Mobile well servicing system and method of using the same
11299963 · 2022-04-12
Assignee
Inventors
Cpc classification
E21B7/023
FIXED CONSTRUCTIONS
E21B33/06
FIXED CONSTRUCTIONS
E21B19/08
FIXED CONSTRUCTIONS
E04H12/345
FIXED CONSTRUCTIONS
E21B41/00
FIXED CONSTRUCTIONS
E21B15/00
FIXED CONSTRUCTIONS
E21B19/008
FIXED CONSTRUCTIONS
International classification
E21B7/02
FIXED CONSTRUCTIONS
E21B19/00
FIXED CONSTRUCTIONS
E21B19/08
FIXED CONSTRUCTIONS
E21B15/00
FIXED CONSTRUCTIONS
E21B41/00
FIXED CONSTRUCTIONS
E21B33/06
FIXED CONSTRUCTIONS
Abstract
A mobile well servicing system and method are provided for performing well services. The mobile well servicing system can include a work surface on a platform supporting an equipment such a jack, a blowout preventer (BOP), a coiled tubing (CT) injector and a mast. The mast is pivotable between a first position, with a lifting point positioned over the work surface, and a second position, with the lifting point positioned behind the platform. A hoist winch assembly mounted at the platform raises the equipment from the platform when the mast is at the first position. The equipment then pass through a space between two parallel legs of the mast, and lowered to a wellhead when the mast is at the second position. Multiple tasks such as well completion, change of dynamic temperature sensor (DTS) and electric submersible pump (ESP) can be achieved using this system.
Claims
1. A mobile well servicing system comprising a platform supported by a plurality of wheels a work surface supported by the platform; a first servicing equipment positionable on the work surface; a mast comprising two parallel legs having proximal ends and distal ends, the proximal ends pivotally connected to the platform, a lifting point positioned at the distal ends of the two parallel legs, and a passthrough space defined between the two parallel legs; and a hoist winch assembly including a drawworks located on the platform, and a lifting device connectable to the first servicing equipment and suspended from the lifting point; wherein the mast is pivotable around the proximal ends of the two parallel legs between a first position, with the lifting point positioned over the work surface, and a second position, with the lifting point positioned behind the platform, and wherein the first servicing equipment is raised off of the work surface of the platform by the hoist winch assembly when the mast is in the first position, the first servicing equipment is then moved through the passthrough space as the mast is moved towards the second position and when the mast is in the second position, the hoist winch assembly lowers the first servicing equipment to a wellhead.
2. The mobile servicing system of claim 1 wherein each of the two parallel legs are telescoping between a lowered positioned and a raised position.
3. The mobile servicing system of claim 2 wherein each of the two parallel legs comprises a hollow main leg and a telescoping leg received in the hollow main leg, the telescoping leg being extendable.
4. The mobile servicing system of claim 2 wherein the two parallel legs are in the lowered positioned when the mast is moved from the first position to the second position.
5. The mobile servicing system of claim 2 wherein the two parallel legs are moved from the lowered position to the raised position when the mast is in the second position.
6. The mobile servicing system of claim 1 wherein each of the two parallel legs comprise at least one aperture.
7. The mobile servicing system of claim 1 further comprising a hydraulic system supported by the platform with hydraulic lines to supply pressurized hydraulic fluid to the first servicing equipment.
8. The mobile servicing system of claim 7 wherein the hoist winch assembly is supplied with pressurized hydraulic fluid from the hydraulic system.
9. The mobile well servicing system of claim 7, wherein the hydraulic system supplies pressurized hydraulic fluid to pivot the mast around the distal ends proximal ends of the two parallel legs.
10. The mobile servicing system of claim 1 wherein the first servicing equipment is at least one of: a jack; a blowout preventer; a coiled tubing injector; and, a work floor.
11. The mobile well servicing system of claim 10, wherein the work floor comprises a corner portion configured to couple with a handler arm of a pipe handle adjacent to the mobile well servicing system for conveying pipes.
