Abstract
Described herein is a method for quenching a hot metal part. The method may comprise selecting a first node located at about a slowest cooling point of the metal part and a second node located at about a fastest cooling portion of the metal part. The method may also comprise quenching the metal part to a finish temperature with the requirement that there is a temperature difference of between about 5° C. and about 30° C. during a quench cycle. The quench cycle may start from a first time when the second node is about 5° C. above a martensite start temperature of the specific metal or metal alloy of the metal part, and end at a second time when the first node is at a temperature which is about or below a martensite finish temperature of the specific metal or metal alloy.
Claims
1. A method of quenching a hot metal part composed of a specific metal or metal alloy capable of having an austenite phase, a martensite phase, and inherent metal properties of a first specific heat and a first thermal conductivity in the austenite phase and a second specific heat and a second thermal conductivity in the martensite phase, comprising the steps of: A. selecting a first point located at, or about, a slowest cooling point of the hot metal part and a second point located at, or about, a fastest cooling point the hot metal part, and B. quenching the hot metal part with the requirement that a temperature difference exists between the first point and the second point, said temperature difference being between about 5° C. and about 30° C. during a quench cycle which starts from a first time when the second point about 5° C. above a martensite start temperature of the specific metal or metal alloy and ends at a second time when the first point at a temperature which is about, or below, a martensite finish temperature of the specific metal or metal alloy.
2. The method of claim 1, wherein the step of quenching the hot metal part comprises exposing the hot metal part to a plurality of quench cycles wherein each quench cycle comprises introducing a first amount of a quenchant at a first quenchant temperature for a first quench time into a quench chamber containing the hot metal part, and subsequently introducing at least one subsequent amount of the quenchant at a subsequent quenchant temperature below the first quenchant temperature for a subsequent quench time into the quench chamber.
3. The method of claim 2, wherein the first amount of the quenchant and the at least one subsequent amount of the quenchant are each independently a quenchant selected from the group consisting of air, steam, water mist, and nitrogen.
4. The method of claim 3, wherein the first amount of the quenchant and the at least one subsequent amount of the quenchant are each of the same type of quenchant.
5. The method of claim 3, wherein the first amount of the quenchant and the at least one subsequent amount of the quenchant are each nitrogen.
6. The method of claim 1, conducted according to a cooling schedule obtained prior to quenching the hot metal part using the steps of: I. determining a CAD geometry of the hot metal part; II. creating a finite element mesh from the CAD geometry; III. selecting a heat transfer coefficient; IV. obtaining a generic cooling schedule for the hot metal part wherein said generic cooling schedule comprises at least a first temperature maintained for a first cooling time, and at least a second temperature maintained for a second cooling time; V. executing a first finite element analysis from the CAD geometry using the generic cooling schedule, the known heat transfer coefficient, and the inherent metal properties to identify a first node on the finite element mesh which has a hottest temperature and a second node on the finite element mesh which has a coldest temperature; and VI. determining the cooling schedule by iteratively modifying the temperature and time conditions in subsequent finite element analyses so that a temperature difference between the first node and the second node is maintained between about 5° C. and about 30° C. during a solid phase transformation of the first node and the second node from the austenite phase to the martensite phase.
7. The method of claim 6, wherein the CAD geometry is selected from the group consisting of a three dimensional CAD geometry, a two-dimensional CAD geometry, or a one dimensional CAD geometry.
8. The method of claim 6, wherein the second temperature is less than the first temperature.
9. The method of claim 6, further comprising a plurality of subsequent cooling temperatures for use in subsequent quench cycles, wherein in each quench cycle, each subsequent cooling temperature is maintained for a subsequent cooling time, and each subsequent cooling temperature is less than its previous cooling temperature.
10. The method of claim 1, conducted according to an empirically determined quenching schedule comprising the steps of: I. placing a first temperature measurement device at the first point and a second temperature measurement device at the second point and II. iteratively exposing the hot metal part to a quenchant at various quenchant temperatures and for various times so as to quantify the temperature difference during the quench cycle.
