DOUBLE CHAMBERS BOILER SYSTEM WITH OXYGEN-ENRICHED COMBUSTION
20210333018 ยท 2021-10-28
Inventors
Cpc classification
F24H1/0027
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F23D14/22
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24H1/187
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F23C9/06
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F23C9/003
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24H1/38
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02E20/34
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
F23L2900/07005
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F23L2900/15043
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24H9/2035
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24H9/1836
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24H1/0063
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F23C2202/20
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24H9/2057
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F23N2221/08
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F24H9/20
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F23C9/06
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F23L7/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24H1/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
A double chambers boiler system with oxygen-enriched combustion is provided, relating to fields of thermal power engineering and mechanical manufacturing. The double chambers boiler system includes a boiler furnace subassembly and a combustion control subassembly. The boiler furnace subassembly includes a combustion chamber and a heat exchange chamber. The heat exchange chamber is arranged above the combustion chamber. A high temperature flue gas outlet is arranged between the combustion chamber and the heat exchange chamber. The combustion control subassembly includes a burner, a pure oxygen injector and a fuel injector. The double chambers boiler system with oxygen-enriched combustion is able to simultaneously solve problems of improving a combustion efficiency and reducing an emission concentration of NO.sub.x.
Claims
1. A double chambers boiler system with oxygen-enriched combustion, comprising a boiler furnace subassembly (01) and a combustion control subassembly (22); wherein: the boiler furnace subassembly (01) comprises a combustion chamber (02) and a heat exchange chamber (03); the combustion chamber (02) is for oxygen-enriched combustion of fuel, so as to generate high temperature flue gas; the heat exchange chamber (03) is for transferring heat from the high temperature flue gas; the heat exchange chamber (03) is arranged above the combustion chamber (02); a high temperature flue gas outlet (10) is arranged between the combustion chamber (02) and the heat exchange chamber (03); pure oxygen is adopted for supporting combustion; the combustion chamber (02) is able to meet a high temperature resistance requirement for combustion in the pure oxygen; and the heat exchange chamber (03) is able to realize a highly-efficient heat transfer of a boiler.
2. The double chambers boiler system with oxygen-enriched combustion, as recited in claim 1, wherein: the combustion control subassembly (22) assists feeding of the fuel with CO.sub.2 and/or flue gas recirculation and is equipped with a flue gas recirculation tube (23); according to a combustion effect in the combustion chamber (02), a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted by the combustion control subassembly (22); and, the combustion control subassembly (22) comprises a burner (04), a pure oxygen injector (08) and a fuel injector (09).
3. The double chambers boiler system with oxygen-enriched combustion, as recited in claim 2, wherein: injection ports (05) are arranged at a middle part of the combustion chamber (02) and on a wall (07) of the combustion chamber (02); the injection ports (05) are arranged horizontally and symmetrically on a same plane, and 3-6 injection ports (05) are arranged on the same plane; for the wall (07) of the combustion chamber (02), an inner layer is made of high temperature refractory material, a middle layer is made of thermal insulation material, and an outer layer is made of structural material; and an ash bucket (11) is arranged below the combustion chamber (02).
4. The double chambers boiler system with oxygen-enriched combustion, as recited in claim 2, wherein: the heat exchange chamber (03) is intercommunicated with the combustion chamber (02) through the high temperature flue gas outlet (10); a flue gas outlet (15) of the heat exchange chamber (03) is arranged at top of the heat exchange chamber (03); a waste heat recovery device (20) is arranged outside the flue gas outlet (15) of the heat exchange chamber (03); an inner wall of the heat exchange chamber (03) is a water wall (06); and a boiler water wall pipe (12) is arranged in middle of the heat exchange chamber (03).
5. The double chambers boiler system with oxygen-enriched combustion, as recited in claim 4, wherein: an economizer (21) is arranged inside the waste heat recovery device (20); an end gas outlet (14) is arranged at a tail end of the waste heat recovery device (20), and the end gas outlet (14) is connected to a pre-heater (13).
6. The double chambers boiler system with oxygen-enriched combustion, as recited in claim 2, wherein: in the burner (04), in order to avoid explosion, primary air and secondary air are separately delivered; the primary air and the secondary air are sprayed into the combustion chamber (02) by the burner (04); the primary air is air carrying the fuel, and the secondary air is the pure oxygen.
7. The double chambers boiler system with oxygen-enriched combustion, as recited in claim 6, wherein: a part of or all of the primary air is end gas exhausted from a waste heat recovery device (20); the end gas exhausted from the waste heat recovery device (20) enters the fuel injector (09) after passing through a pre-heater (13) and processing with flue gas separation; and then the primary air carrying the fuel enters the burner (04); when a part of the primary air is the end gas exhausted from the waste heat recovery device (20), the other part of the primary air is CO.sub.2; the end gas and CO.sub.2 enter the fuel injector (09) after passing through the pre-heater (13); and then the primary air carrying the fuel enters the burner (04); or all of the primary air is CO.sub.2; CO.sub.2 enters the fuel injector (09) after passing through the pre-heater (13); and then the primary air carrying the fuel enters the burner (04); and the secondary air is standard pure oxygen; after passing through the pre-heater (13), the standard pure oxygen enters the burner (04) through the pure oxygen injector (08).
8. The double chambers boiler system with oxygen-enriched combustion, as recited in claim 7, wherein: internal channels of the burner (04) are arranged in structure of concentric circles or parallel channels, comprising an oxygen channel (201) and a fuel channel (202); the oxygen channel (201) and the fuel channel (202) are separated from each other; the primary air carrying the fuel is sprayed into the combustion chamber (02) through the fuel channel (202), and the secondary air enters the combustion chamber (02) through the oxygen channel (201).
9. The double chambers boiler system with oxygen-enriched combustion, as recited in claim 1, wherein: the combustion control subassembly (22) further comprises a detector (24) for automatically monitoring concentrations of oxygen and CO.sub.2 and a temperature, so that a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted according to a combustion effect in the combustion chamber (02).
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The drawings illustrated herein are for providing further understanding of the present invention and constituting a part of the present invention, but not all of the present invention, which will not improperly limit the present invention.
[0027]
[0028]
[0029]
[0030] In figures: 01: boiler furnace subassembly; 02: combustion chamber; 03: heat exchange chamber; 04: burner; 05: injection ports; 06: water wall; 07: wall of combustion chamber; 08: pure oxygen injector; 09: fuel injector; 10: high temperature flue gas outlet; 11: ash bucket; 12: boiler water wall pipe; 13: pre-heater; 14: end gas outlet; 15: flue gas outlet of heat exchange chamber; 16: fuel supply equipment; 17, 18 and 19: draught fans; 20: waste heat recovery device; 21: economizer; 22: combustion control subassembly; 23: flue gas recirculation tube; 24: detector; 201: oxygen channel; and 202: fuel channel.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
[0031] In order to make objects, technical solutions and advantages of the present invention more understandable and clearer, the present invention will be further described in detail with reference to the accompanying drawings and examples. It should be understood that the examples described herein are merely for explaining the present invention, not for limiting the present invention.
