Abstract
Provided is a method of operating a hybrid power plant, including energy generating units including a wind park and at least one unit of another type of renewable energy source and including an energy storage system, the method including: creating a power production schedule based on an actual forecast of power production, an actual forecast of energy price and actual hybrid power plant status, the power production schedule including at least scheduled power for points in time in the future; and controlling, during the points in time in the future the energy generating units and the energy storage system based on the power production schedule, the hybrid power plant status at the points in time in the future, in particular energy storage system status, such as to dispatch power according to the power production schedule, but complying with any grid operator reference at the points in time in the future.
Claims
1. A method of operating a hybrid power plant, including energy generating units comprising a wind park and at least one unit of another type of a renewable energy source and comprising an energy storage system, the method comprising: creating, in particular by an energy management system, a power production schedule based on an actual forecast of power production, an actual forecast of energy price and actual hybrid power plant status, the power production schedule including at least scheduled power for points in time in the future; and controlling, during the points in time in the future, in particular by a plant controller, the energy generating units and the energy storage system based on the power production schedule and the hybrid power plant status at the points in time in the future, in particular energy storage system status, to dispatch power according to the power production schedule, but complying with any grid operator reference at the points in time in the future, wherein creating the power production schedule in particular involves application of a mathematical model and/or an optimization process to optimize a selectable target function, in particular making the hybrid power plant predictable and/or controllable and/or dispatchable.
2. The method according to claim 1, wherein the actual forecast of power production, comprises: forecast of power due to wind in the geographical region of the wind park and/or forecast of power due to sun irradiance in the geographical region of solar power units comprised in the hybrid power plant.
3. The method according to claim 1, wherein the power production schedule is created such as to achieve a desired goal, and/or maximize or minimize a target function, in particular improve profitability and/or reduce power deviations from a previously defined Power Forecast.
4. The method according to claim 1, wherein the power production schedule is created by applying energy arbitrage and/or applying capacity firming, wherein during applying energy arbitrage the power production schedule is created such that: power produced by the energy generating units is stored in the energy storage system, when the energy price is low and energy is released from the energy storage system, when the energy price is high, in particular to maximize profit, wherein during applying capacity firming the power production schedule is created such as to assure a constant and/or predictable and/or dispatchable output power generation capability.
5. The method according to claim 1, wherein the power production schedule is updated at regular points in time, in particular periodically, or irregular points in time.
6. The method according to claim 1, wherein controlling the energy generating units and the energy storage system is further based on a selected grid code application and/or selected energy source priority.
7. The method according to claim 6, wherein at least one other type of a renewable energy source is sun energy, the respective energy generating units comprising solar power units, wherein the energy source priority is selected from the group consisting of: wind power priority: wherein power output of the wind park is maximized, all other types of energy generating units are limited so that a maximum allowed power output or scheduled active power or grid operator reference of the hybrid plant is not exceeded; sun power priority: wherein power output of the solar power units is maximized, all other types of energy generating units are limited so that a maximum allowed power output or scheduled active power or grid operator reference of the hybrid plant is not exceeded; selectable share: Maximum use of solar and wind resources is made when available power is below the maximum allowed limit; hybrid power generation is produced as a percentage of share of solar and wind power when the power from both generation resources is available.
8. The method according to claim 6, wherein the selected grid code application is selected from the group consisting of: voltage control at the point of common coupling to which all energy generation units the energy storage system is connected; primary frequency regulation at the point of common coupling; providing spinning reserve, including to store some of the energy generated by a wind turbine of the wind park in the energy storage system; smoothing of power fluctuations at the point of common coupling by discharging or charging the energy storage system depending on fluctuating power generated by the energy generating units; ramp rate depending charging and discharging the energy storage system, including reducing the rate of change or variation of the generated power so that it affects less to the grid; base load assurance, wherein capacity of the storage system is selected based on minimum power to be output by the plant and duration of the minimum power to be assured; power curtailment of at least one particular energy generating unit by charging the energy storage system or limiting its power generation; adhering to the schedule active power or the grid operator reference, by appropriately charging/discharging the energy storage system; power limit adherence, wherein the energy storage system is charged in order to keep the plant output power below a given power limit or wherein the energy generating units are controlled to limit their power generation.
