Method and apparatus for the bottom-up construction of vertical risers from underground passes through the soil, using a pipe jacking equipment
11441423 · 2022-09-13
Assignee
Inventors
Cpc classification
E21D3/00
FIXED CONSTRUCTIONS
E21B7/18
FIXED CONSTRUCTIONS
International classification
Abstract
A “Riser Concept” Method and Apparatus includes the bottom-up construction of vertical risers from underground passes through the soil, using a pipe jacking equipment. The pipe jacking equipment vertically push the riser pipe from underground pass upwards through soil formations to waterbody, air intake, terrain surface or like. The method and mechanism can be applied either in traditionally bored tunnel or in tunnel bored by tunnel boring machine.
Claims
1. System for the bottom-up construction of vertical riser pipes from underground tunnels to an upper waterbody through the soil, wherein the system comprises: one or more vertical riser pipes comprising at least three riser pipe segments; a pipe jacking equipment which is configured to install said one or more vertical riser pipes by pushing said at least three riser pipe segments into soil formations in the upward direction, from an underground tunnel to an upper level, a load distribution system, configured to transfer thrust force to a tunnel structure during installation of said one or more vertical riser pipes, and a displacement head configured to perform excavation and removal of soil, wherein said displacement head is equipped with a hydro-demolition system and a soil discharge line; wherein said displacement head is fastened, by means of removable connection elements, to a keystone launching segment equipped with a sealing system configured to connect, with a watertight connection, each riser and the tunnel to allow underwater applications, and wherein said sealing system comprises lip gaskets and additional emergency seals, and is configured to ensure the water tightness between each of the vertical riser pipes or the displacement head, and the keystone launching segment.
2. System according to claim 1, further comprising two special segment rings: a positioning segmental ring and a launching segmental ring, which are configured so that, considering the direction of the tunnel advance, the first ring is the positioning segmental ring, and the second ring is the launching segmental ring comprising said keystone launching segment.
3. System according to claim 2, wherein the correct position of said keystone launching segment is adjustable by regulating the position of said segmental ring through slotted holes for longitudinally connecting said two special segment rings to each other, the provision of said slotted holes, enabling an on-site rotational adjustability of the position of the keystone launching segment.
4. System according to claim 1, wherein said displacement head is initially fastened to said keystone launching segment, previously placed in a desired position for the installation of the vertical riser pipe.
5. Method for the bottom-up construction of vertical risers from underground tunnels to an upper waterbody, air intake, terrain surface or the like through the soil by means of the system according to claim 2, wherein the method comprises the following steps: a) positioning of the special segment rings, including said keystone launching segment, said displacement head and said sealing system; b) positioning said pipe jacking equipment underneath said keystone launching segment; c) placing an initial riser pipe segment of the at least three riser pipe segments onto a thrust platform; d) connecting said initial riser pipe segment to the displacement head and holding said initial riser pipe segment in a desired position by means of a pipe clamp, and then disconnecting said displacement head from said keystone launching segment, by removing said removable connection elements; e) hooking up of a high-pressure water system and a discharge line system to said displacement head, the high-pressure water system and the discharge line system passing through said initial riser pipe segment; f) starting operation of the pipe jacking equipment to drive/push said initial riser pipe segment through the soil, by means of said thrust platform and the hydro-demolition system of said displacement head provided with nozzles configured to spray pressurized water to weaken the soil structure in the penetration area of said displacement head; g) removal of the high pressure water system and the discharge line system which have to be passed back through said initial riser pipe segment; h) uniformly transferring the thrust force to the tunnel structure by said load distribution system; i) placing a spacer under the initial riser pipe segment to drive the initial riser pipe segment through the soil up to the required elevation; j) blocking, in this position, said initial riser pipe segment by said pipe clamp; k) removing the spacer and placing an intermediate riser pipe segment of the at least three riser pipe segments on the thrust platform, and connecting said intermediate riser pipe segment to the initial riser pipe segment; and l) repeating the steps from e) to k) to reach the desired elevation when an ending riser pipe segment of the at least three riser pipe segments has to be installed.
