Thread drawing processes
11292171 · 2022-04-05
Assignee
Inventors
- Chung-Ming Yu (Changhua County, TW)
- Shi-Wei Wang (Changhua County, TW)
- Shih-Hao Wang (Changhua County, TW)
Cpc classification
B29C48/28
PERFORMING OPERATIONS; TRANSPORTING
B29C48/919
PERFORMING OPERATIONS; TRANSPORTING
B29C48/0018
PERFORMING OPERATIONS; TRANSPORTING
D01D5/16
TEXTILES; PAPER
International classification
Abstract
The thread drawing processes include the steps of feeding, mixing and stirring, first drying, hot melt extrusion, first cooling, stretch extension, second cooling, winding-strands-into-roll, and second drying. The threads made by the processes mainly use thermoplastic polyurethane particles which are easily prepared. When fabric made by the threads is attached to objects, the fabric is flat and neat.
Claims
1. Thread drawing processes comprising the steps of: a step of feeding: preparing and inputting a plurality of thermoplastic polyurethane particles into a stirring drum and adding a coupler into the stirring drum; a step of mixing and stirring: using the stirring drum to mix and stir the thermoplastic polyurethane particles and the coupler, the thermoplastic polyurethane particles being not adhered with each other, the coupler attached to the thermoplastic polyurethane particles; a step of first drying: drying the thermoplastic polyurethane particles to remove excess water by a dryer, melting the thermoplastic polyurethane particles, wherein a drying temperature of the dryer is from 100° C. to 150° C. ° C. to make the thermoplastic polyurethane particles in a semi liquid status; a step of hot melt extrusion: sending the melted thermoplastic polyurethane particles into a thread molding machine to form a preliminary thread; a step of first cooling: passing the preliminary thread through a cooling tank so as to shape a surface of the preliminary thread; a step of stretch extension: passing the cooled preliminary thread through a stretching area to perform a stretch extension, wherein the stretching area includes a plurality of rollers, the rollers are disposed with an interval apart from each other and arranged in rows, and the preliminary thread is driven by each roller, so that the preliminary thread is stretched; a step of second cooling: entering the preliminary thread processed by the step of stretch extension into a cooling area which is located next to the stretching area, the preliminary thread being cooled to reduce a surface deformation and to fix an interior of the preliminary thread so as to obtain a semi-finished thread; a step of winding-strands-into-roll: scrolling the semi-finished thread, and a step of second drying: using a dehumidifying and drying device to further reduce humidity in the semi-finished thread so as to obtain a finished thread.
2. The thread drawing processes as claimed in claim 1, wherein the thermoplastic polyurethane particles is polyester or polyether, or a combination of the polyester and the polyether, a melting point of the plurality of thermoplastic polyurethane particles is from 190° C. to 220° C., the coupler is a mixture of resin and thickener.
3. The thread drawing processes as claimed in claim 2, wherein a brightener is added in the step of mixing and stirring, and a weight proportion of the brightener is 0.2%˜0.4% of total weight of the thermoplastic polyurethane particles.
4. The thread drawing processes as claimed in claim 3, wherein a pigment with a weight proportion is added in the step of mixing and stirring.
5. The thread drawing processes as claimed in claim 4, wherein a stirring time of the step of mixing and stirring is from 3 to 5 minutes.
6. The thread drawing processes as claimed in claim 5, wherein the dryer comprises a blower and a heat pipe, two ends of the heat pipe respectively communicate with the blower and the stirring drum, and the blower blows hot air from the heat pipe into the stirring drum to dry the thermoplastic polyurethane particles.
7. The thread drawing processes as claimed in claim 6, wherein a rotary disc is provided for winding the semi-finished thread in the step of winding-strands-into-roll, or a container is placed in the cooling area, and then the container is rotated to collect and store the semi-finished thread in the step of winding-strands-into-roll.
8. The thread drawing processes as claimed in claim 6, wherein the drying time of the step of first drying is from 15 to 60 minutes.
9. The thread drawing processes as claimed in claim 8, further comprising a step of second feeding and a step of re-stirring between the step of mixing and stirring and the step of first drying, wherein the step of second feeding prepares and inputs multiple powders into the stirring drum for stirring, and the multiple powders include fluorescent powder, reflective powder, or fine glass powder, and a stirring time of the step of re-stirring is from 3 to 5 minutes.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
(9) Referring to
(10) A step S1 of feeding: preparing and inputting a plurality of thermoplastic polyurethane particles 1 into a stirring drum 2 and adding a coupler 11 into the stirring drum 2.