12. The mobile servicing system of claim 1 wherein the distal ends of the parallel legs of the mast are connected by a transvers beam and the lifting position point is positioned on the transverse beam.
13. The mobile servicing system of claim 1 wherein the passthrough space is unobstructed.
14. The mobile servicing system of claim 1 wherein the mast is pivotal around the proximal ends of the two parallel legs to a recumbent position with the mast substantially horizontal to the platform.
15. The mobile well servicing system of claim 1, further comprising a second servicing equipment.
16. The mobile well servicing system of claim 15 wherein the first servicing equipment is a blowout preventer and the second servicing equipment is a work floor and wherein the blowout preventer is mounted on the wellhead and the work floor is mounted on the blowout preventer.
17. The mobile well servicing system of claim 15 wherein the first servicing equipment is a blowout preventer and the second servicing equipment is a jack.
18. The mobile well servicing system of claim 1, further comprising a stand provided on the working surface and rotatably supporting a wireline spool.
19. The mobile well servicing system of claim 18, wherein the wireline spool is one of: a coiled tubing (CT) spool; and, a power cable spool.
20. The mobile well servicing system of claim 1, wherein the mobile well servicing system is a vehicle.
21. A method of performing well services, comprising: providing a well servicing system comprising: a platform supported by a plurality of wheels; a work surface supported by the platform; a first servicing equipment positionable on the work surface; a mast comprising two parallel legs having proximal ends and distal ends, the proximal ends pivotally connected to the platform, a lifting point positioned at the distal ends of the two parallel legs, and a passthrough space defined between the two parallel legs; and a hoist winch assembly having a lifting device connectable to the first servicing equipment and suspended from the lifting point; moving the well servicing system close to a wellhead of a well; raising the mast from a recumbent position where the mast is substantially horizontal to the platform; pivoting the mast around the proximal ends of the two parallel legs to a first position, with the lifting point positioned over the work surface; using the hoist winch assembly, lifting the first servicing equipment off of the work surface; pivoting the mast around the proximal ends of the two parallel legs and moving the first servicing equipment through the passthrough space, to a second position with the lifting point positioned behind the platform and over the wellhead; using the hoist winch assembly, lowering the first servicing equipment to the wellhead.
22. The method of claim 21 further comprising installing the first servicing equipment on the wellhead.
23. The method of claim 22, further comprising moving the mast back to the first position after a first well service is completed by the first servicing equipment; lifting a second servicing equipment off the work surface of the platform; pivoting the mast around the proximal ends of the two parallel legs and moving the second servicing equipment through the passthrough space as the mast is moved towards the second position; and lowering the second servicing equipment to the wellhead when the mast is in the second position.
24. The method of claim 22, further comprising connecting a second servicing equipment with the first servicing equipment together on the work surface of the platform to form a connected first servicing equipment and second servicing equipment; lifting the connected first servicing equipment and second servicing equipment off the work surface of the platform when the mast is in the first position; pivoting the mast around the proximal ends of the two parallel legs and moving the connected first servicing equipment and second servicing equipment through the passthrough space as the mast is moved towards the second position; and lowering the connected first servicing equipment and second servicing equipment to the wellhead when the mast is in the second position.
25. The method of claim 21 wherein the first servicing equipment is at least one of: a jack; a blowout preventer; a coiled tubing injector; and, a work floor.
26. The method of claim 21, further comprising extending the legs of the mast at second position to place the mast in a full operational position.
27. The method of claim 26 further comprising performing a well service on the wellhead.
28. The method of claim 27 wherein the well service involves at least one of: inserting pipes into the well; and running coiled tubing, while the mast in the full operational position.