[0032] Moreover, replacements, modifications, equivalent methods and solutions, which are made within the spirit and scope of the present invention and defined by claims, are all encompassed in the protection scope of the present invention. In order to make the public better understand the present invention, in the following detailed description of the present invention, some specific details are described. One skilled in the art can fully understand the present invention without the specific details.
Example 1
[0033] As shown in
[0034] An ash bucket 11 is arranged below the combustion chamber 02; three injection ports 05 are arranged at a middle part of the combustion chamber 02; and the high temperature flue gas outlet 10 is arranged at top of the combustion chamber 02. The injection ports 05 are arranged horizontally and symmetrically, namely in arrangement of equilateral triangle. For a wall 07 of the combustion chamber 02, an inner layer is made of high temperature refractory material, a middle layer is made of thermal insulation material, and an outer layer is made of structural material.
[0035] The heat exchange chamber 03 is intercommunicated with the combustion chamber 02 through the high temperature flue gas outlet 10; an inner wall of the heat exchange chamber 03 is a water wall 06; a boiler water wall pipe 12 is arranged in middle of the heat exchange chamber 03; a flue gas outlet 15 of the heat exchange chamber 03 is arranged at top of the heat exchange chamber 03; a waste heat recovery device 20 is arranged outside the flue gas outlet 15 of the heat exchange chamber 03; an economizer 21 is arranged in middle of the waste heat recovery device 20; an end gas outlet 14 is arranged at a tail end of the waste heat recovery device 20, and the end gas outlet 14 is connected to a pre-heater 13.
[0036] In the burner 04, in order to avoid explosion, primary air and secondary air are separately delivered; the primary air and the secondary air are sprayed into the combustion chamber 02 by the burner 04; the primary air is air carrying fuel, and the secondary air is pure oxygen;
[0037] a part of the primary air is end gas exhausted from the waste heat recovery device 20; the end gas exhausted from the waste heat recovery device 20 enters the fuel injector 09 after passing through the pre-heater 13 and processing with flue gas separation, wherein the end gas is induced by a draught fan 17; the other part of the primary air is CO.sub.2; CO.sub.2 induced by a draught fan 18 enters the fuel injector 09 after passing through the pre-heater 13; and then the primary air enters the burner 04 with carrying the fuel of the fuel injector 09; herein, the fuel is fed by a fuel supply equipment 16; and
[0038] the secondary air is standard pure oxygen; after passing through the pre-heater 13, the standard pure oxygen induced by a draught fan 19 enters the burner 04 through the pure oxygen injector 08.
[0039] As shown in
[0040] The combustion control subassembly 22 further comprises a detector 24 for automatically monitoring concentrations of oxygen and CO.sub.2 and a temperature, so that a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted according to a combustion effect.
Example 2
[0041] A double chambers boiler system with oxygen-enriched combustion comprises a boiler furnace subassembly 01 and a combustion control subassembly 22; wherein: the boiler furnace subassembly 01 comprises a combustion chamber 02 and a heat exchange chamber 03; the combustion chamber 02 is a horizontal combustion chamber; the heat exchange chamber 03 is arranged above the horizontal combustion chamber 02; a high temperature flue gas outlet 10 is arranged between the combustion chamber 02 and the heat exchange chamber 03; and, the combustion control subassembly 22 comprises a burner 04, a pure oxygen injector 08 and a fuel injector 09.
[0042] An ash bucket 11 is arranged below the combustion chamber 02; three injection ports 05 are arranged at a middle part of the combustion chamber 02; and the high temperature flue gas outlet 10 is arranged at top of the combustion chamber 02. The injection ports 05 are arranged horizontally and symmetrically, namely in arrangement of equilateral triangle. For a wall 07 of the combustion chamber 02, an inner layer is made of high temperature refractory material, a middle layer is made of thermal insulation material, and an outer layer is made of structural material.
[0043] The heat exchange chamber 03 is intercommunicated with the combustion chamber 02 through the high temperature flue gas outlet 10; an inner wall of the heat exchange chamber 03 is a water wall 06; a boiler water wall pipe 12 is arranged in middle of the heat exchange chamber 03; a flue gas outlet 15 of the heat exchange chamber 03 is arranged at top of the heat exchange chamber 03; a waste heat recovery device 20 is arranged outside the flue gas outlet 15 of the heat exchange chamber 03; an economizer 21 and a heat exchanger are arranged in middle of the waste heat recovery device 20; an end gas outlet 14 is arranged at a tail end of the waste heat recovery device 20, and the end gas outlet 14 is connected to a pre-heater 13.
[0044] In the burner 04, in order to avoid explosion, primary air and secondary air are separately delivered; the primary air and the secondary air are sprayed into the combustion chamber 02 by the burner 04; the primary air is air carrying fuel, and the secondary air is pure oxygen;
[0045] all of the primary air is end gas exhausted from the waste heat recovery device 20; the end gas exhausted from the waste heat recovery device 20 enters the fuel injector 09 after passing through the pre-heater 13 and processing with flue gas separation, wherein the end gas is induced by a draught fan 17; and then the primary air enters the burner 04 with carrying the fuel of the fuel injector 09; herein, the fuel is fed by a fuel supply equipment 16; and
[0046] the secondary air is standard pure oxygen; after passing through the pre-heater 13, the standard pure oxygen induced by a draught fan 19 enters the burner 04 through the pure oxygen injector 08.
[0047] The burner 04 comprises a fuel channel 202 and an oxygen channel 201, wherein: the fuel channel 202 and the oxygen channel 201 are arranged in parallel as shown in
[0048] The combustion control subassembly 22 further comprises a detector 24 for automatically monitoring concentrations of oxygen and CO.sub.2 and a temperature, so that a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted according to a combustion effect.
Example 3
[0049] A double chambers boiler system with oxygen-enriched combustion comprises a boiler furnace subassembly 01 and a combustion control subassembly 22; wherein: the boiler furnace subassembly 01 comprises a combustion chamber 02 and a heat exchange chamber 03; the combustion chamber 02, which is a horizontal combustion chamber, is arranged at a lower part of the boiler furnace subassembly 01, and the heat exchange chamber 03 is arranged at an upper part of the boiler furnace subassembly 01; a high temperature flue gas outlet 10 is arranged between the combustion chamber 02 and the heat exchange chamber 03; and, the combustion control subassembly 22 comprises a burner 04, a pure oxygen injector 08 and a fuel injector 09.
