Battery information processing system, battery assembly, method of calculating capacity of battery module, and method of manufacturing battery assembly
11380941 · 2022-07-05
Assignee
Inventors
Cpc classification
H01M10/48
ELECTRICITY
Y02T10/70
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
H01M2010/4271
ELECTRICITY
H01M2220/20
ELECTRICITY
H01M10/425
ELECTRICITY
B60L58/12
PERFORMING OPERATIONS; TRANSPORTING
International classification
H01M10/42
ELECTRICITY
B60L50/60
PERFORMING OPERATIONS; TRANSPORTING
B60L58/12
PERFORMING OPERATIONS; TRANSPORTING
H01M10/48
ELECTRICITY
Abstract
A battery information processing system includes a control device configured to perform capacity calculation processing. The capacity calculation processing is processing for calculating a full charge capacity Q of the module based on a fitting curve Z calculated by fitting processing of a Nyquist plot representing a result of measurement of an AC impedance of the module. In an OCV-SOC curve of the module, there are a flat region in which a ratio of variation is lower than a reference value and a steep region in which the ratio of variation is higher than the reference value. The control device estimates an OCV of the module from a result of detection by a voltage sensor and performs the capacity calculation processing when the estimated OCV is in the flat region.
Claims
1. A battery information processing system which processes information for calculating a full charge capacity of a battery module including a plurality of nickel metal hydride batteries, the battery information processing system comprising: a voltage sensor configured to detect a voltage of the battery module; and a controller configured to perform capacity calculation processing for calculating the full charge capacity of the battery module, the capacity calculation processing being processing for calculating the full charge capacity of the battery module based on a fitting curve calculated by fitting processing of a Nyquist plot representing a result of measurement of an alternating current (AC) impedance of the battery module, there being a flat region and a steep region in an open circuit voltage (OCV)-state of charge (SOC) curve of the battery module, a ratio of variation representing an amount of increase in OCV with respect to an amount of increase in SOC of the battery module, the ratio in the flat region being lower than a reference value, and the ratio in the steep region being higher than the reference value, the controller being configured to estimate an OCV of the battery module from a result of detection by the voltage sensor and perform the capacity calculation processing when the estimated OCV is in the flat region.
2. The battery information processing system according to claim 1, the battery information processing system further comprising a storage device configured to store a correlation between a feature value to be extracted from the fitting curve and the full charge capacity, wherein the controller is configured to perform processing for extracting the feature value from the fitting curve and calculating the full charge capacity from the extracted feature value by referring to the correlation.
3. The battery information processing system according to claim 1, the battery information processing system further comprising a power converter configured to charge and discharge the battery module, wherein the controller is configured to perform the capacity calculation processing by controlling the controller such that the OCV of the battery module is within the flat region when the OCV estimated from the result of detection by the voltage sensor is in the steep region.
4. A battery assembly comprising: a plurality of the battery modules of which full charge capacity has been calculated by the battery information processing system according to claim 1.
5. A battery module capacity calculation method of calculating a full charge capacity of a battery module including a plurality of nickel metal hydride batteries, there being a flat region and a steep region in an open circuit voltage (OCV)-state of charge (SOC) curve of the battery module, a ratio of variation representing an amount of increase in OCV with respect to an amount of increase in SOC of the battery module, the ratio in the flat region being lower than a reference value, the ratio in the steep region being higher than the reference value, the battery module capacity calculation method comprising: estimating an OCV of the battery module from a result of detection by a voltage sensor; obtaining a Nyquist plot representing a result of measurement of an alternating current (AC); and calculating the full charge capacity of the battery module based on a fitting curve calculated by fitting processing of the Nyquist plot when the OCV of the battery module estimated in the estimating an OCV is in the flat region.