9. The method according to claim 6, wherein the selected grid code application is performed, in particular by a local plant controller, considering at least one of: the scheduled power; the plant status; at least one grid operator reference.
10. The method according to claim 7, further comprising, in case of a failure of a controller and plant output power exceeds maximum technical or administrative allowed output: if, plant power output is above a first threshold but below a second threshold: trying to trip at least one energy generating unit; if tripping is not successful: disconnecting at least one energy generating unit; if disconnecting is not successful: opening a main plant breaker, normally connecting the plant to the grid; if opening the main plant breaker fails: a relay at the input of the plant transformer disconnecting the plant from the utility grid in case of overcurrent.
11. The method according to claim 1, wherein the scheduled power and/or the grid operator reference relates to a power at a point of common coupling to which all energy generating units and the energy storage system output their power or relates to a power at a different point, in particular a generation unit point of connection and/or storage system point of connection.
12. An arrangement for operating a hybrid power plant, including energy generating units comprising a wind park and at least one unit of another type of a renewable energy source and comprising an energy storage system, the arrangement comprising: an energy management system adapted to create a power production schedule based on an actual forecast of power production, an actual forecast of energy price and actual hybrid power plant status, the power production schedule comprising at least scheduled power for points in time in the future; and a plant controller adapted to control, during the points in time in the future, the energy generating units and the energy storage system based on the power production schedule and the hybrid power plant status at the points in time in the future, in particular energy storage system status, to dispatch power according to the power production schedule, but complying with any grid operator reference at the points in time in the future.
13. A hybrid power plant, including: energy generating units comprising a wind park and at least one unit of another type of a renewable energy source, in particular sun energy; an energy storage system; and the arrangement according to claim 12.
Description
BRIEF DESCRIPTION
[0041] Some of the embodiments will be described in detail, with reference to the following figures, wherein like designations denote like members, wherein:
[0042]
[0043]
[0044]
[0045]
[0046]
[0047]
DETAILED DESCRIPTION
[0048] The illustration in the drawings is in schematic form. It is noted that in different figures, elements similar or identical in structure and/or function are provided with the same reference signs or with reference signs, which differ only within the first digit. A description of an element not described in one embodiment may be taken from a description of this element with respect to another embodiment.
[0049] The hybrid power plant 100 schematically illustrated in
[0050] The hybrid power plant 100 further comprises a (optional) plant transformer 123 which is connected to a common busbar 125 at which all the energy generating units, i.e. wind turbines 103a, 103b, 103c comprised in the wind park 101, the solar power units 105a, 105b of the solar park 104 and the energy storage unit 109a, 109b of the energy storage system 107 are connected. At a secondary side, the plant transformer 123 outputs the power plant power to a utility grid 127.
[0051] The solar park 104 illustrated in
[0052]
[0053] Any number of energy generating units of each type may be present and many possible arrangements are possible. Main Breakers for each generation unit in different arrangements may also be present.
[0054] The breakers 237, 235, 239, 245, 249 are controlled (in particular tripped) by a substation control unit 251 which is also receiving measurement signals from measurement equipment 253 connected and arranged to measure power and/or voltage and/or current at the corresponding output terminals 241, 243, 247 of the solar plant 204, the wind farm 201 and the energy storage system 207, respectively, and also at the output terminal 255 of the hybrid power plant 200.
[0055] In other embodiments the substation control unit 251 may be missing and control may be performed e.g. by the hybrid plant controller 215.
Furthermore, the wind turbines 203a, 203b, 203c are connected to the wind farm output terminal 243 via respective transformers 233 and respective wind turbine breakers 256. Those breakers may also be present for each solar power unit 205a,b,c connected to the respective converter 229a,b,c.
[0056] Furthermore, the substation control unit 251 together with or alternatively of the hybrid power plant controller 215 controls the solar plant power unit 205a, 205b, 205c by controlling the connected converters 229a, 229b, 229c. The substation control unit 251 together with or alternatively of the hybrid plant controller 215 further controls the wind turbines 203a, 203b, 203c, by controlling respective control elements 257a, 257b, 257c, respectively. Furthermore, the substation control unit 251 together with or alternatively of the hybrid plant controller 215 also controls one or more of the breakers based on power measurements.