[0050] An ash bucket 11 is arranged below the combustion chamber 02; four injection ports 05 are arranged at a middle part of the combustion chamber 02; and the high temperature flue gas outlet 10 is arranged at top of the combustion chamber 02. The injection ports 05 are arranged horizontally and symmetrically. For a wall 07 of the combustion chamber 02, an inner layer is made of high temperature refractory material, a middle layer is made of thermal insulation material, and an outer layer is made of structural material.
[0051] The heat exchange chamber 03 is intercommunicated with the combustion chamber 02 through the high temperature flue gas outlet 10; an inner wall of the heat exchange chamber 03 is a water wall 06; a boiler water wall pipe 12 is arranged in middle of the heat exchange chamber 03; a flue gas outlet 15 of the heat exchange chamber 03 is arranged at top of the heat exchange chamber 03; a waste heat recovery device 20 is arranged outside the flue gas outlet 15 of the heat exchange chamber 03; an economizer 21 is arranged in middle of the waste heat recovery device 20; an end gas outlet 14 is arranged at a tail end of the waste heat recovery device 20, and the end gas outlet 14 is connected to a pre-heater 13.
[0052] In the burner 04, in order to avoid explosion, primary air and secondary air are separately delivered; the primary air and the secondary air are sprayed into the combustion chamber 02 by the burner 04; the primary air is air carrying fuel, and the secondary air is pure oxygen;
[0053] all of the primary air is CO.sub.2; CO.sub.2 induced by a draught fan 18 enters the fuel injector 09 after passing through the pre-heater 13; and then the primary air enters the burner 04 with carrying the fuel of the fuel injector 09; herein, the fuel is fed by a fuel supply equipment 16; and
[0054] the secondary air is standard pure oxygen; after passing through the pre-heater 13, the standard pure oxygen induced by a draught fan 19 enters the burner 04 through the pure oxygen injector 08.
[0055] The combustion control subassembly 22 further comprises a detector 24 for automatically monitoring concentrations of oxygen and CO.sub.2 and a temperature, so that a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted according to a combustion effect.
Example 4
[0056] A double chambers boiler system with oxygen-enriched combustion comprises a boiler furnace subassembly 01 and a combustion control subassembly 22; wherein: the boiler furnace subassembly 01 comprises a combustion chamber 02 and a heat exchange chamber 03; the combustion chamber 02, which is a horizontal combustion chamber, is arranged at a lower part of the boiler furnace subassembly 01, and the heat exchange chamber 03 is arranged at an upper part of the boiler furnace subassembly 01; a high temperature flue gas outlet 10 is arranged between the combustion chamber 02 and the heat exchange chamber 03; and, the combustion control subassembly 22 comprises a burner 04, a pure oxygen injector 08 and a fuel injector 09.
[0057] An ash bucket 11 is arranged below the combustion chamber 02; four injection ports 05 are arranged at a middle part of the combustion chamber 02; and the high temperature flue gas outlet 10 is arranged at top of the combustion chamber 02. The injection ports 05 are arranged horizontally and symmetrically. For a wall 07 of the combustion chamber 02, an inner layer is made of high temperature refractory material, a middle layer is made of thermal insulation material, and an outer layer is made of structural material.
[0058] The heat exchange chamber 03 is intercommunicated with the combustion chamber 02 through the high temperature flue gas outlet 10; an inner wall of the heat exchange chamber 03 is a water wall 06; a boiler water wall pipe 12 is arranged in middle of the heat exchange chamber 03; a flue gas outlet 15 of the heat exchange chamber 03 is arranged at top of the heat exchange chamber 03; a waste heat recovery device 20 is arranged outside the flue gas outlet 15 of the heat exchange chamber 03; an economizer 21 and a heat exchanger are arranged in middle of the waste heat recovery device 20; an end gas outlet 14 is arranged at a tail end of the waste heat recovery device 20, and the end gas outlet 14 is connected to a pre-heater 13.
[0059] In the burner 04, in order to avoid explosion, primary air and secondary air are separately delivered; the primary air and the secondary air are sprayed into the combustion chamber 02 by the burner 04; the primary air is air carrying fuel, and the secondary air is pure oxygen;
[0060] a part of the primary air is end gas exhausted from the waste heat recovery device 20; the end gas exhausted from the waste heat recovery device 20 enters the fuel injector 09 after passing through the pre-heater 13 and processing with flue gas separation, wherein the end gas is induced by a draught fan 17; the other part of the primary air is CO.sub.2; CO.sub.2 induced by a draught fan 18 enters the fuel injector 09 after passing through the pre-heater 13; and then the primary air enters the burner 04 with carrying the fuel of the fuel injector 09; herein, the fuel is fed by a fuel supply equipment 16; and
[0061] the secondary air is standard pure oxygen; after passing through the pre-heater 13, the standard pure oxygen induced by a draught fan 19 enters the burner 04 through the pure oxygen injector 08.
[0062] The combustion control subassembly 22 further comprises a detector 24 for automatically monitoring concentrations of oxygen and CO.sub.2 and a temperature, so that a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted according to a combustion effect.
Example 5
[0063] A double chambers boiler system with oxygen-enriched combustion comprises a boiler furnace subassembly 01 and a combustion control subassembly 22; wherein: the boiler furnace subassembly 01 comprises a combustion chamber 02 and a heat exchange chamber 03; the combustion chamber 02, which is a horizontal combustion chamber, is arranged at a lower part of the boiler furnace subassembly 01, and the heat exchange chamber 03 is arranged at an upper part of the boiler furnace subassembly 01; a high temperature flue gas outlet 10 is arranged between the combustion chamber 02 and the heat exchange chamber 03; and, the combustion control subassembly 22 comprises a burner 04, a pure oxygen injector 08 and a fuel injector 09.
[0064] An ash bucket 11 is arranged below the combustion chamber 02; five injection ports 05 are arranged at a middle part of the combustion chamber 02; and the high temperature flue gas outlet 10 is arranged at top of the combustion chamber 02. The injection ports 05 are arranged horizontally and symmetrically. For a wall 07 of the combustion chamber 02, an inner layer is made of high temperature refractory material, a middle layer is made of thermal insulation material, and an outer layer is made of structural material.