6. A method of manufacturing a battery assembly, there being a flat region and a steep region in an open circuit voltage (OCV)-state of charge (SOC) curve of a battery module including a plurality of nickel metal hydride batteries, a ratio of variation representing an amount of increase in OCV with respect to an amount of increase in SOC of the battery module, the ratio in the flat region being lower than a reference value, the ratio in the steep region being higher than the reference value, the method comprising: estimating an OCV of the battery module from a result of detection by a voltage sensor; obtaining a Nyquist plot representing a result of measurement of an alternating current (AC) impedance of the battery module; calculating a full charge capacity of the battery module based on a fitting curve calculated by fitting processing of the Nyquist plot when the OCV of the battery module estimated in the estimating an OCV is in the flat region; and manufacturing a battery assembly from a plurality of battery modules of which full charge capacity has been calculated in the calculating the full charge capacity.
7. The battery information processing system of claim 1, wherein, when the estimated OCV is in the steep region, the controller is configured to control the battery module to charge or discharge until the OCV of the battery module enters the flat region before performing the capacity calculation processing.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
DESCRIPTION OF THE PREFERRED EMBODIMENTS
(13) An embodiment of the present disclosure will be described below in detail with reference to the drawings. The same or corresponding elements in the drawings have the same reference characters allotted and description thereof will not be repeated.
(14) In the present disclosure, a battery assembly includes a plurality of battery modules (a battery module being abbreviated as a “module” below). The plurality of modules may be connected in series or in parallel. Each of the plurality of modules includes a plurality of secondary batteries (a secondary battery being denoted as a “cell” below) connected in series.
(15) “Manufacturing” of a battery assembly in the present disclosure means manufacturing of a battery assembly by replacing at least one of a plurality of modules included in a battery assembly with other modules (replacement modules). Though the replacement module is basically a recyclable module taken out of a collected battery assembly, it may be a new module.
(16) In general, “recycle” of a battery assembly is broadly categorized into reuse, rebuild, and resource recycle. In the case of reuse, collected battery assemblies are subjected to necessary shipment inspection and shipped as they are as reuse products. In the case of rebuild, collected battery assemblies are once disassembled to modules (which may be cells). Then, among the disassembled modules, modules which can be used after reconditioning (which may be modules which can be used as they are) are combined to manufacture a new battery assembly. Newly manufactured battery assemblies are subjected to shipment inspection and shipped as rebuilt products. In contrast, in resource recycle (material recycle), renewable materials are taken out of each module (each cell) and collected battery assemblies are not used as other battery assemblies.
(17) In the embodiment described below, a battery assembly collected from a vehicle is once disassembled into modules and a performance test is conducted for each module. A battery assembly is manufactured from modules determined as being recyclable as a result of the performance test. Therefore, a recyclable module means a rebuildable module below. Depending on a configuration of a battery assembly, however, a battery assembly as it is can also be subjected to the performance test without being disassembled into modules. “Recycle” in such a case may encompass both of reuse and rebuild.
(18) In the present embodiment, each cell is implemented by a nickel metal hydride battery. More specifically, a positive electrode is composed of nickel hydroxide (Ni(OH).sub.2) to which a cobalt oxide additive is added. A negative electrode is composed of a hydrogen storage alloy (based on MnNi5 which represents a nickel-based alloy). An electrolyte solution is composed of potassium hydroxide (KOH). These, however, are merely by way of example of a specific cell configuration, and a cell configuration to which the present disclosure is applicable is not limited thereto.
