.jk(t) of the superstructure 7 generated by each of the plurality of axles of the vehicle 6 and calculated in step S5 (step S6). The step S6 is a moving object deflection waveform calculation step.
(219) Next, based on the deflection waveform CP.sub.jm(t) of the superstructure 7 generated by the vehicle 6 calculated in step S6, the measurement device 1 calculates the displacement CU.sub.est (t) of the superstructure 7 according to the above Equation (59) (step S7). The step S7 is a displacement calculation step.
(220) Next, the measurement device 1 outputs the displacement CU.sub.est (t) of the superstructure 7 calculated in step S7 to the server 2 (step S8). The step S8 is an output step.
(221) The measurement device 1 repeats the processing in steps S1 to S8 until the measurement is completed (N in step S9).
(222)
(223) As shown in
(224) Then, when it is determined in step S31 that there is a vehicle 6 traveling on the lane L.sub.j (Y in step S32), the measurement device 1 calculates the times Δt.sub.j1 to Δt.sub.jlast according to the above Equation (45) and using the first observation point information (step S33). That is, the measurement device 1 calculates the times Δt.sub.j1 to Δt.sub.jlast from the leading time point t.sub.j1 when the leading axle of the vehicle 6 passes the observation point P to the time points t.sub.j1 to t.sub.jlast when each of the plurality of axles passes the observation point P.sub.j.
(225) Next, the measurement device 1 calculates normalized times Δt.sub.jstd1 to Δt.sub.jstdlast by dividing the times Δt.sub.j1 to Δt.sub.jlast calculated in step S33 by the time Δt.sub.jlast according to the above Equation (46) (step S34).
(226) Next, according to the above Equation (47), the measurement device 1 calculates the addition normalized impact powers .sub.add{a.sub.pj_std1} to .sub.add{a.sub.pj_stdlast} by dividing the integrated value of the acceleration intensities a.sub.pj1 to a.sub.pjk of the first observation point information by the total sum of the acceleration intensities a.sub.pj1 to a.sub.pjlast (step S35).
(227) Next, according to the above Equation (48), the measurement device 1 calculates shift addition normalized impact powers .sub.shift_add{a.sub.pj_std1} to .sub.shift_add {a.sub.pj_stdlast} by subtracting .sub.imagR.sub.F from the addition normalized impact powers .sub.add {a.sub.pj_std1} to .sub.add {a.sub.pj_stdlast} calculated in step S35 (step S36).
(228) Next, the measurement device 1 sets the x coordinate of the intersection between the straight line passing through the coordinates (Δt.sub.jstds, .sub.shift_add{a.sub.pj_stds} (<0)) and the coordinates (Δt.sub.jstds+1, .sub.shift_add{a.sub.pj_stds+1} (>0)) and y=0 as the reference time Δt.sub.jGOC according to the above Equations (49) to (52) (step S37).
(229) When it is determined in step S31 that there is no vehicle 6 traveling on the lane L.sub.j (N in step S32), the measurement device 1 does not perform the processing in steps S33 to S37.
(230) When the integer j is not N (N in step S38), the measurement device 1 adds 1 to the integer j (step S39), and repeats the processing in steps S31 to S37.
(231) Then, when the integer j is N (Y in step S38), the measurement device 1 ends the processing in the first time calculation step.
(232)
(233) As shown in
(234) Next, according to the above Equation (54), the measurement device 1 calculates the correction coefficients R.sub.j1 to R.sub.js by dividing the normalized time differences Δt.sub.jstd-GOC1 to Δt.sub.jstd-GOCs calculated in step S43 by the sum of the normalized time differences Δt.sub.jstd-GOC1 to Δt.sub.jstd-GOCs (step S44).
(235) Next, according to the above Equation (55), the measurement device 1 calculates the correction coefficients R.sub.js+1 to R.sub.jlast by dividing the normalized time differences Δt.sub.jstd-GOCs+1 to Δt.sub.jstd-GOClast calculated in step S43 by the sum of the normalized time differences Δt.sub.jstd-GOCs+1 to Δt.sub.jstd-GOClast (step S45).
(236) When it is determined in step S31 in
(237) When the integer j is not N (N in step S46), the measurement device 1 adds 1 to the integer j (step S47), and repeats the processing in steps S42 to S45.
(238) Then, when the integer j is N (Y in step S46), the measurement device 1 ends the processing in the correction coefficient calculation step.
(239) 1-7. Configuration of Measurement Device
(240)
(241) The control unit 110 calculates the time point when the vehicle 6 travels on the superstructure 7 or the displacement or the like of the superstructure 7 based on the acceleration data output from each of the sensors 21 and 22 installed in the superstructure 7.
(242) The first communication unit 120 receives the acceleration data from each of the sensors 21 and 22. The acceleration data output from each of the sensors 21 and 22 is, for example, a digital signal. The first communication unit 120 outputs to the control unit 110 the acceleration data received from each of the sensors 21 and 22.
(243) The storage unit 130 is a memory that stores a program, data, and the like for the control unit 110 to perform calculation processing and control processing. In addition, the storage unit 130 stores a program, data, and the like for the control unit 110 to implement a predetermined application function. The storage unit 130 is implemented by, for example, various integrated circuit (IC) memories such as a read only memory (ROM), a flash ROM, and a random access memory (RAM), and a recording medium such as a hard disk and a memory card.
(244) The storage unit 130 includes a non-volatile information storage device that is a device or a medium that can be read by a computer. Various programs, data, and the like may be stored in the information storage device. The information storage device may be an optical disk such as an optical disk DVD or a CD, a hard disk drive, or various types of memories such as a card-type memory or a ROM. In addition, the control unit 110 may receive various programs, data, and the like via the communication network 4 and store the programs, the data, and the like in the storage unit 130.
(245) The second communication unit 140 transmits information such as a calculation result of the control unit 110 to the server 2 via the communication network 4.
(246) The operation unit 150 acquires operation data from the user and transmits the operation data to the control unit 110.
(247) The control unit 110 includes a first observation point information acquisition unit 111, a second observation point information acquisition unit 112, a first time calculation unit 113, a correction coefficient calculation unit 114, a deflection waveform calculation unit 115, a moving object deflection waveform calculation unit 116, a displacement calculation unit 117, a coefficient value calculation unit 118, and an output processing unit 119.