29. The method of claim 27, wherein the well service includes at least one of: installing an electric submersible pump in the well; changing an electric submersible pump; changing power cable in the well; installing a dynamic temperature sensor in the well; and changing a dynamic temperature sensor in the well.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)
(26)
DESCRIPTION
(27) A mobile well servicing system is provided herein for transporting and operating equipment for a number of wellbore services on a single platform, thereby providing time and cost savings. Such wellbore services may include, for example, making/breaking up jointed pipes and jacking said pipes into or out of a wellbore, injecting/retrieving coiled tubing (CT), and running in an electric submersible pump (ESP), for example at the end of a string of jointed pipe with an electrical wireline retained thereto. The equipment on the mobile well servicing system may also configured to provide significant weight reductions relative to existing mobile servicing rigs, thus allowing the mobile well servicing system to transport the equipment necessary for performing a number of different services on a single platform while remaining under the maximum allowable seasonal weight limits for roads leading to the wellsite.
(28) With reference to
(29) Further as best shown in
(30) Servicing equipment, such as a jack 108, a blowout preventer (BOP) 110, a CT injector 112, a work floor 113, a hoist winch assembly 130 and power tongs (not shown) may be positionable and stored on the work surface 103.
(31) The hoist winch assembly 130 may include a drawworks that is located on the platform 102. The hoist winch assembly 130 may include a cable 131 and a lifting device 133 shown in
(32) The mobile well servicing system 100 may also comprise a stand/axle 114 for rotatably supporting a CT spool and/or wireline spool 116. At least one hydraulic system 118 may be placed on a front portion of the work surface 103. The hydraulic system 118 may include a hydraulic reservoir and a pump with hydraulic lines connectable to be in hydraulic communication with the jack 108, the mast 106, the BOP 110, the CT injector 112, the work floor 113 and/or other equipment.
(33) The mobile well servicing system 100 may be a vehicle and have a driver's cab 120 provided at the front end the platform 102 for a driver to transport the mobile well servicing system 100 to a wellsite.
(34) The mast 106 may be configured to support limited vertical loads, and limited lateral and torsional loads, such that the structure of the mast is less capable of loads usually asserted in supporting jointed pipes and/or snubbing relative to the masts or similar structures of existing mobile rigs. Such lighter service structure permits the mast 106 to be lighter than the masts of existing mobile rigs, which reduces the gross vehicle weight and in turn allows additional equipment to be mounted on the mobile well servicing system 100 without exceeding maximum road weight allowances. The jack 108 or other similar devices can be used to manipulate heavier loads.
(35) In one aspect, the mast 106 may comprise two substantially parallel legs 106a and 106b connected at their distal ends 109 by a transverse beam 126. The lifting point 127 may be provided on this transverse beam 126. The proximal ends 111 of the legs 106a and 106b are pivotally mounted to a supporting frame 128 supported by the platform 102. A passthrough space 107 is formed between the two parallel legs 106a, 106b for servicing equipment stored on the work surface 103 to pass through as it is moved by the mobile well servicing system 100 from the work surface 103 to a wellhead. The passthrough space 107 is unobstructed to allow servicing equipment to pass through the passthrough space 107, when the mobile well servicing system 100 is in operation.
(36) The mast 106 may be actuated, for example using hydraulic rams 122 to pivot the mast 106 around the proximal ends 111 of the two parallel legs 106a, 106b from a recumbent or storage position, wherein the mast 106 is positioned substantially horizontally to the platform 102 for storage and transportation.
(37) For lifting servicing equipment from the work surface 103, the mast 106 may be actuated, using the hydraulic rams 122, to pivot the mast 106 around the proximal ends 111 of the two parallel legs 106a, 106b, to a first position, also known as a lifting position, shown in
(38) With the first piece of servicing equipment suspended from the lifting point 127 and above the work surface 103 of the platform 102, the mast 106 may then be pivoted from the first position to a second position, with the lifting point 127 positioned behind the platform 102, shown in
(39) When the mast 106 is in the second position, the hoist winch assembly 130 may lower the first piece of equipment to the wellhead 20.
