Railroad track guidance systems and methods
11433929 · 2022-09-06
Assignee
Inventors
- Todd L. Euston (Austin, TX, US)
- Gregory T. Grissom (Georgetown, TX, US)
- Jeb E. Belcher (Georgetown, TX, US)
- Antonio R. Mauricio (Round Rock, TX, US)
- John J. Kainer (Georgetown, TX, US)
- Ryan S. Richard (Temple, TX, US)
- Carlos A. Repelli (Georgetown, TX, US)
- CHARLES W. AARON (Bertram, TX, US)
Cpc classification
B61K9/08
PERFORMING OPERATIONS; TRANSPORTING
B61L23/048
PERFORMING OPERATIONS; TRANSPORTING
E01B35/00
FIXED CONSTRUCTIONS
E01B35/02
FIXED CONSTRUCTIONS
E01B29/06
FIXED CONSTRUCTIONS
International classification
B61K9/08
PERFORMING OPERATIONS; TRANSPORTING
B61L25/02
PERFORMING OPERATIONS; TRANSPORTING
E01B35/00
FIXED CONSTRUCTIONS
B61L23/04
PERFORMING OPERATIONS; TRANSPORTING
E01B35/02
FIXED CONSTRUCTIONS
Abstract
A method for locating railroad components along a railroad track including obtaining a guidance plan and obtaining inspection data. The guidance plan includes an identity of each of a plurality of assets, the identity including previous features of the assets. The assets may be railroad components. The inspection data includes current features of a plurality of railroad components along the railroad track. The method includes using one or more processors, comparing and correlating the current features of the plurality of railroad components with the previous features of the assets to determine which of the plurality of railroad components corresponds with the plurality of assets.
Claims
1. A system for locating and servicing assets along a predetermined path, the system comprising: survey data of features along a predetermined path, the features including a plurality of assets; a guidance plan identifying a subset of the plurality of assets along the predetermined path, wherein the guidance plan is based only on the survey data; an inspection system configured to travel along the predetermined path and obtain inspection data at a time later than the survey data, the inspection data corresponding to the subset of the plurality of assets along the predetermined path identified in the guidance plan; and a controller, wherein the controller is configured to analyze the inspection data by applying one or more algorithms configured to compare and correlate the assets in the inspection data with the assets in the survey data to determine a location of the inspection system.
2. The system of claim 1, wherein the inspection data comprises a first image of a portion of the predetermined path and the survey data comprises a second image of a portion of the predetermined path.
3. The system of claim 1, wherein the guidance plan includes an identity and position for each asset of the subset of the plurality of assets along the predetermined path.
4. The system of claim 3, further comprising a tool configured to travel along the predetermined path, wherein the controller is in communication with the tool, the controller including programming to operate the tool in accordance with the guidance plan, the guidance plan including an action corresponding to an asset in the guidance plan.
5. The system of claim 4, wherein the tool is a marking tool configured to place physical indicators upon or near the asset in the guidance plan, and the controller includes programming to initiate and terminate operation of the marking tool.
6. The system of claim 5, wherein the physical indicators includes one or more of a paint mark, a RFID tag, a reflective fluid, or a chemical indicator.
7. The system of claim 4, wherein the predetermined path is a railroad track and the system further comprises a rail-traversing vehicle.
8. The system of claim 7, wherein the tool is mounted on a trailer configured to be towed behind the rail-traversing vehicle.
9. The system of claim 7, further comprising a coordinate locating system configured to provide a real-time location of the tool.
10. The system of claim 9, wherein the coordinate locating system comprises an encoder.
11. The system of claim 4, wherein the inspection data and the survey data each includes features of one or more reference components, the controller includes one or more algorithms configured to compare and correlate the features of the one or more reference components in the inspection data with the features of the one or more reference components in the survey data to determine a location of the tool relative to the asset in the guidance plan, the position of the asset in the guidance plan being a known relative position from the one or more reference components.
12. A method for locating and servicing assets along a predetermined path, the method comprising: obtaining survey data of a predetermined path by traversing the predetermined path a first time, the survey data including previous features of the predetermined path; analyzing the survey data, the previous features of the predetermined path including assets; generating a guidance plan based on analyzing the survey data, the guidance plan identifying specific assets along the predetermined path; traversing the predetermined path a second time with an inspection system after generating the guidance plan, wherein generating the guidance plan is done prior to traversing the predetermined path the second time and wherein traversing the predetermined path the second time is done after completely traversing the predetermined path the first time; using the inspection system, obtaining inspection data of the predetermined path, the inspection data including current features of the specific assets along the predetermined path; and using one or more processors, comparing and correlating the current features of the specific assets and the previous features of the specific assets to determine a position of the inspection system.