Embodiment
(19) <Battery Distribution Model>
(20)
(21) Referring to
(22) A collection service provider 10 collects used battery assemblies from vehicles 91 to 93. Battery assemblies 910, 920, and 930 are mounted on vehicles 91, 92, and 93, respectively. Though
(23) In this battery distribution model, identification information (ID) for identifying a module is provided for each module, and a management server 80 manages information on each module. Therefore, collection service provider 10 transmits an ID of each module taken out of a battery assembly to management server 80 through a terminal device 71 (see
(24) A test service provider 20 tests performance of each module collected by collection service provider 10 (S2). Specifically, test service provider 20 tests characteristics of the collected module. For example, test service provider 20 tests such electrical characteristics as a full charge capacity, a resistance value, an OCV, and an SOC. Then, test service provider 20 classifies the modules into recyclable modules and non-recyclable modules based on results of the test, passes the recyclable modules to a reconditioning service provider 30 and the non-recyclable modules to a recycler 60. A test result of each module is transmitted to management server 80 through a terminal device 72 (see
(25) Reconditioning service provider 30 performs a process for reconditioning the module determined as recyclable by test service provider 20 (S3). By way of example, reconditioning service provider 30 restores a full charge capacity of the module by charging the module to an overcharged state. For a module determined as less in lowering in performance in the test by test service provider 20, the reconditioning process may be skipped. A result of reconditioning of each module is transmitted to management server 80 through a terminal device 73 (see
(26) A manufacturer 40 manufactures a battery assembly from modules reconditioned by reconditioning service provider 30 (S4). In the present embodiment, information (assembly information) for manufacturing a battery assembly is generated by management server 80 and transmitted to a terminal device 74 (see
(27) A dealer 50 sells the battery assembly manufactured by manufacturer 40 for vehicle use or for stationary use in a house or the like (S5). In the present embodiment, vehicle 90 is brought to dealer 50 and dealer 50 replaces the battery assembly of vehicle 90 with a reuse product or a rebuilt product manufactured by manufacturer 40.
(28) Recycler 60 disassembles modules determined as being non-recyclable by test service provider 20 for reclamation for use as new cells or as source materials for other products.
(29) Though collection service provider 10, test service provider 20, reconditioning service provider 30, manufacturer 40, and dealer 50 are service providers different from one another in
(30)
(31) Terminal device 71 is a terminal device of collection service provider 10. Terminal device 72 is a terminal device of test service provider 20. Terminal device 73 is a terminal device of reconditioning service provider 30. Terminal device 74 is a terminal device of manufacturer 40. Terminal device 75 is a terminal device of dealer 50.
(32) Management server 80 and terminal devices 71 to 75 are configured to communicate with one another through communication network 81 such as the Internet or telephone lines. Base station 82 on communication network 81 is configured to be able to transmit and receive information to and from vehicle 90 through wireless communication.
(33) In test service provider 20, a battery information processing system 200 for measuring an AC impedance of each module and determining a manner of recycle (rebuild and resource recycle) of the module based on a result of measurement is provided. The manner of recycle of the module determined by battery information processing system 200 is transmitted to management server 80, for example, through terminal device 72.
(34) A situation in which a manner of recycle of a certain module (which is denoted as a “module M”) among a plurality of modules included in battery assembly 910 taken out of vehicle 91 is determined by battery information processing system 200 will be described below. Though an example in which a full charge capacity of module M is evaluated as a representative characteristic of module M is described, a characteristic of the module other than the full charge capacity (for example, an internal resistance) may be evaluated.
(35) <Configuration of Battery Information Processing System>
(36)
(37) Voltage sensor 210 detects a closed circuit voltage (CCV) of module M and outputs a result of detection to control device 260.
(38) Power converter 220 is implemented, for example, by a DC/DC converter or an AC/DC converter and converts electric power of module M in accordance with a control command from control device 260. More specifically, a not-shown power supply or load is electrically connected to power converter 220. Power converter 220 is configured to charge module M with electric power supplied from the power supply or discharge electric power stored in module M to the load. Power converter 220 corresponds to the “power converter” according to the present disclosure.
(39) Measurement device 230 measures an AC impedance of module M and outputs a Nyquist plot representing a result of measurement to control device 260. More specifically, measurement device 230 includes an oscillator 231, a potentiostat 232, a lock-in amplifier 233, and a plotter 234.
(40) Oscillator 231 outputs sinusoidal waves identical in phase to potentiostat 232 and lock-in amplifier 233.