(248) Based on the observation information obtained by the N sensors 21 that observe the observation points P.sub.1 to P.sub.N, the first observation point information acquisition unit 111 performs processing of acquiring the first observation point information including the time point when each of the plurality of axles of the vehicle 6 passes each of the observation points P.sub.1 to P.sub.N, and the acceleration intensity as the first physical quantity which is the response to the action of each of the plurality of axles on each of the observation points P.sub.1 to P.sub.N. That is, the first observation point information acquisition unit 111 performs the processing of the first observation point information acquisition step in
(249) Based on the observation information obtained by the N sensors 22 that observe the observation points Q.sub.1 to Q.sub.N, the second observation point information acquisition unit 112 performs processing of acquiring the second observation point information including the time point when each of the plurality of axles of the vehicle 6 passes each of the observation points Q.sub.1 to Q.sub.N, and the acceleration intensity as the second physical quantity which is the response to the action of each of the plurality of axles on each of the observation points Q.sub.1 to Q.sub.N. That is, the second observation point information acquisition unit 112 performs the processing of the second observation point information acquisition step in
(250) Using the first observation point information acquired by the first observation point information acquisition unit 111, the first time calculation unit 113 performs processing of calculating the normalized times Δt.sub.jstd1 to Δt.sub.jstdlast, which are times from the leading time point t.sub.j1 when the leading axle among the plurality of axles passes the observation point P.sub.j to the time points t.sub.j1 to t.sub.jlast when each of the plurality of axles passes the observation point P.sub.j, and the reference time Δt.sub.jGOC, which is the time from the leading time point t.sub.j1 to the reference time point t.sub.jGOC, which is the time point when the total sum of acceleration intensities a.sub.pj1 to a.sub.pjlast generated by the plurality of axles is distributed at the predetermined distribution ratio .sub.imagR.sub.F:(1−.sub.imagR.sub.F). That is, the first time calculation unit 113 performs the processing of the first time calculation step in
(251) Based on the normalized times Δt.sub.jstd1 to Δt.sub.jstdlast and the reference time Δt.sub.jGOC calculated by the first time calculation unit 113, the correction coefficient calculation unit 114 performs processing of calculating the correction coefficients R.sub.j1 to R.sub.jlast for correcting the acceleration intensities a.sub.pj1 to a.sub.pjlast generated by the plurality of axles. That is, the correction coefficient calculation unit 114 performs the processing of the correction coefficient calculation step in
(252) Based on the first observation point information acquired by the first observation point information acquisition unit 111, the second observation point information acquired by the second observation point information acquisition unit 112, the predetermined coefficient p, the correction coefficient R.sub.jk calculated by the correction coefficient calculation unit 114, and the approximate expression of deflection of the superstructure 7, the deflection waveform calculation unit 115 performs processing of calculating the deflection waveform H.sub.jk(t) of the superstructure 7 generated by each of the plurality of axles. That is, the deflection waveform calculation unit 115 performs the processing of the deflection waveform calculation step in
(253) The moving object deflection waveform calculation unit 116 performs processing of calculating the deflection waveform CP.sub.jm(t) of the superstructure 7 generated by the vehicle 6 by adding the deflection waveform H.sub.jk(t) of the superstructure 7 generated by each of the plurality of axles of the vehicle 6 and calculated by the deflection waveform calculation unit 115. That is, the moving object deflection waveform calculation unit 116 performs the processing of the moving object deflection waveform calculation step in
(254) Based on the deflection waveform CP.sub.jm(t) of the superstructure 7 generated by the vehicle 6 calculated by the moving object deflection waveform calculation unit 116, the displacement calculation unit 117 performs processing of calculating the displacement CU.sub.est(t) of the superstructure 7. That is, the displacement calculation unit 117 performs the processing of the displacement calculation step in
(255) When each of the plurality of test vehicles independently travels on the superstructure 7, the coefficient value calculation unit 118 performs processing of obtaining an approximate straight line that approximates the correlation between the maximum value of the displacement CU.sub.max of the superstructure 7 measured by a displacement meter (not shown) and the maximum value CP.sub.jm-max of the deflection waveform CP.sub.jm(t) calculated by the moving object deflection waveform calculation unit 116, and calculating the value of the first-order coefficient s.sub.cu and the value of the zero-order coefficient i.sub.cu of the above Equation (59). The value of the first-order coefficient s.sub.cu and the value of the zero-order coefficient i.sub.cu calculated by the coefficient value calculation unit 118 are stored in the storage unit 130.
(256) The output processing unit 119 performs processing of outputting the displacement CU.sub.est(t) of the superstructure 7 calculated by the displacement calculation unit 117 to the server 2 via the second communication unit 140. That is, the output processing unit 119 performs the processing of the output step in
(257) For example, based on the operation data from the operation unit 150, the control unit 110 switches between a first mode for calculating the time point when an unknown vehicle 6 travels on the superstructure 7 and the displacement of the superstructure 7 and the like, and a second mode for calculating the value of the first-order coefficient s.sub.cu and the value of the zero-order coefficient i.sub.cu. For example, after the N sensors 21 and the N sensors 22 are installed in the superstructure 7, the load test is performed on the plurality of test vehicles in a state in which the control unit 110 is set to the second mode. After the load test ends, the control unit 110 is set to the first mode.
(258) In the present embodiment, the control unit 110 is a processor that executes various programs stored in the storage unit 130. By executing a measurement program 131 stored in the storage unit 130, each function of the first observation point information acquisition unit 111, the second observation point information acquisition unit 112, the first time calculation unit 113, the correction coefficient calculation unit 114, the deflection waveform calculation unit 115, the moving object deflection waveform calculation unit 116, the displacement calculation unit 117, the coefficient value calculation unit 118, and the output processing unit 119 is implemented. In other words, the measurement program 131 is a program that causes the measurement device 1 as a computer to execute each procedure in the flowchart shown in
(259) In the processor, for example, functions of each part may be implemented by individual hardware, or the functions of each part may be implemented by integrated hardware. For example, the processor may include hardware. The hardware may include at least one of a circuit for processing a digital signal and a circuit for processing an analog signal. The processor may be a central processing unit (CPU), a graphics processing unit (GPU), a digital signal processor (DSP), or the like. The control unit 110 is implemented as a custom integrated circuit (IC) such as an application specific integrated circuit (ASIC), and may implement the functions of each part, or may implement the functions of each part by the CPU and the ASIC.
(260) The control unit 110 may not include the coefficient value calculation unit 118. For example, the server 2 or another device may perform processing of calculating the value of the first-order coefficient s.sub.cu and the value of the zero-order coefficient i.sub.cu, and store the values in the storage unit 130 of the measurement device 1.