13. The method of claim 12, wherein the guidance plan includes an identity and a position of each specific asset along the predetermined path.
14. The method of claim 13, further comprising aligning a tool with one of the specific assets after determining the position of the inspection system.
15. The method of claim 14, wherein the tool is a marking tool, and the method further comprises: signaling the marking tool with the one or more processors when the marking tool is aligned with one of the specific assets; and marking the one of the specific assets.
16. The method of claim 13, wherein generating the guidance plan further comprises: identifying a plurality of components along the predetermined path based on the survey data; analyzing a condition of the plurality of components; identifying a subset of the plurality of components as a plurality of specific assets; and generating the guidance plan with the plurality of specific assets.
17. The method of claim 13, wherein the predetermined path is a railroad track and the specific assets are a plurality of railroad components.
18. The method of claim 17, wherein the plurality of railroad components includes railroad ties.
19. The method of claim 18, wherein the current features includes a relative spacing of a group of the railroad ties and the previous features includes the relative spacing of the group of railroad ties.
20. The method of claim 17, wherein the inspection data comprises a first image of a portion of the railroad track and the survey data comprises a second image of a portion of the railroad track.
21. A method for locating railroad components along a railroad track, the method comprising: traversing a railroad track a first time obtaining survey data, the survey data including prior features of a plurality of railroad components along the railroad track; obtaining a guidance plan, the guidance plan including an identity of each of a plurality of specific assets, the specific assets being railroad components along the railroad track that have been identified to warrant additional inspection, maintenance, or replacement based on the survey data; traversing the railroad track a second time with an inspection system after obtaining survey data and after obtaining the guidance plan; obtaining inspection data with the inspection system; and traversing the railroad track with a tool and aligning the tool with one of the plurality of specific assets using the identity of the one of the plurality of specific assets, wherein the tool traverses the railroad track behind the inspection system.
22. The method of claim 21, wherein the identity comprises one or more of a known position of the tool with respect to the inspection system, a velocity of the inspection system, a velocity of the tool, or a real-time location coordinate from a coordinate locating system.
23. The method of claim 21, wherein the identity includes previous features of the specific asset, and the method further comprises using one or more processors, comparing and correlating current features of the plurality of railroad components with the previous features of the plurality of specific assets to determine which of the plurality of railroad components corresponds with the plurality of specific assets.
24. The method of claim 23, wherein the comparing and correlating is performed while traversing the railroad track.
25. The method of claim 23, wherein the identity of each of the plurality of specific assets includes a position of the asset, the position of the asset being comprised of an identity of one or more reference components and a relative position of the asset with respect to the one or more reference components.
26. The method of claim 23, wherein the plurality of specific assets includes railroad ties.
27. The method of claim 26, wherein the previous features of the railroad ties includes a relative spacing of a group of the railroad ties.
28. The method of claim 26, wherein the previous features of the railroad ties includes a leading edge and a trailing edge of the railroad ties.
29. The method of claim 23, wherein at least some of the plurality of railroad components include an RFID tag with a component identifier and the previous features of the plurality of specific assets includes the component identifier.
30. The method of claim 23, further comprising creating an alert when one of the plurality of railroad components correlated to one of the plurality of specific assets contains current features that are different from the previous features.
31. The method of claim 21, further comprising repairing or replacing the one of the plurality of specific assets using the tool.
32. The method of claim 21, further comprising physically marking the one of the plurality of specific assets using the tool.
33. A method for correlating inspection data, the method comprising: creating a guidance plan impulse signal of survey data that includes previous features of specific assets along a predetermined path; creating an inspection data impulse signal of inspection data that includes current features of the specific assets along the predetermined path; separating the survey data and the inspection data into one or more groups; and aligning at least a portion of the inspection data with at least a portion the survey data based on irregularities in the one or more groups.
34. The method of claim 33, further comprising generating cross correlation data from the guidance plan impulse signal and the inspection data impulse signal, wherein the cross correlation data provides a degree of detected correlation and a measure of confidence.
35. The method of claim 34, wherein generating cross correlation data further comprises determining a dot product on the guidance plan impulse signal and the inspection data impulse signal.
36. The method of claim 35, wherein determining the dot product further comprises shifting one or both the guidance plan impulse signal and inspection data impulse signal.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10) While the disclosure is susceptible to various modifications and alternative forms, specific embodiments have been shown by way of example in the drawings and will be described in detail herein. However, it should be understood that the disclosure is not intended to be limited to the particular forms disclosed. Rather, the intention is to cover all modifications, equivalents and alternatives falling within the scope of the invention as defined by the appended claims.