(41) Potentiostat 232 generates an application signal by superimposing a prescribed direct-current (DC) voltage on an AC voltage (for example, a voltage at an amplitude around 10 mV) identical in phase to sinusoidal waves from oscillator 231 and applies the generated application signal to module M. Then, potentiostat 232 detects a current which flows through module M and outputs a result of detection to lock-in amplifier 233 as a response signal from module M. Potentiostat 232 outputs the application signal and the response signal to plotter 234.
(42) Lock-in amplifier 233 compares a phase of the sinusoidal waves received from oscillator 231 with a phase of the response signal detected by potentiostat 232 and outputs a result of comparison (a phase difference between the sinusoidal waves and the response signal) to plotter 234.
(43) Plotter 234 plots a result of measurement of an AC impedance of module M on a complex plane based on a signal from potentiostat 232 (a signal indicating an amplitude ratio between the application signal and the response signal) and a signal from lock-in amplifier 233 (a signal indicating a phase difference between the application signal and the response signal). More specifically, a frequency of sinusoidal waves output from oscillator 231 is swept in a prescribed frequency range and processing described previously is repeatedly performed by potentiostat 232 and lock-in amplifier 233. Thus, results of measurement of an AC impedance of module M for each frequency of sinusoidal waves are plotted on the complex plane. This plot is called a Nyquist plot (which may also be called a Cole-Cole plot). The Nyquist plot of module M is output to control device 260.
(44) The configuration of measurement device 230 is not limited to the configuration shown in
(45) An approach below can also be adopted as an approach to measurement of an AC impedance. Specifically, an application signal (one of a voltage signal and a current signal) including various frequency components within a prescribed frequency range is generated, and a response signal (the other of the voltage signal and the current signal) at the time of application of the application signal is detected. Each of the application signal and the response signal is subjected to fast Fourier transform (FFT) for frequency decomposition, to thereby calculate an AC impedance for each frequency. A Nyquist plot can be created also by such an approach.
(46) Though details will be described below with reference to
(47) Furthermore, a feature value F(M) is extracted from impedance curve Z(M) of module M in accordance with a predetermined arithmetic equation. Correlation between a feature value F and a full charge capacity Q of a module has been found in preliminary experiments conducted by the present inventors. Therefore, full charge capacity Q(M) of module M can be calculated from feature value F(M) of module M by extracting feature value F(M) from impedance curve Z(M) of module M and referring to correlation between feature value F and full charge capacity Q.
(48) Curve storage device 240 stores an impedance curve Z. A predetermined initial value is set as a value of a circuit constant (see
(49) Correlation storage device 250 stores correlation between feature value F and full charge capacity Q of a module, for example, as a function, a relational expression, or a table. Correlation storage device 250 is referred to by control device 260. Correlation storage device 250 corresponds to the “storage device” according to the present disclosure.
(50) Though not shown, control device 260 is implemented, for example, by a microcomputer including a central processing unit (CPU), a memory, and an input/output port, and analyzes a Nyquist plot of module M obtained by measurement device 230. More specifically, control device 260 includes a condition determination unit 261, a controller 262, a fitting processor 263, a feature value extractor 264, a full charge capacity calculator 265, and a recycle determination unit 266.
(51) Condition determination unit 261 determines whether or not a prescribed condition is satisfied upon receiving a result of detection by voltage sensor 210. The condition will be described in detail with reference to
(52) Controller 262 controls charging and/or discharging of module M by outputting a control command in accordance with a result of determination by condition determination unit 261 to power converter 220.
(53) Fitting processor 263 reads impedance curve Z stored in curve storage device 240 and performs fitting processing (curve regression) of impedance curve Z so as to be best applied to the Nyquist plot created by plotter 234. Values of a plurality of circuit constants (which will be described later) included in impedance curve Z are thus calculated and impedance curve Z(M) of module M is specified. Specified impedance curve Z(M) is output to feature value extractor 264.