[0065] The heat exchange chamber 03 is intercommunicated with the combustion chamber 02 through the high temperature flue gas outlet 10; an inner wall of the heat exchange chamber 03 is a water wall 06; a boiler water wall pipe 12 is arranged in middle of the heat exchange chamber 03; a flue gas outlet 15 of the heat exchange chamber 03 is arranged at top of the heat exchange chamber 03; a waste heat recovery device 20 is arranged outside the flue gas outlet 15 of the heat exchange chamber 03; an economizer 21 is arranged in middle of the waste heat recovery device 20; an end gas outlet 14 is arranged at a tail end of the waste heat recovery device 20, and the end gas outlet 14 is connected to a pre-heater 13.
[0066] In the burner 04, in order to avoid explosion, primary air and secondary air are separately delivered; the primary air and the secondary air are sprayed into the combustion chamber 02 by the burner 04; the primary air is air carrying fuel, and the secondary air is pure oxygen;
[0067] all of the primary air is end gas exhausted from the waste heat recovery device 20; the end gas exhausted from the waste heat recovery device 20 enters the fuel injector 09 after passing through the pre-heater 13 and processing with flue gas separation, wherein the end gas is induced by a draught fan 17; and then the primary air enters the burner 04 with carrying the fuel of the fuel injector 09; herein, the fuel is fed by a fuel supply equipment 16; and
[0068] the secondary air is standard pure oxygen; after passing through the pre-heater 13, the standard pure oxygen induced by a draught fan 19 enters the burner 04 through the pure oxygen injector 08.
[0069] The combustion control subassembly 22 further comprises a detector 24 for automatically monitoring concentrations of oxygen and CO.sub.2 and a temperature, so that a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted according to a combustion effect.
Example 6
[0070] A double chambers boiler system with oxygen-enriched combustion comprises a boiler furnace subassembly 01 and a combustion control subassembly 22; wherein: the boiler furnace subassembly 01 comprises a combustion chamber 02 and a heat exchange chamber 03; the combustion chamber 02, which is a horizontal combustion chamber, is arranged at a lower part of the boiler furnace subassembly 01, and the heat exchange chamber 03 is arranged at an upper part of the boiler furnace subassembly 01; a high temperature flue gas outlet 10 is arranged between the combustion chamber 02 and the heat exchange chamber 03; and, the combustion control subassembly 22 comprises a burner 04, a pure oxygen injector 08 and a fuel injector 09.
[0071] An ash bucket 11 is arranged below the combustion chamber 02; five injection ports 05 are arranged at a middle part of the combustion chamber 02; and the high temperature flue gas outlet 10 is arranged at top of the combustion chamber 02. The injection ports 05 are arranged horizontally and symmetrically. For a wall 07 of the combustion chamber 02, an inner layer is made of high temperature refractory material, a middle layer is made of thermal insulation material, and an outer layer is made of structural material.
[0072] The heat exchange chamber 03 is intercommunicated with the combustion chamber 02 through the high temperature flue gas outlet 10; an inner wall of the heat exchange chamber 03 is a water wall 06; a boiler water wall pipe 12 is arranged in middle of the heat exchange chamber 03; a flue gas outlet 15 of the heat exchange chamber 03 is arranged at top of the heat exchange chamber 03; a waste heat recovery device 20 is arranged outside the flue gas outlet 15 of the heat exchange chamber 03; an economizer 21 and a heat exchanger are arranged in middle of the waste heat recovery device 20; an end gas outlet 14 is arranged at a tail end of the waste heat recovery device 20, and the end gas outlet 14 is connected to a pre-heater 13.
[0073] In the burner 04, in order to avoid explosion, primary air and secondary air are separately delivered; the primary air and the secondary air are sprayed into the combustion chamber 02 by the burner 04; the primary air is air carrying fuel, and the secondary air is pure oxygen;
[0074] all of the primary air is CO.sub.2; CO.sub.2 induced by a draught fan 18 enters the fuel injector 09 after passing through the pre-heater 13; and then the primary air enters the burner 04 with carrying the fuel of the fuel injector 09; herein, the fuel is fed by a fuel supply equipment 16; and
[0075] the secondary air is standard pure oxygen; after passing through the pre-heater 13, the standard pure oxygen induced by a draught fan 19 enters the burner 04 through the pure oxygen injector 08.
[0076] The combustion control subassembly 22 further comprises a detector 24 for automatically monitoring concentrations of oxygen and CO.sub.2 and a temperature, so that a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted according to a combustion effect.
Example 7
[0077] A double chambers boiler system with oxygen-enriched combustion comprises a boiler furnace subassembly 01 and a combustion control subassembly 22; wherein: the boiler furnace subassembly 01 comprises a combustion chamber 02 and a heat exchange chamber 03; the combustion chamber 02, which is a horizontal combustion chamber, is arranged at a lower part of the boiler furnace subassembly 01, and the heat exchange chamber 03 is arranged at an upper part of the boiler furnace subassembly 01; a high temperature flue gas outlet 10 is arranged between the combustion chamber 02 and the heat exchange chamber 03; and, the combustion control subassembly 22 comprises a burner 04, a pure oxygen injector 08 and a fuel injector 09.
[0078] An ash bucket 11 is arranged below the combustion chamber 02; six injection ports 05 are arranged at a middle part of the combustion chamber 02; and the high temperature flue gas outlet 10 is arranged at top of the combustion chamber 02. The injection ports 05 are arranged horizontally and symmetrically. For a wall 07 of the combustion chamber 02, an inner layer is made of high temperature refractory material, a middle layer is made of thermal insulation material, and an outer layer is made of structural material.
[0079] The heat exchange chamber 03 is intercommunicated with the combustion chamber 02 through the high temperature flue gas outlet 10; an inner wall of the heat exchange chamber 03 is a water wall 06; a boiler water wall pipe 12 is arranged in middle of the heat exchange chamber 03; a flue gas outlet 15 of the heat exchange chamber 03 is arranged at top of the heat exchange chamber 03; a waste heat recovery device 20 is arranged outside the flue gas outlet 15 of the heat exchange chamber 03; an economizer 21 is arranged in middle of the waste heat recovery device 20; an end gas outlet 14 is arranged at a tail end of the waste heat recovery device 20, and the end gas outlet 14 is connected to a pre-heater 13.
[0080] In the burner 04, in order to avoid explosion, primary air and secondary air are separately delivered; the primary air and the secondary air are sprayed into the combustion chamber 02 by the burner 04; the primary air is air carrying fuel, and the secondary air is pure oxygen;
[0081] a part of the primary air is end gas exhausted from the waste heat recovery device 20; the end gas exhausted from the waste heat recovery device 20 enters the fuel injector 09 after passing through the pre-heater 13 and processing with flue gas separation, wherein the end gas is induced by a draught fan 17; the other part of the primary air is CO.sub.2; CO.sub.2 induced by a draught fan 18 enters the fuel injector 09 after passing through the pre-heater 13; and then the primary air enters the burner 04 with carrying the fuel of the fuel injector 09; herein, the fuel is fed by a fuel supply equipment 16; and
[0082] the secondary air is standard pure oxygen; after passing through the pre-heater 13, the standard pure oxygen induced by a draught fan 19 enters the burner 04 through the pure oxygen injector 08.