DETAILED DESCRIPTION
(11) An embodiment of a system 100 for locating and servicing assets, such as railroad components, along a predetermined path, such as a railroad track, is shown in
(12) The inspection system 150 is configured to scan and collect features of the predetermined path, such as a component's characteristics, including thermal characteristics, surface profile, position coordinates, and internal characteristics, and/or an image of the predetermined path and components along the predetermined path. The inspection system 150 may include one or more of a camera 151, LiDAR 152, laser 153, or internal imaging system 154, such as x-ray or neutron inspection systems. The inspection system 150 may include a 2D or 3D machine vision system. The inspection system 150 may include a system described in U.S. Pat. No. 9,441,956, entitled “System and Method for Inspecting Railroad Ties” filed on Jan. 19, 2015, the disclosure of which is incorporated herein by reference in its entirety. The internal imaging system 154 may include a system described in U.S. Pat. No. 9,031,188, entitled “Internal Imaging System” filed on Feb. 7, 2013, the disclosure of which is incorporated herein by reference in its entirety.
(13) The computer readable mediums 160 are capable of storing current inspection data 155, a guidance plan 170, and survey data 165. The inspection system 150 traverses and examines the predetermined path to collect the inspection data 155, which is compared with previously collected survey data 165 of the same path. The current inspection data 155 and survey data 165 each includes features of the predetermined path, such as a component's characteristics, including thermal characteristics, surface profile, position coordinates, and internal characteristics, and/or an image of the predetermined path and components along the predetermined path. As used herein, historical data of the predetermined path is referred to as survey data while current data is referred to as inspection data. However, the survey data 165 and the inspection data 155 include the same or overlapping categories of information, and in some embodiments may be gathered using the same system and analysis. The inspection data 155 may be gathered during a current pass while the survey data 165 may be gathered during one or more prior passes along the predetermined path. The survey data 165 may be compiled using information gathered from multiple surveys. Multiple surveys may be used to track characteristics over time; such as if a component changes positions, is wearing at an accelerated rate, or is subject to fluctuations in heat.
(14) Both the survey data 165 and the inspection data 155 may be gathered using the same inspection system 150. In some embodiments, the survey data 165 and the inspection data 155 may be gathered using different systems. For example, survey data 165 may be collected by a drone traversing the predetermined path and equipped with a camera 151, LiDAR 152, and/or a laser 153. The inspection data 155 may be gathered via the inspection system 150, which may be mounted upon a vehicle 101 traveling on rails of the railroad track. The current inspection data 155 is provided to a processor 131 of a controller 130 in order to correlate features of the asset identities 171 in the guidance plan 170 with features of the components at the current location. For example, the processor 131 may compare a first image of a portion of the railroad track with a second image of the railroad track and execute one or more algorithms to correlate features within the images. An operator may also select a portion of the images to be correlated.
(15) The guidance plan 170 includes information relating to assets along the predetermined path. The survey data 165 is analyzed to determine which components along the predetermined path should be identified in the guidance plan 170. As used herein, the term asset refers to a specific component along the predetermined path that has been identified to warrant additional inspection, maintenance, or replacement. For example, an asset may be a railroad tie that needs to be replaced, a missing spike, an anchor, a field weld, a rail, a joint bar, a tie plate, a missing component, or a region of track to be measured and verified. Likewise, components with a grade below a predetermined level may be designated as an asset. It is appreciated that the methods and systems described herein may be applicable to a wide variety of railroad maintenance. When inspection data 155 is collected representing the current condition of components along the predetermined path, similarities between the current data and the historical data are used to identify which of the components are the assets and to verify the location so that the right component may be serviced or marked.
(16) An exemplary embodiment of a guidance plan 170 is shown in
(17) The system 100 may include a coordinate locating system 140, such as a GPS system 141 and/or encoder 145, configured to provide real-time location coordinates of the system 100. The encoder 145 measures linear distance traveled along the track. The encoder 145 may be a single encoder or multiple encoders. The real-time location coordinates from the coordinate locating system 140 are provided to the processor(s) 131 of the controller 130 in order to correlate the position 172 of the assets in the guidance plan 170 with the railroad components at the current location. The real-time location coordinates may be directly provided to the processor(s) 131 or first stored in the computer readable medium 160, such as in the current inspection data 155.
(18) Data from the GPS system 141, encoder 145, or combinations thereof may be sufficient to accurately correlate a component at the current location with the identity 171 and position 172 of an asset in the guidance plan 170. In some instances, GPS data alone may be insufficient to provide the level of detail necessary. Data from the GPS system 141 may be used to identify a region where the system 100 is located. GPS data may be further limited inside tunnels or in narrow valleys. Data from an encoder 145 may be used to further refine the GPS estimates. However, data from the GPS system 141 and encoder 145 may be subject to errors such as scaling and slippage. For example, a level of certain greater than 18″ could result in misidentifying a tie for replacement, when it is actually a neighboring tie that needs replaced. Similarly, even greater precision may be required for operations such as identifying or replacing damaged spikes. Correlation of the features in the asset identity 171 to features of the component at the current location may be used to identify the component as the asset.