(261) 1-8. Operation Effects
(262) In the measurement method according to the first embodiment described above, the measurement device 1 acquires, based on the observation information obtained by the N sensors 21 that observe the observation points P.sub.1 to P.sub.N, the first observation point information including the time point and the acceleration intensity when each of the plurality of axles of the vehicle 6 passes each of the observation points P.sub.1 to P.sub.N. The measurement device 1 acquires, based on the observation information obtained by the N sensors 22 that observe the observation points Q.sub.1 to Q.sub.N, the second observation point information including the time point and the acceleration intensity when each of the plurality of axles of the vehicle 6 passes each of the observation points Q.sub.1 to Q.sub.N. According to Equations (45) to (52), and using the first observation point information, the measurement device 1 calculates the normalized times Δt.sub.jstd1 to Δt.sub.jstdlast, which are times from the leading time point t.sub.j1 when the leading axle passes the observation point P.sub.j to the time points t.sub.j1 to t.sub.jlast when each of the plurality of axles passes the observation point P.sub.j, and the reference time Δt.sub.jGOC from the leading time point t 1 to the reference time point t .sub.jGOC when the total sum of acceleration intensities a.sub.pj1 to a.sub.pjlast generated by the plurality of axles is distributed at the predetermined distribution ratio .sub.imagR.sub.F:(1−.sub.imagR.sub.F). According to Equations (53) to (55), and based on the normalized times Δt.sub.jstd1 to Δt.sub.jstdlast and the reference time Δt.sub.jGOC, the measurement device 1 calculates the correction coefficients R.sub.j1 to R.sub.jlast for correcting the acceleration intensities a.sub.pj1 to a.sub.pjlast generated by the plurality of axles. Next, based on the first observation point information, the second observation point information, the predetermined coefficient p, the correction coefficients R.sub.j1 to R.sub.jlast, and the approximate expression (39) of deflection of the superstructure 7, the measurement device 1 calculates the deflection waveform H.sub.jk(t) of the superstructure 7 generated by each axle according to Equation (56), and calculates the deflection waveform CP.sub.jm (t) of the superstructure 7 generated by the vehicle 6 by adding the deflection waveform H.sub.jk(t). Therefore, according to the measurement method in the first embodiment, the measurement device 1 can calculate the deflection waveform of the superstructure 7 generated by the vehicle 6 which is the moving object that moves on the superstructure 7 without measuring the displacement of the superstructure 7 which is the structure.
(263) Further, according to the measurement method in the first embodiment, the acceleration intensities a.sub.pj1 to a.sub.pjlast generated by each axle are corrected by the correction coefficients R.sub.j1 to R.sub.jlast such that the influence of the distance moment from the center of gravity on the load of each axle is reduced. Therefore, calculation accuracy of the deflection waveform of the superstructure 7 is improved in consideration of the difference in loads between a case where the vehicle 6 is stationary and a case where the vehicle 6 is moving.
(264) In the measurement method according to the first embodiment, according to the correlation equation (59), the measurement device 1 can calculate the displacement CU.sub.est(t) of the lane L based on the deflection waveform CP.sub.jm(t) of the superstructure 7 generated by the vehicle 6. Therefore, according to the measurement method in the first embodiment, the measurement device 1 can estimate the displacement of the superstructure 7 without measuring the displacement of the superstructure 7.
(265) In addition, according to the measurement method in the first embodiment, since it is not necessary to set the observation points for measuring the displacement of the superstructure 7, the number of observation points observed by the observation device is reduced. Further, since the measurement system is simplified, cost required for the measurement is reduced.
(266) Further, according to the measurement method in the first embodiment, since the observation points P.sub.1 to P.sub.N and Q.sub.1 to Q.sub.N are set at both end portions of the superstructure 7, and no observation point is set at the central portion of the superstructure 7, construction and maintenance of the measurement system 10 are facilitated, and the cost required for measurement is reduced.
(267) According to the measurement method in the first embodiment, since the measurement device 1 can calculate the deflection waveform which is the deformation of the superstructure 7 due to the axle load of the vehicle 6 passing through the superstructure 7, sufficient information can be provided for maintenance and management of the bridge 5 to predict the damage of the superstructure 7.
2. Second Embodiment
(268) In the measurement method according to the first embodiment, the measurement device 1 calculates the correction coefficients R.sub.j1 to R.sub.jlast using the first observation point information without using the second observation point information. In a measurement method according to a second embodiment, the measurement device 1 calculates the correction coefficients R.sub.j1 to R.sub.jlast using the first observation point information and the second observation point information. Hereinafter, the same components as those in the first embodiment will be denoted by the same reference numerals for the second embodiment, and the description repeated with the first embodiment will be omitted or simplified, and different contents from the first embodiment will be mainly described.
(269) In the present embodiment, when a first leading time point, which is a time point when the leading axle whose axle number is 1 among the plurality of axles of the vehicle 6 passes the observation point P.sub.j, is set as t.sub.j1_1, the measurement device 1 calculates a time Δt.sub.jk_1 from the first leading time point t.sub.j1_1 to a time point t.sub.jk_1 when the axle whose axle number is k passes the observation point P.sub.j as in Equation (61) which is similar to Equation (45). k is an integer of 1 or more and last or less.
Δt.sub.jk_1=t.sub.jk_1−t.sub.j1_1 (61)
(270) Next, the measurement device 1 calculates a first normalized time Δt.sub.jstdk_1 obtained by normalizing a time Δt.sub.jk_1 expressed by Equation (61) with a time Δt.sub.jlast_1 obtained by Equation (62), which is similar to Equation (46). The Δt.sub.jlast_1 is a time from the first leading time point t.sub.j1_1 to a time point when the last axle passes the observation point P.sub.j.
(271)
(272) Next, according to Equation (63), which is similar to Equation (47), the measurement device 1 calculates a first addition normalized impact power .sub.add{a.sub.pj_stdk_1} obtained by normalizing the integrated value of the acceleration intensities a.sub.pj1_1 to a.sub.pjk_1 at the observation point P generated by each axle from the leading axle whose axle number is 1 to the axle whose axle number is k with the total sum of the acceleration intensities a.sub.pj1_1 to a.sub.pjlast_1 at the observation point P generated by each axle from the leading axle whose axle number is 1 to the last axle whose axle number is last.
(273)
(274) Next, a predetermined distribution ratio for distributing the load of vehicle 6 to a load before the center of gravity of the vehicle 6 and a load after the center of gravity of the vehicle 6 is set as R:1−R=.sub.imagR.sub.F:(1−.sub.imagR.sub.F). According to Equation (64), which is similar to Equation (48), the measurement device 1 calculates a first shift addition normalized impact power .sub.shift_add{a.sub.pj_stdk_1} obtained by subtracting .sub.imagR.sub.F from the addition normalized impact power .sub.add{a.sub.pj_stdk_1}.