(40) After the first piece of servicing equipment such as BOP 110 is moved to the wellhead 20, the mast 106 may be moved back to the first position with the lifting point 127 at the distal ends 109 of the legs 106a, 106b of the mast 106 positioned over the work surface 103 on the platform 102. A second piece of servicing equipment, such as a jack 108 or a CT injector 112, may be raised off of the work surface 103 of the platform 102 by the hoist winch assembly 130. The second piece of servicing equipment may then be moved through the passthrough space 107 as the mast 106 is moved towards the second position. When the mast 106 is in the second position, the hoist winch assembly 103 may lower the second piece of servicing equipment to the wellhead 20.
(41) In another aspect, the first piece of servicing equipment and the second piece of servicing equipment may be stacked or connected together on the work surface 103. The combined first piece of servicing equipment and the second piece of servicing equipment may be lifted off of the work surface 103 by the hoist winch assembly 130 when the mast 106 is in the first position. The mast 106 may then be pivoted from the first position to the second position causing the combined first piece of equipment and the second piece of equipment to move through the passthrough space 107 to the wellhead 20.
(42) In a further aspect, each of the legs 106a and 106b may be telescoping between a lowered positioned and a raised position, and comprises a main leg and a telescoping leg. For example, as shown in
(43) When the mast 106 is in the second position shown in
(44) In one aspect, the telescoping legs 1063 and 1064 may be driven by the power of the pressurized hydraulic fluid from the hydraulic system 118 on the platform 102. With the telescoping structure, the mast 106 may be extended from approximate 60 feet to 90 feet, in one embodiment, which may meet the height requirements for different tasks.
(45) In the embodiment depicted in
(46) In another aspect, a piece of servicing equipment, such as the jack 108, may be installed on the wellhead 20 and used to lift and manipulate heavier loads from the wellbore that cannot be lifted by the lightweight mast 106, for example a string of jointed pipe. The jack 108 may be any suitable jacking unit, such as those used in snubbing. For example, the jack 108 can comprise a lower, stationary slip assembly and an upper, travelling slip assembly for releasably and controllably shifting tubulars along a common axis into or out of the wellbore.
(47) In one aspect, the jack 108 and the BOP 110 may be stored on the work surface 103 of the platform 102 when not in service or during transportation. When the mobile well servicing system 100 is on the field site and ready for work, it is positioned close to the wellhead 20. The BOP 110 may be first pulled up by the hoist winch assembly 130, and then lowered down onto the wellhead 20. The BOP 110 may be secured to the wellhead by bolts or other fastening means known in the art. The jack 108 may then be installed on top of the BOP 110 in the same manner. The work floor 113 may also be stacked and mounted on top of the jack 108 or the BOP 110.
(48) In one aspect, the spool stand/axle 114 is used to rotatably retain a CT spool or wireline spool 116, depending on the current service being performed by the mobile servicing platform 100. The spool 116 that is not in use may be stored off the mobile well servicing platform 100, such as on a pickup truck. A fork loader or other suitable means (not shown) can be used to install and remove the spool from a spool stand 114.
(49) With this compact and lightened design, multiple tasks can be achieved with the single mobile well servicing system 100, For example,
(50) During the operation, the pipe or string may become stuck due to friction when being inserted into the well. Field workers may stand on the work floor 113 and use the jack 108 to push the string downhole as shown in
(51) Now referring to
(52) After coiled tubing 136 has been run into the well, the coiled tubing 136 may be cut on the surface. The rest of the coiled tubing 136 left on the surface may be wound back onto the spool 116 for future use. In another aspect, the spool 116 having coiled tubing 136 may be replaced by another cable spool 117 as shown in
(53) In another aspect, a pipe handler 200 may also be provided, either on the mobile platform 102 or on a separate platform, as shown in
Example Procedures
(54) Multiple tasks can be performed by using the mobile well servicing system 100. The tasks may involve conventional services using jointed pipes as well as the hydraulic services using coiled tubing. Example well servicing procedures for a SAGD well using the present mobile well servicing system 100 are described below with reference to
Completion (Production Well)
(55) With reference to the flow chart 1000 depicted in
(56) The step of preparing and installing BOP at step 1200 may further include moving and spotting the mobile well servicing system 100 such as the rig and equipment close to the wellhead 20 as shown in
(57) Meanwhile, ensure well is depressurized.