(19) The system 100 includes a controller 130 to correlate the location of the system 100 with asset positions 172 so that an action 173 in the guidance plan 170 associated with the identity 171 of that asset may be executed. The controller 130 includes one or more processor(s) 131. In some embodiments, the controller 130 includes a remote link 136 to access remotely stored data. The computer readable mediums 160 may be contained within the controller 130. The guidance plan 170 may be stored directly on a computer readable medium 160 of the controller 130. The controller 130 accesses, locally or remotely, a guidance plan 170 corresponding to the predetermined path being traveled. The controller 130, or another controller, may also be utilized to operate the inspection system 150.
(20) The controller 130 includes programming to access the guidance plan 170 to determine the identity 171 and the position 172 of assets to be marked. The controller 130 also includes one or more algorithms to be executed by the processor(s) 131 to correlate the current location of a portion of the system 100 with the position 172 of an asset within the guidance plan 170. As the system 100 traverses railroad tracks, the processor(s) 131 correlate the location of the railroad components near the system 100 with the position 172 of an asset in the guidance plan 170 using real-time location data and/or by correlating features in the asset identity 71 to features of the component at the current location. In some embodiments, the controller 130, or another controller, provides and/or receives information with a graphical user interface 180. The graphical user interface 180 may be a computer or tablet computer positioned within a cab of a hi-rail vehicle, for example. Inspection data 155 from the current pass along the predetermined path may be a displayed side-by-side or overlaid with the survey data 165 such that an operator viewing the graphical user interface 180 can view the correlation between the data. In some instances, the operator may make adjustments to the correlated data.
(21) Once an asset has been located, it is “marked” logically for further actions. A notification may be presented through the graphical user interface 180, such as a visual or audible alert, to indicate that a component has been recognized as an asset within the guidance plan 170. The controller 130 may determine the action 173 that corresponds to the identity 171 and position 172 of the located asset. The action 173 may include aligning one of the tools 105 with the located asset. The action 173 may include physically marking the asset with the marking tool 110 so that it can be more readily identified by a team performing maintenance, such as a tie gang. The physical and logical marking may form a single action. In some embodiments, one or more actions 173 may be displayed upon the graphical user interface 180 for selection by an operator. The action 173 may be to perform maintenance on the asset with the component tool 106, such as replacing a tie, placing a spike in a tie plate, or tightening a joint bar. In some cases, the action 173 may be to alert an operator that the features contained within the inspection data 155 and the features contained within the survey data 165 are different, indicating that a change to the component has occurred. The component tool 106 may be used to service the asset as part of overall maintenance operations or the marking tool 110 may be used to place a physical indicator 115 on or near the asset. Depending on the type of railroad maintenance to be performed, performing the service as part of the same consist as the inspection system 150 may reduce the need for physical markers, reduce opportunities for misidentification, and/or expedite maintenance operations. In instances where it is desired or needed to perform the maintenance operations at a later time, the physical indicator 115 may be used to more readily identify the asset. Likewise, the physical indicators 115 may be selected to correspond to an indicator detector on a component tool 106.
(22) In some embodiments, the asset position 172 may be determined by the correlation of features of reference components at a current location with prior features of the reference components from the survey data 165 and used as a frame of reference to locate assets to be marked. For example, the reference component may be another railroad component or identifiable component along the predetermined path.
(23) The controller 130 includes programming to access the asset position 172A in the guidance plan 170 to determine the identities 176 and positions 177 of the reference components. The controller 130 also includes one or more algorithms to be executed by the processor(s) 131 to correlate the location of a component on the railroad track with the position 177 of the reference component in the guidance plan 170A to determine the current location of the system 100 or one of the tools 105, such as the marking tool 110. The controller 130 may include programming to be executed by the processor(s) 131 to utilize the relative position 178 in the asset position 172A to align one of the tools 105 with the asset. According to the action 173 associated with the asset, the asset may be marked using the marking tool 110 or serviced via the component tool 106. The asset may also be marked, logically or physically, for further observation.
(24) For example, the controller 130 may correlate the current features of a joint bar with previously surveyed features of the joint bar and thereby determine the location of the tool 105 along the railroad track. Once the location of the tool 105 has been determined, the action 173 for that asset may be executed on the asset. For instance, the marking tool 110 may be used to mark the joint bar. Alternatively or in addition, using the known relative position 178 of another asset, such as a tie, with respect to the joint bar, the joint bar may be used as a reference point to guide the tool 105 into alignment with the tie. Also for example, the component positions 177 may include the leading and trailing edges of a tie and the asset relative position 178 may identify the position of a missing spike relative to the leading and trailing edges of the tie. Therefore, the asset being marked is not necessarily the reference component whose features are correlated to determine the location of the tool 105.