.sub.shift_add{a.sub.pj_std.sub.
(275) Next, the measurement device 1 obtains an axle number s in which the first shift addition normalized impact power .sub.shift_add{a.sub.pj_stds_1} for the axles whose axle numbers are 1 to s is a negative value and the first shift addition normalized impact power .sub.shift_add{a.sub.pj_stds_1} for the axles whose axle numbers are s+1 to last is a positive value.
(276) Similar to Equation (49), as in Equation (65), coordinates indicating the first normalized time Δt.sub.jstds_1 and the first shift addition normalized impact power .sub.shift_add{a.sub.pj_stds_1}, which is a negative value, for the axle whose axle number is s are set as (x.sub.s_1, y.sub.s_1).
point.sub.n(Δt.sub.jstd.sub.
(277) Similar to Equation (50), as in Equation (66), coordinates indicating the first normalized time Δt.sub.jstds+1_1 and the first shift addition normalized impact power .sub.shift_add{a.sub.pj_stds+1_1}, which is a positive value, for the axle whose axle number is s are set as (x.sub.s+1_1, y.sub.s+1_1).
point.sub.p(Δt.sub.jstd.sub.
(278) A straight line passing through the point of the coordinates (x.sub.s_1, y.sub.s_1) and the point of the coordinates (x.sub.s+1_1, y.sub.s+1_1) is given by Equation (67), which is similar to Equation (51).
(279)
(280) According to Equation (68), which is similar to Equation (52), the measurement device 1 calculates an x coordinate of an intersection between the straight line expressed by Equation (67) and y=0, and sets the calculated x coordinate as a first reference time Δt.sub.jGOC_1.
(281)
(282) Here, when the time point when the total sum of the acceleration intensities a.sub.pj1_1 to a.sub.pjlast_1 at the observation point P.sub.j generated by each axle from the leading axle whose axle number is 1 to the last axle whose axle number is last is distributed at the predetermined distribution ratio .sub.imagR.sub.F:(1−.sub.imagR.sub.F) is defined as the first reference time point t.sub.jGOC_1, the first reference time Δt.sub.jGOC_1 is a time from the time point when the leading axle passes the observation point P.sub.j to the first reference time point t.sub.jGOC_1. The first reference time point t.sub.jGOC_1 is a time point when the center of gravity of the vehicle 6 is estimated to pass the observation point P.sub.j.
(283) Further, when a second leading time point, which is a time point when the leading axle whose axle number is 1 among the plurality of axles of the vehicle 6 passes the observation point Q.sub.j, is set as t.sub.j1_2, the measurement device 1 calculates a time Δt.sub.jk_2 from the second leading time point t.sub.j1_2 to a time point t.sub.jk_2 when the axle whose axle number is k passes the observation point Q.sub.j as in Equation (69), which is similar to Equation (61).
Δt.sub.jk_2=t.sub.jk_2−t.sub.j1_2 (69)
(284) Next, the measurement device 1 calculates a second normalized time Δt.sub.jstdk_2 obtained by normalizing a time Δt.sub.jk_2 expressed by Equation (69) with a time Δt.sub.jlast_2 obtained by Equation (70), which is similar to Equation (62). The Δt.sub.jlast_2 is a time from the second leading time point t.sub.j1_2 to a time point when the last axle passes the observation point Q
(285)
(286) Next, according to Equation (71), which is similar to Equation (63), the measurement device 1 calculates a second addition normalized impact power .sub.add{a.sub.pj_stdk_2} obtained by normalizing the integrated value of the acceleration intensities a.sub.pj1_2 to a.sub.pjk_2 at the observation point Q.sub.j generated by each axle from the leading axle whose axle number is 1 to the axle whose axle number is k with the total sum of the acceleration intensities a.sub.pj1_2 to a.sub.pjlast_2 at the observation point Q.sub.j generated by each axle from the leading axle whose axle number is 1 to the last axle whose axle number is last.
(287)
(288) Next, the measurement device 1 calculates a second shift addition normalized impact power .sub.shift_add{a.sub.pj_stdk_2} by subtracting .sub.imagR.sub.F from the second addition normalized impact power .sub.add{a.sub.pj_stdk_2} according to Equation (72), which is similar to Equation (64).
.sub.shift_add{a.sub.pj_std.sub.
(289) Next, the measurement device 1 obtains an axle number s in which the second shift addition normalized impact power .sub.shift_add{a.sub.pj_stds_2} for the axles whose axle numbers are 1 to s is a negative value and the second shift addition normalized impact power .sub.shift_add{a.sub.pj_stds_2} for the axles whose axle numbers are s+1 to last is a positive value.
(290) Similar to Equation (65), as in Equation (73), coordinates indicating the second normalized time Δt.sub.jstds_2 and the second shift addition normalized impact power .sub.shift_add{a.sub.pj_stds_2}, which is a negative value, for the axle whose axle number is s are set as (x.sub.s_2, y.sub.s_2).
point.sub.n(Δt.sub.jstd.sub.
(291) Similar to Equation (66), as in Equation (74), coordinates indicating the second normalized time Δt.sub.jstds+1_2 and the second shift addition normalized impact power .sub.shift_add{a.sub.pj_stds+1_2}, which is a positive value, for the axle whose axle number is s are set as (x.sub.s+1_2, y.sub.s+1_2).
point.sub.p(Δt.sub.jstd.sub.
(292) A straight line passing through the point of the coordinates (x.sub.s_2, y.sub.s_2) and the point of the coordinates (x.sub.s+1_2, y.sub.s+1_2) is given by Equation (75), which is similar to Equation (67).
(293)
(294) According to Equation (76), which is similar to Equation (68), the measurement device 1 calculates an x coordinate of an intersection between the straight line expressed by Equation (75) and y=0, and sets the calculated x coordinate as a second reference time Δt.sub.jGOC_2.
(295)
(296) Here, when the time point when the total sum of the acceleration intensities a.sub.pj1_2 to a.sub.pjlast_2 at the observation point Q.sub.j generated by each axle from the leading axle whose axle number is 1 to the last axle whose axle number is last is distributed at the predetermined distribution ratio .sub.imagR.sub.F:(1−.sub.imagR.sub.F) is defined as the second reference time point t.sub.jGOC_2 the second reference time Δt.sub.jGOC_2 is a time from the time point when the leading axle passes the observation point Q.sub.j to the second reference time point t .sub.jGOC_2. The second reference time point t .sub.jGOC_2 is a time point when the center of gravity of the vehicle 6 is estimated to pass the observation point Q.sub.j.