11. The method of claim 1, conducted according to a quenching schedule determined in real time during the quenching step, comprising the steps of: I. measuring a temperature of the first node using a first temperature measurement device and a second temperature of the second node using a second temperature measurement device while the hot metal part is exposed to a quenchant at a quenchant temperature, and II. adjusting the quenchant temperature to maintain the temperature difference during the quench cycle.
Description
DESCRIPTION OF FIGURES
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
DETAILED DESCRIPTION
(16) The austenite and martensite phases are well known in the metallurgy industry and depend upon how the part is cooled. It is also possible for the material to be in the austenite phase in one location in the part, and be in the martensite phase in another location during a cooling process.
(17) Metallurgists wish to obtain martensite at critical areas of the part for a hardening process.
(18) The material's density in the austenite phase is different than its density in the martensite phase. This density difference is one main reason for a part to distort as one location of the part has a different volume changing rate than the other.
(19) What has been found is that, contrary to what is believed in the industry, distortion can be limited or almost eliminated by subjecting the hot metal part to a slower and longer quenching operation which controls the temperature difference at various points on the hot metal part throughout the quenching operation. By keeping the temperature difference small by following a designed quench profile during controlled cooling, distortion is reduced while still converting the metal from an austenite phase to a martensite phase, while satisfying mechanical properties with little or no ferrite, pearlite or bainite formation.
(20) It has also been discovered that the use of the disclosed method is capable of not only producing a martensite phase, but that some of the martensite phase may be a tempered martensite.
(21) For high hardenability steels, one way to do this is to slowly reduce the surrounding temperature of the part. This can be done for example, by reducing the temperature by 1° C. and holding the part at that temperature until the entire part is at that temperature. Then reducing the surrounding temperature by another 1° C. and waiting for a sufficient time for all points of the part to reach that temperature, and proceeding to the next temperature. However, this process takes a very long time for large parts having large bulks of metal where the cooling is controlled by the core to surface distance, and the process can be detrimental to the mechanical properties.
(22) One of ordinary skill will recognize that reducing the temperature is accomplished by introducing a quenchant into the quench unit.
(23) The disclosed method of determining a quench profile for an improved quenching process starts with a metal part comprised of a metal material which is capable of having an austenite phase and a martensite phase. This material may be a single metal or an alloy of various metals. It may be possible that there are one or more metals, but the metal part must at least be capable of having an austenite phase and a martensite phase in the metal part. The inherent metal part properties of specific heat and thermal conductivity at quenching temperatures and in the respective solid austenite and martensite phase are used in the method and therefore need to be known.
(24) This specification discloses a method for quenching a hot metal part. The method may include selecting a first node corresponding to about a slowest cooling portion of the hot metal part and a second node corresponding to about a fastest cooling portion of the hot metal part. One of ordinary skill will recognize that node refers to a specific point on the hot metal part. In the context of the method to quench the hot metal part, node and point may be used interchangeably. In the context of a method to develop a cooling schedule for the hot metal part according to a CAD geometry as described herein, node may also refer to a specific location within the CAD geometry.
(25) The method may also include quenching the hot metal part to a finish temperature. The finish temperature is not considered important, but in general the finish temperature will be about room temperature (i.e.—about 25° C.).
(26) During the quenching of the hot metal part it is preferred that a temperature difference exists between the first node and the second node. The temperature difference during the quench cycle may be between about 5° C. and about 30° C., between about 5° C. and about 25° C., between about 5° C. and about 20° C., between about 5° C. and about 15° C., between about 5° C. and about 10° C., between about 10° C. and about 30° C., between about 15° C. and about 30° C., between about 20° C. and about 30° C., or between about 25° C. and about 30° C.