(25) The system 100 may include a trigger 120 to initiate and terminate operation of the tools 105. The trigger 120 is connected to the controller 130 via a communication link 135. The communication link 135 represents generally any combination of cable, wireless, or remote connection via a telecommunication link, an infrared link, a radio frequency link, or any other connectors or systems that provides electronic communication between the trigger 120 and the controller 130. In some embodiments, the trigger 120 is integral to the tools 105 themselves. The trigger 120 may be automatically operated by the controller 130. In embodiments comprising multiple tools 105, such as one or more component tools 106 and/or a marking tool 110, the trigger 120 may initiate and terminate operation of the tools 105 independently of each other. The trigger 120 may cause a tie or joint bar to be marked with a physical indicator 115 in one section and cause replacement operations to commence on a tie at another section of the consist.
(26) An embodiment of a marking tool 110 and its operation includes the controller 130 accessing the guidance plan to determine the identity 171 and position 172 of assets to be physically marked. The controller 130 includes one or more algorithms to be executed by the processor(s) 131 to correlate the current location of the marking tool 110 with the position 172 of the pre-identified assets 171 within the guidance plan 170. As the system 100 travels along the predetermined path, the controller 130 correlates the current location of the marking tool 110 with the position 172 of the assets to be marked and signals the trigger 120 to initiate a marking phase when the marking tool 110 is aligned with one of the assets. Once a physical indicator 115 has been placed on or near the asset, the controller 130 releases the trigger 120 to terminate the marking phase.
(27) A physical indicator 115 placed near an asset may not be on an asset, but is close enough to indicate which asset is being marked. For example, a physical indicator 115 near a tie may be on the ballast or rail adjacent to the tie, and a physical indicator 115 for a tie plate may be on the tie adjacent to the tie plate. The marking tool 110 may include a laser configured to mark assets along the predetermined path. The physical indicators 115 may be paint marks. The marking tool 110 may include a sprayer, dauber, or gun positioned to paint a portion of a railroad component along the railroad track as the system 100 traverses the railroad track. The physical indicators 115 may be more permanent than paint. The physical indicators 115 may be chemical, electrical, or radio. For example, the physical indicators 115 may be a RFID tag applied with an adhesive or mechanical fastener. The physical indicators 115 may be a reflective fluid or chemical detectable by a railroad worker and/or sensor. The physical indicators 115 may be an etching or engraving. The physical indicator 115 may be an object with a specific shape or physical characteristic or a change of a shape or characteristic of the component being marked. For example, the physical indicators 115 may have a shape that is not common to the component being examined, such as a cube or pyramid shape, so that it may be more readily distinguished from the component. The physical indicator 115 may be a magnet. For instance, a cube shaped magnet may be magnetically coupled to a rail or tie plate on a railroad track, and an inspection system 150 may be used to detect the cube shape and detect a magnetic field emitted from the physical indicator 115. Other types of physical indicators 115 are possible. The marking tool 110 may place different physical indicators 115 to designate different conditions. Different physical indicators 115 may be used to designate a type of railroad component to be replaced, a grade (rating) of a railroad component, and/or other characteristic of the railroad component. For example, different colors of physical indicators 115 may be used. A degraded tie may be marked with a first color, a misaligned or sunken tie plate marked with a second color, and a missing spike marked with a third color. In other embodiments, different physical indicators 115 may include variations in number, pattern, intensity, shape, or placement of marks. The railroad components may be directly marked. In other embodiments, the railroad component may be indirectly marked, such as by marking a tie with the second color to indicate that a tie plate associated with that tie is misaligned or sunken. In the case of railroad maintenance, physical indicators 115 may still be used when the operations are being performed by equipment within the same consist. For instance, physical indicators 115 may assist in aligning component tools 106 and/or reduce the computational requirements for preserving an asset's location as the system 100 continues to travel down the railroad tracks.
(28) In some embodiments, a separate consist may use the physical indicators 115 to determine which operations to perform and/or to align a component tool 106 with an asset to be serviced. It is appreciated that the use of the physical indicators 115 may be used in connection with, or in some cases separate from, the correlated component features discussed herein. Physical indicators 115, such as an RFID tag, may be placed on the railroad component. The RFID tag includes a component identifier and may include a coordinate location of the railroad component. The RFID tag may include other information regarding the railroad components, such as the last date the RFID tag was accessed. The RFID tag may be used to correlate the location of a tool 105. For instance, the inspection system 150 may include a reader to access the component identifier of the RFID tag, which can then be used with information such as GPS data, encoder data, machine vision data, or combinations thereof, to correlate the location of the system 100 along the railroad track. RFID tags may be placed periodically along the railroad track or on specific components, such as railroad ties. In addition, the correlation of features and identification of a component may be conducted without the use of an RFID tag, but the RFID tag corresponding to the identified component may then be read and provided to a component tool 106 so that the component tool 106 may be aligned with the component matching the component identifier of the RFID tag. In some embodiments, the identification of components may be conducted using only RFID tags.