(297) Next, the measurement device 1 calculates an average value of the first normalized time Δt.sub.jstdk_1 and the second normalized time Δt.sub.jstdk_2 of each axle according to Equation (77), and sets the average value as the normalized time Δt.sub.jstdk.
(298)
(299) In addition, the measurement device 1 calculates an average value of the first reference time Δt.sub.jGOC_1 and the second reference time Δt.sub.jGOC_2 according to Equation (78), and sets the average value as the reference time Δt.sub.jGOC.
(300)
(301) Then, the measurement device 1 calculates the normalized time difference Δt.sub.jstd-GOCk according to the above Equation (53), and calculates the correction coefficients R.sub.j1 to R.sub.jlast of the axles whose the axle numbers are 1 to last according to the above Equations (54) and (55).
(302)
(303) As shown in
(304) Next, the measurement device 1 performs the processing of the second observation point information acquisition step (step S102), which is similar to step S2 in
(305) Next, using the first observation point information acquired in step S101, the measurement device 1 calculates the first normalized times Δt.sub.jstd1_1 to Δt.sub.jstdlast_1 which are times from the first leading time point t.sub.j1_1 when the leading axle among the plurality of axles passes the observation point P.sub.j to the time points t.sub.j1_1 to t.sub.jlast_1 when each of the plurality of axles passes the observation point P.sub.j, and the first reference time Δt.sub.jGOC_1, which is the time from the first leading time point t.sub.j1_1 to the first reference time point t.sub.jGOC_1, which is the time point when the total sum of acceleration intensities a.sub.pj1_1 to a.sub.pjlast_1 generated by the plurality of axles is distributed at the predetermined distribution ratio .sub.imagR.sub.F:(1−.sub.imagR.sub.F (step S103). Specifically, the measurement device 1 calculates the first normalized times Δt.sub.jstd1_1 to Δt.sub.jstdlast_1 and the first the reference time Δt.sub.jGOC_1 according to the above Equations (61) to (68). The step S103 is a first time calculation step.
(306) Next, using the second observation point information acquired in step S102, the measurement device 1 calculates the second normalized times Δt.sub.jstd1_2 to Δt.sub.jstdlast_2, which are times from the second leading time point t.sub.j1_2 when the leading axle among the plurality of axles passes the observation point Q.sub.j to the time points t.sub.j1_2 to t.sub.jlast_2 when each of the plurality of axles passes the observation point Q.sub.j, and the second reference time Δt.sub.jGOC_2, which is the time from the second leading time point t.sub.j1_2 to the second reference time point t.sub.jGOC_2, which is the time point when the total sum of acceleration intensities a.sub.pj1_2 to a.sub.pjlast_2 generated by the plurality of axles is distributed at the predetermined distribution ratio .sub.imagR.sub.F:(1−.sub.imagR.sub.F) (step S104). Specifically, the measurement device 1 calculates the second normalized times Δt.sub.jstd1_2 to Δt.sub.jstdlast_2 and second the reference time Δt.sub.jGOC_2 according to the above Equations (69) to (76). The step S104 is a second time calculation step.
(307) Next, based on the first normalized times Δt.sub.jstd1_1 to Δt.sub.jstdlast_1 and the first reference time Δt.sub.jGOC_1 calculated in step S103 and the second normalized times Δt.sub.jstd1_2 to Δt.sub.jstdlast_2 and the second reference time Δt.sub.jGOC_2 calculated in step S104, the measurement device 1 calculates the correction coefficients R.sub.j1 to R.sub.jlast for correcting the acceleration intensities a.sub.pj1_1 to a.sub.pjlast_1 at the observation point P.sub.j and the acceleration intensities a.sub.pj1_2 to a.sub.pjlast_2 at the observation point Q.sub.j which are generated by the plurality of axles (step S105). Specifically, the measurement device 1 calculates the normalized time Δt.sub.jstdk and the reference time Δt.sub.jGOC according to the above Equations (77) and (78), and calculates the correction coefficients R.sub.j1 to R.sub.jlast according to Equations (53) to (55). The step S105 is a correction coefficient calculation step.
(308) Next, the measurement device 1 performs processing of a deflection waveform calculation step (step S106), which is similar to step S5 in
(309) Next, the measurement device 1 performs processing of a moving object deflection waveform calculation step (step S107), which is similar to step S6 in
(310) Next, the measurement device 1 performs processing of a displacement calculation step (step S108), which is similar to step S7 in
(311) Next, the measurement device 1 performs processing of an output step (step S109), which is similar to step S8 in
(312) The measurement device 1 repeats the processing in steps S101 to S109 until the measurement is completed (N in step S110).
(313)
(314) As shown in
(315) Then, when it is determined in step S131 that there is a vehicle 6 traveling on the lane L.sub.j (Y in step S132), the measurement device 1 calculates the times Δt.sub.j1_1 to Δt.sub.jlast_1 according to the above Equation (61) and using the first observation point information (step S133). That is, the measurement device 1 calculates the times Δt.sub.j1_1 to Δt.sub.jlast_1 from the first leading time point t.sub.j1_1 when the leading axle of the vehicle 6 passes the observation point P.sub.j to the time points t.sub.j1_1 to t.sub.jlast_1 when each of the plurality of axles passes the observation point P.sub.j.
(316) Next, the measurement device 1 calculates the first normalized times Δt.sub.jstd1_1 to Δt.sub.jstdlast_1 by dividing the times Δt.sub.j1_1 to Δt.sub.jlast_1 calculated in step S133 by the time Δt.sub.jlast_1 according to the above Equation (62) (step S134).
(317) Next, the measurement device 1 calculates the first addition normalized impact powers .sub.add{a.sub.pj_std1_1} to .sub.add{a.sub.pj_stdlast_1} by dividing the integrated value of the acceleration intensities a.sub.pj1_1 to a.sub.pjk_1 of the first observation point information by the total sum of the acceleration intensities a.sub.pj1_1 to a.sub.pjlast_1 according to the above Equation (63) (step S135).
(318) Next, the measurement device 1 calculates the first shift addition normalized impact powers .sub.shift_add{a.sub.pj_std1_1} to .sub.shift_add{a.sub.pj_stdlast_1} by subtracting .sub.imagR.sub.F from the first addition normalized impact powers .sub.add{a.sub.pj_std1_1} to .sub.add{a.sub.pj_stdlast_1} calculated in step S135 according to the above Equation (64) (step S136).