(27) The quench cycle may start from a first time when the second node is about 5° C. above a martensite start temperature of the specific metal or metal alloy, and may end at a second time when the first node is at a temperature which is about a martensite finish temperature of the specific metal or metal alloy. In some embodiments, the step of quenching the hot metal part may comprise exposing the hot metal part to a plurality of quench cycles. Each quench cycle may comprise introducing a first amount of a quenchant at a first quenchant temperature for a first quench time into a quench chamber containing the hot metal part. Subsequently, the quench cycle may comprise introducing at least a second amount of the quenchant at a second quenchant temperature below that of the first quenchant temperature for a second quench time into the quench chamber. The number of amounts of the quenchant, quenchant temperatures, and quenchant times is not considered important, and will vary based on a number of factors including the size and shape of the hot metal part being quenched, the specific type of quenchant being used, and the characteristics of the quench chamber. For instance, in some embodiments there may be a third amount of the quenchant at a third quenchant temperature below that of the second quenchant temperature for a third quench time, a fourth amount of the quenchant at a fourth quenchant temperature below that of the third quenchant temperature for a fourth quench time, and so on.
(28) In some embodiments, the first amount of a quenchant and the at least a second amount of a quenchant are each independently of a type of quenchant selected from the group consisting of air, steam, water mist, and nitrogen. Each amount of a quenchant may be of the same or different types of quenchant. For example, in some embodiments, the first amount of a quenchant and the at least a second amount of a quenchant may each be nitrogen. As another example, in some embodiments, the first amount of a quenchant may be nitrogen while the second amount of a quenchant may be water mist.
(29) The method may be conducted according to a quenching schedule. This specification also discloses a method for determining a quenching schedule more rapidly cooling a hot metal part to form martensite. The method may comprise several steps. The first step, as demonstrated in
(30) The method assumes, but does not require, that the known heat transfer coefficient is uniform on the entire part surface. A typical heat transfer coefficient for a slow cooling process is 50 W/m.sup.2K. The quench unit, which is defined as the physical unit itself, the flow rate and the quenchant used in the treatment will define what are known as thermal boundary conditions. The quench unit used to quench a hot metal part will have a heat transfer coefficient which is a measure of how fast a fluid can remove heat from a solid's surface in the unit. It is well known that each quench unit will have its own unique range of heat transfer coefficient. While it is known within the art how to determine this for a given unit, the heat transfer coefficient is typically provided by the quench unit supplier as part of the specification. The examples used in this simulation had the following thermal boundary conditions, which, in part, is how fast a system can recover to the set point temperature from a known mass at a known temperature. The recovery is from the cooling of the gas quenchant from the cool air that enters with the hot part. This cool air drops the temperature of the gas quenchant from the set point hold temperature. The curve will have a rise in quenchant temperature caused by the hot part, with a subsequent fall in temperature as the part is cooled to the set point of approximately room temperature. One wants to replicate the mass and initial temperature to be used in production as closely as possible.
(31) The following table (Table 1), is the recovery time for the quench unit, having a Heat Transfer Coefficient of 95 W/(m.sup.2*K) [Watts/(square meter*degree Kelvin)].
(32) TABLE-US-00001 TABLE 1 Thermal Boundary Conditions of Quench Unit. Time Temperature (Seconds) (° C.) 0 250 30 325 120 393 12000 393
(33) In this case, the set point was 393° C., and is the martensite start temperature of the material.
(34) After the CAD rendering, known as a CAD geometry, one creates a finite element mesh from the CAD geometry, an example of which is shown in
(35) Next, one selects or obtains a generic cooling schedule for the hot metal part. The generic cooling schedule is the temperature and time conditions to which the part will be exposed. Example schedule conditions could be 1° C. drop each minute until stopped, or 2° C. drop every 5 minutes. The generic cooling schedule forms the starting point from which the actual cooling schedule will be determined. Table 2 shows a typical generic cooling schedule.
(36) TABLE-US-00002 TABLE 2 Generic Cooling Schedule Time Temperature (Seconds) (° C.) 0 250 30 325 90 350 120 393 2500 393 4300 60 10800 60
(37) In this schedule, the italicized values are the time it takes the quench unit to recover from the introduction of the hot metal part to the quench chamber. It takes 120 seconds to recover to 393° C. Accordingly, these conditions cannot be modified or changed. In this generic schedule, 393° C. is the temperature corresponding to the martensite start temperature (M.sub.S) for the metal of the hot metal part. The martensite start temperature is the temperature at which the particular material of the hot metal part first begins to transition from the austenite phase to the martensite phase. It is held for 2380 seconds (Note: 2380-2500-120). There is then a ramp of 1800 seconds to go to point number 2, 60° C. 60° C. is the approximate martensite finish temperature of the material (M.sub.F). (Note: 4300-2500-1800). The martensite finish temperature is the temperature at which the particular material of the hot metal part has completed the transition from the austenite phase to the martensite phase. The part is then held at a time chosen to be longer than the assumed time needed to reach thermal equilibrium throughout the part with the second temperature. The actual time to reach thermal equilibrium is then determined at some time during the excessively long hold.