6. Method according to claim 5, wherein a temporary bulkhead is installed at the bottom of the ending riser pipe segment to prevent water from entering in the tunnel.
7. Method according to claim 6, wherein the final step comprises the removal of said displacement head, the installation of a diffuser at the top of the initial riser pipe segment, and the removal of the temporary bulkhead.
8. System according to claim 1, wherein said at least three pipe riser segments include: an initial riser pipe segment, at least one intermediate riser pipe segment, and an ending riser pipe segment, wherein said initial riser pipe segment is configured to be connected to the displacement head before starting a jacking process; wherein said ending rise pipe segment is configured to be connected to the tunnel structure at the completion of the jacking process, and to allow installation of a temporary bulkhead to prevent water from entering into the tunnel structure; and wherein said at least three riser pipe segments are configured to sustain thrust forces and allow fast joint connection and water tightness of joints and smooth interface with the sealing system.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The present invention will become more fully understood from the detailed description given hereinbelow and the accompanying drawings which are given by way of illustration only, and thus, are not limitive of the present invention, and wherein:
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
DETAILED DESCRIPTION
(12) In case of applying the invention in TBM tunnels (
(13) A displacement head (2) is fastened to keystone launching segment (3), which has previously been placed in the desired position for the installation of the riser (7). The displacement head (2) is fastened to the keystone launching segment (3) by means of removable connections elements 20 (see, e.g.,
(14) According to a peculiar feature of the invention, the correct position of keystone launching segment (3) is adjustable by regulating the rotation of said special segment rings through special slotted holes (19) or the like for the longitudinal connection between the special rings (4, 5). Said slotted holes, or the like, enable an on-site rotational adjustability of the position of keystone launching segment (3).
(15) A sealing system (6), comprising lip gaskets (6A) and additional emergency seals (6B), is configured to ensure the water tightness between riser (7) or displacement head (2) and keystone launching segment (3).
(16) According to the method of the present invention:
(17) a) A pipe jacking equipment (1) is positioned underneath said keystone launching segment (3) and
(18) b) A riser initial segment (7A) is placed onto a thrust platform (14);
(19) c) Said riser initial segment (7A) is connected to the displacement head (2) and is hold in the desired position by a pipe clamp (8) and then displacement head (2) is disconnected from keystone launching segment (3) by removing the removable connection elements 20,
d) A high-pressure water system (17) and a discharge line system (18) are hooked up to displacement head (2) passing through riser initial segment (7A),
e) The pipe jacking equipment (1) starts to drive/push riser initial segment (7A) through the soil, by means of a trust platform (14) and of a hydro-demolition system of displacement head (2) provided with nozzles configured to spray pressurized water to weaken the soil structure in the penetration area of displacement head (2),
f) The thrust force is uniformly transferred to the tunnel structure by a load distribution system (15),
g) A spacer (9) is placed under the riser initial segment (7A) to drive the segment trough the soil up to the required elevation;
h) In this position, riser initial segment (7A) is blocked by pipe clamp (8),
i) The spacer (9) is removed and a riser standard segment (78) is placed on the trust platform and connected to the previous one.
(20) These operations are repeated up to reach the desired elevation when the last segment, a riser ending segment (7C), has to be installed. Such last element is provided with two flanges: one for the permanent connection with keystone launching segment (3) and the other one to fasten a temporary bulkhead (11).
(21) Before removing displacement head (2) from the top of riser initial segment (7A), said temporary bulkhead (11) or the like must be installed at the bottom of riser ending segment (7C) to prevent water from entering in the tunnel.
(22) The final step would be the removal of displacement head (2), the installation of diffuser (10) or the like at the top riser initial segment (7A) and the removal of the temporary bulkhead (11) or the like from the bottom of riser ending segment.
(23) According to the present invention:
(24) All risers comprise at least three segments: riser initial segment (7A), riser standard segment (7B) and riser ending segment (7C).
(25) All the riser segments joints are designed and configured in order to: guarantee the desired structural capacity; avoid damage on the interface of riser segments (7) and sealing system (6) during the pushing operation; ensure water tightness, maximum assembly speed, constructability in an underground working space.