(29) The system 100 may be mounted upon a vehicle 101. The vehicle 101 may be a rail-traversing vehicle. The vehicle 101 may be an unmanned aerial vehicle (UAV). The rail-traversing vehicle 101 may be a hi-rail equipped pickup truck or other vehicle traveling upon rails of the railroad track. In other embodiments, the system 100 may be mounted on a trailer 102 to be towed behind a rail-traversing vehicle 101. In still other embodiments, a portion of the system 100 may be mounted upon the rail-traversing vehicle 101 and another portion may be mounted on the towable trailer 102. For example, the controller 130 may be mounted on a rail-traversing vehicle 101 and the tools 105 may be mounted on the trailer 102 behind the rail-traversing vehicle 101. Further, a marking tool 110 may be mounted on one trailer 102 and one or more component tools 106 are mounted on one or more additional trailers 102, such as rail cars. The guidance plan 170 may be accessed by the controller 130 from within the inspection vehicle 101 and signals are sent to the trigger 120 via the communication link 135 in order to operate the tools 105. In some embodiments, the rail-traversing vehicle 101 may be the same vehicle used to conduct an initial survey to gather survey data 165 to form the guidance plan 170.
(30) In operation, assets, such as railroad components, along the predetermined path, such as a railroad track, may be identified by comparing previous features in the survey data 165 with current features of the predetermined path in the inspection data 155. The survey data 165 is analyzed to determine an asset of interest, whose identity 171 and position 172 are placed into the guidance plan 170. As the system 100 travels along the predetermined path, inspection data 155 is generated and similarities between the survey data 165 and inspection data 155 are utilized to identify which components are assets so that they be actually physically marked and/or serviced.
(31) An embodiment of a method 200 for identifying assets, such as railroad components, along a predetermined path, such as a railroad track, is show in
(32) In Action 210, the survey data is analyzed to identify specific assets of interest in Action 215. The assets may be identified automatically based upon certain conditions or may be manually selected. The assets may require further inspection or warrant repair or replacement. For instance, the assets may be a tie that needs replacing, a missing spike, a misaligned or missing tie plate, the presence of a field weld, a joint bar that may need replacing or tightening, or a region of track where the rail gauge needs to be adjusted or verified. The identities of the assets are used to generate a guidance plan in Action 220. The guidance plan includes characteristics of the assets and may include characteristics of other components in a region containing one of the assets.
(33) In Action 225, the railroad track is scanned and a current physical representation of the railroad track is obtained. The railroad track may be scanned using a survey system that is similar to the system used to generate the previous survey data. Inspection data of the current conditions of the predetermined path is generated in Action 230 from the scan in Action 225. In Action 235, the inspection data is compared with the survey data. From the comparison, an asset is located in Action 240. The inspection data may be displayed side-by-side or overlaid with the survey data such that an operator viewing a graphical user interface can view the correlation between the data. The operator may make adjustments to the correlated data. Once the asset has been located, it is logically marked. A notification may be presented through the graphical user interface, such as a visual or audible alert, to indicate that a component has been recognized as an asset within the guidance plan. Depending on the types of component and the action to be performed, the asset may be marked with physical indicators in Action 245. Then, in Action 250, the asset may be examined or serviced. In some embodiments, the asset may be examined or serviced without any physical marking taking place.
(34) In some embodiments, the physical indicators that have been placed or physical indicators that have been previously placed may be used in place of, or in addition to, GPS data, encoder data, machine vision data, or combinations thereof. The inspection system may include a reader to read the physical indicator, such as an RFID tag or chemical marker, associated with a portion of the railroad track or a railroad component. Information from the physical indicator may be used to locate an asset, or the physical indicator may serve to identify a reference component and locate the asset in relation to the reference component. In some embodiments, the identification of components may be conducted using only RFID tags.