(58) Remove upper part of wellhead at 7″ flange connection.
(59) Remove lower part of wellhead at 11″ connection.
(60) Install 11″ BOP unit including the BOP 110, the jack 108, and the work floor 113 as shown in
(61) After the BOP unit is installed, field worker may stand on the work floor 113 to perform the operation of installing the DTS coiled tubing of step 1300. The installation of the DTS coiled tubing may include first picking up and running in hole 3½″ jointed pipes as a guide string 134 to prescribed depth using the jack as shown in
(62) Then, set the guide string 134 in slips and close BOP. Pick coiled tubing injector 112 with the hoist winch assembly 130, install it above the wellhead 20, and run in 1¼″ DTS coiled tubing 136 inside the guide string 134 and tag bottom as shown in
(63) Leave coiled tubing on bottom and cut it at surface just above guide string 134.
(64) Pull out and lay down 3½″ guide string 134 and leave coiled tubing 136 in well.
(65) Remove the work floor 113, the jack 108 and the BOP 110.
(66) Install lower part of wellhead at 11″ connection, thread DTS coiled tubing through side port on wellhead.
(67) Pull up on coiled tubing using CT injector to get the bottom of the coiled tubing about 13 m from bottom of well to allow for expansion.
(68) Set coiled tubing in wellhead slips and install sealing assembly. The installation of the DTS coiled tubing at step 1300 is finished now.
(69) In order to install ESP at step 1400, the BOP unit including the BOP 110, the jack 108 and the work floor 113 may be reinstalled on 7″ connection on upper part of the wellhead again.
(70) The installation of ESP at step 1400 may further include changing the spool 116 on platform 102 of the mobile well servicing system 100 to accommodate ESP power cable spool 117 having ESP power cable 138 as shown in
(71) The field workers may stand on the work floor 113 to pick up and run in hole ESP pipe string 144 containing ESP using jack, clamping power cable 138 to side of ESP pipe string 144 as shown in
(72) Install ESP tubing hanger.
(73) After the ESP tubing hanger is installed, the final completing step 1500 may include removing the work floor 113, the jack 108 and the BOP 110. Then install upper part of wellhead at the 7″ connection as shown in
Electric Submersible Pump (ESP) Change (Production Well)
(74) In addition to the completion operation, the mobile well servicing system 100 can be used for performing other operations. With reference to the flow chart depicted in
(75) Similar to the completion operation, the step of preparing and installing the BOP unit at step 2200 may include moving and spotting the mobile well servicing system 100 such as rig and equipment close to the wellhead 20 as shown in
(76) Meanwhile, ensure well is depressurized.
(77) Remove upper part of wellhead at 7″ flange connection.
(78) Install the BOP unit including the BOP 110, the jack 108, and the work floor 113. The preparation step 2200 is finished.
(79) Next, the changing ESP step 2300 may include pulling up the tubing hanger of ESP pipe string and disconnect power cable from the ESP pipe string. If the weight of the ESP pipe string exceeds the capacity of the mast and hoist winch assembly, the jack can be used to hoist the tubing hanger.
(80) Then, pull out of well production tubing and ESP pipe string using jack at the same time as un-clamping and spooling ESP power cable onto ESP cable spool 117 on mobile platform 102 as shown in
(81) Disassemble ESP from the ESP pipe string when it is at surface.
(82) Assemble a new ESP.
(83) Change ESP power cable spool with a spool of new cable.
(84) Run in new ESP using jack and ESP power cable.
(85) Pick up and run in hole a new ESP, clamping power cable to side of ESP pipe.