(38) Accordingly, the generic cooling schedule comprises at least a first temperature maintained for a first cooling time, and at least a second temperature maintained for a second cooling time. As mentioned previously, this is merely a starting schedule. The first temperature is typically less than the initial surface temperature of the hot metal part, but above or equal to the martensite start temperature (M.sub.S) of the hot metal part. The second temperature will be less than the first temperature and less than or equal to the martensite start temperature, and preferably less than or equal to the martensite finish temperature.
(39) The model selects conditions which change fast enough, i.e. cool fast enough, to create the temperature differentials between the coldest node and the hottest node as described herein.
(40) The practitioner will then execute a first finite element analysis using the generic cooling schedule and the thermal boundary conditions to identify a first node of the hot metal part on the finite element mesh which is the hottest node and a second node on the finite element mesh which is the coolest node. These nodes are demonstrated in
(41) It is important to note that, in the three dimensional model, the hottest node is likely to be “inside” the hot metal part. It has been determined that these nodes will have the same hot vs cold relationship to the other nodes throughout the cooling cycle. Accordingly, the same two nodes will be the hottest and coldest nodes, respectively, regardless of which initial two temperatures are selected. Referring to
(42) Executing a finite element analysis along a cooling schedule is well known in the art and conducted using commercial computer programs. For example, DANTE Solutions, Inc.'s, DANTE® program, Cleveland, Ohio is one such program with these capabilities.
(43) After completing the first finite element analysis, one iteratively modifies the generic cooling schedule using at least a second finite element analysis to create a finished cooling schedule wherein the finished cooling schedule is such that the temperature difference between the first node and the second node during the solid phase transformation of the first node and the second node from the austenite phase to the martensite phase is preferably no greater than 30° C., with 20° C. being more preferred, and 10° C. being the most preferred. This phase transformation starts at the martensite start temperature (M.sub.S) and ends at the martensite finish temperature (M.sub.F).
(44) Iteratively modifying time and temperature conditions involves creating a cooling schedule (n, where n=1), executing a finite element analysis (n) examining the temperature difference between the hottest node and the coldest node for those conditions (Quenchant Temperature and time at that temperature) where the difference between the hottest node and the coldest node during the phase transformation of the hottest node and the coldest node from the austenite phase to the martensite phase is greater than a target temperature difference, preferably below 30° C. (i.e. during the martensite phase transformation) and changing the conditions of the cooling schedule to create a new cooling schedule (n+1) to reduce that temperature difference. Finite element analysis (n+1) is conducted and the examination of the temperature difference between the hottest and coldest nodes for the conditions where the difference is greater than the 30° C. target temperature is done again. This process continues until the temperature difference during the cooling schedule is less than 30° C., preferably less than 25° C., with less than 20° C. being more preferred and less than 15° C. or less than 10° C. being the most preferred.
(45) Once this temperature difference is no greater than the target difference, the iterative process stops and the cooling schedule resulting in the reduced temperature difference can be used to quench the part.
(46) What follows is an example iteration.
(47) Examining
(48) Then one examines the temperature profiles of the generic cooling schedule. Looking at
(49) Ramp time is from the end of the previous hold time to the start of the next hold time. The ramp time is assumed to be 50% of the time from the end of the previous hold time to the start of the next hold time. So, for the ramp time from 393° C. to 370° C., the total time is 333 seconds, so the ramp time is 166.5 seconds and the actual hold time is 166.5 seconds. This is an arbitrary selection, one could use 25% ramp and 75% hold or any other ramp vs. hold ratio. The subsequent simulation will tell whether this is correct or not.