[0057] In particular, there may not be any communication or coordination between element 251 and 215. They may be independent systems, wherein controller 251 might be a backup in case the regulation and limit provided by controller 215 fails.
[0058] Thereby, for controlling the respective solar plant 204, the wind farm 201 and the energy storage system 207, the hybrid plant controller 215 communicates via communication signals 259 with the remote energy management system 213 which in particular supplies a created power production schedule 261 to the hybrid plant controller 215.
[0059] The power plants 100, 200, illustrated in
[0060] In other embodiments, not an integrated renewable hybrid power plants is controlled, but another configuration e.g. in a co-located configuration.
[0061] According to embodiments of the present invention control of a co-located configuration of a hybrid power plant is provided. Co-located is known to be when two or more generation plants and/or a BESS (battery energy storage system) share the substation and evacuation lines but each of them with a separate control. Typically, a Wind+BESS co-located power plant may have a dedicated control for the Wind Farm and another dedicated control for the BESS which may be limited to correct the output of the Wind Farm. Whereas in the ‘integrated’ approach according to embodiments of the present invention, there may be full control of each individual unit participating in the power plant.
[0062] For example, the solar wind park 104 may have a nominal capacity of about 60 to 80% of the capacity of the wind farm 104. The energy storage system 107 may have for example a capacity of 30% of the capacity of the wind farm 101. Other values are possible.
[0063]
[0064] Embodiments allow differentiating between local grid control application (GCAp) and a remote energy management system (EMS) to optimize the generation of renewable power plant and comply with the grid code and customer requirements. The target of the energy management system may be to improve the profitability of the generated energy. Thereby, the energy management system 313 may create an optimum production schedule 361 of power references Ptarget, at different time points t, t+1, t+2, t+3, t+4, t+5 in the future. The power schedule 361 is sent for example via communication signals 359 to the hybrid plant 300, in particular, to local controller 115, 215 and/or to the respective energy generating units and the energy storage units. The power schedule 361 may also be shared with other plants or other interesting parties 363.
[0065] For generating the power schedule 361, the energy management system 313 receives production forecast data 365, state data 367 of the respective energy storage system and further receives market price forecasts 369. The power production schedule 361 is updated periodically based on the forecast and market prices 365, 369 and also based on the plant state (e.g. at least of the batteries) 367. The local grid control application may be executed by for example the local plant controller 115 illustrated in
[0066] The aim of the energy management system 313 or 213 or 113 illustrated in
[0067] Based on the energy production forecast 365, the energy market price forecast 369 and the status of the power plant 367, the energy management system 313 schedules the generation of the hybrid plant for the next time frame. Internal algorithms may calculate the most adequate power generation and storage management strategy to achieve a specific goal, when considering also the technical requirements and incorporating them in its mathematical model formulation. The plant schedule 361 may be updated every time it is required or there is a change in the calculation of power references. Furthermore, any logics to confirm the validity of the new power references may be considered. Each energy management service (comprised in the energy management system 313, for example) may schedule the generation of the hybrid plant according to its own functionality and its inputs: forecast, pricing, plant status and so on. The power references (for example Ptarget at the different time points), t, t+1, t+2, t+3, t+4, t+5 illustrated in
[0068]
[0069] In particular, the forecast service 471 may provide power production and price forecasts, based on Weather forecasts (Wind and Solar) data bases and telemetry of local weather conditions.
[0070] The forecasts 477 are provided to the enterprise control module 479 as an example of an implementation of an energy management system as is for example illustrated in
[0071]
[0072] Grid control applications, for example executed or performed by the local plant controller 115, 215, 515 illustrated in
[0073] the target generation schedule received from the energy management system
[0074] the current state of the hybrid plant
[0075] the configuration of the selected grid code application
[0076] external commands coming from for example a grid operator or a TSO.
[0077] Furthermore, there may be different control modes available to achieve the desired behaviour. During voltage control for example, not only the reactive capability of the wind turbines may be utilized but also the reactive capability of the energy storage system. In particular, the reactive power capability of the STATCOM may be used over the other sources of reactive power. Thereby, the reactive power of the equipment may be used sequentially (or in a parallel manner) on the following order:
1. STATCOM,
[0078] 2. BESS, i.e. energy storage system,
3. POWER in PV inverter, i.e. photovoltaic inverter
4. wind turbine.