(86) Install ESP tubing hanger.
(87) After the new ESP has been installed, the final completing step 2400 may include removing the work floor 113, the jack 108, and the BOP 110 using the hoist winch assembly 130, and installing upper part of wellhead at the 7″ connection, which is similar to the step 1500 of the completing procedure as shown in
Dynamic Temperature Sensor (DTS) Change (Production Well)
(88) With reference to the flow chart depicted in
(89) The preparation step 3200 of changing DTS may include moving and spotting the mobile well servicing system 100 such as the rig and equipment close to the wellhead.
(90) Meanwhile, ensure well is depressurized.
(91) Remove upper part of wellhead at 7″ flange connection.
(92) Install the BOP unit including the BOP 110, the jack 108, and the work floor 113. The preparation step 2200 is finished.
(93) Next, the step 3300 for removing current DTS and ESP may include pulling up tubing hanger of ESP pipe string and disconnecting power cable from pipe string. If the weight of the ESP pipe string exceeds the capacity of the mast and the hoist winch assembly, the jack can be used to hoist the hanger.
(94) Then pull out of well production tubing and ESP pipe string using jack at the same time as un-clamping and spooling ESP power cable 138 onto ESP cable spool 117 on the platform 102.
(95) Dis-assemble ESP when it is at surface.
(96) Change ESP cable spool with DTS coiled tubing spool on the platform 102, as shown in
(97) Remove BOP from 7″ wellhead connection.
(98) Remove seal and slip assembly from DTS coiled tubing on lower part of wellhead, let coil string sit on bottom.
(99) Remove lower part of wellhead at 11″ connection.
(100) Install 7″×11″ cross over spool on 11″ wellhead connection.
(101) Install 7″ gate valve on cross over spool.
(102) Install annular coil BOP and CT injector on 7″ valve using hoist winch assembly as shown in
(103) Pull out of well DTS coiled tubing onto the coiled tubing spool 116 on the platform 102.
(104) Remove CT injector, 7″ valve and crossover spool from wellhead.
(105) After the current DTS and ESP have been removed, it will repeat the steps of installing DTS and ESP as described at steps 1300 and 1400 of
(106) Install 11″ Bop stack, jack and working floor, pressure test.
(107) Pick up and run in hole 3½″ jointed guide string to prescribed depth using jack.
(108) Set guide string in slips and close BOP.
(109) Pick coiled tubing injector with hoist winch assembly and run in 1¼″ DTS coil string inside guide string and tag bottom.
(110) Leave coiled tubing on bottom and cut it at surface just above guide string.
(111) Pull out and lay down 3½″ guide string leaving coiled tubing in well.
(112) Remove work floor, jack and BOP.
(113) Install lower part of wellhead at 11″ connection, thread DTS coiled tubing through side port on wellhead.
(114) Pull up on coiled tubing string to get the bottom of the coiled tubing string about 13 m from bottom of well to allow for expansion.
(115) Set coiled tubing in wellhead slips and install sealing assembly.
(116) Install BOP, jack and work floor on 7″ connection on upper part of wellhead.
(117) Change the spool 116 on the platform 102 to accommodate Electric Submersible Pump power cable.
(118) Pick up and run in hole ESP using jack, clamping power cable to side of ESP pipe string.
(119) Install ESP tubing hanger.
(120) Remove the work floor, the jack and the BOP.
(121) Install upper part of wellhead at the 7″ connection.
(122) Although particular operations using the mobile well servicing system have been described herein, these particular operations are demonstrative. Other operations may be conducted by the system as known to one of skill in the art.
(123) The foregoing is considered as illustrative only of the principles of the invention. Further, since numerous changes and modifications will readily occur to those skilled in the art, it is not desired to limit the invention to the exact construction and operation shown and described, and accordingly, all such suitable changes or modifications in structure or operation which may be resorted to are intended to fall within the scope of the claimed invention.