(54) Feature value extractor 264 extracts feature value F(M) from impedance curve Z(M) of module M by performing a prescribed operation on impedance curve Z(M). Extracted feature value F(M) is output to full charge capacity calculator 265.
(55) Full charge capacity calculator 265 calculates a full charge capacity corresponding to feature value F(M) of module M by referring to correlation between feature value F and the full charge capacity stored in correlation storage device 250. Calculated full charge capacity Q(M) is output to recycle determination unit 266.
(56) Recycle determination unit 266 determines a manner of recycle (rebuild or material recycle) of module M in accordance with full charge capacity Q(M) of module M. Recycle determination unit 266 may determine whether or not module M is recyclable. A result of determination by recycle determination unit 266 is output to display 270.
(57) Display 270 is implemented, for example, by a liquid crystal display and shows a result of determination by recycle determination unit 266. Test service provider 20 can thus know how module M should be processed.
(58) <Flow of Determination of Manner of Recycle>
(59) In succession, a process flow for determining a manner of recycle of module M will be described in detail.
(60)
(61) Components (such as plotter 234 of measurement device 230 or fitting processor 263 of control device 260) of battery information processing system 200 as an entity to perform each type of processing are not particularly distinguished below and they are comprehensively denoted as a “processing device 200.” Though each step is basically performed by software processing by processing device 200, it may partly or entirely be performed by hardware (an electric circuit) provided in processing device 200.
(62) In S11, processing device 200 obtains an OCV of module M. More specifically, processing device 200 obtains from voltage sensor 210, a voltage (CCV) of module M which was left stand for a prescribed period (for example, several ten minutes or longer) without being charged or discharged and thereby depolarized. Processing device 200 can set a value thus obtained as the OCV of module M.
(63) In S12, processing device 200 determines whether or not the OCV of module M obtained in S11 is in the “flat region” which is a predetermined OCV region.
(64)
(65) As shown in
(66) The OCV-SOC curve of the module monotonously increases and one-to-one correspondence is satisfied between the OCV and the SOC of the module. Therefore, by using an SOC instead of an OCV, an SOC region expressed as S1≤SOC≤S2 may be defined as the flat region and SOC regions other than that (0≤SOC<S1, S2<SOC≤100) may be defined as steep regions.
(67)
(68)
(69) In the example shown in
(70) Owing to such OCV dependency (SOC dependency) of the AC impedance, the present inventors have found that accuracy in calculation of a full charge capacity of module M is improved when such a condition as an OCV (which may be an SOC) of module M being in the flat region is satisfied. Based on this finding, processing device 200 determines whether or not an OCV of module M is in the flat region (in
(71) Thereafter, in S14, processing device 200 measures an AC impedance of module M and obtains a Nyquist plot from a result of measurement. Since the approach to measurement of an AC impedance is described in detail in the description of the configuration of measurement apparatus 230 with reference to
(72)
(73)
(74) Referring again to
(75)
(76) Junction inductance L refers to an inductance component in a portion of junction between cells included in a module (a portion of junction between the positive electrode and the negative electrode). Junction resistance R refers to a resistance component in the junction portion. Solution resistance Rsol refers to a resistance component of an electrolyte solution present between the positive electrode and the negative electrode. Charge transfer resistance Rct refers to a resistance component relating to transfer of charges (supply and reception of charges) at an electrode/electrolyte interface (surfaces of a positive electrode active material and a negative electrode active material). The diffusion resistance refers to a resistance component relating to diffusion of a charge transfer material in salt or an active material in the electrolyte solution. The electric double layer capacitance refers to a capacitance component of an electric double layer formed at an electrode/electrolyte solution interface. Each of these circuit constants results from combination of corresponding components in all cells in the module.