(26) For all jacking operations, before to apply the thrust, pipe clamp (8) is opened to drive riser segment into the soil and after to apply the thrust, pipe clamp (8) is closed to hold riser segment.
(27) High Pressure water system (17) and discharge line system (18) must be disconnected from displacement head (2), passed through each riser segment and reconnected to displacement head (2), before activating the pipe jacking equipment (1).
(28) A preferred embodiment designed to carry out the Riser Concept of the present invention will hereinafter be described, with reference to a non-limitative application thereof.
(29) A submarine outfall is a pipeline or tunnel that discharges municipal or industrial wastewater, storm water, combined sewer overflow or brine effluent from a wastewater treatment plant or desalination plant into a waterbody. The wastewater treatment plant treats to discharge positively buoyant effluent from a wastewater treatment plant, while the desalination plant treats to discharge negatively buoyant effluent (
(30) Both schematics show an inclined tunnel from the wastewater plant, the outfall tunnel and a diffuser comprising several risers with outlet nozzles on its top, through which the wastewater is diffused under the water surface (P. Tate—S. Scaturro—B. Cathers, 2016).
(31) In
(32) Usually, the installation of the diffusion risers represents one of the most critical activities; in fact, this is performed through a multistage offshore work (
(33) The connection of the offshore work to the underground work represents a challenging operation: “probe holes are drilled from the tunnel to ascertain the location of the pre-installed risers and to drain the risers of ballast water”, then the offtake adits are excavated to expose the risers (
(34) In typical submarine outfall tunnel projects in soil foundation, three main construction stages are executed: the underground tunnel, the maritime transition shaft and a diffusion pipeline equipped by risers anchored on the waterbody bed.
(35) In terms of schedule, the connection of diffusion tunnel equipped by risers (
(36) Typically, the connection between tunnel and the transition shaft (
(37) In submarine outfall tunnel projects, adopting the solution of the Riser Concept according to the present invention, the construction stages are simplified and in general two main construction stages are executed: the excavation of the tunnel and the construction of the risers from inside the tunnel, both underground (
(38) Then, in the non-limitative embodiments thereof submarine outfall project construction, the adoption of Riser Concept provides several benefits and advantages, such as:
(39) 1. Elimination of several works:
(40) a. maritime offshore works, i.e. dredging of the bed sediment, drilling of a riser hole, installation of permanent casing, grouting by a vessel; or, dredging of the bed sediment, construction of underwater foundation, underwater installation of pipes.
(41) b. underground activities, i.e. riser probe drilling, drill-and-blast adits excavation, installation of permanent lining and grouting; or, connection between tunnel and transition shaft, connection between transition shaft and diffusion tunnel.
(42) 2. Elimination of various maritime operations:
(43) a. Avoidance of potential construction delays, due to suspension of maritime operations, which can be inevitably induced by marine conditions.
(44) b. Minimization navigation traffic disruptions.
(45) c. Mitigation of negative environmental impacts caused by dredging and drilling activities, such as may be destruction of habitats, suspension of sediments, resettling of fishes, and displacement of infauna and marine plants.
(46) 3. Attaining a reduction of both construction cost and operational cost:
(47) a. During construction: the total cost of the project is reduced due to the elimination of several complex works, and substantial reduction of maritime operations;
(48) b. During the operational life: the hydraulic performance inside the tunnel is much improved, as encountered hydraulic losses are less, with a reduction of energy consumption.
(49) While a preferred embodiment of the invention has been described using specific terms, such description is for illustrative purposes only, and it is to be understood that changes and variations may be made without departing from the spirit or scope of the following claims.
(50) While a preferred embodiment of the invention has been described using specific terms, such description is for illustrative purposes only, and it is to be understood that changes and variations may be made without departing from the scope of the following claims.
(51) The invention being thus described, it will be obvious that the same may be varied in many ways. Such variations are not to be regarded as a departure from the spirit and scope of the invention, and all such modifications as would be obvious to one skilled in the art are to be included within the scope of the following claims.