(50) The analyst continues building the new curve by examining the profile across the part as time progresses in the generic cooling curve. In this case, examining
(51) The curve is continued to be built. As shown in
(52) TABLE-US-00003 TABLE 3 Iteration 1 of The Generic Cooling Schedule. Total Time of Simulation Start Total Time of of Hold (End of Simulation End Ramp), of Hold, Temperature Points (Seconds) (Seconds) (° C.) Cannot be 0/no hold 250 changed Cannot be 3/no hold 325 changed Cannot be 90/no hold 350 changed Cannot be 120/no hold 393 changed 1 1533 393 2 1699.5 1866 370 (1533 + 166.5) (1533 + 333) 3 2066 2266 330 (1866 + 36 (1533 + 733) 4 2516 2766 250 (1533 + 1233) 5 3016 3266 150 (1533 + 1733) 6 4316 5366 60 (1533 + 3833)
(53) The simulation is run using the above cooling schedule and analyzed for the locations where the temperature differences during the M.sub.S to M.sub.F may be greater than the target temperature.
(54) Table 4 shows the second iteration which is built as follows.
(55) As shown in
(56) Examining
(57) Examining
(58) Iterations to the cooling schedule continue in the manner described above until the 1.sup.st point and the 2.sup.nd point satisfy the target temperature difference from the martensite start temperature to the martensite finish temperature.
(59) TABLE-US-00004 TABLE 4 Second Iteration of the Cooling Curve. Total Time of Simulation Start Total Time of of Hold (End of Simulation End Ramp), of Hold, Temperature Points (Seconds) (Seconds) (° C.) Cannot be 0/no hold 250 changed Cannot be 3/no hold 325 changed Cannot be 90/no hold 350 changed Cannot be 120/no hold 393 changed 1/7 1533 393 8 1766.5 2000 370 9 2200 2400 330 10 2700 3000 250 11 3317 3634 150 12 4500 5366 60
(60) Table 5 shows the out of round distortion of the offset ring part when processed according to different Heat Transfer Coefficients (HTC) and the iterated cooling schedule generated according the disclosed process. In this case, the target temperature difference was 15° C. Looking at the table, the maximum temperature differences experienced by the part during the phase transformation from austenite to martensite can be as high as 310° C. creating tremendous out of round distortions. As compared to even a slow cooling part in a chamber having a heat transfer coefficient of 20 W/m.sup.2K, the disclosed cooling schedule experiences 50% less distortion. The values of 20 W/m.sup.2K, 50 W/m.sup.2K, and 100 W/m.sup.2K are known HTC's used within the industry. The iterated curve has an HTC of 95 W/m.sup.2K for that unit as discussed earlier. The difference is the iterated curve varied the temperature according to the schedule created using the disclosed method.
(61) TABLE-US-00005 TABLE 5 Distortion Results of Various Cooling Schedules Disk with Offset Hole Out of Max Max ΔM Vertical Horizontal Round HTC ΔT during Distortion Distortion Distortion (W/m.sup.2 * K) (° C.) Trans. (%) (mm) (mm) (mm) 20 71 47 0.0225 −0.0211 0.0436 50 177 76 0.0517 −0.0400 0.0917 100 310 89 0.0878 −0.0634 0.1512 Iterated 15 13 0.0382 0.0106 0.0276 Curve
(62) Given a steel's alloying elements and a given cooling rate, mechanical properties can remain ideal while significantly reducing distortion caused by quenching. The alloy investigated, Ferrium C64, has high hardenability and a high tempering temperature; although this method may not degrade the mechanical properties of steels with a different hardenability and tempering temperature. The hardness profiles through a carburized case, tensile properties, Charpy impact properties, and distortion are compared between the standard quenching process and the process described herein for the investigated alloy.
(63) Other embodiments for obtaining the cooling schedule may exist. In one embodiment, the method may be conducted according to an empirically determined quenching schedule. The empirically determined quenching schedule may be determined by first placing a first temperature measurement device at the first node and a second temperature measurement device at the second node, and then iteratively exposing the hot metal part to a quenchant at various temperatures and times so as to characterize the temperature difference during the quench cycle. One preferred first temperature measurement device and/or second temperature measurement device is a thermocouple.