(77) Junction inductance L and junction resistance R are connected in parallel to each other. Solution resistance Rsol is connected in series to a parallel circuit of junction inductance L and junction resistance R. Charge transfer resistance Rct and the diffusion resistance are connected in series to each other. A series circuit of charge transfer resistance Rct and the diffusion resistance and the electric double layer capacitance are connected in parallel to each other. A combined circuit including junction inductance L, junction resistance R, and solution resistance Rsol and a combined circuit including charge transfer resistance Rct, the diffusion resistance, and the electric double layer capacitance are connected in series to each other. In the present embodiment, in order to appropriately express a capacitive behavior of module M, each of the diffusion resistance and the electric double layer capacitance of the module is expressed by a non-linear element called a constant phase element (CPE). More specifically, an impedance Z.sub.CPE1 corresponding to the diffusion resistance is expressed as shown in an expression (1) below with a CPE index p1 and a CPE constant T1. In the expression (1), an angular frequency of an AC signal applied to the module (application signal) is denoted as ω (ω=2πf).
Z.sub.CPE1=1/{(jω).sup.p1×T1} (1)
(78) Similarly, an impedance Z.sub.CPE2 corresponding to the electric double layer capacitance can also be expressed as shown in (2) below with a CPE index p2 and a CPE constant T2.
Z.sub.CPE2=1/{(jω).sup.p2×T2} (2)
(79) In the present embodiment, an equivalent circuit model including eight circuit constants above is adopted. Impedance curve Z(M) corresponding to module M is specified (see S15 in
(80)
(81) Processing device 200 substitutes an initial value (a predetermined value) of each of the eight circuit constants shown in
(82) In succession, processing device 200 allows the process to proceed to S16 shown in
(83) Which feature value should be extracted to establish correlation between the feature value and full charge capacity Q of the module is confirmed in advance in experiments conducted by the present inventors. More specifically, relation between feature value F and full charge capacity Q (a full charge capacity measured by actual charging and/or discharging of the module) of a large number of modules is experimentally found. By way of example, correlation expressed by a linear function as in an expression (3) below is established between feature value F and full charge capacity Q (a being a number other than 0).
Q=a×F+b (3)
(84) In S16, specific feature value F(M) of which correlation with full charge capacity Q(M) has been confirmed is extracted from impedance curve Z(M). Such feature value F(M) can be extracted from impedance curve Z(M), for example, by a statistic approach such as multiple regression analysis. In this multiple regression analysis, variables in consideration of a real number value and an imaginary number value on impedance curve Z(M) as well as kurtosis, skewness, and multicolinearity of each component such as an inclination of a tangential line at each frequency are used.
(85) When feature value F(M) is extracted from impedance curve Z(M), processing device 200 calculates full charge capacity Q(M) of module M based on extracted feature value F(M) (S17).
(86) Thereafter, processing device 200 determines a manner of recycle of module M in accordance with full charge capacity Q(M) of module M (S18). For example, processing device 200 calculates a capacity retention which represents a ratio (=Q(M)/Q.sub.0) between current full charge capacity Q(M) of module M and an initial full charge capacity Q.sub.0 (a value already known from specifications of module M) and compares the capacity retention with a prescribed reference value. When the capacity retention of module M is not lower than the reference value, processing device 200 determines that module M can be used for rebuild of a battery assembly, and when the capacity retention of module M is lower than the reference value, it determines that module M cannot be used for rebuild and should be resource recycled.
(87) <Accuracy in Calculating Full Charge Capacity>
(88) Accuracy in calculating a full charge capacity by a method of determining a manner of recycle of a module in the present embodiment will finally be described.
(89)
(90) As shown in
(91) As set forth above, in the present embodiment, whether or not an OCV of module M is in the flat region is determined. OCV dependency of an AC impedance of module M is lower when the OCV is in the flat region than when the OCV is in the steep region. Therefore, even though the process proceeds to measurement of an AC impedance of module M (see S14 in
(92) Though the embodiment of the present disclosure has been described, it should be understood that the embodiment disclosed herein is illustrative and non-restrictive in every respect. The scope of the present disclosure is defined by the terms of the claims and is intended to include any modifications within the scope and meaning equivalent to the terms of the claims.