[0083] The combustion control subassembly 22 further comprises a detector 24 for automatically monitoring concentrations of oxygen and CO.sub.2 and a temperature, so that a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted according to a combustion effect.
Example 8
[0084] A double chambers boiler system with oxygen-enriched combustion comprises a boiler furnace subassembly 01 and a combustion control subassembly 22; wherein: the boiler furnace subassembly 01 comprises a combustion chamber 02 and a heat exchange chamber 03; the combustion chamber 02, which is a horizontal combustion chamber, is arranged at a lower part of the boiler furnace subassembly 01, and the heat exchange chamber 03 is arranged at an upper part of the boiler furnace subassembly 01; a high temperature flue gas outlet 10 is arranged between the combustion chamber 02 and the heat exchange chamber 03; and, the combustion control subassembly 22 comprises a burner 04, a pure oxygen injector 08 and a fuel injector 09.
[0085] An ash bucket 11 is arranged below the combustion chamber 02; six injection ports 05 are arranged at a middle part of the combustion chamber 02; and the high temperature flue gas outlet 10 is arranged at top of the combustion chamber 02. The injection ports 05 are arranged horizontally and symmetrically. For a wall 07 of the combustion chamber 02, an inner layer is made of high temperature refractory material, a middle layer is made of thermal insulation material, and an outer layer is made of structural material.
[0086] The heat exchange chamber 03 is intercommunicated with the combustion chamber 02 through the high temperature flue gas outlet 10; an inner wall of the heat exchange chamber 03 is a water wall 06; a boiler water wall pipe 12 is arranged in middle of the heat exchange chamber 03; a flue gas outlet 15 of the heat exchange chamber 03 is arranged at top of the heat exchange chamber 03; a waste heat recovery device 20 is arranged outside the flue gas outlet 15 of the heat exchange chamber 03; an economizer 21 and a heat exchanger are arranged in middle of the waste heat recovery device 20; an end gas outlet 14 is arranged at a tail end of the waste heat recovery device 20, and the end gas outlet 14 is connected to a pre-heater 13.
[0087] In the burner 04, in order to avoid explosion, primary air and secondary air are separately delivered; the primary air and the secondary air are sprayed into the combustion chamber 02 by the burner 04; the primary air is air carrying fuel, and the secondary air is pure oxygen;
[0088] all of the primary air is end gas exhausted from the waste heat recovery device 20; the end gas exhausted from the waste heat recovery device 20 enters the fuel injector 09 after passing through the pre-heater 13 and processing with flue gas separation, wherein the end gas is induced by a draught fan 17; and then the primary air enters the burner 04 with carrying the fuel of the fuel injector 09; herein, the fuel is fed by a fuel supply equipment 16; and
[0089] the secondary air is standard pure oxygen; after passing through the pre-heater 13, the standard pure oxygen induced by a draught fan 19 enters the burner 04 through the pure oxygen injector 08.
[0090] The combustion control subassembly 22 further comprises a detector 24 for automatically monitoring concentrations of oxygen and CO.sub.2 and a temperature, so that a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted according to a combustion effect.
Example 9
[0091] A double chambers boiler system with oxygen-enriched combustion comprises a boiler furnace subassembly 01 and a combustion control subassembly 22; wherein: the boiler furnace subassembly 01 comprises a combustion chamber 02 and a heat exchange chamber 03; the combustion chamber 02, which is a standing combustion chamber, is arranged at a lower part of the boiler furnace subassembly 01, and the heat exchange chamber 03 is arranged at an upper part of the boiler furnace subassembly 01; a high temperature flue gas outlet 10 is arranged between the combustion chamber 02 and the heat exchange chamber 03; and, the combustion control subassembly 22 comprises a burner 04, a pure oxygen injector 08 and a fuel injector 09.
[0092] An ash bucket 11 is arranged below the combustion chamber 02; three injection ports 05 are arranged at a middle part of the combustion chamber 02; and the high temperature flue gas outlet 10 is arranged at top of the combustion chamber 02. The injection ports 05 are arranged horizontally and symmetrically. For a wall 07 of the combustion chamber 02, an inner layer is made of high temperature refractory material, a middle layer is made of thermal insulation material, and an outer layer is made of structural material.
[0093] The heat exchange chamber 03 is intercommunicated with the combustion chamber 02 through the high temperature flue gas outlet 10; an inner wall of the heat exchange chamber 03 is a water wall 06; a boiler water wall pipe 12 is arranged in middle of the heat exchange chamber 03; a flue gas outlet 15 of the heat exchange chamber 03 is arranged at top of the heat exchange chamber 03; a waste heat recovery device 20 is arranged outside the flue gas outlet 15 of the heat exchange chamber 03; an economizer 21 is arranged in middle of the waste heat recovery device 20; an end gas outlet 14 is arranged at a tail end of the waste heat recovery device 20, and the end gas outlet 14 is connected to a pre-heater 13.
[0094] In the burner 04, in order to avoid explosion, primary air and secondary air are separately delivered; the primary air and the secondary air are sprayed into the combustion chamber 02 by the burner 04; the primary air is air carrying fuel, and the secondary air is pure oxygen;
[0095] all of the primary air is CO.sub.2; CO.sub.2 induced by a draught fan 18 enters the fuel injector 09 after passing through the pre-heater 13; and then the primary air enters the burner 04 with carrying the fuel of the fuel injector 09; herein, the fuel is fed by a fuel supply equipment 16; and
[0096] the secondary air is standard pure oxygen; after passing through the pre-heater 13, the standard pure oxygen induced by a draught fan 19 enters the burner 04 through the pure oxygen injector 08.
[0097] The combustion control subassembly 22 further comprises a detector 24 for automatically monitoring concentrations of oxygen and CO.sub.2 and a temperature, so that a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted according to a combustion effect.
Example 10
[0098] A double chambers boiler system with oxygen-enriched combustion comprises a boiler furnace subassembly 01 and a combustion control subassembly 22; wherein: the boiler furnace subassembly 01 comprises a combustion chamber 02 and a heat exchange chamber 03; the combustion chamber 02, which is a standing combustion chamber, is arranged at a lower part of the boiler furnace subassembly 01, and the heat exchange chamber 03 is arranged at an upper part of the boiler furnace subassembly 01; a high temperature flue gas outlet 10 is arranged between the combustion chamber 02 and the heat exchange chamber 03; and, the combustion control subassembly 22 comprises a burner 04, a pure oxygen injector 08 and a fuel injector 09.