(319) Next, the measurement device 1 sets the x coordinate of the intersection between the straight line passing through the coordinates (Δt.sub.jstds_1, .sub.shift_add{a.sub.pj_stds_1} (<0)) and the coordinates (Δt.sub.jstds+1_1, .sub.shift_add{a.sub.pj_stds+1_1} (>0)) and y=0 as the first reference time Δt.sub.jGOC_1 according to the above Equations (65) to (68) (step S137).
(320) When it is determined in step S131 that there is no vehicle 6 traveling on the lane L.sub.j (N in step S132), the measurement device 1 does not perform the processing in steps S133 to S137.
(321) When the integer j is not N (N in step S138), the measurement device 1 adds 1 to the integer j (step S139), and repeats the processing in steps S131 and S137.
(322) Then, when the integer j is N (Y in step S138), the measurement device 1 ends the processing in the first time calculation step.
(323)
(324) As shown in
(325) Next, the measurement device 1 calculates the second normalized times Δt.sub.jstd1_2 to Δt.sub.jstdlast_2 by dividing the times Δt.sub.j1_2 to Δt.sub.jlast_2 calculated in step S143 by the time Δt.sub.jlast_2 according to the above Equation (70) (step S144).
(326) Next, the measurement device 1 calculates the second addition normalized impact powers .sub.add{a.sub.pj_std1_2} to .sub.add{a.sub.pj_stdlast_2} by dividing the integrated value of the acceleration intensities a.sub.pj1_2 to a.sub.pjk_2 of the second observation point information by the total sum of the acceleration intensities a.sub.pj1_2 to a.sub.pjlast_2 according to the above Equation (71) (step S145).
(327) Next, the measurement device 1 calculates the second shift addition normalized impact powers .sub.shift_add{a.sub.pj_std1_2} to .sub.shift_add{a.sub.pj_stdlast_2} by subtracting .sub.imagR.sub.F from the second addition normalized impact powers .sub.add{a.sub.pj_std1_2} to .sub.add{a.sub.pj_stdlast_2} calculated in step S145 according to the above Equation (72) (step S146).
(328) Next, the measurement device 1 sets the x coordinate of the intersection between the straight line passing through the coordinates (Δt.sub.jstds_2, .sub.shift_add{a.sub.pj_stds_2} (<0)) and the coordinates (Δt.sub.jstds+1_2, .sub.shift_add{a.sub.pj_stds+1_2} (>0)) and y=0 as the second reference time Δt.sub.jGOC_2 according to the above Equations (73) to (76) (step S147).
(329) When it is determined in step S131 in
(330) When the integer j is not N (N in step S148), the measurement device 1 adds 1 to the integer j (step S149), and repeats the processing in steps S141 and S147.
(331) Then, when the integer j is N (Y in step S148), the measurement device 1 ends the processing in the second time calculation step.
(332)
(333) As shown in
(334) Next, the measurement device 1 calculates an average value of the first reference time Δt.sub.jGOC_1 calculated in step S137 in
(335) Next, the measurement device 1 calculates differences between the normalized times Δt.sub.jstd1 to Δt.sub.jstdlast calculated in step S153 and the reference time Δt.sub.jGOC calculated in step S154 according to Equation (53), and sets the differences as the normalized time differences Δt.sub.jstd-GOC1 to Δt.sub.jstd-GOClast (step S155).
(336) Next, the measurement device 1 calculates the correction coefficients R.sub.j1 to R.sub.js by dividing the normalized time differences Δt.sub.jstd-GOC1 to Δt.sub.jstd-GOCs calculated in step S155 by the sum of the normalized time differences Δt.sub.jstd-GOC1 to Δt.sub.jstd-GOCs according to the above Equation (54) (step S156).
(337) Next, the measurement device 1 calculates the correction coefficients R.sub.js+1 to R.sub.jlast by dividing the normalized time differences Δt.sub.jstd-GOCs+1 to Δt.sub.jstd-GOClast calculated in step S155 by the sum of the normalized time differences Δt.sub.jstd-GOCs+1 to Δt.sub.jstd-GOClast according to the above Equation (55) (step S157).
(338) When it is determined in step S131 in
(339) When the integer j is not N (N in step S158), the measurement device 1 adds 1 to the integer j (step S159), and repeats the processing in steps S152 and S157.
(340) Then, when the integer j is N (Y in step S158), the measurement device 1 ends the processing in the correction coefficient calculation step.
(341)
(342) Since the processing performed by the first communication unit 120, the storage unit 130, the second communication unit 140, and the operation unit 150 are the same as those in the first embodiment, the description thereof will be omitted.
(343) The control unit 110 calculates the time point when the vehicle 6 travels on the superstructure 7 or the load or the like generated by the vehicle 6 based on the acceleration data output from each of the sensors 21 and 22 installed in the superstructure 7.
(344) The control unit 110 includes the first observation point information acquisition unit 111, the second observation point information acquisition unit 112, the first time calculation unit 113, the correction coefficient calculation unit 114, the deflection waveform calculation unit 115, the moving object deflection waveform calculation unit 116, the displacement calculation unit 117, the coefficient value calculation unit 118, the output processing unit 119, and a second time calculation unit 161.
(345) Since the processing performed by the first observation point information acquisition unit 111, the second observation point information acquisition unit 112, the deflection waveform calculation unit 115, the moving object deflection waveform calculation unit 116, the displacement calculation unit 117, the coefficient value calculation unit 118, and the output processing unit 119 are the same as those in the first embodiment, the description thereof will be omitted.