(11) A step S2 of mixing and stirring: using the stirring drum 2 to mix and stir the thermoplastic polyurethane particles 1 and the coupler 11 for 3 to 5 minutes to attach the coupler 11 to the thermoplastic polyurethane particles 1, wherein the thermoplastic polyurethane particles 1 is polyester type or polyether type, or a combination of the polyester type and the polyether type, and the melting point of the plurality of thermoplastic polyurethane particles 1 is from 190° C. to 220° C., the coupler is a mixture of resin and thickener.
(12) If necessary, a brightener 3 is added in the step S2 of mixing and stirring, and the weight proportion of the brightener 3 is 0.2%˜0.4% of total weight of the thermoplastic polyurethane particles 1 so that the fabric 10 composed of the threads looks clean. Alternatively, a pigment 4 with a proportion is added in the step S2 of mixing and stirring to provide desired color to the thermoplastic polyurethane particles 1 such that the fabric 10 composed of the threads have colors.
(13) A step S3 of first drying: drying the thermoplastic polyurethane particles 1 to remove excess water by a dryer 5 so that the thermoplastic polyurethane particles 1 do not stick with each other due to the coupler 11 at the initial stage of mixing and stirring. The drying temperature of the dryer 5 is from 100° C. to 150° C. and the drying time is set to be 15 to 60 minutes so as to ensure that the thermoplastic polyurethane particles 1 are melted and become semi-liquid status. The dryer 5 comprises a blower 51 and a heat pipe 52. Two ends of the heat pipe 52 respectively communicate with the blower 51 and the stirring drum 2, and the blower 51 blows hot air from the heat pipe 52 into the stirring drum 2 to dry and melt the thermoplastic polyurethane particles 1.
(14) A step S4 of hot melt extrusion: sending the melted thermoplastic polyurethane particles 1 into a thread molding machine 6 to form a preliminary thread 71.
(15) A step S5 of first cooling: passing the preliminary thread 71 through a cooling tank 8 in which water or cooling liquid is filled so as to shape the surface of the preliminary thread 71.
(16) A step S6 of stretch extension: passing the cooled preliminary thread 71 through a stretching area 9 to perform a stretch extension, wherein the stretching area 9 includes a plurality of rollers 91, the rollers 91 are disposed with an interval apart from each other and arranged in rows, and the preliminary thread 71 is driven by each roller 91, so that the preliminary thread 71 is stretched. The shape of the cross section of the preliminary thread 71 can be controlled by the rotation speed of the rollers 91 and the tension applied to the preliminary thread 71.
(17) A step S7 of second cooling: entering the preliminary thread 71 processed by the step of stretch extension S6 into an cooling area 92 which is located next to the stretching area 9, the preliminary thread 71 being cooled to reduce surface deformation and to fix the interior of the preliminary thread 71 so as to obtain a semi-finished thread 72.
(18) A step S8 of winding-strands-into-roll: scrolling the semi-finished thread 72. A rotary disc 20 is provided for winding the semi-finished thread 72 in the step S8 of winding-strands-into-roll, or a container 30 is placed in the cooling area 92, and then the container 30 is rotated to collect and store the semi-finished thread 72 in the step S8 of winding-strands-into-roll.
(19) A step S9 of second drying: using a dehumidifying and drying device 40 to further reduce humidity in the semi-finished thread 72 so as to obtain a finished thread 73. The drying time is 48 hours.
(20) As shown in
(21) The finished threads 73 are woven to be a fabric 10. It is noted that the fabric 10 can be attached to each other without sewing or gluing, and the fabric 10 can be easily attached to objects such as the suitcase 50 disclosed in
(22) The fabric 10 composed of the finished threads 73 of the present invention can be attached to objects of different types of material which can be another piece of fabric, a hard case, or a plastic object. The fabric 10 composed of the finished threads 73 of the present invention can also be sandwiched between two pieces of fabric.
(23) While we have shown and described the embodiment in accordance with the present invention, it should be clear to those skilled in the art that further embodiments may be made without departing from the scope of the present invention.