[0099] An ash bucket 11 is arranged below the combustion chamber 02; three injection ports 05 are arranged at a middle part of the combustion chamber 02; and the high temperature flue gas outlet 10 is arranged at top of the combustion chamber 02. The injection ports 05 are arranged horizontally and symmetrically, namely in arrangement of equilateral triangle. For a wall 07 of the combustion chamber 02, an inner layer is made of high temperature refractory material, a middle layer is made of thermal insulation material, and an outer layer is made of structural material.
[0100] The heat exchange chamber 03 is intercommunicated with the combustion chamber 02 through the high temperature flue gas outlet 10; an inner wall of the heat exchange chamber 03 is a water wall 06; a boiler water wall pipe 12 is arranged in middle of the heat exchange chamber 03; a flue gas outlet 15 of the heat exchange chamber 03 is arranged at top of the heat exchange chamber 03; a waste heat recovery device 20 is arranged outside the flue gas outlet 15 of the heat exchange chamber 03; an economizer 21 and a heat exchanger are arranged in middle of the waste heat recovery device 20; an end gas outlet 14 is arranged at a tail end of the waste heat recovery device 20, and the end gas outlet 14 is connected to a pre-heater 13.
[0101] In the burner 04, in order to avoid explosion, primary air and secondary air are separately delivered; the primary air and the secondary air are sprayed into the combustion chamber 02 by the burner 04; the primary air is air carrying fuel, and the secondary air is pure oxygen;
[0102] a part of the primary air is end gas exhausted from the waste heat recovery device 20; the end gas exhausted from the waste heat recovery device 20 enters the fuel injector 09 after passing through the pre-heater 13 and processing with flue gas separation, wherein the end gas is induced by a draught fan 17; the other part of the primary air is CO.sub.2; CO.sub.2 induced by a draught fan 18 enters the fuel injector 09 after passing through the pre-heater 13; and then the primary air enters the burner 04 with carrying the fuel of the fuel injector 09; herein, the fuel is fed by a fuel supply equipment 16; and the secondary air is standard pure oxygen; after passing through the pre-heater 13, the standard pure oxygen induced by a draught fan 19 enters the burner 04 through the pure oxygen injector 08.
[0103] The combustion control subassembly 22 further comprises a detector 24 for automatically monitoring concentrations of oxygen and CO.sub.2 and a temperature, so that a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted according to a combustion effect.
Example 11
[0104] A double chambers boiler system with oxygen-enriched combustion comprises a boiler furnace subassembly 01 and a combustion control subassembly 22; wherein: the boiler furnace subassembly 01 comprises a combustion chamber 02 and a heat exchange chamber 03; the combustion chamber 02, which is a standing combustion chamber, is arranged at a lower part of the boiler furnace subassembly 01, and the heat exchange chamber 03 is arranged at an upper part of the boiler furnace subassembly 01; a high temperature flue gas outlet 10 is arranged between the combustion chamber 02 and the heat exchange chamber 03; and, the combustion control subassembly 22 comprises a burner 04, a pure oxygen injector 08 and a fuel injector 09.
[0105] An ash bucket 11 is arranged below the combustion chamber 02; four injection ports 05 are arranged at a middle part of the combustion chamber 02; and the high temperature flue gas outlet 10 is arranged at top of the combustion chamber 02. The injection ports 05 are arranged horizontally and symmetrically. For a wall 07 of the combustion chamber 02, an inner layer is made of high temperature refractory material, a middle layer is made of thermal insulation material, and an outer layer is made of structural material.
[0106] The heat exchange chamber 03 is intercommunicated with the combustion chamber 02 through the high temperature flue gas outlet 10; an inner wall of the heat exchange chamber 03 is a water wall 06; a boiler water wall pipe 12 is arranged in middle of the heat exchange chamber 03; a flue gas outlet 15 of the heat exchange chamber 03 is arranged at top of the heat exchange chamber 03; a waste heat recovery device 20 is arranged outside the flue gas outlet 15 of the heat exchange chamber 03; an economizer 21 is arranged in middle of the waste heat recovery device 20; an end gas outlet 14 is arranged at a tail end of the waste heat recovery device 20, and the end gas outlet 14 is connected to a pre-heater 13.
[0107] In the burner 04, in order to avoid explosion, primary air and secondary air are separately delivered; the primary air and the secondary air are sprayed into the combustion chamber 02 by the burner 04; the primary air is air carrying fuel, and the secondary air is pure oxygen;
[0108] all of the primary air is end gas exhausted from the waste heat recovery device 20; the end gas exhausted from the waste heat recovery device 20 enters the fuel injector 09 after passing through the pre-heater 13 and processing with flue gas separation, wherein the end gas is induced by a draught fan 17; and then the primary air enters the burner 04 with carrying the fuel of the fuel injector 09; herein, the fuel is fed by a fuel supply equipment 16; and
[0109] the secondary air is standard pure oxygen; after passing through the pre-heater 13, the standard pure oxygen induced by a draught fan 19 enters the burner 04 through the pure oxygen injector 08.
[0110] The combustion control subassembly 22 further comprises a detector 24 for automatically monitoring concentrations of oxygen and CO.sub.2 and a temperature, so that a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted according to a combustion effect.
Example 12
[0111] A double chambers boiler system with oxygen-enriched combustion comprises a boiler furnace subassembly 01 and a combustion control subassembly 22; wherein: the boiler furnace subassembly 01 comprises a combustion chamber 02 and a heat exchange chamber 03; the combustion chamber 02, which is a standing combustion chamber, is arranged at a lower part of the boiler furnace subassembly 01, and the heat exchange chamber 03 is arranged at an upper part of the boiler furnace subassembly 01; a high temperature flue gas outlet 10 is arranged between the combustion chamber 02 and the heat exchange chamber 03; and, the combustion control subassembly 22 comprises a burner 04, a pure oxygen injector 08 and a fuel injector 09.
[0112] An ash bucket 11 is arranged below the combustion chamber 02; four injection ports 05 are arranged at a middle part of the combustion chamber 02; and the high temperature flue gas outlet 10 is arranged at top of the combustion chamber 02. The injection ports 05 are arranged horizontally and symmetrically. For a wall 07 of the combustion chamber 02, an inner layer is made of high temperature refractory material, a middle layer is made of thermal insulation material, and an outer layer is made of structural material.