(346) Using the first observation point information acquired by the first observation point information acquisition unit 111, the first time calculation unit 113 performs processing of calculating the first normalized times Δt.sub.jstd1_1 to Δt.sub.jstdlast_1, which are times from the first leading time point t.sub.j1_1 when the leading axle among the plurality of axles passes the observation point P.sub.j to the time points t.sub.j1_1 to t.sub.jlast_1 when each of the plurality of axles passes the observation point P.sub.j, and the first reference time Δt.sub.jGOC_1, which is the time from the first leading time point t.sub.j1_1 to the first reference time point t.sub.jGOC_1, which is the time point when the total sum of acceleration intensities a.sub.pj1_1 to a.sub.pjlast_1 at the observation point P generated by the plurality of axles is distributed at the predetermined distribution ratio .sub.imagR.sub.F:(1−.sub.imagR.sub.F). That is, the first time calculation unit 113 performs the processing of the first time calculation step in
(347) Using the second observation point information acquired by the second observation point information acquisition unit 112, the second time calculation unit 161 performs processing of calculating the second normalized times Δt.sub.jstd1_2 to Δt.sub.jstdlast_2, which are times from the second leading time point t.sub.j1_2 when the leading axle among the plurality of axles passes the observation point Q.sub.j to the time points t.sub.j1_2 to t.sub.jlast_2 when each of the plurality of axles passes the observation point Q.sub.j, and the second reference time Δt.sub.jGOC_2, which is the time from the second leading time point t.sub.j1_2 to the second reference time point t.sub.jGOC_2, which is the time point when the total sum of acceleration intensities a.sub.pj1_2 to a.sub.pjlast_2 at the observation point Q.sub.j generated by the plurality of axles is distributed at the predetermined distribution ratio .sub.imagR.sub.F:(1−.sub.imagR.sub.F). That is, the second time calculation unit 161 performs the processing of the second time calculation step shown in
(348) Based on the first normalized times Δt.sub.jstd1_1 to Δt.sub.jstdlast_1 and the first reference time Δt.sub.jGOC_1 calculated by the first time calculation unit 113 and the second normalized times Δt.sub.jstd1_2 to Δt.sub.jstdlast_2 and the second reference time Δt.sub.jGOC_2 calculated by the second time calculation unit 161, the correction coefficient calculation unit 114 performs processing of calculating the correction coefficients R.sub.j1 to R.sub.jlast for correcting the acceleration intensities a.sub.pj1_1 to a.sub.pjlast_1 at the observation point P.sub.j and the acceleration intensities a.sub.pj1_2 to a.sub.pjlast_2 at the observation point Q.sub.j which are generated by the plurality of axles. That is, the correction coefficient calculation unit 114 performs the processing of the correction coefficient calculation step in
(349) For example, based on the operation data from the operation unit 150, the control unit 110 switches between a first mode for calculating the time point when an unknown vehicle 6 travels on the superstructure 7 and the load generated by the vehicle 6 and the like, and a second mode for calculating the value of the first-order coefficient s.sub.cu and the value of the zero-order coefficient i.sub.cu. For example, after the N sensors 21 and the N sensors 22 are installed in the superstructure 7, the load test is performed on the plurality of test vehicles in a state in which the control unit 110 is set to the second mode. After the load test ends, the control unit 110 is set to the first mode.
(350) As in the first embodiment, the control unit 110 is a processor that executes various programs stored in the storage unit 130. By executing the measurement program 131 stored in the storage unit 130, each function of the first observation point information acquisition unit 111, the second observation point information acquisition unit 112, the first time calculation unit 113, the correction coefficient calculation unit 114, the deflection waveform calculation unit 115, the moving object deflection waveform calculation unit 116, the displacement calculation unit 117, the coefficient value calculation unit 118, the output processing unit 119, and the second time calculation unit 161 is implemented. In other words, the measurement program 131 is a program that causes the measurement device 1 as a computer to execute each procedure in the flowchart shown in
(351) The control unit 110 may not include the coefficient value calculation unit 118. For example, the server 2 or another device may perform the processing of calculating the value of the first-order coefficient s.sub.cu and the value of the zero-order coefficient i.sub.cu, and store the values in the storage unit 130 of the measurement device 1.
(352) In the measurement method according to the second embodiment described above, the measurement device 1 calculates, according to Equations (61) to (68), the first normalized times Δt.sub.jstd1_1 to Δt.sub.jstdlast_1 and the first reference time Δt.sub.jGOC_1 using the first observation point information. In addition, the measurement device 1 calculates, according to Equations (69) to (76), the second normalized times Δt.sub.jstd1_2 to Δt.sub.jstdlast_2 and the second reference time Δt.sub.jGOC_2 using the second observation point information. Further, the measurement device 1 calculates, according to Equations (77), (78), and (53) to (55), the correction coefficients R.sub.j1 to R.sub.jlast based on the first normalized times Δt.sub.jstd1_1 to Δt.sub.jstdlast_1, the first reference time Δt.sub.jGOC_1, the second normalized times Δt.sub.jstd1_2 to Δt j.sub.stdlast_2, and the second reference time Δt.sub.jGOC_2. Then, based on the first observation point information, the second observation point information, the predetermined coefficient p, the correction coefficients R.sub.j1 to R.sub.jlast, and the approximate expression (39) of deflection of the superstructure 7, the measurement device 1 calculates, according to Equation (56), the deflection waveform H.sub.jk(t) of the superstructure 7 generated by each axle, and the deflection waveform CP.sub.jm(t) of the superstructure 7 generated by the vehicle 6 by adding the deflection waveform H.sub.jk(t). Therefore, according to the measurement method in the second embodiment, the measurement device 1 can calculate the deflection waveform of the superstructure 7 generated by the vehicle 6 which is the moving object that moves on the superstructure 7 without measuring the displacement of the superstructure 7 which is the structure.
(353) In addition, according to the measurement method in the second embodiment, the acceleration intensities a.sub.pj1 to a.sub.pjlast generated by each axle are corrected by the correction coefficients R.sub.j1 to R.sub.jlast such that the influence of the distance moment from the center of gravity on the load of each axle is reduced. Therefore, calculation accuracy of the deflection waveform of the superstructure 7 is improved in consideration of the difference in loads between a case where the vehicle 6 is stationary and a case where the vehicle 6 is moving.
(354) Further, in the measurement method according to the second embodiment, the measurement device 1 calculates the average value of the first normalized times Δt.sub.jstd1_1 to Δt.sub.jstdlast_1 and the second normalized times Δt.sub.jstd1_2 to Δt.sub.jstdlast_2 as the normalized time Δt.sub.jstdk according to Equation (77), and calculates the average value of the first reference time Δt.sub.jGOC_1 and the second reference time Δt.sub.jGOC_2 as the reference time Δt.sub.jGOC according to Equation (78). Then, the measurement device 1 calculates, according to Equations (53) to (55), the correction coefficients R.sub.j1 to R.sub.jlast using the normalized time Δt.sub.jstdk and the reference time Δt.sub.jGOC. Therefore, according to the measurement method in the second embodiment, since random noise component included in the normalized time Δt.sub.jstdk and the reference time Δt.sub.jGOC are reduced by the averaging, the accuracy of the correction coefficients R.sub.j1 to R.sub.jlast is improved, and the calculation accuracy of the deflection waveform of the superstructure 7 is further improved.
(355) Further, according to the measurement method in the second embodiment, similar to the measurement method in the first embodiment, the measurement device 1 can estimate the displacement of the superstructure 7 without measuring the displacement of the superstructure 7, and the cost required for the measurement is reduced.
3. Modifications
(356) The present disclosure is not limited to the above embodiments, and various modifications can be made within the scope of the gist of the present disclosure.