(64) In another embodiment, the method may be conducted according to a quenching schedule determined in real time during the quenching step. The real time determined quenching schedule may be determined by measuring a temperature of the first node using a first temperature measurement device and a second temperature of the second node using a second temperature measurement device while the hot metal part is exposed to a quenchant at a quenchant temperature, and then adjusting the quenchant temperature to maintain the temperature difference during the quench cycle. One preferred first temperature measurement device and/or second temperature measurement device is a themocouple.
(65)
(66)
(67) Table 6 shows the tensile property comparison between the standard process (labeled “STD”) and the process described herein (labeled “CTL”).
(68) TABLE-US-00006 TABLE 6 Tensile Property Comparison Between a Standard Quenching Process (STD) and the process described herein (CTL) ELONGATION SAMPLE ID TENSILE (psi) YIELD OS .2% (psi) 4D(%) RA (%) STD CTL SID CTL SID CTL SID CTL SID CTL 01L 1-1 236,000 237,000 203,000 202,000 17.0 18.0 71.0 73.0 02L 2-1 236,000 236,000 203,000 200,000 17.0 18.0 71.0 70.0 03L 3-1 235,000 237,000 203,000 199,000 17.0 18.0 71.0 70.0 04L 4-1 236,000 234,000 204,000 214,000 16.0 17.0 71.0 72.0 AVG 235,750 236,000 203,250 203,750 16.8 17.8 71.0 71.3
(69) Table 7 shows the impact Charpy property comparison between the standard process (labeled “STD”) and the process described herein (labeled “CTL”).
(70) TABLE-US-00007 TABLE 7 Charpy impact property comparison between a standard quenching process (STD) and the process described herein (CTL) STD CTL CVN CVN SAMPLE ENERGY SAMPLE ENERGY ID (ft. lbs.) ID (ft. lbs.) Set 1 11L 17.0 1-1 18.0 Comparison 12L 20.0 1-2 21.0 13L 17.0 1-3 20.0 AVG 18.0 AVG 19.7 Set 2 21L 19.0 2-1 19.0 Comparison 22L 15.0 2-2 18.0 23L 18.0 2-3 16.0 AVG 17.3 AVG 17.7 TOTAL AVG STD 17.7 CTL 18.7
(71) Table 8 shows the distortion comparison between the standard process (labeled “STD”) and the process described herein (labeled “CTL”). The distortion measured the out of round of the hole in the coupon depicted in
(72) Table 8—Comparison of out-of-round distortion of coupons processed using standard quenching process (STD) and process described herein (CTL); EW and NS measurements are relative, Out-of-round measurements are absolute.
(73) TABLE-US-00008 Out-of-round STD Coupon #1 (mm) EW1 0.46 NS1 0.28 0.18 EW2 0.53 NS2 0.30 0.23 EW3 0.52 NS3 0.30 0.22 EW4 0.51 NS4 0.32 0.19 EW5 0.51 NS5 0.23 0.28 AVG. 0.220 Out-of-round STD Coupon #2 (mm) EW1 0.55 NS1 0.30 0.25 EW2 0.51 NS2 0.30 0.21 EW3 0.51 NS3 0.30 0.21 EW4 0.50 NS4 0.29 0.21 EW5 0.46 NS5 0.21 0.25 AVG. 0.226 Out-of-round CTL Coupon #1 (mm) EW1 0.30 NS1 0.19 0.11 EW2 0.30 NS2 0.21 0.09 EW3 0.31 NS3 0.24 0.07 EW4 0.35 NS4 0.25 0.10 EW5 0.38 NS5 0.28 0.10 AVG. 0.094 Out-of-round CTL Coupon #2 (mm) EW1 0.46 NS1 0.34 0.12 EW2 0.44 NS2 0.32 0.12 EW3 0.41 NS3 0.28 0.13 EW4 0.41 NS4 0.29 0.12 EW5 0.41 NS5 0.33 0.08 AVG. 0.114