[0113] The heat exchange chamber 03 is intercommunicated with the combustion chamber 02 through the high temperature flue gas outlet 10; an inner wall of the heat exchange chamber 03 is a water wall 06; a boiler water wall pipe 12 is arranged in middle of the heat exchange chamber 03; a flue gas outlet 15 of the heat exchange chamber 03 is arranged at top of the heat exchange chamber 03; a waste heat recovery device 20 is arranged outside the flue gas outlet 15 of the heat exchange chamber 03; an economizer 21 and a heat exchanger are arranged in middle of the waste heat recovery device 20; an end gas outlet 14 is arranged at a tail end of the waste heat recovery device 20, and the end gas outlet 14 is connected to a pre-heater 13.
[0114] In the burner 04, in order to avoid explosion, primary air and secondary air are separately delivered; the primary air and the secondary air are sprayed into the combustion chamber 02 by the burner 04; the primary air is air carrying fuel, and the secondary air is pure oxygen;
[0115] all of the primary air is CO.sub.2; CO.sub.2 induced by a draught fan 18 enters the fuel injector 09 after passing through the pre-heater 13; and then the primary air enters the burner 04 with carrying the fuel of the fuel injector 09; herein, the fuel is fed by a fuel supply equipment 16; and
[0116] the secondary air is standard pure oxygen; after passing through the pre-heater 13, the standard pure oxygen induced by a draught fan 19 enters the burner 04 through the pure oxygen injector 08.
[0117] The combustion control subassembly 22 further comprises a detector 24 for automatically monitoring concentrations of oxygen and CO.sub.2 and a temperature, so that a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted according to a combustion effect.
Example 13
[0118] A double chambers boiler system with oxygen-enriched combustion comprises a boiler furnace subassembly 01 and a combustion control subassembly 22; wherein: the boiler furnace subassembly 01 comprises a combustion chamber 02 and a heat exchange chamber 03; the combustion chamber 02, which is a standing combustion chamber, is arranged at a lower part of the boiler furnace subassembly 01, and the heat exchange chamber 03 is arranged at an upper part of the boiler furnace subassembly 01; a high temperature flue gas outlet 10 is arranged between the combustion chamber 02 and the heat exchange chamber 03; and, the combustion control subassembly 22 comprises a burner 04, a pure oxygen injector 08 and a fuel injector 09.
[0119] An ash bucket 11 is arranged below the combustion chamber 02; five injection ports 05 are arranged at a middle part of the combustion chamber 02; and the high temperature flue gas outlet 10 is arranged at top of the combustion chamber 02. The injection ports 05 are arranged horizontally and symmetrically. For a wall 07 of the combustion chamber 02, an inner layer is made of high temperature refractory material, a middle layer is made of thermal insulation material, and an outer layer is made of structural material.
[0120] The heat exchange chamber 03 is intercommunicated with the combustion chamber 02 through the high temperature flue gas outlet 10; an inner wall of the heat exchange chamber 03 is a water wall 06; a boiler water wall pipe 12 is arranged in middle of the heat exchange chamber 03; a flue gas outlet 15 of the heat exchange chamber 03 is arranged at top of the heat exchange chamber 03; a waste heat recovery device 20 is arranged outside the flue gas outlet 15 of the heat exchange chamber 03; an economizer 21 is arranged in middle of the waste heat recovery device 20; an end gas outlet 14 is arranged at a tail end of the waste heat recovery device 20, and the end gas outlet 14 is connected to a pre-heater 13.
[0121] In the burner 04, in order to avoid explosion, primary air and secondary air are separately delivered; the primary air and the secondary air are sprayed into the combustion chamber 02 by the burner 04; the primary air is air carrying fuel, and the secondary air is pure oxygen;
[0122] a part of the primary air is end gas exhausted from the waste heat recovery device 20; the end gas exhausted from the waste heat recovery device 20 enters the fuel injector 09 after passing through the pre-heater 13 and processing with flue gas separation, wherein the end gas is induced by a draught fan 17; the other part of the primary air is CO.sub.2; CO.sub.2 induced by a draught fan 18 enters the fuel injector 09 after passing through the pre-heater 13; and then the primary air enters the burner 04 with carrying the fuel of the fuel injector 09; herein, the fuel is fed by a fuel supply equipment 16; and
[0123] the secondary air is standard pure oxygen; after passing through the pre-heater 13, the standard pure oxygen induced by a draught fan 19 enters the burner 04 through the pure oxygen injector 08.
[0124] The combustion control subassembly 22 further comprises a detector 24 for automatically monitoring concentrations of oxygen and CO.sub.2 and a temperature, so that a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted according to a combustion effect.
Example 14
[0125] A double chambers boiler system with oxygen-enriched combustion comprises a boiler furnace subassembly 01 and a combustion control subassembly 22; wherein: the boiler furnace subassembly 01 comprises a combustion chamber 02 and a heat exchange chamber 03; the combustion chamber 02, which is a standing combustion chamber, is arranged at a lower part of the boiler furnace subassembly 01, and the heat exchange chamber 03 is arranged at an upper part of the boiler furnace subassembly 01; a high temperature flue gas outlet 10 is arranged between the combustion chamber 02 and the heat exchange chamber 03; and, the combustion control subassembly 22 comprises a burner 04, a pure oxygen injector 08 and a fuel injector 09.
[0126] An ash bucket 11 is arranged below the combustion chamber 02; five injection ports 05 are arranged at a middle part of the combustion chamber 02; and the high temperature flue gas outlet 10 is arranged at top of the combustion chamber 02. The injection ports 05 are arranged horizontally and symmetrically. For a wall 07 of the combustion chamber 02, an inner layer is made of high temperature refractory material, a middle layer is made of thermal insulation material, and an outer layer is made of structural material.
[0127] The heat exchange chamber 03 is intercommunicated with the combustion chamber 02 through the high temperature flue gas outlet 10; an inner wall of the heat exchange chamber 03 is a water wall 06; a boiler water wall pipe 12 is arranged in middle of the heat exchange chamber 03; a flue gas outlet 15 of the heat exchange chamber 03 is arranged at top of the heat exchange chamber 03; a waste heat recovery device 20 is arranged outside the flue gas outlet 15 of the heat exchange chamber 03; an economizer 21 and a heat exchanger are arranged in middle of the waste heat recovery device 20; an end gas outlet 14 is arranged at a tail end of the waste heat recovery device 20, and the end gas outlet 14 is connected to a pre-heater 13.