(357) In the first embodiment described above, the measurement device 1 acquires the observation point information including the time point when each axle of the vehicle 6 passes the observation point P and the acceleration intensity with respect to the observation point P generated by each axle as the first observation point information, and acquires the observation point information including the time point when each axle of the vehicle 6 passes the observation point Q.sub.j and the acceleration intensity with respect to the observation point Q.sub.j generated by each axle as the second observation point information. In contrast, the measurement device 1 may acquire the observation point information including the time point when each axle of the vehicle 6 passes the observation point Q.sub.j and the acceleration intensity with respect to the observation point Q.sub.j generated by each axle as first observation point information, and acquires the observation point information including the time point when each axle of the vehicle 6 passes the observation point P.sub.j and the acceleration intensity with respect to the observation point P.sub.j generated by each axle as second observation point information. Then, the measurement device 1 may calculate the normalized times Δt.sub.jstd1 to Δt.sub.jstdlast and the reference time Δt.sub.jGOC using the first observation point information, and may calculate the correction coefficients R.sub.j1 to R.sub.jlast based on the normalized times Δt.sub.jstd1 to Δt.sub.jstdlast and the reference time Δt.sub.jGOC.
(358) Further, in each of the above embodiments, the measurement device 1 calculates the displacement CU.sub.est(t) according to Equation (59). However, the displacement CU.sub.est(t) may be converted into a load using a predetermined correlation equation. For example, a relationship between a load CW.sub.k(t) and a displacement x.sub.k (t) at an observation position R.sub.k of the superstructure 7 is expressed by Equation (79). Here, the load CW.sub.k(t) is a load waveform corresponding to the displacement waveform in BWIM. A first-order coefficient Sc.sub.kk and a zero-order coefficient Ic.sub.k in Equation (79) are obtained by a load test performed on a plurality of test vehicles.
CW.sub.k(t)=Sc.sub.kk.Math.x.sub.k(t)+Ic.sub.k (79)
(359) When Ic.sub.k is sufficiently small in Equation (79), Equation (80) is obtained.
CW.sub.k(t)=Sc.sub.kk.Math.x.sub.k(t) (80)
(360) In Equation (80), the displacement x.sub.k (t) is replaced with the displacement CU.sub.est(t), and a correlation equation between the load CW.sub.k(t) and the displacement CU.sub.est(t) is expressed by Equation (81). The measurement device 1 can convert the displacement CU.sub.est(t) into the load CW.sub.k(t) according to the correlation Equation (81).
CW.sub.k(t)=Sc.sub.kk.Math.CU.sub.est(t) (81)
(361) In each of the above embodiments, the observation device that observes observation points P.sub.1 to P.sub.N and the observation device that observes observation points Q.sub.1 to Q.sub.N are acceleration sensors, but the present disclosure is not limited thereto. For example, the observation device may be an impact sensor, a microphone, a strain gauge, or a load cell. It is not necessary that the observation device and the observation point have a one-to-one correspondence, and one observation device may observe apart or all of the observation points P.sub.1 to P.sub.N and Q.sub.1 to Q.sub.N.
(362) The impact sensor detects an impact acceleration as a response to the action of each axle of the vehicle 6 on the observation points P.sub.1 to P.sub.N and Q.sub.1 to Q.sub.N. The measurement device 1 acquires first observation point information based on the impact acceleration for the observation points P.sub.1 to P.sub.N, and acquires second observation point information based on the impact acceleration for the observation points Q.sub.1 to Q.sub.N. The microphone detects sound as a response to the action of each axle of the vehicle 6 on the observation points P.sub.1 to P.sub.N and Q.sub.1 to Q.sub.N. The measurement device 1 acquires first observation point information based on the sound for the observation points P.sub.1 to P.sub.N, and acquires second observation point information based on the sound for the observation points Q.sub.1 to Q.sub.N. The strain gauge and the load cell detect a stress change as a response to the action of each axle of the vehicle 6 on the observation points P.sub.1 to P.sub.N and Q.sub.1 to Q.sub.N. The measurement device 1 acquires first observation point information based on the stress change for the observation points P.sub.1 to P.sub.N, and acquires second observation point information based on the stress change for the observation points Q.sub.1 to Q.sub.N.
(363) In each of the above embodiments, the direction in which the vehicle 6 travels on the lanes L.sub.1 to L.sub.N is all the same. Alternatively, the traveling direction of the vehicle 6 may be different from at least one lane of the lanes L.sub.1 to L.sub.N and other lanes. For example, the vehicle 6 may travel in a direction from the observation point P.sub.1 to the observation point Q.sub.1 on the lane L.sub.1, and may travel in a direction from the observation point Q.sub.2 to the observation point P.sub.2 on the lane L.sub.2. In this case, the measurement device 1 acquires the entry time point of the vehicle 6 to the lane L.sub.1 based on the acceleration data output from the sensor 21 that observes the observation point P.sub.1, and acquires the exit time point of the vehicle 6 from the lane L.sub.1 based on the acceleration data output from the sensor 22 that observes the observation point Q.sub.1. The measurement device 1 acquires the entry time point of the vehicle 6 to the lane L.sub.2 based on the acceleration data output from the sensor 22 that observes the observation point Q.sub.2, and acquires the exit time point of the vehicle 6 from the lane L.sub.2 based on the acceleration data output from the sensor 21 that observes the observation point P.sub.2.
(364) In each of the above embodiments, the sensors 21 and 22 are provided on the main girder G of the superstructure 7. Alternatively, the sensors may be provided on the surface or inside of the superstructure 7, a lower surface of the floor plate F, the bridge pier 8a, or the like. In each of the above embodiments, the road bridge is taken as an example of the bridge 5, but the present disclosure is not limited thereto. For example, the bridge 5 may be a railway bridge. In each of the above embodiments, the superstructure of the bridge is taken as an example of the structure, but the present disclosure is not limited thereto. The structure may be deformed by the movement of the moving object.
(365) The embodiments and the modifications described above are merely examples, and the present disclosure is not limited thereto. For example, the embodiments and the modifications can be combined as appropriate.
(366) The present disclosure includes a configuration substantially the same as the configuration described in the embodiments, for example, a configuration having the same function, method, and result, or a configuration having the same object and effect. The present disclosure includes a configuration in which a non-essential portion of the configuration described in the embodiment is replaced. In addition, the present disclosure includes a configuration having the same action effect as the configuration described in the embodiment, or a configuration capable of achieving the same object. The present disclosure includes a configuration in which a known technique is added to the configuration described in the embodiment.