(35)
(36) The method 300 includes Action 320 of generating a guidance plan that identifies which of the components have been designated as assets. The guidance plan includes an asset identity and position. The asset identity includes features of the asset that correspond to survey data received from steps 305 and 310 that may be used to correlate and verify the identity of the asset. The position may include coordinates, relative coordinates, or may in some embodiments be encompassed by the features in the identity which are used to verify the identity and thereby the location of the asset. The survey results, or a portion thereof, may be stored as part of the guidance plan to be compared with current inspection data obtained while operating the guidance system. The assets may be railroad components, such as ties, along a specific stretch of railroad track. Actions 305-320 may take place during and/or after an initial pass of an inspection vehicle. The guidance plan is used to designate or automatically mark assets along the predetermined path.
(37) Actions 325-380 may be performed on a different pass than Actions 305-320 and/or may take place on a separate vehicle. In some embodiments, Actions 305-380 may take place on a single pass. In other embodiments, Actions 305-380 may be divided between multiple passes. It is foreseeable that systems with sufficient computing power may be capable of performing a survey, analyzing the condition of components, identifying assets, and generating a guidance plan while a service vehicle, such as a tie gang, follows behind to perform repairs or replacements. For example, a set of rules and/or statistical data and conditions of the assets may be used to create a guidance plan from a single pass. The statistical data may be created by applying statistical analysis to inspection data. As an inspection system traverses the railroad track, the condition of components is analyzed and assets are identified. Using a known position of a tool with respect to the inspection system, a velocity of the inspection system, a velocity of the tool, and/or real-time location coordinates from a coordinate locating system, such as measurements from an encoder, the position of a tool following behind the inspection system is identified. When the tool is aligned with one of the assets, the tool may be used to mark or service the asset. In other words, the guidance plan may be generated from the inspection data, and the identity of the assets may be defined using a known position of a tool with respect to the inspection system, a velocity of the inspection system, a velocity of the tool, and/or real-time location coordinates from a coordinate locating system. The velocity of the inspection system may be equal to the velocity of the tool if the tool forms part of the same consist as the inspection system. In some embodiments, these elements are used in addition to the previous and current features of the railroad track to align a tool with an asset after being scanned by an inspection system.
(38) Action 325 includes determining the current location of a marking tool of a guidance system or of another tool, such as a component tool used to service a component. The guidance system may be system 100. The marking tool is configured to place indicators on or near assets along the predetermined path. Using a coordinate locating system of the guidance system, the current location of the tool is determined. The coordinate locating system may include a GPS and/or an encoder.
(39) In Action 330 of method 300, the position of an asset is obtained from the guidance plan. A controller of the guidance system may locally or remotely access the guidance plan corresponding to the predetermined path in order to obtain the asset position. In Action 335, the position of the asset is compared to the current location of the marking tool by a processor of the controller. In Action 340, the position of the asset to be marked is correlated with the location of the guidance system. As the guidance system travels along the predetermined path in either direction, the controller updates the current location using the coordinate locating system to correlate to the position predicted within the guidance plan. The current location of the guidance system may be updated until it corresponds to the position of an asset to be marked. In some embodiments, GPS data is utilized to determine a general region of the guidance system. The location of the guidance system may be further refined through or replaced with the use of an encoder.
(40) In some instances, the coordinate locating system alone may be insufficient to adequately correlate the current location of the guidance system with respect to the position identified in the guidance plan. Distinguishing features of the assets may be used to correlate and verify the identity of assets along the predetermined path. In some embodiments, the correlated features may be used to indirectly identify an asset to be marked. For example, a known distance of the correlated features from an asset to be marked may be used to align a marking tool or component tool with the asset to be marked. In railroad applications, current track features obtained from an inspection system may be periodically compared to the survey data at or near the predicted location. The features may be continuously compared. If the compared data does not correlate, corrections to the current location of the guidance system are made to keep the current location aligned with the position within the guidance plan.
(41) Method 300 may include Actions 345-370. Survey data is obtained in Action 345 of method 300 for use in comparing and correlating features. A controller of the guidance system may locally or remotely access survey data corresponding to the predetermined path. In Action 350, the predetermined path is inspected again using an inspection system to identify features of the predetermined path, such as a component's characteristics, including thermal characteristics, surface profile, position coordinates, and internal characteristics, and/or an image of the predetermined path and components along the predetermined path. The inspection system may include a 2D or 3D machine vision system. The inspection system is used to generate inspection data in Action 355 that corresponds to current conditions of the predetermined path, which is then compared with the prior survey data in Action 360. In Action 365, features within the current inspection data and features within the survey data are correlated to determine the location of the guidance system with respect to the position of the assets to be marked. In other words, asset features previously identified during the survey are compared and correlated with features currently being inspected in real time in order to determine the location of the guidance system relative to an asset to be marked, serviced, or otherwise located. For railroad tracks, these features may include, but are not limited to the leading or trailing edge of ties, joint bars, crossings or bridges, patterns on the surface of a tie, such as texture or crack location, or plate size and/or plate cut measurement.