[0128] In the burner 04, in order to avoid explosion, primary air and secondary air are separately delivered; the primary air and the secondary air are sprayed into the combustion chamber 02 by the burner 04; the primary air is air carrying fuel, and the secondary air is pure oxygen;
[0129] all of the primary air is end gas exhausted from the waste heat recovery device 20; the end gas exhausted from the waste heat recovery device 20 enters the fuel injector 09 after passing through the pre-heater 13 and processing with flue gas separation, wherein the end gas is induced by a draught fan 17; and then the primary air enters the burner 04 with carrying the fuel of the fuel injector 09; herein, the fuel is fed by a fuel supply equipment 16; and
[0130] the secondary air is standard pure oxygen; after passing through the pre-heater 13, the standard pure oxygen induced by a draught fan 19 enters the burner 04 through the pure oxygen injector 08.
[0131] The combustion control subassembly 22 further comprises a detector 24 for automatically monitoring concentrations of oxygen and CO.sub.2 and a temperature, so that a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted according to a combustion effect.
Example 15
[0132] A double chambers boiler system with oxygen-enriched combustion comprises a boiler furnace subassembly 01 and a combustion control subassembly 22; wherein: the boiler furnace subassembly 01 comprises a combustion chamber 02 and a heat exchange chamber 03; the combustion chamber 02, which is a standing combustion chamber, is arranged at a lower part of the boiler furnace subassembly 01, and the heat exchange chamber 03 is arranged at an upper part of the boiler furnace subassembly 01; a high temperature flue gas outlet 10 is arranged between the combustion chamber 02 and the heat exchange chamber 03; and, the combustion control subassembly 22 comprises a burner 04, a pure oxygen injector 08 and a fuel injector 09.
[0133] An ash bucket 11 is arranged below the combustion chamber 02; six injection ports 05 are arranged at a middle part of the combustion chamber 02; and the high temperature flue gas outlet 10 is arranged at top of the combustion chamber 02. The injection ports 05 are arranged horizontally and symmetrically. For a wall 07 of the combustion chamber 02, an inner layer is made of high temperature refractory material, a middle layer is made of thermal insulation material, and an outer layer is made of structural material.
[0134] The heat exchange chamber 03 is intercommunicated with the combustion chamber 02 through the high temperature flue gas outlet 10; an inner wall of the heat exchange chamber 03 is a water wall 06; a boiler water wall pipe 12 is arranged in middle of the heat exchange chamber 03; a flue gas outlet 15 of the heat exchange chamber 03 is arranged at top of the heat exchange chamber 03; a waste heat recovery device 20 is arranged outside the flue gas outlet 15 of the heat exchange chamber 03; an economizer 21 is arranged in middle of the waste heat recovery device 20; an end gas outlet 14 is arranged at a tail end of the waste heat recovery device 20, and the end gas outlet 14 is connected to a pre-heater 13.
[0135] In the burner 04, in order to avoid explosion, primary air and secondary air are separately delivered; the primary air and the secondary air are sprayed into the combustion chamber 02 by the burner 04; the primary air is air carrying fuel, and the secondary air is pure oxygen;
[0136] all of the primary air is end gas exhausted from the waste heat recovery device 20; the end gas exhausted from the waste heat recovery device 20 enters the fuel injector 09 after passing through the pre-heater 13 and processing with flue gas separation, wherein the end gas is induced by a draught fan 17; and then the primary air enters the burner 04 with carrying the fuel of the fuel injector 09; herein, the fuel is fed by a fuel supply equipment 16; and
[0137] the secondary air is standard pure oxygen; after passing through the pre-heater 13, the standard pure oxygen induced by a draught fan 19 enters the burner 04 through the pure oxygen injector 08.
[0138] The combustion control subassembly 22 further comprises a detector 24 for automatically monitoring concentrations of oxygen and CO.sub.2 and a temperature, so that a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted according to a combustion effect.
Example 16
[0139] A double chambers boiler system with oxygen-enriched combustion comprises a boiler furnace subassembly 01 and a combustion control subassembly 22; wherein: the boiler furnace subassembly 01 comprises a combustion chamber 02 and a heat exchange chamber 03; the combustion chamber 02, which is a standing combustion chamber, is arranged at a lower part of the boiler furnace subassembly 01, and the heat exchange chamber 03 is arranged at an upper part of the boiler furnace subassembly 01; a high temperature flue gas outlet 10 is arranged between the combustion chamber 02 and the heat exchange chamber 03; and, the combustion control subassembly 22 comprises a burner 04, a pure oxygen injector 08 and a fuel injector 09.
[0140] An ash bucket 11 is arranged below the combustion chamber 02; six injection ports 05 are arranged at a middle part of the combustion chamber 02; and the high temperature flue gas outlet 10 is arranged at top of the combustion chamber 02. The injection ports 05 are arranged horizontally and symmetrically. For a wall 07 of the combustion chamber 02, an inner layer is made of high temperature refractory material, a middle layer is made of thermal insulation material, and an outer layer is made of structural material.
[0141] The heat exchange chamber 03 is intercommunicated with the combustion chamber 02 through the high temperature flue gas outlet 10; an inner wall of the heat exchange chamber 03 is a water wall 06; a boiler water wall pipe 12 is arranged in middle of the heat exchange chamber 03; a flue gas outlet 15 of the heat exchange chamber 03 is arranged at top of the heat exchange chamber 03; a waste heat recovery device 20 is arranged outside the flue gas outlet 15 of the heat exchange chamber 03; an economizer 21 and a heat exchanger are arranged in middle of the waste heat recovery device 20; an end gas outlet 14 is arranged at a tail end of the waste heat recovery device 20, and the end gas outlet 14 is connected to a pre-heater 13.
[0142] In the burner 04, in order to avoid explosion, primary air and secondary air are separately delivered; the primary air and the secondary air are sprayed into the combustion chamber 02 by the burner 04; the primary air is air carrying fuel, and the secondary air is pure oxygen;
[0143] a part of the primary air is end gas exhausted from the waste heat recovery device 20; the end gas exhausted from the waste heat recovery device 20 enters the fuel injector 09 after passing through the pre-heater 13 and processing with flue gas separation, wherein the end gas is induced by a draught fan 17; the other part of the primary air is CO.sub.2; CO.sub.2 induced by a draught fan 18 enters the fuel injector 09 after passing through the pre-heater 13; and then the primary air enters the burner 04 with carrying the fuel of the fuel injector 09; herein, the fuel is fed by a fuel supply equipment 16; and
[0144] the secondary air is standard pure oxygen; after passing through the pre-heater 13, the standard pure oxygen induced by a draught fan 19 enters the burner 04 through the pure oxygen injector 08.
[0145] The combustion control subassembly 22 further comprises a detector 24 for automatically monitoring concentrations of oxygen and CO.sub.2 and a temperature, so that a ratio of CO.sub.2 to flue gas and a ratio of fuel to pure oxygen which is a combustion supporting gas are able to be adjusted according to a combustion effect.