[0079] During primary frequency regulation, the energy storage system may provide the capability of overproducing and consuming power from the grid by discharging and charging it, thus contributing to system stability. Regarding spinning reserve, the energy storage system may allow the facility to work at available power and respond to the primary, secondary or tertiary regulation by using the energy stored in the batteries or storage units.
[0080] Smoothing of energy output may consist of stabilizing (and/or reducing high frequency power variations) the power output of the plant by charging/discharging the energy storage system.
[0081] The mode “base load” may be implemented in a way that a high capacity battery is used in order to ensure a minimum level of generated power on the power plant. Sizing of the energy storage system may take into account the coincidence of energy resource as well as the minimum power level and duration to be assured. There may be no upper limit to the generation as opposed to the control mode of “capacity firming”.
[0082] In the mode “power curtailment”, a maximum power limit may be established for curtailment. Thereby, the generation is limited by either storing the excess of energy in the battery or by limiting the generation of the energy or power.
[0083] In the control mode “power target” it is followed an external power reference set point. It may differ from the power curtailment mode in the fact that the power curtailment only establishes the maximum limit that can be produced but the power target is a reference that shall be met.
[0084] In the mode “power limit”, active power production is limited to a certain value. The generation of energy or power is limited by either storing the excess of energy in the battery or by limiting the generation.
[0085] There may be a small difference with respect to “power curtailment” in that “power limit” may be a fixed (adjusted in the settings) protection limit used to stablish the total maximum output power of the plant.
[0086] “power curtailment” in contrast may be rather a control signal that can be fixed or may vary, both by the control or externally (i.e. by a TSO) that is used for power control purposes in mind.
[0087] Embodiments of the present invention also provide the opportunity to prioritize one of several kinds of energy resources. In particular, the priority may be given to wind energy or solar energy based energy generation units. It may refer to the possibility of selecting the priority and hence how the generation resources are curtailed in order to avoid exceeding the maximum power at the point of common connection. [0088] Wind power priority: Maximum wind resource utilization is used for power generation. Solar power generation is limited for not exceeding the maximum allowed output of the hybrid plant [0089] Solar power priority: Maximum solar resource utilization is used for power generation. Wind power generation is limited for not exceeding the maximum allowed power output of the hybrid plant [0090] Configurable % of each generation (hybrid balance): Maximum use of solar and wind resources is made when available power is below the maximum allowed limit. Hybrid power generation is produced as a percentage of share of solar and wind power when the power from both generation resources is available.
[0091]
[0092] On an ordinate 683, the delivered hybrid power is indicated. When the delivered hybrid power is below a maximum power Pmax, the power plant is controlled according to a normal operation 685. If the power is above the maximum power Pmax but below a first threshold 687, the power plant is controlled in stage 1 representing a regulation margin 689.
[0093] If power reaches the first threshold 687 it should start tripping the protections as per the programmed logic.
[0094] If power enters Stage 2 (labelled with reference sign 693) it may be, because there are failures over the control of the generated power and the trip of the breakers (action programmed for the 687 threshold). This can be due to multiple reasons such as communication errors for example.
[0095] If power reaches second threshold 691, it should trip the Mains breaker. The difference with respect to threshold 695 is on the type of relay used and the current level required to trip them. With 691 the electrical risk may be reduced, because the system will not be overloading.
[0096] Thereby, a programmed logic in separate control units may try to trip one of the generation sources first in order to minimize the power output of the plant. If this is not possible, it may try to disconnect the other one and if this is not possible it will try to disconnect the main breaker, for example breaker 235 and/or 237 illustrated in
[0097] As can be taken from
[0098] According to other embodiments, the whole system may work without the EMS and/or external Grid operator reference, with limited capabilities obviously.
[0099] As can be taken from
[0100] Although the present invention has been disclosed in the form of preferred embodiments and variations thereon, it will be understood that numerous additional modifications and variations could be made thereto without departing from the scope of the invention.