(42) Algorithms and machine visions systems may be used to correlate the data. In other embodiments, an operator may review the current characteristics side-by-side or overlaid with the survey data to correlate the guidance system's current location with the position of the assets in the guidance plan and manually adjust the current location of the marking tool. In Action 370, the correlated data may be used to update the current location of the guidance system relative to the asset to be marked. In some embodiments, the component whose position and features are compared and correlated is different from the asset being marked. In Action 330, the identity and position of a reference component, such as another railroad component, may be obtained from the guidance plan. In Action 335, the position of the reference component is compared to the current location of the guidance system. In Action 340, the position of the reference component is correlated to determine the current location of the guidance system along the railroad track. Then, a known relative position between an asset to be marked and the reference component may be utilized to align the marking tool with the asset to be marked. In Actions 360-370, features of the reference component obtained from the current inspection data are compared and correlated with features within the survey data to determine and update the location of the marking tool or component tool along the railroad track. The known relative position between an asset to be marked and the reference component may be utilized to align the marking tool or component tool with the asset to be marked and serviced.
(43) The initial track survey may be conducted on a separate occasion. The same inspection vehicle that conducted the survey may also be equipped with the guidance system to mark and/or service the assets on a subsequent pass. In some embodiments, the track survey of a first set of assets may be performed simultaneously with marking of a second set of assets. A known distance between the inspection system conducting the survey and the marking tool or component tool may be used to correlate the current position of the tool with the position of an asset to be marked or serviced. The guidance system may be mounted upon the inspection vehicle conducting the survey or towed in a trailer behind the inspection vehicle. The inspection system surveys the track, processes the data to determine railroad components to be replaced, repaired, or otherwise serviced and a guidance plan is generated identifying the assets to be replaced or repaired. As the inspection vehicle continues to survey another portion of the track, the guidance system marks the assets or the component tool services the assets as identified in the guidance plan. Generation of the guidance plan may be performed within the inspection vehicle during a single pass. However, with the development of communication links capable of supporting greater speeds and bandwidth, it is foreseeable that survey data may be transmitted to another location, analyzed to generate a guidance plan, and the guidance plan relayed back to the inspection vehicle or guidance system before the guidance system passes the assets identified to be marked. In yet another embodiment, the guidance system may be mounted upon a second rail-traversing vehicle following the inspection vehicle. Information obtained from the survey may be processed by the inspection vehicle or the second rail-traversing vehicle to form the guidance plan used by the guidance system on the second rail-traversing vehicle.
(44) The method 300 may include physically marking the asset in Action 375. The controller may automatically access, or an operator may instruct, an action that corresponds to a particular asset. The action or actions corresponding to a particular asset may be stored within the guidance plan. The action may include physically marking an asset, replacing an asset, repairing an asset, or conduct further examination or monitoring of the asset. If the action indicates that the asset should be physically marked, when the marking tool is aligned with the asset, the controller initiates the marking phase. During the marking phase, the marking tool places physical indicators on or near the asset. For example, a paint stripe may be placed along the width of a degraded tie. Once the asset has been marked, the controller releases the trigger to terminate the marking phase. The process is continued until each asset identified in the guidance plan has been physically marked by the marking tool or other action has taken place according to the guidance plan. Subsequently, a replacement crew or specialized machine may use the physical marks to identify railroad components to be replaced or repaired. In Action 380, the asset may be examined or serviced. In some embodiments, the asset may be examined or serviced without any physical marking taking place.
(45) In some embodiments, the system and methods may be used to find new and/or unaccounted for changes to the components. For example, such systems and methods could be used to determine whether maintenance was performed to the correct components or if unauthorized changes were made to other components. In one instance, a tie gang may operate upon a railroad track and replace a group. A scan of the railroad track may be conducted to generate current inspection data, and a comparison and correlation of the current inspection data to previously gathered survey data would indicate any components that have changed, such as ties that are in different positions. An alert may be triggered upon a graphical user interface to inform an operator of these changes. In other words, an alert may be created when a railroad component from the current inspection data is correlated to an asset in the previous survey data, but the current features are different from the previous features, indicating that a change to the component has occurred. The creation of the alert may be the action corresponding to the asset in the guidance plan, if the different features are detected. In this manner, the operator could quickly identify if the proper ties were replaced and the work could be checked. Likewise, changes to components caused by other events, such as a washout of ballast by flooding or wear by rail traffic, may be more readily identified.
(46)
(47)
(48)
(49) Although this disclosure has been described in terms of certain preferred embodiments, other embodiments that are apparent to those of ordinary skill in the art, including embodiments that do not provide all of the features and advantages set forth herein, are also within the scope of this disclosure. Accordingly, the scope of the present disclosure is defined only by reference to the appended claims and equivalents thereof.